TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR UNDER HB1182, AS AMENDED PURSUANT TO RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE PROJECTS LISTED ALPHABETICALLY PREPARED BY THE NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION July 24, 2020 Projects Only

Upload: others

Post on 21-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

TEN YEAR TRANSPORTATION

IMPROVEMENT PLAN

2021 - 2030

APPROVED BY THE NH LEGISLATURE

AND SIGNED INTO LAW BY THE GOVERNOR

UNDER HB1182, AS AMENDED

PURSUANT TO

RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE

PROJECTS LISTED ALPHABETICALLY

PREPARED BY THE NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION

July 24, 2020

Projects Only

Page 2: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

HB 1182 - AS AMENDED BY THE SENATE

19Feb2020... 0202h

06/16/2020   1488s

2020 SESSION

20-2317

11/05

HOUSE BILL 1182

AN ACT establishing the commission to study the on road usage of non-traditional motor vehicles,

relative to motor vehicles and transportation, relative to roadable aircraft, and making

an appropriation to the department of education for the purpose of funding the Hudson

CTE center.

SPONSORS: Rep. Packard, Rock. 5; Rep. Walsh, Merr. 24; Rep. McGuire, Merr. 29

COMMITTEE: Transportation

-----------------------------------------------------------------

AMENDED ANALYSIS

This bill:

I.  Establishes a commission to study the on road usage of non-traditional motor vehicles.

II.  Allows an airport to charge a fee to transportation network companies which is not greater than motor

carrier or taxicab charges.

III.   Authorizes the director of the division of motor vehicles to enter into agreements with foreign

jurisdictions related to the waiver of road skill examinations for applicants licensed in such jurisdictions.

IV.  Permits the department of transportation to access crash data held by other governmental agencies

for the purpose of advancing safety related initiatives.

V.  Requires the department of transportation to provide assessing officials, in municipalities where the

department leases property to others, with copies of such leases by April, 2021 and annually thereafter.

VI.   Clarifies the appeal process for disqualification of commercial motor vehicle driving privileges,

expands the circumstances under which a person may be found guilty of aggravated driving while

intoxicated, and provides for the immediate disqualification of a commercial motor vehicle driver upon

receipt of information such driver refused a blood alcohol concentration test.

VII.   Clarifies the penalties imposed for the sale, purchase, and installation of improperly operating

airbags.

VIII.  Clarifies the prohibition against displaying or permitting to be displayed any revoked or suspended

driver’s license or permit, and authorizes the department of safety to participate in the state to state

driver information program and the driver license data verification program.

IX.  Clarifies which federal motor carrier safety regulations may be adopted by the commissioner of the

department of safety as administrative rules, and repeals the authority of the commissioner to waive the

skills test for an applicant for a commercial driver’s license.

Page 3: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

X.  Prohibits the owner of a vehicle driven in a manner that evades toll collection from obtaining a new

plate for the vehicle until the toll is paid.

XI.  Adopts the 10-year transportation improvement plan for 2021-2030.

XII.  Amends the project named Bedford Mainline Toll Plaza.

XIII.  Limits the projects for which the state may issue GARVEE bonds.

XIV.  Moves funding for the project named Plymouth from 2027 to 2022, 2024, and 2025.

XV.  Moves funding for the project named Bedford-Merrimack from 2022 and 2023 to 2023 and 2024.

XVI.  Adds a project in Merrimack to remove exit 11 ramp toll plazas.

XVII.   Grants temporary authority to the department of transportation to distribute Block Grant Aid

funds at a percentage greater than 12 percent, and to suspend the highway and bridge betterment

program and to reduce betterment funded projects in the ten year plan as needed to meet operational

needs to offset decreased revenue due to the novel coronavirus disease (Covid-19) pandemic.

XVIII.  This bill adds deaf or hard of hearing to the medical conditions that may be indicated on a driver's

license or nondriver's identification card.

XIX.  Defines and establishes inspection and registration requirements for roadable aircraft.

XX.   Makes a bonded, supplemental appropriation to the department of education for the purpose of

completing construction of the Hudson CTE center.

XXI.  Requires the department of transportation to include in its engineering and design how to mitigate

effects on entry, access, or parking for projects exceeding $5,000,000.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

19Feb2020... 0202h

06/16/2020   1488s

20-2317

11/05

STATE OF NEW HAMPSHIRE

In the Year of Our Lord Two Thousand Twenty

AN ACT establishing the commission to study the on road usage of non-traditional motor vehicles,

relative to motor vehicles and transportation, relative to roadable aircraft, and making

an appropriation to the department of education for the purpose of funding the Hudson

CTE center.

Be it Enacted by the Senate and House of Representatives in General Court convened:

1  New Subdivision; Commission to Study the On Road Usage of Non-Traditional Motor Vehicles.  Amend

RSA 260 by inserting after section 77 the following new subdivision:

Commission to Study the On Road Usage of Non-Traditional Motor Vehicles

n46gld
n46gld
Page 4: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

260:78  Commission to Study the On Road Usage of Non-Traditional Motor Vehicles.  

I.  There is established a committee to study the on road usage of non-traditional motor vehicles.

II.  The members of the commission shall be as follows:

(a)   Five members of the house of representatives, 3 of whom shall serve on the house transportation

committee and 2 of whom shall serve on the house resources, recreation, and development committee,

appointed by the speaker of the house of representatives.

(b)  One member of the senate, appointed by the president of the senate.

(c)   Two representatives of the department of safety, division of motor vehicles, appointed by the

commissioner of the department of safety.

(d)  One representative of the department of safety, division of state police, appointed by the commissioner

of the department of safety.

(e)  The commissioner of the department of transportation, or designee.

(f)  The executive director of the fish and game commission, or designee.

(g)  The attorney general, or designee.

(h)  The commissioner of the department of natural and cultural resources, or designee.

(i)  A representative of the New Hampshire Automobile Dealers Association, appointed by the association.

(j)   A representative of the New Hampshire Off Highway Vehicle Association, appointed by the

association.

(k)  A representative of the New Hampshire Farm Bureau Federation, appointed by the federation.

(l)   A representative of the New Hampshire City and Town Clerks' Association, appointed by the

association.

III.  Legislative members of the commission shall receive mileage at the legislative rate when attending to

the duties of the commission.

IV.  The commission shall study the on road usage of non-traditional motor vehicles, such as all terrain

vehicles and golf carts.

V.  The members of the commission shall elect a chairperson from among the members.  The first meeting

of the commission shall be called by the first-named house member.  The first meeting of the commission

shall be held within 45 days of the effective date of this section.  Nine members of the commission shall

constitute a quorum.

VI.  The commission shall submit an interim report of its findings and any recommendations for proposed

legislation to the speaker of the house of representatives, the president of the senate, the house clerk, the

senate clerk, the governor, and the state library on or before November 1, 2020.  The commission shall

submit a final report of its findings and any recommendations for proposed legislation to the speaker of

the house of representatives, the president of the senate, the house clerk, the senate clerk, the governor,

and the state library on or before November 1, 2021.

2  Repeal.  RSA 260:78, relative to the commission to study the on road usage of non-traditional motor

vehicles, is repealed.

3  Transportation Network Company; Airport Charges.  Amend RSA 376-A:17 to read as follows:

376-A:17  Controlling Authority.  Notwithstanding any other provision of law, TNCs and TNC drivers are

governed exclusively by this chapter and any rules by the department of safety consistent with this

chapter.  No municipality or other local entity may impose a tax on, or require a license for, a TNC, a TNC

driver, or a vehicle used by a TNC driver where such tax or licenses relates to providing prearranged

rides, or subject a TNC to the municipality's or other local entity's rate, entry, operational, or other

requirements, except that an airport that is federally obligated may charge a TNC fee, as may be

amended from time to time, which is not greater than a fee applied to a taxicab service.

Page 5: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

4  Drivers' Licenses; Issuance of Licenses; Examination.  Amend RSA 263:6 to read as follows:

263:6  Examination.  

I.  Before a license is granted to any person, the applicant, if not previously licensed to drive a motor

vehicle in this state, shall pass such examinations as to the person's qualifications as the director may

prescribe.  Such examinations may include an examination for visual acuity, knowledge, and road skill as

prescribed by the director.  All license examinations shall be conducted by department of safety personnel

and shall include knowledge questions regarding distracted driving, driving under the influence, and

driving during poor weather conditions.  No license shall be issued until the director is satisfied that the

applicant is a proper person to receive it.  No physical defect of an applicant shall prohibit the applicant

from receiving a license unless it can be shown by common experience that such defect results in an

incapacity to safely drive a motor vehicle, except as provided in RSA 263:13.

II.  The director may enter into agreements with foreign jurisdictions related to the waiver of

road skill examinations for applicants currently licensed in such foreign jurisdictions.   The

director may adopt rules pursuant to RSA 541-A to enforce the terms of such agreements.

5  New Section; Access to Crash Data.  Amend RSA 21-L by inserting after section 12-d the following new

section:

21-L:12-e  Access to Crash Data.  Notwithstanding any provision of law to the contrary, the commissioner

of the department of transportation and designated department of transportation safety representatives

are authorized to access or be provided with crash data held by the department of safety, local law

enforcement, or other government agencies or entities.  The purpose of this authorization is to enable the

department of transportation and its agents to access information for the sole purpose of timely crash

analysis to improve safety and to advance safety related initiatives.   For the stated purpose, the

department of transportation is authorized to share the redacted data with governmental transportation

planning agencies and their contracted agents for transportation planning purposes, provided the

information shall not be further disseminated or used for any other purpose.   In the event that the

department obtains personally identifiable information, the department shall redact such information and

not include such information in its analysis nor disclose the personally identifiable information.   The

department is authorized to publish the following analytical information for public information purposes

and to help prioritize transportation projects: the number of accidents, each accident location, type of

accident, and severity of impact at each accident location.  Any information received under this section by

the department of transportation shall not be subject to RSA 91-A.

6  Real Estate and Personal Property Tax Exemption.  Amend RSA 72:23, I(b)(1)(B) to read as follows:

(B)  Annually, on or before April 15, the lessors of all leases and other agreements, the terms of which

provide for the use or occupation by others of real or personal property owned by the state or a county,

city, town, school district, or village district, including those properties identified under subparagraph (d),

shall provide written notice and a copy of the lease or other agreement to the assessing officials of the

municipality in which the property is located.  This subparagraph does not apply to the department

of transportation.

(C)  On or before April 15, 2021, the department of transportation shall provide to the assessing

officials of the municipality in which leased property is located a copy of any lease in effect as

of January 1, 2021.   Thereafter on an annual basis, on or before April 15, the department of

transportation shall provide to the assessing officials of the municipality in which leased

property is located a copy of any new or renewed lease in effect.   Such lease filing with

municipal assessing officials shall not include permits, licenses, or non-lease agreements.

Page 6: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

7  Drivers' Licenses; Commercial Licensing; Violations; Penalties; Serious Violations.  Amend RSA 263:94,

VII to read as follows:

VII.   [Prior to disqualifying a driver under this section, the commissioner shall provide the driver with

notice and an opportunity for a hearing.]   If the director disqualifies a person pursuant to this

section, the department shall grant a hearing to the person, upon written application to the

department, within 15 days after the filing of such application.

8  Driving or Operating Under the Influence of Drugs or Liquor.  Amend RSA 265-A:3, I(c)-(d) to read as

follows:

(c)  Attempts to elude pursuit by a law enforcement officer by increasing speed, extinguishing headlamps

or, in the case of a boat, navigational lamps while still in motion, or abandoning a vehicle, boat, or OHRV

while being pursued; [or]

(d)  Carries as a passenger a person under the age of 16; or

(e)  Drives a vehicle with a gross combination weight rating of 10,001 pounds or more;

9  Driving or Operating Under the Influence of Drugs or Liquor.  Amend RSA 265-A:3, II(c)-(d) to read as

follows:

(c)  Attempts to elude pursuit by a law enforcement officer by increasing speed, extinguishing headlamps

or, in the case of a boat, navigational lights while still in motion, or abandoning a vehicle, boat, or OHRV

while being pursued;[ or]

(d)  Carries as a passenger a person under the age of 16; or

(e)  Drives a vehicle with a gross combination weight rating of 10,001 pounds or more; or

10   Driving or Operating Under the Influence of Drugs or Liquor; Implied Consent Requirements for

Commercial Motor Vehicle Drivers.  Amend RSA 265-A:25, V to read as follows:

V.   Upon receipt of the sworn report of a law enforcement officer submitted under paragraph IV, the

department shall immediately disqualify the driver from driving a commercial motor vehicle under RSA

265-A:23.

11  Regulation of Motor Vehicle Repair Facilities; Definitions  RSA 358-D:1 is repealed and reenacted to

read as follows:

358-D:1  Definitions.  As used in this chapter:

I.   "Airbag" means a motor vehicle inflatable occupant restraint system device that is part of a

supplemental restraint system.

II.  "Counterfeit supplemental restraint system" means a supplemental restraint system component that

displays a mark identical or substantially similar to the genuine mark of a motor vehicle manufacturer or

a supplier of parts to the manufacturer of a motor vehicle without authorization from such manufacturer

or supplier, including, but not limited to, an airbag cover, an inflator, cushion material, sensors, a control

unit, and seat belt tensors.

III.  "Customer" means any person, or representative thereof, who is seeking to have performed, is having

performed, or has had performed, any service or repair work on a motor vehicle.

IV.  "Motor vehicle" means any vehicle defined by RSA 259:60, I except "motor trucks," "motorcycles" and

"motor-driven cycles" as defined by RSA 259.

V.  "Motor vehicle repair facility" means any person who performs services or repair work on any motor

vehicle.

VI.  "Nonfunctional airbag" means an airbag that meets any of the following criteria:

(a)  The airbag was previously deployed or damaged.

(b)  The airbag has an electric fault that is detected by the motor vehicle's diagnostic system when the

installation procedure is completed and:

Page 7: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

(1)  The motor vehicle is returned to the customer who requested the work be performed; or

(2)  Ownership of the vehicle is intended to be transferred.

(c)  The airbag includes a part or object installed in a motor vehicle to mislead the owner or operator of the

motor vehicle into believing that a functional airbag has been installed.

(d)  The airbag is subject to the prohibitions of 49 U.S.C. section 30120(j).

VII.  "Person" means any person defined by RSA 358-A:1, I.

VIII.  "Supplemental restraint system" means a passive inflatable motor vehicle occupant crash protection

system designed for use in conjunction with a seat belt assembly as defined in 49 C.F.R. section 571.209,

and which includes one or more airbags and all components required to ensure that an airbag works as

designed by the vehicle manufacturer, including both of the following:

(a)  The airbag operates as designed in the event of a collision.

(b)  The airbag is designed in accordance with federal motor vehicle safety standards for the specific make,

model, and year of the motor vehicle in which it is or will be installed.

12  Regulation of Motor Vehicle Repair Facilities; Sale, Purchase, and Installation of Airbags; Criminal

Penalty Established.  Amend RSA 358-D:11-a to read as follows:

358-D:11-a  Sale, Purchase, and Installation of Airbags; Criminal Penalty Established.  

I.  Any person who knowingly manufactures, imports, sells, offers for sale, purchases, installs, or

reinstalls any object [which is] intended to replace a supplemental restraint system component as

part of a vehicle inflatable restraint system, and said object is not a properly operating airbag that

was designed in accordance with federal safety regulations for the make, model, and year of the vehicle,

[as part of a vehicle inflatable restraint system,] including a counterfeit supplemental restraint

system component or a nonfunctional airbag, shall be guilty of a class A misdemeanor.

II.  Any person who knowingly and intentionally sells, installs, or reinstalls a device that causes

a motor vehicle's diagnostic system to fail to warn when the motor vehicle is equipped with a

counterfeit supplemental restraint system component or a nonfunctional airbag or when no

airbag is installed shall be guilty of a class A misdemeanor.

13  Regulation of Motor Vehicle Repair Facilities; Installation of Recycled Airbag.  Amend RSA 358-D:11-b

to read as follows:

358-D:11-b  Installation of Recycled Airbag; Disposal of Counterfeit Supplemental Restraint System

Components or Nonfunctional Airbags.  

I.  Nothing in RSA 358-D:11-a shall prohibit the installation or reinstallation of a recycled airbag that was

designed in accordance with federal safety regulations for the make, model, and year of the vehicle, as

part of a vehicle inflatable restraint system.

II. Nothing in RSA 358-D:11-a shall prohibit automotive dealers, repair professionals,

recyclers, original equipment manufacturers, or contractors from disposing of counterfeit

supplemental restraint system components or nonfunctional airbags in accordance with federal

or state law.

14  Drivers' Licenses; Prohibitions.  Amend RSA 263:12, I to read as follows:

I.  Display or cause or permit to be displayed any [revoked, suspended,] fictitious, or fraudulently altered

driver's license or permit.

I-a.   Display or cause or permit to be displayed any revoked or suspended driver's license or

permit while operating a motor vehicle.

15   Administration of Motor Vehicle Laws; Provision for Federal Identification Database Prohibited.

 Amend RSA 260:14-a, VI to read as follows:

Page 8: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

VI.  Notwithstanding any law to the contrary, the department is authorized to participate in [a pointer

based state-to-state driver verification system with information from applicants for drivers' licenses and

identification cards pursuant to RSA 263:14-b, RSA 263:14-c, RSA 260:21-a, and RSA 260:21-b] the state

to state (S2S) driver information program.

VII.  Notwithstanding any law to the contrary, the department is authorized to participate in

the driver license data verification (DLDV) program.

16  Equipment of Vehicles; Motor Carriers; Equipment; Roadside Inspections.  Amend RSA 266:72-a, I to

read as follows:

I.   The commissioner may adopt as rules, under RSA 541-A, the current version of the federal motor

carrier safety regulations promulgated by the U.S. Department of Transportation, Pipeline and

Hazardous Materials Safety Administration and Federal Motor Carrier Safety Administration, contained

in 49 C.F.R. parts 107, 380, and 382[, and 385]-397.  Notwithstanding the provisions of RSA 541-A, any

amendments or additions by the respective federal agencies or their successor agencies shall also amend

or supplement the rules adopted by the commissioner of safety without further action on the part of the

commissioner.  The commissioner shall be authorized to exempt vehicles and drivers operating exclusively

in intrastate commerce from such rules which the commissioner determines impose an unnecessary

regulatory burden without providing a corresponding safety benefit.

17  Drivers' Licenses; Commercial Driver License Qualification Standards.  Amend RSA 263:87 to read as

follows:

263:87  Commercial Driver License Qualification Standards.  

[I.]  No person shall be issued a commercial driver license unless that person is a resident of the state of

New Hampshire and has passed a knowledge and skills test for driving a commercial motor vehicle.  The

knowledge and skills test shall comply with minimum federal standards established by federal regulation,

as enumerated in 49 C.F.R. part 383, sub-parts G and A, in addition to other requirements imposed by

state law or federal regulation.   The tests shall be prescribed and conducted by the department.   The

department may authorize a person, including an agency of this or another state, an employer, a private

driver training facility, or other private institution, or a department, agency, or instrumentality of local

government, to administer the skills test in accordance with 49 C.F.R. part 383.

[II.  The department may waive the skills test for a commercial driver license applicant who meets the

following requirements:

(a)  The applicant has a minimum of 2 years of recent experience driving a vehicle that is representative

of the group of vehicles for which he wishes to obtain a commercial driver license;

(b)   The applicant's employer has provided certification to the division of motor vehicles that indicates

that the applicant has the experience as required in subparagraph (a);

(c)   The applicant holds a commercial light, commercial heavy or tractor-trailer or commercial driver

license at the time he applies for the commercial driver license, and is regularly employed as a commercial

motor vehicle driver; and

(d)  The applicant has a driving record that is free of license suspensions, revocations, or cancellations,

and free of disqualifying offenses, for a 2-year period immediately prior to applying for a commercial

driver license.]

18   Suspension for Evasion of Electronic Toll Collection System.   Amend RSA 263:56-f, I to read as

follows:

I.  Upon receiving a report from the commissioner of the department of transportation or designee, or

another state having a reciprocal toll collection enforcement agreement, that the owner of a vehicle, as

defined in RSA 236:31, has violated the terms of RSA 236:31, or a reciprocal toll collection enforcement

Page 9: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

agreement in accordance with RSA 237:16-c, the director shall notify the owner in writing by first class

mail that the owner's motor vehicle registration renewal privileges for the vehicle driven in violation

of RSA 236:31 may be suspended on the date which is 30 days from the date of notification unless the toll

and any administrative fees assessed by the department of transportation are paid.  Furthermore, the

registered owner of the vehicle driven in violation of RSA 236:31 is prohibited from transferring

a plate to said vehicle or obtaining a new plate for said vehicle until such tolls and fees are

paid.  The director shall also notify the owner that he or she may request an administrative hearing

before the suspension takes effect.   The hearing shall be limited in scope and shall not constitute an

appeal of the fees or fines related to the unpaid tolls, which can only be determined by the department of

transportation.   A request for a hearing shall be in writing.   A request for a hearing received by the

division more than 30 days from the date the notice is issued shall be denied as untimely.

19  Evasion of Tolls and Charges.  Amend RSA 236:31, IV(c) to read as follows:

(c)  A procedure for processing all other violations of this section, which shall require the department, or

its designee, to send by regular mail, or other agreed upon method, an advisory and payment request to

the owner of the vehicle, within [30] 60 days of the date of the violation.   The advisory and payment

request shall notify the owner of the date, time, and location of the alleged violation, give the owner the

opportunity to resolve the alleged violation by payment of the toll or charge due and a reasonable

administrative fee, and advise the owner that failure to pay the required toll or charge and administrative

fee [within 60 days of the date of the violation] shall cause the department to file a report with the

department of safety, division of motor vehicles, seeking an order of suspension pursuant to RSA 263:56-f.

20   New Subparagraph; Evasion of Tolls and Charges.   Amend RSA 236:31, VI by inserting after

subparagraph (b) the following new subparagraph:

(c)  The department may use an agent or third party contractor, including but not limited to collection

agencies, to pursue and collect tolls and fees from users of the turnpike system whose vehicles are

registered outside the United States.

21  State 10-Year Transportation Improvement Plan.  The legislature hereby adopts the plan known as

the “Ten Year Transportation Improvement Plan 2021-2030 Submitted by the Governor to the Legislature

Pursuant to RSA 228:99 and RSA 240 of the Laws of New Hampshire” and encourages expeditious

implementation of the projects shown therein.  This plan required the legislature to grant the authority to

borrow up to $44,000,000 to advance projects associated with the State Aid Bridge Program.   This

authority is not granted as such project schedules should be adjusted to align with the August 12, 2019

version of the ten year plan presented during the public hearing phase of the ten year plan process.

22  Bedford.  The project named Bedford-Merrimack, project number 16100, shall be modified to convert

the mainline toll plaza in Bedford to all electronic tolling.

23  Garvee Bonds; Issuance of Revenue Bonds.  Amend RSA 228-A:2 to read as follows:

228-A:2   Issuance of Revenue Bonds.   The state may issue bonds under this chapter to be known as

"federal highway grant anticipation bonds."  The bonds may be issued from time to time for the purpose of

financing project costs related to the widening of Interstate 93 from Manchester to the Massachusetts

border[, the replacement of the Sarah Mildred Long Bridge in Portsmouth, New Hampshire,] and any

other federally aided highway project hereafter authorized by the general court to be financed under this

chapter.  Bonds issued hereunder shall be special obligations of the state and the principal of, premium, if

any, and interest on all bonds shall be payable solely from the particular funds provided therefor under

this chapter.   The issuing of bonds shall be contingent upon the availability of sufficient anticipated

federal aid over the term of the bonds.  The bonds shall be issued by the treasurer in such amounts as the

fiscal committee of the general court and the governor and council shall determine, and shall not exceed

n46gld
Page 10: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

$490,000,000.  Debt service for federal highway grant anticipation bonds (GARVEE bonds) for the projects

shall be paid from a portion of future federal funds.  Bonds of each issue shall be dated, shall bear interest

at such rate or rates, including rates variable from time to time as determined by such index, banker's

loan rate, or other method as may be determined by the treasurer, and shall mature at such time or times

as may be determined by the treasurer, except that no bond shall mature more than 15 years from the

date of its issue.  Bonds may be made redeemable before maturity either at the option of the state or at

the option of the holder, or on the occurrence of specified events, at such price or prices and under such

terms and conditions as may be fixed by the treasurer prior to the issue of bonds.  The treasurer shall

determine the form and details of bonds.  Subject to RSA 93-A, the bonds shall be signed by the treasurer

and countersigned by the governor.  The bonds may be sold in such manner, either at public or private

sale, for such price, including above or below par value, at such rate or rates of interest, or at such

discount in lieu of interest, as the treasurer may determine.  [The state may further issue GARVEE bonds

for the purpose of financing the project costs related to the replacement and/or rehabilitation of 2

Connecticut River bridges, located in Lebanon, New Hampshire and Hinsdale, New Hampshire, pursuant

to the issuance process in this section.]

24  Plymouth.  Funding for preliminary engineering, right of way and construction for the project named

Plymouth, project number 41583, shall be moved from 2027 to 2022, 2024 and 2025 respectively.

25   Bedford-Merrimack.   Funding for construction for the project named Bedford-Merrimack, project

number 16100, shall be moved from 2022 and 2023 to 2023 and 2024.

26  Merrimack; Removal of Ramp Toll Plazas.  The following shall be added to the 10-year transportation

improvement plan 2021-2030: Removal of the exit 11 ramp toll plazas in 2021 with funding for

construction totaling $600,000.

27   New Paragraph; Turnpike System; Authority Granted.   Amend RSA 237:2 by inserting after

paragraph X the following new paragraph:

XI.  Remove the exit 11 ramp toll plazas in the town of Merrimack.

28  Turnpike System; Funds Provided.  Amend RSA 237:7(h) to read as follows:

(h)   Improvements to central New Hampshire turnpike.   RSA 237:2, IV(h), VII, VII(b), VII(c), IX, XI.

 [$891,000,000]$954,000,000

29  Department of Transportation; Betterment Program and Block Grant Aid; Temporary Authority.  Due

to unprecedented circumstances resulting in significant declines in highway revenues and uncertain

federal financial assistance, and notwithstanding provisions to the contrary, the legislature hereby

authorizes the department of transportation to take the following actions as necessary and subject to the

approval of the fiscal committee and the governor and council:

I.  In the event the department receives significant additional federal funds as part of novel coronavirus

disease (Covid-19) relief, and with the intent to distribute an amount up to the fiscal year 2021 budgeted

amount, the department is authorized, with approval of the joint legislative fiscal committee and governor

and council, to deviate from the provisions of RSA 235:23 concerning the distribution of the block grant

aid, and may distribute the funds at a percentage greater than 12 percent.

II.   Excluding funds deposited in the highway and bridge betterment account in accordance with RSA

260:32-b, IV(c), in the event that federal relief is not forthcoming, to offset decreased highway fund

revenue due to the novel coronavirus disease (Covid-19) pandemic, the department is authorized, with

approval of the joint legislative fiscal committee and governor and council, to temporarily suspend the

highway and bridge betterment program provisions established in RSA 235:23-a through the end of the

fiscal year ending June 30, 2021, to meet departmental operational needs as budgeted and amended by

n46gld
Page 11: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

the joint legislative fiscal committee and to further reduce the betterment funded projects in the ten year

plan in proportion to available projected revenue.

III.   In the event that federal relief is received after such suspensions and transfers are made, the

department is authorized, with approval of the joint legislative fiscal committee and governor and council,

to restore betterment funded projects to the extent possible.

30  Drivers' Licenses; Form of License; Medically Recognized Disorder Indication.  Amend RSA 263:41-b,

III to read as follows:

III.  For the purpose of this section, [autism spectrum disorder (ASD) or its abbreviation is] the following

medically recognized disorders, or their abbreviations, are authorized to be printed on the driver's

license or nondriver's picture identification card[.]:

(a)  Autism spectrum disorder (ASD).

(b)  Deaf or hard of hearing.

31   New Section; Motor Vehicles; Definitions; Roadable Aircraft.   Amend RSA 259 by inserting after

section 91 the following new section:

259:91-a  Roadable Aircraft.  "Roadable aircraft" shall mean any aircraft capable of taking off and landing

from a suitable airfield which is also designed to be driven on public roadways as a conveyance.

32  New Subparagraph; Certificates of Title; Exempted Vehicles.  Amend RSA 261:3, I by inserting after

subparagraph (k) the following new subparagraph:

(l)  A roadable aircraft as defined in RSA 259:91-a.

33  New Section; Motor Vehicles; Registration; Roadable Aircraft.   Amend RSA 261 by inserting after

section 41-b the following new section:

261:41-c  Roadable Aircraft; Registration.

I.  Upon receipt of an application for registration of a roadable aircraft and payment of applicable state

and municipal registration permit fees, the department shall issue a certificate of registration to the

owner of such aircraft, provided that the application is accompanied by the following:

(a)   Proof of valid and unexpired aircraft registration issued by the New Hampshire department of

transportation.

(b)   A copy of an annual aircraft inspection completed within the 12 calendar months immediately

preceding the date of application.

II.  For purposes of this section, roadable aircraft shall be identified by the registration number assigned

to such aircraft by the New Hampshire department of transportation.

III.  The expiration date of a certificate issued pursuant to this section shall match the expiration of the

aircraft registration issued by the New Hampshire department of transportation.

IV.  The fees for registration of roadable aircraft shall be comprised of the fee prescribed by RSA 261:141,

III(g), payable to the department, plus a municipal registration permit fee of $2,000, payable to the city or

town in which the owner of such roadable aircraft resides.

34  New Section; Certificates of Title and Registration of Vehicles; Number Plates; Roadable Aircraft.

 Amend RSA 261 by inserting after section 89-d the following new section:

261:89-e   Identification of Roadable Aircraft.   Roadable aircraft as defined in RSA 259:91-a shall be

identified using the federally issued tail number and shall not be required to display an additional license

plate or decal.

35  Motor Vehicle Inspections; Roadable Aircraft.  Amend RSA 266:1, I-II to read as follows:

I.   The director may require the inspection of any vehicle, except an OHRV, snowmobile, moped,

roadable aircraft, or any other vehicle exempted under this chapter, to determine whether it is fit to be

n46gld
Page 12: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

driven.  Such inspection shall be made at such times and in such manner as the director may specify,

subject to the requirements set forth in this section.

II.  Any vehicle registered under this title, except an OHRV, snowmobile, moped, roadable aircraft, or

other exempt vehicle, shall be inspected once a year, during the month in which the birth date of the

owner is observed, if the owner is a natural person.  An inspection sticker shall be valid for the same

duration as the vehicle's registration, which shall not exceed 16 months.   If the month in which the

anniversary of the owner's birth occurs will be one of the next 4 months, an inspection sticker may be

issued, with an expiration date of the birth month in the following year, of the first person named on the

title application.   Nothing in this paragraph shall require any person who has registered and had

inspected a vehicle with temporary plates to have the vehicle reinspected upon receipt of permanent

motor vehicle plates.  An inspection sticker shall not expire when a vehicle is transferred to a licensed

dealer.

36  Motor Vehicle Inspections; Roadable Aircraft.  Amend RSA 266:1, IV to read as follows:

IV.  Notwithstanding paragraphs II and III, newly registered vehicles, other than vehicles transferred to a

licensed dealer, OHRVs, snowmobiles, [and] mopeds, roadable aircraft, and vehicles, other than

vehicles transferred to a licensed dealer, OHRVs, snowmobiles, [and] mopeds, and roadable aircraft,

the ownership of which has been transferred, shall be inspected not later than 10 days after the

registration or transfer of ownership of said vehicle.  However, if a new vehicle is purchased at retail from

a licensed dealer, as defined in RSA 259:18, the vehicle shall be inspected not later than 20 days after the

date of transfer.  A used vehicle for which a dealer has issued a 20-day plate pursuant to RSA 261:109

shall be inspected by the dealer or an authorized inspection station on behalf of the dealer at the time of

the attachment of the plate unless a valid inspection sticker issued by the dealer is in place, in which case

the vehicle shall be inspected within 20 days or before the sticker expires, whichever occurs first.   All

other expired motor vehicle inspections shall be subject to the 10-day grace period in RSA 266:5.

37  Motor Vehicle Inspections; Roadable Aircraft.  Amend RSA 266:1, X to read as follows:

X.  The director may authorize properly qualified persons to inspect any motor vehicle, except an OHRV,

snowmobile, moped, roadable aircraft, or any other vehicle exempted under this chapter, which has

been involved in a fatal accident or an accident involving serious bodily injury as defined in RSA 625:11,

VI, to determine whether the vehicle was in compliance with state inspection requirements.

38  New Paragraph; Aeronautics; Definitions; Roadable Aircraft.  Amend RSA 422:3 by inserting after

paragraph XXIV the following new paragraph:

XXIV-a.  "Roadable aircraft" means any aircraft capable of taking off and landing from a suitable airfield

which is also designed to be driven on public roadways as a conveyance.

39   New Section; Aeronautics; Prohibitions and Penalties; Roadable Aircraft in Operation on Public

Roadways.  Amend RSA 422 by inserting after section 27 the following new section:

422:27-a  Roadable Aircraft in Operation on Public Roadways.

I.  All roadable aircraft shall be considered motor vehicles while in operation on the roadways of the state

and shall comply with the provisions of RSA 265.

II.   The operation of roadable aircraft shall be subject to restrictions placed upon the use of public

roadways by rules adopted by the department of safety.

III.   All roadable aircraft shall be required to take off and land from a suitable airstrip and shall be

prohibited from taking off and landing from any public roadway, unless under conditions of an emergency.

40  Department of Education; Hudson CTE Center; Supplemental Appropriation.

I.   The sum of $2,550,000 for the biennium ending June 30, 2021, is hereby appropriated to the

department of education for the purpose of completing the construction and renovation of the Wilbur H.

Page 13: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Palmer Career and Technical Education Center located at the Alvirne High School in Hudson, New

Hampshire.  The appropriation shall be part of, and not in addition to, the $17,000,000 appropriated to

the department for renovation of the center in 2019, 146:18, I.  The appropriation made in this section

shall not lapse until June 30, 2023 and shall be in lieu of the anticipated appropriation for the biennium

ending June 30, 2023 in 2019, 146:18, II, B.

II.  To provide funds for the appropriation made in paragraph I, the state treasurer is hereby authorized

to borrow upon the credit of the state not exceeding the sum of $2,550,000 and for said purpose may issue

bonds and notes in the name of and on behalf of the state of New Hampshire in accordance with RSA 6-A.

 Payments of principal and interest on the bonds and notes shall be made from the general fund of the

state.

III.  All contracts and projects and plans and specifications therefor for the projects authorized in this

section shall be awarded in accordance with the provisions of RSA 21-I.

41  Appropriation Lapses.  To offset $1,018,000 of sums appropriated in section 40 of this act, the sum of

$865,000 from the unencumbered balance of the appropriation made to the department of administrative

services in 2015, 220:1, II, D, 1, extended by 2017, 228:22, 26 and extended by 2019, 146:20, 36 for

Merrimack county superior court - new courthouse, $99,186 from the unencumbered balance of the

appropriation made to the department of administrative services in 2017, 228:1, II, D, 1, extended by

2019, 146:20, 25 for convert AOC building to probate court and the sum of $53,814 from the

unencumbered balances of the appropriation made to the department of administrative services in 2017,

228:1, II, B, 8, extended by 2019, 146:20, 20 for state library parapet and ceiling repair shall lapse on June

30, 2020.

42  New Section; Department of Transportation; Business Impacts.  Amend RSA 228 by inserting after

section 31-b the following new section:

228:31-c   Business Impacts; Department of Transportation.    For projects exceeding $5,000,000, the

department of transportation shall include in its engineering and design how to mitigate effects on entry,

access, or parking. 

43  Effective Date.  

I.  Section 2 of this act shall take effect November 1, 2021.

II.  Sections 6-13 of this act shall take effect January 1, 2021.

III.  Section 3, 4, 18-20, and 30-39 of this act shall take effect 60 days after its passage.

IV.  Section 42 of this act shall take effect July 1, 2020.

V.  The remainder of this act shall take effect upon its passage.

Page 14: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan Total = 1,978.84$ (in millions)

FAST ACT Estimated Revenue = 1,935.36$ (in millions)

47.61$ (in millions)

1,982.97$

Notes: - HSIP, RecTrails, TAP Programs at FAST ACT funded levels (with exception of CMAQ - at FAST Act funded level minus $4.4M)

- CMAQ Allocation - $2.2M transfer to FTA, $2.2M flexed to other Fed-Aid programs, $6.7M available for grant rounds 24-Jul-20

Total Federal Revenue =

2021-2030 Ten Year Plan

Federal Aid Program

Non-Federal Formula Revenue =

$241.3

$197.1 $198.9 $195.9

$204.4 $200.9

$185.5$189.1 $185.3

$180.5

$100.0

$120.0

$140.0

$160.0

$180.0

$200.0

$220.0

$240.0

2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Ten Year Plan Federal-Aid Target

Page 15: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

SAB 8,9 I-93 Debt

Service

TIFIA

Pledged

Paving &

Bridge

2021 241.31$ 15.10$ 24.05$ 20.84$ 2.15$ 29.79$ 29.21$ 362.45$ 49.57$ 24.35$ 0.66$ 28.48$ 45.80$ 511.30 12.6%

2022 197.09$ 23.90$ 24.05$ 10.66$ 2.20$ 22.10$ 2.94$ 282.93$ 48.90$ 13.90$ 2.10$ 29.17$ 24.85$ 401.86 9.9%

2023 198.92$ -$ 24.05$ 8.39$ 2.20$ 24.70$ 7.53$ 265.79$ 67.54$ 14.40$ 0.60$ 29.79$ 39.20$ 417.33 10.3%

2024 195.88$ -$ 24.05$ 10.30$ 2.20$ 23.77$ 1.98$ 258.17$ 59.21$ 13.30$ 0.60$ 30.43$ 27.54$ 389.24 9.6%

2025 204.37$ -$ 24.05$ 10.00$ 2.19$ 19.70$ 2.53$ 262.85$ 58.73$ 13.60$ 2.10$ 31.08$ 33.48$ 401.84 9.9%

2026 200.94$ 25.00$ 24.05$ 7.30$ 23.41$ 1.50$ 0.14$ 282.34$ 47.56$ 13.80$ 0.60$ 31.74$ 17.19$ 393.22 9.7%

2027 185.47$ 40.00$ 24.05$ 8.30$ 23.41$ 1.50$ 0.17$ 282.90$ 51.12$ 14.10$ 0.60$ 32.39$ 21.83$ 402.94 10.0%

2028 189.07$ 30.00$ 24.05$ 8.50$ 23.41$ 1.50$ 1.61$ 278.13$ 63.48$ 14.40$ 2.10$ 33.07$ 28.76$ 419.95 10.4%

2029 185.30$ -$ 24.05$ 8.50$ 23.41$ 1.50$ 4.52$ 247.27$ 42.52$ 14.70$ 0.60$ 32.66$ 18.65$ 356.41 8.8%

2030 180.48$ -$ 24.05$ 8.50$ 23.41$ 1.50$ 0.05$ 237.99$ 30.94$ 15.00$ 0.60$ 33.32$ 31.24$ 349.09 8.6%

Program Total 1,978.84 134.00 240.50 101.29 127.96 127.55 50.69 2,760.82 519.56 151.55 10.56 312.13 288.56 4,043.18 100.0%

% of Total

Program71.7% 4.9% 8.7% 3.7% 4.6% 4.6% 1.8% 100.0%

Revenue 7 $1,983 $134.00 $240.50 $50.69 $2,764.96 519.56$ 151.55$ 10.56$ 312.13$ 288.56$ $4,047.32

Surplus/(Deficit) $4.14 $0.00 $0.00 $0.00 $4.14 -$ -$ -$ -$ -$ 4.14$

Notes: 1. I-93 Payments based on GARVEE Bonds and Debt Service are Included

2. Betterment program maintained at current budget levels and SAB program includes carryover from the State Aid Bridge program

3. Total comprised from project matching costs Maine, Vermont, other states, and municipalities

4. Figures include inflation

5. FHWA categories includes approximately $1.16 million annually to address railroad crossings

6. Self-funded FTA programs and projects are limited to available funds

7. FHWA Revenue based on FAST Act anticipated apportionments based on FY 2020 and level funded there after.

8. 2021; 2022; 2023 funding includes other non-formula federal funds (FEMA)

9. Program includes 20% match component

~ Dollars include indirect costs and inflation (2.80%) Dollars in Millions

% of Total

ProgramTurnpike R&R

Turnpike

Improvement

SB367

$356.80

$0.00

24-Jul-20

2021-2030 Ten Year Plan

Total Program Dollars by FY

FY FHWA 1,4,5

Major

Projects

GARVEEBetterment

2 Sub Total Rail 5

Other 3

Matching

Funds

Highway Funded Non-Highway Funded

Highway and Bridge Other Modes

TYP FY

TotalTransit

6 Airport

Page 16: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

FHWA

49%

GARVEE

3%

Betterment

6%

SB367

9%

Other Matching

Funds

1%

Turnpike

Improvement

13%

Turnpike R&R

4%

Rail

< 1%

Transit

7%

Airport

7%

2021-2030 Ten Year Plan

Share of Total Program Dollars by Program

24-Jul-20

Page 17: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

FISCAL

YEAR PAVEMENT BRIDGES

I-93

EXPANSION

MANDATED

FEDERAL

INDIVIDUAL

PROJECTS ROADSIDE RAIL TRANSIT AIRPORTS

DEBT

SERVICE

GRAND

TOTAL

2021 86.42 185.25 27.49 30.57 69.70 11.78 0.60 31.68 45.80 22.01 511.30

2022 95.16 89.66 14.16 29.22 80.31 12.06 2.10 32.37 24.85 21.96 401.86

2023 71.93 99.09 12.50 29.06 98.48 11.80 0.60 32.99 39.20 21.67 417.33

2024 70.83 90.91 12.50 29.06 90.85 12.06 0.60 33.63 27.54 21.27 389.24

2025 83.28 80.43 0.00 29.06 106.14 12.14 2.10 34.28 33.48 20.92 401.84

2026 80.72 92.50 0.00 29.06 96.86 14.06 0.60 34.94 17.19 27.31 393.22

2027 80.93 86.84 0.00 29.12 93.21 14.04 0.60 35.59 21.83 40.78 402.94

2028 72.04 103.32 0.00 28.94 93.79 14.06 2.10 36.27 28.76 40.68 419.95

2029 95.24 68.43 0.00 28.94 50.29 17.92 0.60 35.86 18.65 40.48 356.41

2030 87.72 53.67 0.00 30.43 54.38 14.06 0.60 36.52 31.24 40.48 349.09

Total 824.27 950.09 66.65 293.45 834.01 133.95 10.50 344.13 288.56 297.56 4043.18

% Grand

Total20.4% 23.5% 1.6% 7.3% 20.6% 3.3% 0.3% 8.5% 7.1% 7.4% 100.0%

~ Dollars include indirect costs and inflation (2.80%)

~Totals adjusted in individual years to account for estimated bridge work 24-Jul-20

2021-2030 Ten Year Plan

All Funding

Page 18: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

24-Jul-20

PAVEMENT

21%

BRIDGES

24%

I-93

EXPANSION

2%MANDATED

FEDERAL

7%

INDIVIDUAL

PROJECTS

21%

ROADSIDE

3%

RAIL

< 1%

TRANSIT

9%

AIRPORTS

7%

DEBT

SERVICE

7%

2021-2030 Ten Year Plan

Share of Total Dollars of Funding

Page 19: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 16

ALBANY (29597)

SHOULDER WIDENING AND PAVEMENT

RESURFACING TO ENABLE INSTALLATION OF

CENTERLINE RUMBLE STRIPS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

154,920Right of Way 2021 None-Highway

844,733Construction 2023 None-Highway

5,992,610Construction 2024 None-Highway

$8,919,463

$6,992,263

$6,992,263 $1,927,200Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 28

ALLENSTOWN (40362)

ADDRESS RED LIST BRIDGE CARRYING NH 28

OVER SUNCOOK RIVER (BR NO 107/098)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

2,261,600Construction 2021 Bridg-T1-2-Rehab-Rcn

$2,661,600

$2,261,600

$2,261,600 $400,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 1 of 226Includes inflation and indirects using program

Page 20: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

HILL ROAD OVER DARBY BROOK

ALSTEAD (40649)

BRIDGE REHABILITATION-HILL ROAD OVER DARBY

BROOK-BR. #159-134

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

46,671Preliminary Engineering 2021 SAB *

87,431Construction 2021 SAB *

137,857Construction 2022 SAB *

$271,960

$271,960

$271,960 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

COMSTOCK ROAD OVER DARBY BROOK

ALSTEAD (40661)

BRIDGE REPLACEMENT-COMSTOCK ROAD OVER

DARBY BROOK-BR. #046/141

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

141,229Preliminary Engineering 2023 SAB *

2,173Right of Way 2023 SAB *

8,934Right of Way 2024 SAB *

398,482Construction 2023 SAB *

565,990Construction 2024 SAB *

$1,116,808

$1,116,808

$1,116,808 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 2 of 226Includes inflation and indirects using program

Page 21: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 11

ALTON (40624)

ADDRESS RED LIST BRIDGE CARRYING NH 11

OVER MERRYMEETING RIVER (BR NO 163/184)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

232,492Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

113,080Right of Way 2021 Bridg-T1-2-Rehab-Rcn

1,493,764Construction 2023 Bridg-T1-2-Rehab-Rcn

307,118Construction 2024 Bridg-T1-2-Rehab-Rcn

$2,421,455

$2,146,455

$2,146,455 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MONT VERNON ROAD OVER CEASARS BROOK

AMHERST (40654)

BRIDGE REPLACEMENT-MONT VERNON ROAD

OVER CEASARS BROOK-BR. #112/071

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

142,666Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

389,214Construction 2023 SAB *

552,204Construction 2024 SAB *

$1,089,368

$1,089,368

$1,089,368 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 3 of 226Includes inflation and indirects using program

Page 22: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

THORNTON FERRY ROAD OVER BEAVER BROOK

AMHERST (40657)

BRIDGE REPLACEMENT-THORNTON FERRY ROAD

OVER BEAVER BROOK-BR. #145/106

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

271,593Preliminary Engineering 2025 SAB *

5,431Right of Way 2025 SAB *

757,745Construction 2025 SAB *

757,746Construction 2026 SAB *

$1,792,515

$1,792,515

$1,792,515 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 122

AMHERST (41413)

REHAB OF RED LIST BRIDGE CARRYING NH 122

(MAIN ST) OVER NH 101 IN THE TOWN OF

AMHERST (135/109)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

226,160Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

2,261,600Construction 2021 Bridg-T3-4-Rehab-Rcn

$2,707,760

$2,487,760

$2,487,760 $220,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 4 of 226Includes inflation and indirects using program

Page 23: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

AMHERST RAIL TRAIL

AMHERST (42593)

RAIL TRAIL BETWEEN BABOOSIC LAKE ROAD AND

WALNUT HILL ROAD, LOCATED ON ABANDONED

RR ROW.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

88,516Preliminary Engineering 2026 None-Other

187,084Right of Way 2028 None-Other

576,966Construction 2029 None-Other

$852,566

$852,566

$852,566 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 11

ANDOVER (20650)

REPLACE 2 BRIDGES - NH 11 OVER NHRR(ABD)

(206/137) AND NH 11 OVER SUCKER BROOK

(208/137)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

169,620Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

58,123Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

39,578Right of Way 2021 Bridg-T1-2-Rehab-Rcn

11,625Right of Way 2022 Bridg-T1-2-Rehab-Rcn

2,390,023Construction 2023 Bridg-T1-2-Rehab-Rcn

4,913,887Construction 2024 Bridg-T1-2-Rehab-Rcn

$8,325,355

$7,582,855

$7,582,855 $742,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 5 of 226Includes inflation and indirects using program

Page 24: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 4

ANDOVER (40392)

REPLACEMENT OF BRIDGE CARRYING US 4 OVER

BLACKWATER RIVER (143/077)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

220,000Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

165,000Right of Way 2021 Bridg-T1-2-Rehab-Rcn

3,850,000Construction 2021 Bridg-T1-2-Rehab-Rcn

$4,675,000

$4,235,000

$4,235,000 $440,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

LAWRENCE ROAD OVER BLACKWATER RIVER

ANDOVER (41407)

BRIDGE REPLACEMENT-LAWRENCE ROAD OVER

BLACKWATER RIVER-BR. #098/093

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

295,950Preliminary Engineering 2026 SAB *

5,584Right of Way 2026 SAB *

1,479,750Construction 2026 SAB *

1,825,420Construction 2027 SAB *

$3,606,704

$3,606,704

$3,606,704 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 6 of 226Includes inflation and indirects using program

Page 25: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CRAIG ROAD

ANTRIM (14942)

BRIDGE REPLACEMENT-CRAIG ROAD OVER

BROOK - 117/093 {RED LIST}

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

95,111Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

113,076Construction 2023 SAB *

219,447Construction 2024 SAB *

$432,919

$432,919

$432,919 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 31

ANTRIM (42579)

ADDRESS RED LIST BRIDGE (133/132) CARRYING

NH 31 OVER STEEL POND BROOK IN THE TOWN OF

ANTRIM

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

189,430Preliminary Engineering 2025 Bridg-T3-4-Rehab-Rcn

133,458Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

1,410,362Construction 2029 Bridg-T3-4-Rehab-Rcn

$1,733,251

$1,733,251

$1,733,251 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 7 of 226Includes inflation and indirects using program

Page 26: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US ROUTE 3

ASHLAND - BRIDGEWATER (24904)

ADDRESS BRIDGE CARRYING US 3 & NH25 OVER

NHRR AND PEMIGEWASSET RIVER (BR NO 076/080)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

214,500Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

6,784,800Construction 2022 Bridg-T1-2-Rehab-Rcn

$7,459,800

$6,999,300

$6,999,300 $460,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GRIFFIN MILL ROAD OVER MAPLE FALLS BROOK

AUBURN (29316)

BRIDGE REHABILITATION-GRIFFIN MILL RD OVER

MAPLE FALLS BROOK-BR. #095/127

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

140,552Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

268,423Construction 2023 SAB *

425,859Construction 2024 SAB *

$840,118

$840,118

$840,118 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 8 of 226Includes inflation and indirects using program

Page 27: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

HANNAH NUTTER ROAD

BARNSTEAD (16020)

BRIDGE REPLACEMENT-HANNAH NUTTER ROAD

OVER BIG RIVER-BR. #149/073

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

475,964Construction 2021 SAB *

$1,028,907

$475,964

$475,964 $552,943Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US ROUTE 4

BARRINGTON (16402)

ROUTE 4 CULVERT REPLACEMENT JUST WEST OF

TOPAZ DRIVE

Route/Road

Scope

Program

ROADSIDE

TIER 3

Category

Strategy

90,464Preliminary Engineering 2021 CRDR *

92,997Preliminary Engineering 2022 CRDR *

17,925Right of Way 2023 CRDR *

944,059Construction 2023 CRDR *

798,507Construction 2024 CRDR *

$2,142,852

$1,943,952

$1,943,952 $198,900Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 9 of 226Includes inflation and indirects using program

Page 28: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

GREEN HILL RD OVER ISINGLASS RIVER

BARRINGTON (26722)

BRIDGE REHABILITATION-GREENHILL RD OVER

ISINGLASS RIVER-BR. #109/162

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

290,108Preliminary Engineering 2022 SAB *

5,284Right of Way 2022 SAB *

1,007,132Construction 2022 SAB *

1,144,513Construction 2023 SAB *

$2,447,038

$2,447,038

$2,447,038 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

OLD CANAAN ROAD OVER SPRUCE BROOK

BARRINGTON (41410)

BRIDGE REPLACEMENT-OLD CANAAN ROAD OVER

SPRUCE BROOK-BR. #052/059

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

134,546Preliminary Engineering 2026 SAB *

5,584Right of Way 2026 SAB *

298,741Construction 2026 SAB *

307,106Construction 2027 SAB *

$745,977

$745,977

$745,977 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 10 of 226Includes inflation and indirects using program

Page 29: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US ROUTE 4

BARRINGTON (41415)

REHAB OR REPLACEMENT OF RED LIST BRIDGE

CARRYING US 4 OVER OYSTER RIVER IN THE

TOWN OF BARRINGTON

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

226,160Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

1,195,011Construction 2023 Bridg-T1-2-Rehab-Rcn

$1,421,171

$1,421,171

$1,421,171 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

F.E. EVERETT TPK

BEDFORD - MERRIMACK (16100)

IMPROVEMENT TO BEDFORD MAINLINE TOLL

PLAZA TO INSTITUTE ALL ELECTRONIC TOLLING

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

8,450,000Construction 2023 TPK *

2,000,000Construction 2024 TPK *

$10,450,000

$10,450,000

$10,450,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 11 of 226Includes inflation and indirects using program

Page 30: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 101

BEDFORD (13692C)

BRIDGE REHAB OR REPLACEMENT OF BR NO

090/065 CARRYING NH 101 OVER PULPIT BROOK

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

127,963Preliminary Engineering 2021 Other Fed Aid

3,110,184Construction 2021 Bridg-T1-2-Rehab-Rcn

1,654,541Construction 2022 Other Fed Aid

587,338Construction 2022 Bridg-T1-2-Rehab-Rcn

$5,976,369

$5,480,026

$5,480,026 $496,343Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CATESBY LANE

BEDFORD (21684)

BRIDGE REPLACEMENT-CATESBY LANE OVER

MCQUADE BROOK-BR. #102/098 (NEW)

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

92,520Preliminary Engineering 2021 SAB *

5,140Right of Way 2021 SAB *

210,740Construction 2021 SAB *

317,035Construction 2022 SAB *

$625,435

$625,435

$625,435 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 12 of 226Includes inflation and indirects using program

Page 31: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BEALS RD OVER BABOOSIC BROOK

BEDFORD (24217)

BRIDGE REPLACEMENT-BEALS RD OVER

BABOOSIC BROOK-BR. #105-055

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

159,718Preliminary Engineering 2022 SAB *

5,284Right of Way 2022 SAB *

443,849Construction 2022 SAB *

546,446Construction 2023 SAB *

$1,155,298

$1,155,298

$1,155,298 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3

BEDFORD (40664)

US 3 WIDENING FROM HAWTHORNE DRIVE NORTH

TO MANCHESTER AIRPORT ACCESS ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,673,016Preliminary Engineering 2023 None-Highway

280,188Right of Way 2023 None-Highway

3,115,750Right of Way 2026 None-Highway

5,013,814Construction 2026 None-Highway

2,914,663Construction 2029 None-Highway

$13,272,432

$12,997,432

$12,997,432 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 13 of 226Includes inflation and indirects using program

Page 32: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 101/BOYNTON ST

BEDFORD (42268)

REHABILITATE 90" STRUCTURAL PLATE PIPE

UNDER NH 101 & BOYNTON ST IN BEDFORD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

446,666Construction 2021 CRDR *

$1,552,166

$446,666

$446,666 $1,105,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 114

BEDFORD-GOFFSTOWN (41859)

CORR. STUDY OF NH114 FROM THE NH114/NH101

INTERSECTION IN BEDFORD TO NH114/HNRY

BRDG RD. GOFFSTOWN

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

385,000Other 2021 CORRST

$385,000

$385,000

$385,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 140 AND MAIN STREET

BELMONT (40635)

IMPROVE INTERSECTION SAFETY AND

CONGESTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

32,220Right of Way 2023 None-Highway

550,405Construction 2025 None-Highway

$692,625

$582,625

$582,625 $110,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 14 of 226Includes inflation and indirects using program

Page 33: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

S BENNINGTON ROAD

BENNINGTON (29486)

SOUTH BENNINGTON ROAD OVER RUSSELL

BROOK BRIDGE REHAB OR REPLACEMENT

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

678,480Construction 2021 Bridg-T3-4-Rehab-Rcn

$927,658

$678,480

$678,480 $249,178Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAIN STREET AND RIVERSIDE DRIVE

BERLIN (41367)

CONST. MULTI-USE PATH ALONG ANDROSCOGGIN

RIVER FROM SERVICE CREDIT UNION HERITAGE

PARK TO 12TH ST.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

901,347Construction 2022 TA *

574,201Construction 2022 NON-PAR (other)

$1,610,537

$1,475,548

$1,475,548 $134,989Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 15 of 226Includes inflation and indirects using program

Page 34: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 142

BETHLEHEM (41575)

ADDRESS RED LIST BRIDGE (099/152) CARRYING

NH 142 OVER AMMONOOSUC RIVER IN TOWN OF

BETHLEHEM

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

298,753Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

122,847Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

324,557Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

133,458Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

1,835,047Construction 2027 Bridg-T3-4-Rehab-Rcn

1,886,428Construction 2028 Bridg-T3-4-Rehab-Rcn

$4,601,091

$4,601,091

$4,601,091 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US302, NH 10 & US302

BETHLEHEM-CARROLL (42501)

BRIDGE PRESERVATION ON CARROLL 173/141 AND

BETHLEHEM 125/177.

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

517,906Construction 2021 Bridg-T1-2-Main-Pres

$3,305,856

$517,906

$517,906 $2,787,950Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 16 of 226Includes inflation and indirects using program

Page 35: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

BETHLEHEM-LITTLETON (42437)

REHABILITATION (4R) ON I-93 FROM MM 120.5 TO

MM 125.0 INCLUDING RAMPS AT EXITS 40, 41, & 42.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

205,792Preliminary Engineering 2028 Pave-T1-Rehab

317,332Preliminary Engineering 2029 Pave-T1-Rehab

70,518Right of Way 2029 Pave-T1-Rehab

$21,752,047

$593,642

$593,642 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$21,158,406

Phase Year Funding

KING ST

BOSCAWEN (41578)

MULTIMODAL AND SAFETY IMPROVEMENTS TO

KING STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

290,616Preliminary Engineering 2022 None-Highway

184,271Preliminary Engineering 2024 None-Highway

24,569Right of Way 2024 None-Highway

4,474,777Construction 2027 None-Highway

$4,974,233

$4,974,233

$4,974,233 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 17 of 226Includes inflation and indirects using program

Page 36: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BOSTON EXPRESS

BOSTON - MANCHESTER (68093O)

BOSTON EXPRESS - OPERATING EXPENSES FOR

FE EVERETT TURNPIKE COMMUTER SERVICE.

ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

TIER 1

Category

Strategy

51,400Other 2021 FTA5307_NHDOT

52,839Other 2022 FTA5307_NHDOT

54,319Other 2023 FTA5307_NHDOT

55,840Other 2024 FTA5307_NHDOT

57,403Other 2025 FTA5307_NHDOT

59,010Other 2026 FTA5307_NHDOT

60,663Other 2027 FTA5307_NHDOT

62,361Other 2028 FTA5307_NHDOT

$1,301,440

$453,835

$453,835 $847,605Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BOSTON EXPRESS

BOSTON-MANCHESTER (68093P)

BOSTON EXPRESS - OPERATING EXPENSES FOR

I93 COMMUTER SERVICE. ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

TIER 1

Category

Strategy

668,200Other 2021 FTA5307_NHDOT

686,910Other 2022 FTA5307_NHDOT

706,143Other 2023 FTA5307_NHDOT

725,915Other 2024 FTA5307_NHDOT

746,241Other 2025 FTA5307_NHDOT

767,135Other 2026 FTA5307_NHDOT

788,615Other 2027 FTA5307_NHDOT

810,696Other 2028 FTA5307_NHDOT

$5,899,856

$5,899,856

$5,899,856 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 18 of 226Includes inflation and indirects using program

Page 37: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

BOW - CONCORD (13742)

I-93 WIDENING FROM I-89 TO BETWEEN EXIT 15

AND 16

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,506,020Preliminary Engineering 2021 TPK *

226,160Preliminary Engineering 2021 None-Highway

1,505,917Preliminary Engineering 2022 TPK *

232,492Preliminary Engineering 2022 None-Highway

2,015,224Preliminary Engineering 2023 TPK *

239,002Preliminary Engineering 2023 None-Highway

2,020,836Preliminary Engineering 2024 None-Highway

2,026,331Preliminary Engineering 2025 TPK *

1,521,757Preliminary Engineering 2025 None-Highway

2,031,729Preliminary Engineering 2026 None-Highway

2,029,958Preliminary Engineering 2026 TPK *

5,146,976Preliminary Engineering 2030 None-Highway

498,580Right of Way 2021 TPK *

100,394Right of Way 2022 TPK *

101,033Right of Way 2023 TPK *

303,089Right of Way 2025 None-Highway

1,518,928Right of Way 2026 None-Highway

407,172Right of Way 2026 TPK *

15,000,000Construction 2026 GARVEE-26

9,168,227Construction 2026 None-Highway

3,855,922Construction 2026 TPK *

21,360,995Construction 2027 TPK *

15,000,000Construction 2027 GARVEE-26

7,088,669Construction 2027 None-Highway

33,649,162Construction 2028 TPK *

15,000,000Construction 2028 GARVEE-26

8,500,000Construction 2028 None-Highway

42,521,677Construction 2029 TPK *

30,942,245Construction 2030 TPK *

13,496,824Construction 2030 None-Highway

Page 19 of 226Includes inflation and indirects using program

Page 38: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

$375,214,015

$239,015,321

$239,015,321 $7,940,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$128,258,694

Phase Year Funding

PAGE RD OVER BELA BROOK

BOW (24223)

BRIDGE REPLACEMENT-PAGE RD OVER BELA

BROOK-BR. #065/140

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

382,836Construction 2026 SAB *

393,555Construction 2027 SAB *

$875,791

$776,391

$776,391 $99,400Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RIVER RD OVER BOW BOG BROOK

BOW (24224)

BRIDGE REPLACEMENT-RIVER RD OVER BOW BOG

BROOK-BR. #184/127

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

123,847Preliminary Engineering 2024 SAB *

559,483Construction 2024 SAB *

575,148Construction 2025 SAB *

$1,258,477

$1,258,477

$1,258,477 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 20 of 226Includes inflation and indirects using program

Page 39: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 3A

BOW (29641)

NH RTE 3A CORRIDOR SAFETY IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

3,272,018Construction 2022 None-Highway

$4,372,018

$3,272,018

$3,272,018 $1,100,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

DUNKLEE ROAD

BOW (40346)

BRIDGE REHABILITATION-DUNKLEE ROAD OVER

BOW BOG BROOK

BR. #182/113

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

451,199Construction 2021 SAB *

$992,990

$451,199

$451,199 $541,791Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 104

BRISTOL (40636)

ROADWAY WIDENING AND SHOULDERS FOR

BIKE/PED TRAVEL FROM SCHOOL ST TO WEST OF

DANFORTH BROOK RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

141,350Preliminary Engineering 2021 None-Highway

133,578Right of Way 2023 None-Highway

2,530,249Construction 2026 None-Highway

$2,970,177

$2,805,177

$2,805,177 $165,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 21 of 226Includes inflation and indirects using program

Page 40: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

LAKE STREET

BRISTOL (41579)

BIKE PED IMPROVEMENTS TO LAKE ST.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

229,552Preliminary Engineering 2021 None-Highway

11,950Right of Way 2023 None-Highway

2,358,882Construction 2026 None-Highway

$2,600,385

$2,600,385

$2,600,385 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 13

BROOKLINE (40662)

CONSTRUCT SOUTHBOUND LEFT TURN LANE

ONTO OLD MILFORD RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

113,080Preliminary Engineering 2021 None-Highway

59,751Right of Way 2023 None-Highway

649,115Construction 2026 None-Highway

$821,945

$821,945

$821,945 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 22 of 226Includes inflation and indirects using program

Page 41: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BOND STREET OVER NISSITISSIT RIVER

BROOKLINE (41408)

BRIDGE REHABILITATION-BOND STREET OVER

NISSITISSIT RIVER-BR. #088/074

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

196,319Preliminary Engineering 2026 SAB *

1,213Right of Way 2026 SAB *

401,342Construction 2026 SAB *

520,291Construction 2027 SAB *

$1,119,164

$1,119,164

$1,119,164 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH13/MAIN ST

BROOKLINE (42592)

PROJECT WILL ADDRESS INTERSECTION SAFETY

CONCERNS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

100,093Preliminary Engineering 2027 None-Other

34,299Right of Way 2028 None-Other

564,145Construction 2029 None-Other

$698,537

$698,537

$698,537 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 23 of 226Includes inflation and indirects using program

Page 42: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 49

CAMPTON (41472)

ADDRESS BRIDGE CARRYING NH 49 OVER

PEMIGEWASSET RIVER IN THE TOWN OF

CAMPTON (124/129)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

226,160Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

116,246Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

252,574Preliminary Engineering 2025 Bridg-T3-4-Rehab-Rcn

259,646Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

64,911Right of Way 2026 Bridg-T3-4-Rehab-Rcn

5,338,318Construction 2027 Bridg-T3-4-Rehab-Rcn

1,371,948Construction 2028 Bridg-T3-4-Rehab-Rcn

$7,629,804

$7,629,804

$7,629,804 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CLARK POND ROAD OVER CLARK POND BROOK

CANAAN (26704)

BRIDGE REPLACEMENT-CLARK POND RD OVER

CLARK POND BROOK-BR. #101/152

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

78,202Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

233,021Construction 2023 SAB *

233,021Construction 2024 SAB *

$549,527

$549,527

$549,527 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 24 of 226Includes inflation and indirects using program

Page 43: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

POTATO ROAD OVER INDIAN RIVER

CANAAN (41399)

BRIDGE REHABILITATION-POTATO ROAD OVER

INDIAN RIVER-BR. #147/055

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

449,685Construction 2021 SAB *

$972,121

$449,685

$449,685 $522,437Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GRIST MILL HILL ROAD OVER INDIAN RIVER

CANAAN (41406)

BRIDGE REHABILITATION-GRIST MILL HILL ROAD

OVER INDIAN RIVER-BR. #172/070

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

146,300Preliminary Engineering 2024 SAB *

5,584Right of Way 2024 SAB *

312,702Construction 2024 SAB *

321,458Construction 2025 SAB *

$786,043

$786,043

$786,043 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 25 of 226Includes inflation and indirects using program

Page 44: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH43/NH27/RAYMOND RD

CANDIA (41592)

SAFETY & OPERATIONAL IMPROVEMENTS ON NH

27; NH 43 & RAYMOND ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

174,369Preliminary Engineering 2022 None-Highway

189,430Preliminary Engineering 2025 None-Highway

126,287Right of Way 2025 None-Highway

5,378,036Construction 2028 None-Highway

$5,868,122

$5,868,122

$5,868,122 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WAUKEWAN ROAD

CENTER HARBOR - NEW HAMPTON (24579)

Waukewan Road Bridge Rehabilitation over Lake

Waukewan Inlet, Redlist Bridge 080/040

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

904,640Construction 2021 Bridg-T3-4-Rehab-Rcn

$1,322,640

$904,640

$904,640 $418,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 26 of 226Includes inflation and indirects using program

Page 45: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

F.E. EVERETT TURNPIKE

CENTRAL TURNPIKE DRAINAGE REHABILITATION (40042)

TURNPIKE DRAINAGE REHABILITATION ALONG THE

F.E. EVERETT CORRIDOR.

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

743,976Construction 2022 TRR *

$753,976

$743,976

$743,976 $10,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

FEET

CENTRAL TURNPIKE PAVING (41821)

FEET

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

3,798,460Construction 2021 TRR *

$4,063,460

$3,798,460

$3,798,460 $265,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 27 of 226Includes inflation and indirects using program

Page 46: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 11

CHARLESTOWN, NH - SPRINGFIELD, VT (41478)

ADDRESS BRIDGE CARRYING NH 11 OVER CONN

RIVER BETWEEN CHARLESTOWN, NH AND

SPRINGFIELD, VT (135/052)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

56,540Preliminary Engineering 2021 Bridg-T3-4-Main-Pres

58,123Preliminary Engineering 2022 Bridg-T3-4-Main-Pres

119,501Preliminary Engineering 2023 Bridg-T3-4-Main-Pres

1,228,472Construction 2024 Bridg-T3-4-Main-Pres

$1,462,636

$1,462,636

$1,462,636 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 12

CHARLESTOWN (40667)

RECONSTRUCT OR REHABILITATE FROM NH 12A IN

SOUTHERN CHARLESTOWN TO ALMAR STREET

(APPROX 2.4 MILES)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

408,375Preliminary Engineering 2023 None-Highway

390,585Right of Way 2023 None-Highway

4,533,724Construction 2026 None-Highway

2,594,141Construction 2027 None-Highway

$8,256,825

$7,926,825

$7,926,825 $330,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 28 of 226Includes inflation and indirects using program

Page 47: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

RT12

CHARLESTOWN (41591)

RECONSTRUCT/REHABILITATE NH12 FROM NH12A

TO ALMAR STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

351,312Preliminary Engineering 2028 None-Highway

175,656Right of Way 2028 None-Highway

2,666,779Construction 2028 None-Highway

$3,193,747

$3,193,747

$3,193,747 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 12

CHARLESTOWN (42484)

NH 12 BRIDGE PRESERVATION EFFORTS FOR

NH12 OVER NECRR IN CHARLESTOWN (BR. NO.

181/058).

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

411,200Construction 2021 BET-BMT-BD

$436,200

$411,200

$411,200 $25,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 102

CHESTER (41848)

NH 102 / NH 121 INTERSECTION SAFETY

IMPROVEMENTS

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 3

Category

Strategy

1,130,800Construction 2021 HSIP *

$1,570,800

$1,130,800

$1,130,800 $440,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 29 of 226Includes inflation and indirects using program

Page 48: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 28 AND MAIN STREET

CHICHESTER (40631)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

145,308Preliminary Engineering 2022 None-Highway

71,491Right of Way 2022 None-Highway

1,320,961Construction 2025 None-Highway

$1,675,260

$1,537,760

$1,537,760 $137,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 12 & NH 103

CLAREMONT, NH - WEATHERSFIELD, VT (41467)

BRIDGE PRESERVAT, BRIDGE CARRYING NH 12 &

103 OVER CT RIVER BETWEEN CLAREMONT NH &

WEATHERSFIELD VT

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

101,134Preliminary Engineering 2022 Bridg-T1-2-Main-Pres

13,738Preliminary Engineering 2022 NON-PAR (Vermont)

103,966Preliminary Engineering 2023 Bridg-T1-2-Main-Pres

14,123Preliminary Engineering 2023 NON-PAR (Vermont)

2,671,926Construction 2024 Bridg-T1-2-Main-Pres

362,958Construction 2024 NON-PAR (Vermont)

$3,267,845

$3,267,845

$3,267,845 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 30 of 226Includes inflation and indirects using program

Page 49: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 12

CLAREMONT (13248)

NH 12 & NORTH STREET INTERSECTION

RELOCATION {MUPCA AND DEMO ID NH039 &

NH059}

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

3,254,794Construction 2022 Ear-NH059

380,305Construction 2022 Other Fed Aid

$4,596,685

$3,635,099

$3,635,099 $961,586Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 12A

CLAREMONT (27691)

NH 12A, BRIDGE REHABILITATION CARRYING NH

12A OVER SUGAR RIVER, BR NO 072/127

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

3,487,387Construction 2022 Bridg-T3-4-Rehab-Rcn

3,585,034Construction 2023 Bridg-T3-4-Rehab-Rcn

$7,572,421

$7,072,421

$7,072,421 $500,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 31 of 226Includes inflation and indirects using program

Page 50: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CLAREMONT MUNICIPAL AIRPORT

CLAREMONT (40577)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

3,460,934Other 2021 Airport Improvement

181,063Other 2023 Airport Improvement

409,491Other 2024 Airport Improvement

558,724Other 2025 Airport Improvement

196,702Other 2026 Airport Improvement

606,627Other 2027 Airport Improvement

163,525Other 2028 Airport Improvement

384,644Other 2029 Airport Improvement

421,775Other 2030 Airport Improvement

$6,383,485

$6,383,485

$6,383,485 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WASHINGTON STREET

CLAREMONT (41748)

TO LINK TEN TRAFFIC SIGNALS ON A TWO MILE

STRETCH OF WASHINGTON STREET.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

593,978Construction 2021 CMAQ *

$668,778

$593,978

$593,978 $74,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 32 of 226Includes inflation and indirects using program

Page 51: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 3 / MAIN STREET

COLEBROOK (40640)

RECONSTRUCTION OF ABOUT 2700' OF US 3/MAIN

ST FROM SOUTH MAIN STREET TRAFFIC ISLAND

TO BEAVER BROOK

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,495,693Construction 2021 None-Highway

648,948Construction 2021 TA *

$2,495,895

$2,144,640

$2,144,640 $351,255Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HARVEY SWELL ROAD OVER EAST BRANCH

COLEBROOK (40651)

BRIDGE REHABILITATION-HARVEY SWELL ROAD

OVER EAST BRANCH-BR. #190/109

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

102,800Preliminary Engineering 2021 SAB *

5,140Right of Way 2021 SAB *

143,612Construction 2021 SAB *

189,904Construction 2022 SAB *

$441,456

$441,456

$441,456 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 33 of 226Includes inflation and indirects using program

Page 52: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BEAR ROCK ROAD OVER WEST BRANCH (MOHAWK

RIVER)

COLEBROOK (40652)

BRIDGE REPLACEMENT-BEAR ROCK ROAD OVER

WEST BRANCH (MOHAWK RIVER) BR. #167/120

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

123,360Preliminary Engineering 2021 SAB *

5,140Right of Way 2021 SAB *

173,012Construction 2021 SAB *

230,696Construction 2022 SAB *

$532,208

$532,208

$532,208 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PLEASANT STREET OVER MOHAWK RIVER

COLEBROOK (40655)

BRIDGE REHABILITATION-PLEASANT STREET

OVER MOHAWK RIVER-BR. #050/099

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

95,111Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

216,640Construction 2023 SAB *

266,162Construction 2024 SAB *

$583,197

$583,197

$583,197 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 34 of 226Includes inflation and indirects using program

Page 53: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NORTH PEMBROKE ROAD

CONCORD - PEMBROKE (14841A)

REPLACE NORTH PEMBROKE RD BRIDGE OVER

SOUCOOK RIVER-BR. #183/156

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

854,195Construction 2021 SAB *

$2,089,321

$854,195

$854,195 $1,235,126Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HOOKSETT TURNPIKE (LOCAL RD)

CONCORD (15877)

BRIDGE REPLACEMENT-HOOKSETT TURNPIKE

OVER BELA BROOK-BR. #200/015

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

463,258Construction 2021 SAB *

$913,898

$463,258

$463,258 $450,640Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BIRCHDALE ROAD

CONCORD (15878)

BRIDGE REPLACEMENT-BIRCHDALE RD OVER

BELA BROOK-BR. #193/027

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

463,258Construction 2021 SAB *

$913,898

$463,258

$463,258 $450,640Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 35 of 226Includes inflation and indirects using program

Page 54: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-393 - DRAINAGE

CONCORD (28417)

EVALUATE EXISTING DRAINAGE SYSTEM ON US

202 MP 55.07 TO 55.2 (I-393 CONNECTOR)

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

565,400Construction 2021 Pave-T1-Resurf

$812,900

$565,400

$565,400 $247,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 13

CONCORD (29601)

IMPROVEMENTS AT I89 EXIT 2 NB AND SB RAMPS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

346,760Preliminary Engineering 2021 None-Highway

37,090Right of Way 2021 None-Highway

2,475,765Construction 2023 None-Highway

$3,134,615

$2,859,615

$2,859,615 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 36 of 226Includes inflation and indirects using program

Page 55: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CONCORD MUNICIPAL AIRPORT

CONCORD (40565)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

171,334Other 2021 Airport Improvement

176,131Other 2022 Airport Improvement

181,063Other 2023 Airport Improvement

262,446Other 2024 Airport Improvement

261,503Other 2025 Airport Improvement

269,088Other 2026 Airport Improvement

458,341Other 2027 Airport Improvement

692,904Other 2028 Airport Improvement

1,424,608Other 2029 Airport Improvement

9,109,174Other 2030 Airport Improvement

$13,006,591

$13,006,591

$13,006,591 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 9 (LOUDON RD) OVER MERRIMACK

RIVER

CONCORD (41212)

BRIDGE REHABILITATION-NH ROUTE 9 (LOUDON

RD) OVER MERRIMACK RIVER BR. #163/111

(SAB+MOBRR) RED LIST

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

4,464,997Construction 2023 MOBRR *

4,209,043Construction 2024 MOBRR *

$8,674,040

$8,674,040

$8,674,040 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 37 of 226Includes inflation and indirects using program

Page 56: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ARFF TRAINING FACILITY

CONCORD (41411)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF ARFF TRAINING FACILITIES;

PLANNING STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

456,888Other 2021 Airport Improvement

372,264Other 2024 Airport Improvement

202,209Other 2027 Airport Improvement

219,675Other 2030 Airport Improvement

$1,251,037

$1,251,037

$1,251,037 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93 NB & SB

CONCORD (41468)

ADDRESS PRIORITY BRIDGES CARRYING I-93 NB &

SB OVER MERRIMACK RIVER (136/117 & 136/116) IN

CONCORD

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

193,788Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

193,788Preliminary Engineering 2024 Bridg-HIB-Rehab-Rcn

199,215Preliminary Engineering 2025 Bridg-T1-2-Rehab-Rcn

199,215Preliminary Engineering 2025 Bridg-HIB-Rehab-Rcn

955,698Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

955,698Preliminary Engineering 2026 Bridg-HIB-Rehab-Rcn

701,755Preliminary Engineering 2027 Bridg-T1-2-Rehab-Rcn

701,755Preliminary Engineering 2027 Bridg-HIB-Rehab-Rcn

15,000,000Construction 2027 GARVEE-26

15,000,000Construction 2028 GARVEE-26

$34,100,912

$34,100,912

$34,100,912 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 38 of 226Includes inflation and indirects using program

Page 57: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US ROUTE 202 & NH ROUTE 9

CONCORD (42574)

ADDRESS RED LIST BRIDGE (147/028) CARRYING

US 202 & NH 9 OVER ASH BROOK IN THE CITY OF

CONCORD

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

239,002Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

252,574Preliminary Engineering 2025 Bridg-T1-2-Rehab-Rcn

63,143Right of Way 2025 Bridg-T1-2-Rehab-Rcn

1,410,362Construction 2029 Bridg-T1-2-Rehab-Rcn

$1,965,082

$1,965,082

$1,965,082 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3

CONCORD (42614)

US3 WIDENING BETWEEN GARVINS FALLS ROAD

AND AIRPORT ROAD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

606,627Right of Way 2027 None-Other

5,487,592Construction 2029 None-Other

$6,144,219

$6,094,219

$6,094,219 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 39 of 226Includes inflation and indirects using program

Page 58: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

CONCORD-ASHLAND-CAMPTON (41706)

PAINTING I-93 BRIDGES IN CONCORD, ASHLAND,

AND CAMPTON

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

2,348,174Construction 2022 Bridg-T1-2-Main-Pres

569,607Construction 2022 Bridg-T3-4-Main-Pres

$2,963,981

$2,917,781

$2,917,781 $46,200Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89

CONCORD-HOPKINTON (41703)

PAINTING I-89 BRIDGES BETWEEN CONCORD AND

HOPKINTON

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

1,976,186Construction 2022 Bridg-T1-2-Main-Pres

988,093Construction 2022 Bridg-T3-4-Main-Pres

$3,043,479

$2,964,279

$2,964,279 $79,200Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH16, NH 113 AND NH 153

CONWAY (40638)

INTERSECTION IMPROVEMENTS TO NH 16

INCLUDING INTERSECTIONS OF NH 16/NH 153 AND

NH 16/NH 113

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

2,670,487Construction 2021 None-Highway

$3,272,737

$2,670,487

$2,670,487 $602,250Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 40 of 226Includes inflation and indirects using program

Page 59: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

WASHINGTON STREET OVER SWIFT RIVER

CONWAY (41402)

BRIDGE REHABILITATION-WASHINGTON STREET

OVER SWIFT RIVER

BR. #164/063

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

163,052Preliminary Engineering 2025 SAB *

967,142Construction 2025 SAB *

1,149,211Construction 2026 SAB *

$2,279,405

$2,279,405

$2,279,405 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 302 / EAST CONWAY RD

CONWAY (42522)

IMPLEMENT INTERSECTION SAFETY

IMPROVEMENTS

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

113,080Preliminary Engineering 2021 HSIP *

2,390,023Construction 2023 HSIP *

$2,833,103

$2,503,103

$2,503,103 $330,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 41 of 226Includes inflation and indirects using program

Page 60: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 4

DANBURY (16303)

REHABILITATE OR REPLACE RED LIST BRIDGE

CARRYING US 4 OVER NHRR - 156/104

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

4,220,000Construction 2021 Bridg-T1-2-Rehab-Rcn

$4,808,500

$4,220,000

$4,220,000 $588,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4

DANBURY (40395)

US 4 OVER SMITH RIVER BRIDGE REHABILITATION

OR REPLACEMENT

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

3,719,880Construction 2022 Bridg-T1-2-Rehab-Rcn

$4,104,880

$3,719,880

$3,719,880 $385,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 107

DEERFIELD (24477)

NH 107 OVER FREESE'S POND - REPLACE BRIDGE

NUMBER 137/116.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

56,540Right of Way 2021 Bridg-T3-4-Rehab-Rcn

1,162,462Construction 2022 Bridg-T3-4-Rehab-Rcn

$1,482,940

$1,219,002

$1,219,002 $263,937Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 42 of 226Includes inflation and indirects using program

Page 61: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

DERRY - LONDONDERRY (13065)

I-93 EXIT 4A - PRELIM., FINAL DESIGN, ROW &

CONSTRUCTION OF NEW INTERCHANGE AND

CONNECTING ROADWAY

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

5,991,938Right of Way 2021 Other Fed Aid

18,018,523Construction 2021 Other Fed Aid

3,317,664Construction 2021 NON-PAR (other)

14,161,445Construction 2022 Other Fed Aid

12,500,000Construction 2023 Other Fed Aid

12,500,000Construction 2024 Other Fed Aid

$95,702,677

$66,489,572

$66,489,572 $29,213,105Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 1 2020 (42318)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 1.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,180,742Construction 2021 Pave-T3-4-Resurf

$1,884,016

$1,180,742

$1,180,742 $703,274Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 43 of 226Includes inflation and indirects using program

Page 62: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

DISTRICT 1 (16161I)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 1.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,005,706Construction 2021 Pave-T3-4-Resurf

581,452Construction 2021 Pave-T2-Resurf

$2,248,866

$1,587,158

$1,587,158 $661,708Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 2 2020 (42319)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 2.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

184,733Construction 2021 Pave-T3-4-Resurf

$261,772

$184,733

$184,733 $77,040Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 2 (16162I)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 2.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,328,070Construction 2021 Pave-T3-4-Resurf

671,855Construction 2021 Pave-T2-Resurf

$2,833,716

$1,999,926

$1,999,926 $833,791Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 44 of 226Includes inflation and indirects using program

Page 63: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

DISTRICT 3 (16163I)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 3.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,567,404Construction 2021 Pave-T3-4-Resurf

548,946Construction 2021 Pave-T2-Resurf

$2,998,678

$2,116,350

$2,116,350 $882,328Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 4 (16164I)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 4.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,854,207Construction 2021 Pave-T3-4-Resurf

238,077Construction 2021 Pave-T2-Resurf

$2,964,579

$2,092,284

$2,092,284 $872,295Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 45 of 226Includes inflation and indirects using program

Page 64: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

DISTRICT 5 (16165I)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 1.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

592,636Construction 2021 Pave-T3-4-Resurf

416,736Construction 2021 Pave-T2-Resurf

$1,430,202

$1,009,372

$1,009,372 $420,830Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 6 (16166I)

RESURFACING VARIOUS TIER 2, 3, AND 4

ROADWAYS IN DISTRICT 6.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,448,446Construction 2021 Pave-T3-4-Resurf

737,429Construction 2021 Pave-T2-Resurf

$3,097,188

$2,185,875

$2,185,875 $911,313Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 46 of 226Includes inflation and indirects using program

Page 65: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

PROVINCE ROAD OVER BUCKS BROOK

DORCHESTER (42091)

BRIDGE REPLACEMENT-PROVINCE ROAD OVER

BUCKS BROOK-BR #151/055

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

142,666Preliminary Engineering 2022 FEMA

5,284Right of Way 2022 FEMA

311,751Construction 2022 FEMA

320,480Construction 2023 FEMA

$780,181

$780,181

$780,181 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PROVINCE ROAD OVER SOUTH BRANCH OF BAKER

RIVER

DORCHESTER (42092)

BRIDGE REPLACEMENT-PROVINCE ROAD OVER

SOUTH BRANCH OF BAKER RIVER-BR. #156/053

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

149,060Preliminary Engineering 2021 FEMA

5,140Right of Way 2021 FEMA

406,060Construction 2021 FEMA

417,430Construction 2022 FEMA

$977,690

$977,690

$977,690 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 47 of 226Includes inflation and indirects using program

Page 66: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SPAULDING TURNPIKE

DOVER - ROCHESTER (29440)

CONSTRUCT ALL ELECTRONIC TOLLING AT DOVER

AND ROCHESTER TOLL PLAZAS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

17,990,000Construction 2021 TPK *

$19,691,294

$17,990,000

$17,990,000 $1,701,294Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 108

DOVER - SOMERSWORTH - ROCHESTER (29604)

NH RTE 108 - COMPLETE STREETS CONSISTENT

WITH IMPROVEMENTS UNDER U-3 ALTERNATIVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

354,986Preliminary Engineering 2021 None-Highway

1,262,523Preliminary Engineering 2022 None-Highway

1,569,324Right of Way 2022 None-Highway

6,215,048Construction 2024 None-Highway

3,276,261Construction 2025 None-Highway

$14,825,891

$12,678,141

$12,678,141 $2,147,750Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 48 of 226Includes inflation and indirects using program

Page 67: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 16 (SPAULDING TURNPIKE)

DOVER - SOMERSWORTH - ROCHESTER (40599)

UPDATE OF FEASIBILITY STUDY FOR

CONSTRUCTION OF EXIT 10 & EASTERLY

CONNECTION ALONG NH 16.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,911,056Preliminary Engineering 2022 TPK *

$1,911,056

$1,911,056

$1,911,056 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GULF ROAD

DOVER, NH - SOUTH BERWICK, MAINE (41433)

ADDRESS RED LIST BRIDGE CARRYING GULF

ROAD OVER SALMON FALLS RIVER BETWEEN

DOVER AND SOUTH BERWICK

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

122,847Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

111,679Preliminary Engineering 2024 NON-PAR (Maine)

64,911Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

59,010Preliminary Engineering 2026 NON-PAR (Maine)

133,458Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

121,325Preliminary Engineering 2027 NON-PAR (Maine)

1,714,935Construction 2028 Bridg-T3-4-Rehab-Rcn

1,559,032Construction 2028 NON-PAR (Maine)

$3,887,198

$3,887,198

$3,887,198 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 49 of 226Includes inflation and indirects using program

Page 68: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

RTE 155, RTE 108, BELLAMY RD. DALEY DR.

DURHAM RD

DOVER (41373)

IMP. EXIST. PATH FROM KNOX MARSH RD. TO

BELLAMY RD. CONSTRUCT NEW MULTI-USE PATH

FROM BELLAM

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

149,271Construction 2022 TA *

153,450Construction 2023 TA *

$420,221

$302,721

$302,721 $117,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RTE 108

DOVER (41746)

TRAFFIC SIGNAL IMPROVEMENTS AND

INSTALLATION OF A CAMERA SYSTEM TO

MONITOR TRAFFIC FLOW.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

133,640Construction 2021 CMAQ *

$153,640

$133,640

$133,640 $20,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16

DOVER (41824)

BRIDGE PRESERVATION FOR NH 16 NB (#106/133)

AND SB (#105/133)BRIDGES OVER COCHECO RIVER

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

51,400Preliminary Engineering 2021 TRR *

3,350,377Construction 2024 TRR *

$3,451,777

$3,401,777

$3,401,777 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 50 of 226Includes inflation and indirects using program

Page 69: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CHESTNUT STREET

DOVER (42626)

PEDESTRIAN AND ACCESSIBILITY IMPROVEMENTS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

31,181Preliminary Engineering 2028 None-Other

230,658Construction 2030 None-Other

$261,839

$261,839

$261,839 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16

DUMMER - CAMBRIDGE - ERROL (16304B)

WIDENING AND REHABILITATION OF

APPROXIMATELY 1.4 MILES OF NH16 IN

CAMBRIDGE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

6,911,306Construction 2022 None-Highway

$7,906,856

$6,911,306

$6,911,306 $995,550Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 51 of 226Includes inflation and indirects using program

Page 70: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BENNETT ROAD

DURHAM (41432)

ADDRESS THE RED LIST BRIDGE CARRYING

BENNETT ROAD OVER PAR IN THE TOWN OF

DURHAM (093/080)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

122,847Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

129,823Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

133,458Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

137,195Preliminary Engineering 2028 Bridg-T3-4-Rehab-Rcn

68,597Right of Way 2028 Bridg-T3-4-Rehab-Rcn

1,028,961Construction 2028 Bridg-T3-4-Rehab-Rcn

$1,620,881

$1,620,881

$1,620,881 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4 / MADBURY RD

DURHAM (42523)

IMPLEMENT INTERSECTION SAFETY

IMPROVEMENTS

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

113,080Preliminary Engineering 2021 HSIP *

2,390,023Construction 2023 HSIP *

$2,833,103

$2,503,103

$2,503,103 $330,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 52 of 226Includes inflation and indirects using program

Page 71: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

UNH

DURHAM (42873)

PURCHASE TWO CNG BUSES AND ONE DIESEL

(B20 BIODIESEL) BUS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

750,000Other 2021 CMAQ *

771,000Other 2022 CMAQ *

$1,521,000

$1,521,000

$1,521,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16

EASTERN TURNPIKE PAVING (41822)

NH 16

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

3,017,180Construction 2021 TRR *

$3,282,180

$3,017,180

$3,017,180 $265,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 53 of 226Includes inflation and indirects using program

Page 72: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

POTTER ROAD OVER SNOW BROOK

EATON (41404)

BRIDGE REPLACEMENT-POTTER ROAD OVER

SNOW BROOK-BR. #058/130

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

121,462Preliminary Engineering 2021 SAB *

1,028Right of Way 2021 SAB *

226,723Construction 2021 SAB *

307,046Construction 2022 SAB *

$656,259

$656,259

$656,259 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SHAKER BOULEVARD

ENFIELD (13592)

SHAKER BLVD OVER KNOX RIVER

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

97,774Preliminary Engineering 2024 SAB *

16,296Right of Way 2024 SAB *

217,275Construction 2024 SAB *

245,694Construction 2025 SAB *

$577,038

$577,038

$577,038 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 54 of 226Includes inflation and indirects using program

Page 73: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 4

ENFIELD (40526)

ADD SHOULDERS, IMPROVE ALIGNMENT, AND

REMOVE CLEAR ZONE OBSTRUCTIONS ON US 4

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

305,614Preliminary Engineering 2022 None-Highway

183,376Right of Way 2022 None-Highway

94,255Right of Way 2023 None-Highway

528,852Construction 2024 None-Highway

5,652,441Construction 2025 None-Highway

$7,328,742

$6,764,538

$6,764,538 $564,204Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 125

EPPING (29608)

NH RTE 125 CAPACITY AND TRAFFIC

MANAGEMENT IMPROVEMENTS FROM BRICKYARD

PLAZA TO NH 87

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

904,640Preliminary Engineering 2021 None-Highway

1,162,462Preliminary Engineering 2022 None-Highway

476,842Right of Way 2022 None-Highway

273,281Right of Way 2023 None-Highway

10,240,249Construction 2025 None-Highway

$14,284,304

$13,057,474

$13,057,474 $1,226,830Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 55 of 226Includes inflation and indirects using program

Page 74: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 111 (KINGSTON ROAD)

EXETER (40436)

WIDEN SHOULDERS TO 5' ON KINGSTON ROAD (NH

ROUTE 111) FOR APPROXIMATELY 1.1 MILES.

(14-26TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 3

Category

Strategy

833,380Construction 2022 TA *

163,802Construction 2022 NON-PAR (other)

$1,155,630

$997,181

$997,181 $158,449Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 111A

EXETER (40623)

BRIDGE REPLACEMENT TO ADDRESS PRIORITY

BRIDGE CARRYING NH 111A OVER LITTLE RIVER

(BR NO 075/078)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

290,616Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

368,542Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

245,694Right of Way 2024 Bridg-T3-4-Rehab-Rcn

2,596,458Construction 2026 Bridg-T3-4-Rehab-Rcn

$3,501,310

$3,501,310

$3,501,310 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 56 of 226Includes inflation and indirects using program

Page 75: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SOUTH NEW BOSTON ROAD

FRANCESTOWN (15765)

BRIDGE REPLACEMENT-SO. NEW BOSTON RD

OVER SO. BR. PISCATAQUOG RIVER; BR. #149/058

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

564,299Construction 2021 SAB *

$1,182,816

$564,299

$564,299 $618,517Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

FRANCONIA (40514)

REHAB (4R) OF I-93 FROM MM 111.6 (SOUTH OF

EXIT 35) TO MM 116.1. INCLUDES RAMPS AT 35, 36,

& 37.

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

126,287Preliminary Engineering 2025 Pave-T1-Rehab

129,823Preliminary Engineering 2026 Pave-T1-Rehab

233,551Preliminary Engineering 2027 Pave-T1-Rehab

129,823Right of Way 2026 Pave-T1-Rehab

9,603,635Construction 2026 Pave-T1-Rehab

9,342,057Construction 2027 Pave-T1-Rehab

$19,565,176

$19,565,176

$19,565,176 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 57 of 226Includes inflation and indirects using program

Page 76: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

FRANCONIA-SUGAR HILL-BETHLEHEM (42436)

I-93 4R FROM MM 116.1 TO MM 120.5 INCLUDING

RAMPS AT EXITS 38 & 39

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

200,187Preliminary Engineering 2027 Pave-T1-Rehab

308,688Preliminary Engineering 2028 Pave-T1-Rehab

68,597Right of Way 2028 Pave-T1-Rehab

13,396,632Construction 2029 Pave-T1-Rehab

5,967,735Construction 2030 Pave-T1-Rehab

$19,941,839

$19,941,839

$19,941,839 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

TRESTLE BRIDGE MILL CITY PARK TRAIL

FRANKLIN (42513)

CONSTRUCT A PEDESTRIAN WALKWAY ON THE

EXISTING TRESTLE BRIDGE TO CONNECT TO MILL

CITY PARK TRAIL

Route/Road

Scope

Program

ROADSIDE

TIER 6

Category

Strategy

25,700Preliminary Engineering 2021 TA *

613,801Construction 2023 TA *

$689,501

$639,501

$639,501 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 58 of 226Includes inflation and indirects using program

Page 77: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

OSSIPEE LAKE ROAD

FREEDOM (15987)

BRIDGE REPLACEMENT-OSSIPEE LAKE RD OVER

DANFORTH BAY OUTLET-BR. #115/074

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

398,739Construction 2021 SAB *

7,774Construction 2021 NON-PAR (other)

$830,189

$406,513

$406,513 $423,676Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MARTIN RD

FREMONT (23793)

BRIDGE REPLACEMENT-MARTIN RD. OVER

PISCASSIC RIVER-BR. #155/133

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

113,080Preliminary Engineering 2021 SAB *

10,280Right of Way 2021 SAB *

215,880Construction 2021 SAB *

348,739Construction 2022 SAB *

$687,979

$687,979

$687,979 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 59 of 226Includes inflation and indirects using program

Page 78: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

GARVEE DS_21 (42893)

DEBT SERVICE FOR STATEWIDE PROJECTS.

ISSUANCE 2021

Route/Road

Scope

Program

DEBT SERVICE

ALL TIERS

Category

Strategy

2,000,000Construction 2021 GARVEE-21

2,100,000Construction 2022 GARVEE-21

2,100,000Construction 2023 GARVEE-21

2,000,000Construction 2024 GARVEE-21

2,000,000Construction 2025 GARVEE-21

2,000,000Construction 2026 GARVEE-21

6,800,000Construction 2027 GARVEE-21

6,700,000Construction 2028 GARVEE-21

6,500,000Construction 2029 GARVEE-21

6,500,000Construction 2030 GARVEE-21

$38,700,000

$38,700,000

$38,700,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

GARVEE DS_26 (42894)

DEBT SERVICE FOR STATEWIDE PROJECT.

ISSUANCE 2026.

Route/Road

Scope

Program

DEBT SERVICE

ALL TIERS

Category

Strategy

1,900,000Construction 2026 GARVEE-26

10,576,020Construction 2027 GARVEE-26

10,576,020Construction 2028 GARVEE-26

10,576,020Construction 2029 GARVEE-26

10,576,020Construction 2030 GARVEE-26

$117,916,519

$44,204,080

$44,204,080 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$73,712,439

Page 60 of 226Includes inflation and indirects using program

Page 79: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

LACONIA MUNICIPAL AIRPORT

GILFORD (40574)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

2,090,266Other 2021 Airport Improvement

1,393,513Other 2022 Airport Improvement

4,072,062Other 2023 Airport Improvement

1,551,101Other 2024 Airport Improvement

1,033,256Other 2025 Airport Improvement

1,049,074Other 2026 Airport Improvement

606,627Other 2027 Airport Improvement

692,904Other 2028 Airport Improvement

221,170Other 2029 Airport Improvement

273,495Other 2030 Airport Improvement

$12,983,469

$12,983,469

$12,983,469 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3 AND NH 11

GILFORD (41502)

ADDRESS RED LIST BRIDGE CARRYING US 3 AND

NH 11 OVER US 3 AND NH 11 IN THE TOWN OF

GILFORD(114/066)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

113,080Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

1,792,517Construction 2023 Bridg-T1-2-Rehab-Rcn

$2,125,597

$1,905,597

$1,905,597 $220,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 61 of 226Includes inflation and indirects using program

Page 80: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 11

GILFORD (42577)

ADDRESS RED LIST BRIDGE (115/147) CARRYING

NH ROUTE 11 OVER POOR FARM BROOK IN THE

TOWN OF GILFORD

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

307,118Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

194,734Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

64,911Right of Way 2026 Bridg-T1-2-Rehab-Rcn

2,743,896Construction 2028 Bridg-T1-2-Rehab-Rcn

$3,310,659

$3,310,659

$3,310,659 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CRYSTAL LAKE ROAD

GILMANTON (16234)

BRIDGE REPLACEMENT-CRYSTAL LAKE RD OVER

NELSON BROOK-BR. #174/094

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

102,800Preliminary Engineering 2021 SAB *

130,218Preliminary Engineering 2022 SAB *

5,140Right of Way 2021 SAB *

393,737Construction 2021 SAB *

1,017,696Construction 2022 SAB *

$1,649,591

$1,649,591

$1,649,591 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 62 of 226Includes inflation and indirects using program

Page 81: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH140/NH107

GILMANTON (42603)

CONSTRUCT PEDESTRIAN ISLANDS AND

SIDEWALKS AND IMPROVE CURB

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

252,574Preliminary Engineering 2025 None-Other

205,792Right of Way 2028 None-Other

1,449,853Construction 2030 None-Other

$1,908,218

$1,908,218

$1,908,218 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CENTER STREET OVER HARRY BROOK

GOFFSTOWN (41597)

BRIDGE REPLACEMENT-CENTER STREET OVER

HARRY BROOK- BR. #129/116

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

156,138Preliminary Engineering 2025 SAB *

5,741Right of Way 2025 SAB *

757,721Construction 2025 SAB *

$1,054,600

$919,600

$919,600 $135,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 63 of 226Includes inflation and indirects using program

Page 82: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

RTE 16

GORHAM (42598)

ROADWAY IMPROVEMENT.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

290,460Preliminary Engineering 2025 None-Highway

66,729Right of Way 2027 None-Highway

3,173,315Construction 2029 None-Highway

$3,530,504

$3,530,504

$3,530,504 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH121/DERRY RD/DEPOT RD

HAMPSTEAD (41717)

IMPROVE THE INTERSECTION OF NH121/DERRY

RD/DEPOT RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

179,252Preliminary Engineering 2023 None-Highway

194,734Preliminary Engineering 2026 None-Highway

115,802Right of Way 2026 None-Highway

2,080,147Construction 2028 None-Other

$2,569,935

$2,569,935

$2,569,935 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 64 of 226Includes inflation and indirects using program

Page 83: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

OCEAN BOULEVARD

HAMPTON (40797)

IMPROVEMENTS TO OCEAN BOULEVARD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,113,080Preliminary Engineering 2021 Other Fed Aid

319,677Preliminary Engineering 2022 Other Fed Aid

113,080Right of Way 2021 Other Fed Aid

205,165Right of Way 2022 Other Fed Aid

6,624,332Construction 2024 Other Fed Aid

$9,062,835

$8,375,335

$8,375,335 $687,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH101/US1

HAMPTON (41584)

NH 101/ US 1 INTERCHANGE RECONFIGURATION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

740,852Preliminary Engineering 2028 None-Highway

205,792Right of Way 2028 None-Highway

6,461,874Construction 2028 None-Highway

$7,408,518

$7,408,518

$7,408,518 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 65 of 226Includes inflation and indirects using program

Page 84: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US ROUTE 1

HAMPTON (42573)

ADDRESS RED LIST BRIDGE (163/184) CARRYING

US 1 OVER PAR (ABD) IN THE TOWN OF HAMPTON

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

282,700Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

290,616Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

315,717Preliminary Engineering 2025 Bridg-T1-2-Rehab-Rcn

324,557Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

324,557Right of Way 2026 Bridg-T1-2-Rehab-Rcn

6,173,765Construction 2028 Bridg-T1-2-Rehab-Rcn

$7,711,913

$7,711,913

$7,711,913 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WINNACUNNET RD

HAMPTON (42606)

COMPLETE STREET IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

172,209Preliminary Engineering 2025 None-Other

60,663Right of Way 2027 None-Other

948,789Construction 2029 None-Other

$1,181,661

$1,181,661

$1,181,661 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 66 of 226Includes inflation and indirects using program

Page 85: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-95

HAMPTON-NORTH HAMPTON-PORTSMOUTH (42115)

HI-MAST LIGHT REPLACEMENT WITH LED

LIGHTING AT EXITS 2, 3 AND 4 INTERCHANGES OF

I-95

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

23,249Preliminary Engineering 2022 TRR *

813,724Construction 2022 TRR *

$837,867

$836,973

$836,973 $894Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 10A

HANOVER, NH - NORWICH, VT (42278)

BRIDGE PRESERVATION EFFORT ON THE BRIDGE

CARRYING NH 10A OVER CONN RIVER (LEDYARD

BRIDGE)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

1,566,660Construction 2023 Bridg-HIB-Main-Pres

639,874Construction 2023 NON-PAR (Vermont)

$2,431,334

$2,206,534

$2,206,534 $224,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 67 of 226Includes inflation and indirects using program

Page 86: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SOUTH ROAD

HARRISVILLE (16114)

BRIDGE REPLACEMENT-SOUTH RD OVER

MINNEWAWA BROOK-BR. #061/060

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

26,287Preliminary Engineering 2027 SAB *

1,180Right of Way 2027 SAB *

400,030Construction 2027 SAB *

493,458Construction 2028 SAB *

$1,010,683

$920,956

$920,956 $89,727Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CHESHAM ROAD

HARRISVILLE (42575)

ADDRESS RED LIST BRIDGE (056/058) CARRYING

CHESHAM ROAD OVER MINNEWAWA BROOK IN

TOWN OF HARRISVILLE

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

368,542Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

400,374Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

4,231,087Construction 2029 Bridg-T3-4-Rehab-Rcn

$5,000,003

$5,000,003

$5,000,003 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 68 of 226Includes inflation and indirects using program

Page 87: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

DEAN MEMORIAL AIRPORT

HAVERHILL (41409)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

228,444Other 2021 Airport Improvement

528,392Other 2022 Airport Improvement

173,820Other 2023 Airport Improvement

106,716Other 2024 Airport Improvement

637,813Other 2025 Airport Improvement

415,433Other 2026 Airport Improvement

218,386Other 2027 Airport Improvement

2,743,896Other 2028 Airport Improvement

71,231Other 2029 Airport Improvement

85,673Other 2030 Airport Improvement

$5,209,804

$5,209,804

$5,209,804 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 202, NH 9, NH 127

HENNIKER - HOPKINTON (40633)

INTERSECTION IMPROVEMENTS AT US 202, NH 9

AND NH 127

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

119,501Preliminary Engineering 2023 None-Highway

119,501Right of Way 2023 None-Highway

631,434Construction 2025 None-Highway

1,298,229Construction 2026 None-Highway

$2,443,666

$2,168,666

$2,168,666 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 69 of 226Includes inflation and indirects using program

Page 88: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BUNKER HILL ROAD OVER NEEDLE SHOP BROOK

HILL (41661)

BRIDGE REHABILITATION-BUNKER HILL ROAD

OVER NEEDLE SHOP BROOK

BR. #140/099

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

215,880Construction 2021 SAB *

$515,780

$215,880

$215,880 $299,900Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WEST MAIN STREET / NH RTE 149

HILLSBOROUGH (41368)

CONSTRUCT APPROXIMATLY 4,600 FEET OF

SIDEWALK ALONG ROUTE 149 FROM EDGEBROOK

ROAD TO 77 W. MAIN.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 3

Category

Strategy

594,845Construction 2021 TA *

$679,658

$594,845

$594,845 $84,813Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 70 of 226Includes inflation and indirects using program

Page 89: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 119

HINSDALE, NH - BRATTLEBORO, VT (12210C)

RECONSTRUCTION OF THE NEW BRIDGE OVER

THE CONNECTICUT RIVER

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

22,656,717Construction 2021 Other Fed Aid

14,417,884Construction 2021 NON-PAR (Vermont)

12,000,000Construction 2021 TIGER

8,516,000Construction 2021 SB367-4-CENTS

$68,872,716

$57,590,601

$57,590,601 $11,282,115Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 119

HINSDALE, NH - BRATTLEBORO, VT (12210D)

BRIDGE REHAB OF BRIDGES CARRYING NH ROUTE

119 OVER CONN RIVER BETWEEN HINSDALE AND

BRATTLEBORO

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

3,967,438Construction 2023 Bridg-T3-4-Rehab-Rcn

738,734Construction 2023 NON-PAR (Vermont)

4,078,526Construction 2024 Bridg-T3-4-Rehab-Rcn

759,419Construction 2024 NON-PAR (Vermont)

$9,760,717

$9,544,117

$9,544,117 $216,600Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 71 of 226Includes inflation and indirects using program

Page 90: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BRATTLEBORO ROAD

HINSDALE (41365)

CONSTRUCT SIDEWALKS ALONG BRATTLEBORO

ROAD.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

489,733Construction 2021 TA *

$563,133

$489,733

$489,733 $73,400Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Project On-Shelf for 2020 CON fundingComments

$0

Phase Year Funding

US 3 / NH 28

HOOKSETT (29611)

RECONSTRUCTION AND WIDENING FROM NH 27 /

WHITEHALL RD / MARTIN'S FERRY RD TO W ALICE

AVE / ALICE AVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

59,461Preliminary Engineering 2021 None-Highway

208,111Right of Way 2021 None-Highway

2,445,007Right of Way 2022 None-Highway

5,872,583Construction 2024 None-Highway

6,036,621Construction 2025 None-Highway

$16,353,241

$14,621,783

$14,621,783 $1,731,457Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 72 of 226Includes inflation and indirects using program

Page 91: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 3A

HUDSON (41754)

CONSTRUCTING A THIRD SOUTHBOUND RIGHT

TURN LANE ON LOWELL RD/NH 3A

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

1,285,000Construction 2021 CMAQ *

$1,554,660

$1,285,000

$1,285,000 $269,660Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CIRCUMFERENTIAL HIGHWAY

HUDSON (42108)

PLAN, ENG & CONSTRUCT A ROADWAY BETWEEN

RTE 3A & RTE 111, SOUTHERN PORTION OF

CIRCUMFERENTIAL HWY

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,028,000Preliminary Engineering 2021 NON-PAR (other)

1,056,784Preliminary Engineering 2022 NON-PAR (other)

$53,896,860

$2,084,784

$2,084,784 $1,975,134Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$49,836,942

Phase Year Funding

VALLEY CROSS ROAD OVER WILDCAT BROOK

JACKSON (40808)

BRIDGE REHABILITATION-VALLEY CROSS RD OVER

WILDCAT BROOK-BR. #153/066

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

449,473Construction 2021 SAB *

217,463Construction 2021 NON-PAR (other)

$1,220,041

$666,937

$666,937 $553,105Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 73 of 226Includes inflation and indirects using program

Page 92: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 202

JAFFREY (16307)

RECONFIGURE ''DOG-LEG'' INTERSECTION OF US

202, NH 124, AND NH 137

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

4,102,222Construction 2022 None-Highway

4,500,000Construction 2023 None-Highway

$15,070,222

$8,602,222

$8,602,222 $6,468,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NUTTING ROAD OVER CONTOOCOOK RIVER

JAFFREY (41401)

BRIDGE REHABILITATION-NUTTING ROAD OVER

CONTOOCOOK RIVER-BR. #159/094

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

154,200Preliminary Engineering 2021 SAB *

5,140Right of Way 2021 SAB *

244,356Construction 2021 SAB *

414,999Construction 2022 SAB *

$818,695

$818,695

$818,695 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 74 of 226Includes inflation and indirects using program

Page 93: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STRATTON RD PETERBOROUGH ST

JAFFREY (42512)

CONSTRUCT AND RECONSTRUCT SIDEWALKS,

CROSSWALKS AND BIKE LANES ON STRATTON RD.

AND PETERBOROUGH ST.

Route/Road

Scope

Program

ROADSIDE

TIER 6

Category

Strategy

32,810Preliminary Engineering 2021 TA *

18,761Right of Way 2021 TA *

737,051Construction 2023 TA *

$863,622

$788,622

$788,622 $75,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 2

JEFFERSON - RANDOLPH (13602C)

IMPROVEMENTS FROM NH 115 TO

JEFFERSON/RANDOLPH TOWNLINE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

520,015Preliminary Engineering 2021 Other Fed Aid

288,898Right of Way 2021 Other Fed Aid

296,987Right of Way 2022 Other Fed Aid

10,327,247Construction 2023 Other Fed Aid

2,000,000Construction 2024 Other Fed Aid

$14,021,648

$13,433,148

$13,433,148 $588,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 75 of 226Includes inflation and indirects using program

Page 94: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 9/10/12/101

KEENE - SWANZEY (40100)

CONSTRUCTION OF FLOODPLAIN AND WETLAND

MITIGATION FOR THE KEENE-SWANZEY SERIES OF

PROJECTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

56,540Preliminary Engineering 2021 Other Fed Aid

1,311,593Construction 2021 Other Fed Aid

$1,918,133

$1,368,133

$1,368,133 $550,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

DILLANT-HOPKINS AIRPORT

KEENE (40568)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

4,112,000Other 2021 Airport Improvement

2,655,580Other 2023 Airport Improvement

974,091Other 2024 Airport Improvement

1,730,513Other 2025 Airport Improvement

457,134Other 2026 Airport Improvement

2,052,557Other 2027 Airport Improvement

1,186,527Other 2028 Airport Improvement

213,692Other 2029 Airport Improvement

219,675Other 2030 Airport Improvement

$13,601,768

$13,601,768

$13,601,768 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 76 of 226Includes inflation and indirects using program

Page 95: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

GEORGE STREET OVER BEAVER BROOK

KEENE (40653)

BRIDGE REPLACEMENT-GEORGE STREET OVER

BEAVER BROOK-BR. #142/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

121,530Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

301,183Construction 2023 SAB *

301,183Construction 2024 SAB *

$729,181

$729,181

$729,181 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 10 (WINCHESTER STREET)

KEENE (40666)

RECONSTRUCT WINCHESTER ST FROM NH 101 TO

SWANZEY TOWN LINE INCLUDE ASH SWAMP BRK

BRIDGE REPLACEMENT

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

436,846Preliminary Engineering 2021 None-Other

185,040Preliminary Engineering 2021 MOBRR *

164,457Preliminary Engineering 2021 None-Highway

161,040Right of Way 2022 None-Highway

52,839Right of Way 2022 MOBRR *

361,083Right of Way 2023 None-Highway

2,900,200Construction 2025 None-Highway

958,632Construction 2025 MOBRR *

2,024,899Construction 2026 None-Highway

$7,393,736

$7,245,038

$7,245,038 $148,698Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 77 of 226Includes inflation and indirects using program

Page 96: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SWANZEY FACTORY RD/NH 101

KEENE (41590)

RECONSTRUCTION OF NH 101 FROM SWANZEY

FACTORY RD TO BRANCH RD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

232,492Preliminary Engineering 2022 None-Highway

184,271Preliminary Engineering 2024 None-Highway

165,414Right of Way 2024 None-Highway

3,078,875Construction 2027 Other Fed Aid

2,103,003Construction 2029 Other Fed Aid

$5,764,055

$5,764,055

$5,764,055 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MARLBORO ST CHESHIRE RAIL TRAIL

KEENE (42515)

IMPROVE. MARLBORO ST. AND CONSTRUCT TRAIL

TO CHESHIRE RAIL TRAIL

Route/Road

Scope

Program

ROADSIDE

TIER 6

Category

Strategy

193,205Construction 2024 TA *

487,927Construction 2025 TA *

$681,132

$681,132

$681,132 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 78 of 226Includes inflation and indirects using program

Page 97: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH107/NH150

KENSINGTON (42610)

INTERSECTION RE-ALIGNMENT AND UPGRADES

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

378,861Preliminary Engineering 2025 None-Other

205,792Right of Way 2028 None-Other

1,884,808Construction 2030 None-Other

$2,469,461

$2,469,461

$2,469,461 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CENTENARY AVENUE

LACONIA (24181)

BRIDGE REMOVAL, CARRYING CENTENARY

AVENUE OVER NH RR, BR. NO. 126/163, RED LIST

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

89,626Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

378,861Construction 2025 Bridg-T3-4-Rehab-Rcn

$468,487

$468,487

$468,487 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 79 of 226Includes inflation and indirects using program

Page 98: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

ACADEMY STREET OVER DURKEE BROOK

LACONIA (26706)

BRIDGE REPLACEMENT-ACADEMY ST OVER

DURKEE BROOK-BR. #121/037

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

179,653Preliminary Engineering 2022 SAB *

10,568Right of Way 2022 SAB *

200,155Construction 2022 SAB *

346,988Construction 2023 SAB *

$737,364

$737,364

$737,364 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

COURT STREET OVER DURKEE BROOK

LACONIA (40656)

BRIDGE REPLACEMENT-COURT STREET OVER

DURKEE BROOK-BR. #113/036

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

42,271Right of Way 2022 SAB *

1,147,325Construction 2021 SAB *

$2,463,804

$1,189,596

$1,189,596 $1,274,208Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 80 of 226Includes inflation and indirects using program

Page 99: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 3 AND NH 11

LACONIA (41469)

ADDRESS BRIDGE CARRYING US 3 AND NH 11

OVER MILE HILL ROAD IN THE CITY OF LACONIA

(121/028)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

358,503Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

259,646Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

64,911Right of Way 2026 Bridg-T1-2-Rehab-Rcn

3,336,449Construction 2027 Bridg-T1-2-Rehab-Rcn

$4,019,510

$4,019,510

$4,019,510 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 2

LANCASTER, NH - GUILDHALL, VT (16155)

BRIDGE REPLACEMENT, US 2 OVER CONNECTICUT

RIVER (ROGER'S RANGER'S BRIDGE BR #111/129)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

2,697,428Construction 2021 NON-PAR (Vermont)

$13,126,073

$2,697,428

$2,697,428 $10,428,645Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 81 of 226Includes inflation and indirects using program

Page 100: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

MOUNT ORNE ROAD

LANCASTER (22192)

MOUNT ORNE ROAD OVER CONNECTICUT RIVER;

MOUNT ORNE COVERED BRIDGE #039/105

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

29,505Preliminary Engineering 2026 SAB *

206,536Construction 2026 SAB *

212,319Construction 2027 SAB *

$448,361

$448,361

$448,361 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89 NB & SB

LEBANON, NH - HARTFORD, VT (16148)

SUPERSTRUCTURE REPLACE & WIDENING, I-89 NB

& SB OVER CONNECTICUT RIVER (BR NO 044/103 &

044/104)

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

4,883,272Construction 2021 NON-PAR (Vermont)

3,417,424Construction 2023 NON-PAR (Vermont)

$45,667,470

$8,300,695

$8,300,695 $37,366,775Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 82 of 226Includes inflation and indirects using program

Page 101: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 12A

LEBANON (13558A)

NH 12A BRIDGE REPLACEMENT OVER B&M RR

BRIDGE# 062/117 (MOBRR-221)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

3,084,000Construction 2021 MOBRR *

$7,799,000

$3,084,000

$3,084,000 $4,715,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

TRUES BROOK RD OVER BLOODS BROOK

LEBANON (24221)

BRIDGE REPLACEMENT-TRUES BROOK RD OVER

BLOODS BROOK-BR. #066/059

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

195,505Preliminary Engineering 2022 SAB *

15,852Right of Way 2022 SAB *

1,278,709Construction 2022 SAB *

1,400,000Construction 2023 SAB *

$2,890,066

$2,890,066

$2,890,066 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 83 of 226Includes inflation and indirects using program

Page 102: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 120 OVER NHRR (ABD)

LEBANON (24222)

BRIDGE REPLACEMENT NH 120 OVER NHRR (ABD)

-BR. #121/117

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

109,140Preliminary Engineering 2024 SAB *

5,432Right of Way 2024 SAB *

552,204Construction 2024 SAB *

552,204Construction 2025 SAB *

$1,218,980

$1,218,980

$1,218,980 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I89

LEBANON (29612)

EXIT 18 / NH 120 IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

565,400Preliminary Engineering 2021 None-Highway

290,616Preliminary Engineering 2022 None-Highway

921,635Right of Way 2021 None-Highway

3,071,001Construction 2023 None-Highway

$6,306,152

$4,848,652

$4,848,652 $1,457,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 84 of 226Includes inflation and indirects using program

Page 103: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

LEBANON MUNICIPAL AIRPORT

LEBANON (40564)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

1,657,364Other 2021 Airport Improvement

1,467,756Other 2022 Airport Improvement

905,311Other 2023 Airport Improvement

9,927,044Other 2024 Airport Improvement

10,205,001Other 2025 Airport Improvement

1,311,343Other 2026 Airport Improvement

1,348,060Other 2027 Airport Improvement

1,385,806Other 2028 Airport Improvement

1,424,608Other 2029 Airport Improvement

1,464,497Other 2030 Airport Improvement

$31,096,790

$31,096,790

$31,096,790 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4 (MECHANIC ST)

LEBANON (40794)

RECONSTRUCT MECHANIC ST / HIGH ST /

MASCOMA ST INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

2,640,000Construction 2022 Other Fed Aid

$3,053,580

$2,640,000

$2,640,000 $413,580Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 85 of 226Includes inflation and indirects using program

Page 104: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

LAHAYE DRIVE

LEBANON (41366)

CONSTRUCT BICYCLE AND PEDESTRIAN

IMPROVEMENTS ALONG LAHAYE DR FROM NH RTE

120 TO MOUNT SUPPORT RD

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

738,734Construction 2023 TA *

$821,840

$738,734

$738,734 $83,106Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US4/MECHANIC ST/SLAYTON HILL RD

LEBANON (42604)

INTERSECTION IMPROVEMENT

Route/Road

Scope

Program

ROADSIDE

TIER 5

Category

Strategy

344,419Preliminary Engineering 2025 None-Other

242,651Right of Way 2027 None-Other

4,125,661Construction 2029 None-Other

$4,712,731

$4,712,731

$4,712,731 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 86 of 226Includes inflation and indirects using program

Page 105: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 125

LEE (41322)

BRIDGE REPLACEMENT OF CULVERT CARRYING

NH 125 OVER LITTLE RIVER BR NO 073/084

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

220,000Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

16,962Right of Way 2022 Bridg-T1-2-Rehab-Rcn

1,696,200Construction 2022 Bridg-T1-2-Rehab-Rcn

$2,153,162

$1,933,162

$1,933,162 $220,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RTE 125

LEE (42876)

CONSTRUCT UP TO AN 80 SPACE PARK AND RIDE

LOT NEAR THE JUNCTION OF US4 AND NH125.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 4

Category

Strategy

137,500Preliminary Engineering 2021 CMAQ *

82,500Right of Way 2021 CMAQ *

876,370Construction 2022 CMAQ *

$1,096,370

$1,096,370

$1,096,370 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 87 of 226Includes inflation and indirects using program

Page 106: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 18

LITTLETON, NH - WATERFORD, VT (27711)

DECK REPLACEMENT AND PAINTING OF RED LIST

BRIDGE CARRYING NH 18 OVER CONNECTICUT

RIVER (109/134)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

113,080Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

54,278Preliminary Engineering 2021 NON-PAR (Vermont)

116,246Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

55,798Preliminary Engineering 2022 NON-PAR (Vermont)

136,709Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

57,361Preliminary Engineering 2023 NON-PAR (Vermont)

3,367,650Construction 2025 Bridg-T3-4-Rehab-Rcn

1,530,750Construction 2025 NON-PAR (Vermont)

$5,759,073

$5,431,873

$5,431,873 $327,200Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

COTTAGE STREET, MILL STREET, SOUTH STREET,

MEADOW STREET

LITTLETON (41362)

CONST SIDEWALKS ALONG COTTAGE ST, MILL ST,

SOUTH ST, MEADOW ST, MT. EUSTIS RD,

BRONSON ST

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

887,699Construction 2022 TA *

$1,055,453

$887,699

$887,699 $167,754Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 88 of 226Includes inflation and indirects using program

Page 107: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH28/NH128

LONDONDERRY (41593)

SAFETY & OPERATIONAL IMPROVEMENTS AT THE

INTERSECTION OF NH 28/NH 128

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

179,252Preliminary Engineering 2023 None-Highway

194,734Preliminary Engineering 2026 None-Highway

66,599Right of Way 2026 None-Highway

1,231,750Construction 2027 None-Highway

$1,672,336

$1,672,336

$1,672,336 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 28/STONEHENGE ROAD

LONDONDERRY (41715)

OPERATIONAL AND CAPACITY IMPROVEMENTS AT

THE INTERSECTION OF NH 28 & STONEHENGE

ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

682,594Construction 2021 NON-PAR (other)

682,594Construction 2021 None-Highway

$1,675,188

$1,365,188

$1,365,188 $310,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Town to provide 50% match.Comments

$0

Page 89 of 226Includes inflation and indirects using program

Page 108: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

HARVEY RD. WEBSTER RD. GRENIER FIELD RD.

LONDONDERRY (42508)

CONSTRUCT A 1 MILE MULTI-USE PATH ALONG

THE SIDE OF HARVEY RD. WEBSTER RD, AND

GRENIER FIELD RD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

41,120Preliminary Engineering 2021 TA *

30,840Right of Way 2021 TA *

954,858Construction 2024 TA *

223,358Construction 2024 NON-PAR (other)

$1,325,176

$1,250,176

$1,250,176 $75,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH RTE 106

LOUDON - CANTERBURY (29613A)

NH RTE 106 ROADWAY WIDENING (2ND SEGMENT

OF PHASE 1) FROM SOUCOOK RD, LOUDON TO

AMES RD, CANTERBURY

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

5,088,600Construction 2021 None-Highway

$8,212,600

$5,088,600

$5,088,600 $3,124,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 90 of 226Includes inflation and indirects using program

Page 109: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH RTE 106

LOUDON - CANTERBURY (29613C)

NH 106 ROADWAY WIDENING (PHASE 3)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,500,000Preliminary Engineering 2021 None-Highway

500,000Right of Way 2024 None-Highway

10,000,000Construction 2026 GARVEE-26

10,000,000Construction 2027 GARVEE-26

$22,000,000

$22,000,000

$22,000,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 106 AND SOUTH VILLAGE ROAD

LOUDON (40632)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

87,185Preliminary Engineering 2022 None-Highway

59,605Right of Way 2022 None-Highway

1,894,303Construction 2025 None-Highway

$2,233,593

$2,041,093

$2,041,093 $192,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 91 of 226Includes inflation and indirects using program

Page 110: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NHRR

LYNDEBOROUGH (41435)

ADDRESS RED LIST BRIDGE CARRYING NHRR

OVER GLASS FACTORY ROAD IN THE TOWN OF

LYNDEBOROUGH (108/070)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 6

Category

Strategy

129,823Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

133,458Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

1,371,948Construction 2028 Bridg-T3-4-Rehab-Rcn

$1,635,229

$1,635,229

$1,635,229 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NUTE ROAD OVER BELLAMY RIVER

MADBURY (24226)

BRIDGE REPLACEMENT-NUTE RD OVER BELLAMY

RIVER-BR. #056/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

126,444Preliminary Engineering 2021 SAB *

5,140Right of Way 2021 SAB *

344,380Construction 2021 SAB *

424,827Construction 2022 SAB *

$900,792

$900,792

$900,792 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 92 of 226Includes inflation and indirects using program

Page 111: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

FRESHET ROAD OVER JOHNSON CREEK

MADBURY (41462)

BRIDGE REPLACEMENT-FEDSHET ROAD OVER

JOHNSON CREEK-BR. #160/086

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

111,680Preliminary Engineering 2026 SAB *

11,168Right of Way 2026 SAB *

273,614Construction 2026 SAB *

273,614Construction 2027 SAB *

$670,076

$670,076

$670,076 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MADBURY RD

MADBURY (41596)

PLANNING STUDY TO IDENTIFY POTENTIAL

INTERSECTION SAFETY IMPROVEMENTS TO THE

NH 155/MADBURY ROAD/TO

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

667,290Preliminary Engineering 2027 None-Highway

$667,290

$667,290

$667,290 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 93 of 226Includes inflation and indirects using program

Page 112: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

GOFFS FALLS ROAD

MANCHESTER (15401)

BRIDGE REPLACEMENT OVER B&M RR

BRG#188/092

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

835,250Construction 2021 SAB *

$1,747,750

$835,250

$835,250 $912,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3 (ELM STREET)

MANCHESTER (15837)

BRIDGE REHABILITATION-US 3 (ELM ST) OVER

B&MRR-BR. #144/075

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

521,699Preliminary Engineering 2028 SAB *

30,331Right of Way 2028 SAB *

1,910,875Construction 2028 SAB *

2,400,909Construction 2029 SAB *

$4,863,815

$4,863,815

$4,863,815 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 94 of 226Includes inflation and indirects using program

Page 113: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-293 / FEE TPK

MANCHESTER (16099)

PRELIMINARY ENGINEERING & ROW FOR

RECONSTRUCTION OF THE F.E. EVERETT

TURNPIKE AT EXITS 6 AND 7

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,959,789Preliminary Engineering 2022 TPK *

1,375,196Preliminary Engineering 2023 TPK *

3,929,133Right of Way 2023 TPK *

6,105,002Right of Way 2024 TPK *

$20,269,120

$13,369,120

$13,369,120 $6,900,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RECONSTRUCT AND WIDENING OF EXIT 6

(AMOSKEAG)

MANCHESTER (16099A)

RECONSTRUCT AND WIDEN OF EXIT 6

(AMOSKEAG) IN MANCHESTER.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

8,587,581Construction 2025 TPK *

29,684,537Construction 2026 TPK *

29,756,904Construction 2027 TPK *

29,829,446Construction 2028 TPK *

$97,858,468

$97,858,468

$97,858,468 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 95 of 226Includes inflation and indirects using program

Page 114: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

EXIT 7 FEE TURNPIKE

MANCHESTER (16099B)

RECONSTRUCT EXIT 7

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

15,555,124Construction 2024 TPK *

23,100,808Construction 2025 TPK *

11,578,562Construction 2026 TPK *

$50,234,494

$50,234,494

$50,234,494 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SALMON STREET WB OVER RD, BMRR,

MARRIMACK RIVER AND RAMP

MANCHESTER (24206)

BRIDGE REHAB-SALMON ST WB OVER RD, BMRR,

MERRIMACK RIVER, RAMP-BR. #106/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

500,000Preliminary Engineering 2021 MOBRR *

102,800Preliminary Engineering 2022 MOBRR *

6,066Right of Way 2028 MOBRR *

5,088,770Construction 2028 MOBRR *

2,590,753Construction 2029 MOBRR *

$8,288,389

$8,288,389

$8,288,389 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 96 of 226Includes inflation and indirects using program

Page 115: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SAMON ST EB OVER RD, BMRR, MERRIMACK RIVER

AND RAMP

MANCHESTER (24212)

AMOSKEG EAST BND - SALMON ST OVER RD,RR,&

RIVER (BRG#107/072) AND ADJACENT RAMP "E"

(BRG#107/071)

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

500,000Preliminary Engineering 2021 MOBRR *

195,320Preliminary Engineering 2022 MOBRR *

211,357Preliminary Engineering 2023 MOBRR *

10,864Right of Way 2024 MOBRR *

5,583,962Construction 2025 MOBRR *

3,558,994Construction 2026 MOBRR *

$10,060,497

$10,060,497

$10,060,497 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

REHAB QUEEN CITY BRIDGE OVER I-293, BMRR &

MERRIMACK RIVER

MANCHESTER (28336)

BRIDGE REHABILITATION-QUEEN CITY BR. OVER

I-293, BMRR & MERRIMACK RIVER-BR. #151/065

(MOBRR)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

4,577,838Construction 2021 SAB *

$9,035,988

$4,577,838

$4,577,838 $4,458,150Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 97 of 226Includes inflation and indirects using program

Page 116: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

RAIL TRAIL

MANCHESTER (40428)

CONSTRUCT MULTI-USE PATH ALONG BAKER ST,

BROWN AVE, DUBISZ ST, AND SUNDIAL AVE.

(14-25TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

699,276Construction 2021 TA *

$831,546

$699,276

$699,276 $132,270Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MANCHESTER-BOSTON REGIONAL AIRPORT

MANCHESTER (40563)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

30,840,000Other 2021 Airport Improvement

6,692,965Other 2022 Airport Improvement

15,752,422Other 2023 Airport Improvement

5,025,566Other 2024 Airport Improvement

5,485,188Other 2025 Airport Improvement

5,638,774Other 2026 Airport Improvement

4,853,017Other 2027 Airport Improvement

5,958,966Other 2028 Airport Improvement

6,125,817Other 2029 Airport Improvement

6,297,340Other 2030 Airport Improvement

$92,670,054

$92,670,054

$92,670,054 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 98 of 226Includes inflation and indirects using program

Page 117: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

HUSE ROAD

MANCHESTER (41414)

REHAB RED LIST BRIDGE CARRYING HUSE ROAD

OVER I-293 AND NH ROUTE 101 (176/106)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

169,620Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

2,827,000Construction 2021 Bridg-T3-4-Rehab-Rcn

$3,161,620

$2,996,620

$2,996,620 $165,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-293

MANCHESTER (41594)

OPERATIONAL IMPROVEMENTS AT THE I-293 EXIT

1 INTERCHANGE (SOUTH WILLOW ST.)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

184,271Preliminary Engineering 2024 None-Highway

194,734Preliminary Engineering 2026 None-Highway

66,567Right of Way 2026 None-Highway

1,829,012Construction 2028 None-Highway

$2,274,584

$2,274,584

$2,274,584 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 99 of 226Includes inflation and indirects using program

Page 118: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

GRANITE ST & SOUTH WILLOW ST

MANCHESTER (41747)

IMPLEMENT AN ADAPTIVE SIGNAL CONTROL

SYSTEM ON GRANITE ST &UPGRADE SO. WILLOW

ST.SIGNAL PERFORMANCE

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

1,294,560Construction 2022 CMAQ *

$1,569,560

$1,294,560

$1,294,560 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PERIMETER RD. SOUTH WILLOW ST. HARVEY RD.

MANCHESTER (42509)

CONST. ADA COMPLIANT PEDESTRIAN BICYCLE

TRAIL ALONG PERIMETER RD., SOUTH WILLOW ST.

AND HARVEY RD.

Route/Road

Scope

Program

ROADSIDE

TIER 5

Category

Strategy

51,400Preliminary Engineering 2021 TA *

25,700Right of Way 2021 TA *

947,152Construction 2025 TA *

$1,124,252

$1,024,252

$1,024,252 $100,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 100 of 226Includes inflation and indirects using program

Page 119: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

WILLOW STREET/WESTON ROAD

MANCHESTER (42881)

CONSTRUCT A NORTHBOUND RIGHT TURN LAND

AND MODIFY LANE UTILIZATION AT WILLOW ST. &

WESTON RD INTER.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

200,000Preliminary Engineering 2021 CMAQ *

100,000Right of Way 2022 CMAQ *

2,800Right of Way 2023 CMAQ *

739,749Construction 2023 CMAQ *

$1,042,549

$1,042,549

$1,042,549 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RIVER RD/BICENTENNIAL DR

MANCHESTER (42886)

CONSTRUCT A ROUNDABOUT AT ENTRANCE OF

DERRYFIELD SCHOOL AT RIVER RD/BICENTENNIAL

RD INTERSECTION

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

120,000Preliminary Engineering 2021 CMAQ *

1,787,085Construction 2024 CMAQ *

$1,907,085

$1,907,085

$1,907,085 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 101 of 226Includes inflation and indirects using program

Page 120: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 10, NH 123

MARLOW (40088)

ADDRESS BRIDGE CARRYING NH 10 & NH 123

OVER ASHUELOT RIVER (BR NO 116/091)

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

152,658Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

17,437Right of Way 2022 Bridg-T3-4-Rehab-Rcn

1,073,439Construction 2025 Bridg-T3-4-Rehab-Rcn

$1,243,533

$1,243,533

$1,243,533 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US ROUTE 3

MEREDITH (41483)

ADDRESS BRIDGE CARRYING US ROUTE 3 OVER

MAPLE STREET AND NHRR IN THE TOWN OF

MEREDITH (184/138)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

113,080Preliminary Engineering 2021 Bridg-T1-2-Main-Pres

565,400Construction 2021 Bridg-T1-2-Main-Pres

$788,480

$678,480

$678,480 $110,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 102 of 226Includes inflation and indirects using program

Page 121: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 101A

MERRIMACK (10136D)

INTERSECTION & SAFETY IMPR. TO BOSTON POST

RD TO CONT. BLVD/101A & CRAFTSMAN LANE /

BOSTON POST RD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

2,116,335Construction 2021 Other Fed Aid

2,712,039Construction 2022 Other Fed Aid

$6,643,374

$4,828,374

$4,828,374 $1,815,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BEDFORD ROAD

MERRIMACK (15841)

BRIDGE REPLACEMENT-BEDFORD RD OVER

BABOOSIC BROOK-BR. #113/159

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

2,101,960Construction 2021 SAB *

$4,339,039

$2,101,960

$2,101,960 $2,237,079Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 103 of 226Includes inflation and indirects using program

Page 122: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 3 OVER BABOOSIC BROOK

MERRIMACK (29174)

BRIDGE REPLACEMENT-US 3 OVER BABOOSIC

BROOK-BR. # 118/135

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

206,411Preliminary Engineering 2024 SAB *

10,864Right of Way 2024 SAB *

1,415,546Construction 2024 SAB *

1,981,759Construction 2025 SAB *

$3,614,580

$3,614,580

$3,614,580 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PEDESTRIAN TRAIL FROM DW HIGHWAY TO

EXISTING TRAIL

MERRIMACK (40300)

CONSTRUCT PEDESTRIAN TRAIL IN THE TOWN OF

MERRIMACK FOR APPROXIMATLY 700LF.

(14-15TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

924,024Construction 2021 TA *

$1,131,647

$924,024

$924,024 $207,623Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Project On-Shelf for 2020 CON fundingComments

$0

Page 104 of 226Includes inflation and indirects using program

Page 123: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

DW HIGHWAY

MERRIMACK (41588)

SAFETY & CAPACITY IMPROVEMENTS TO THE

US3/WIRE ROAD INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

83,651Preliminary Engineering 2023 None-Highway

13,346Right of Way 2027 None-Highway

1,007,608Construction 2027 None-Highway

$1,104,604

$1,104,604

$1,104,604 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

F. E. EVERRETT TURNPIKE

MERRIMACK (41727)

EXIT 11 TOLL PLAZA REMOVAL

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

25,700Preliminary Engineering 2021 TPK *

603,950Construction 2021 TPK *

$629,650

$629,650

$629,650 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 105 of 226Includes inflation and indirects using program

Page 124: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BERLIN REGIONAL AIRPORT

MILAN (40576)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

381,616Other 2022 Airport Improvement

806,572Other 2024 Airport Improvement

765,375Other 2025 Airport Improvement

808,837Other 2027 Airport Improvement

1,039,354Other 2028 Airport Improvement

2,592,161Other 2030 Airport Improvement

$6,393,915

$6,393,915

$6,393,915 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 101A & NH 13

MILFORD (14492)

EARMARK PROJECT NH038 AND NH058.

PROJECTS WILL BE CREATED FROM THIS PARENT

PROJECT.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

835,461Construction 2021 Ear-NH058

$1,464,983

$835,461

$835,461 $629,522Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 106 of 226Includes inflation and indirects using program

Page 125: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BRIDGE STREET

MILFORD (41587)

REHABILITATION OF THE SWING BRIDGE IN THE

TOWN OF MILFORD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

122,847Preliminary Engineering 2024 None-Highway

6,314Right of Way 2025 None-Highway

757,721Construction 2025 None-Highway

$947,383

$886,883

$886,883 $60,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

MILFORD (42883)

CONSTRUCT A 5' SIDEWALK AND BICYCLE LANE

OFF OF OSGOOD ROAD AND ARMORY ROAD.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

112,000Preliminary Engineering 2021 CMAQ *

15,852Right of Way 2023 CMAQ *

663,660Construction 2023 CMAQ *

$791,512

$791,512

$791,512 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 107 of 226Includes inflation and indirects using program

Page 126: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

RTE 101A/NASHUA ST.

MILFORD (42887)

CONSTRUCT SIDEWALKS ALONG NASHUA

STREET.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

119,000Preliminary Engineering 2021 CMAQ *

15,852Right of Way 2023 CMAQ *

706,566Construction 2023 CMAQ *

$841,418

$841,418

$841,418 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MASON RD

MILFORD (43115)

BRIDGE REPLACEMENT OVER GREAT BROOK BR#

089/106

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

121,325Preliminary Engineering 2028 SAB *

6,066Right of Way 2028 SAB *

360,943Construction 2028 SAB *

445,883Construction 2029 SAB *

$934,218

$934,218

$934,218 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 108 of 226Includes inflation and indirects using program

Page 127: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 25 AND LAKE SHORE ROAD

MOULTONBOROUGH (40639)

SAFETY IMPROVEMENTS FROM JUST WEST OF

LAKE SHORE DRIVE (W) TO JUST EAST OF LAKE

SHORE DRIVE (E)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

174,369Preliminary Engineering 2022 None-Highway

174,369Right of Way 2022 None-Highway

1,894,303Construction 2025 None-Highway

$2,463,042

$2,243,042

$2,243,042 $220,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 25 / WHITTIER HIGHWAY

MOULTONBOROUGH (41580)

COMPLETE STREETS IMPROVEMENTS TO

MOLTONBOROUGH CENTRAL VILLAGE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

179,252Preliminary Engineering 2023 None-Highway

94,715Preliminary Engineering 2025 None-Highway

12,629Right of Way 2025 None-Highway

1,312,559Construction 2027 None-Highway

$1,599,155

$1,599,155

$1,599,155 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 109 of 226Includes inflation and indirects using program

Page 128: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SHERIDAN RD AND NH 25

MOULTONBOROUGH (41581)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

119,501Preliminary Engineering 2023 None-Highway

63,143Preliminary Engineering 2025 None-Highway

6,314Right of Way 2025 None-Highway

563,860Construction 2027 None-Highway

$752,819

$752,819

$752,819 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH25/REDDING LANE

MOULTONBOROUGH (42602)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

126,287Preliminary Engineering 2025 None-Other

66,729Right of Way 2027 None-Other

564,145Construction 2029 None-Other

$757,161

$757,161

$757,161 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 110 of 226Includes inflation and indirects using program

Page 129: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

F. E. EVERETT TURNPIKE

NASHUA - MERRIMACK - BEDFORD (13761)

F.E.E.TURNPIKE WIDENING OF 2-LANE SECTIONS

FROM EXIT 8 (NASHUA) TO I-293 (BEDFORD).

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,028,000Preliminary Engineering 2021 TPK *

4,112,000Right of Way 2021 TPK *

10,963,826Construction 2021 TPK *

30,673,734Construction 2022 TPK *

41,358,144Construction 2023 TPK *

28,655,177Construction 2024 TPK *

25,013,315Construction 2025 TPK *

$156,604,196

$141,804,196

$141,804,196 $14,800,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 101A

NASHUA (10136A)

WIDENING OF NH 101A FROM SOMERSET PKWY

TO CELINA AVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

1,172,226Preliminary Engineering 2022 Other Fed Aid

2,148,045Right of Way 2022 Other Fed Aid

5,010,277Right of Way 2023 Other Fed Aid

596,661Construction 2025 NON-PAR (other)

4,812,997Construction 2026 Other Fed Aid

7,241,968Construction 2027 Other Fed Aid

$23,133,092

$20,982,173

$20,982,173 $2,150,918Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 111 of 226Includes inflation and indirects using program

Page 130: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BOIRE FIELD

NASHUA (40561)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

616,800Other 2021 Airport Improvement

6,668,307Other 2022 Airport Improvement

1,339,861Other 2023 Airport Improvement

4,592,250Other 2025 Airport Improvement

393,402Other 2026 Airport Improvement

424,639Other 2027 Airport Improvement

6,236,127Other 2028 Airport Improvement

1,851,990Other 2029 Airport Improvement

5,638,316Other 2030 Airport Improvement

$27,761,692

$27,761,692

$27,761,692 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

EAST HOLLIS ST

NASHUA (40660)

IMPROVEMENTS ALONG EAST HOLLIS STREET

FROM MAIN STREET EAST TO PROPOSED

ROUNDABOUT

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

424,299Preliminary Engineering 2022 None-Highway

224,196Right of Way 2024 None-Highway

3,918,051Construction 2025 None-Highway

$4,566,546

$4,566,546

$4,566,546 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 112 of 226Includes inflation and indirects using program

Page 131: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

DW HIGHWAY

NASHUA (41585)

DW HIGHWAY PEDESTRIAN SAFETY

IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

89,626Preliminary Engineering 2023 None-Highway

31,572Preliminary Engineering 2025 None-Highway

6,472Right of Way 2025 None-Highway

448,219Construction 2027 None-Highway

$575,888

$575,888

$575,888 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WALNUT ST/CHESTNUT ST/CENTRAL ST

NASHUA (41586)

SAFETY, CAPACITY AND MULTIMODAL ACCESS

IMPROVEMENTS TO THE WALNUT STREET OVAL

INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

184,032Preliminary Engineering 2023 None-Highway

64,754Preliminary Engineering 2025 None-Highway

64,754Right of Way 2025 None-Highway

2,444,283Construction 2027 None-Highway

$2,757,822

$2,757,822

$2,757,822 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 113 of 226Includes inflation and indirects using program

Page 132: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 101 A

NASHUA (41745)

TO EXPAND NASHUA TRANSIT SYSTEM(NTS) WEST

ALONG AMHERST STREET, (NH101A) TO WALMART

IN AMHERST

Route/Road

Scope

Program

TRANSIT

TIER 2

Category

Strategy

148,303Other 2021 CMAQ *

$465,461

$148,303

$148,303 $317,158Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

LOCK STREET WHITNEY STREET

NASHUA (42516)

UPGRADE SIDEWALKS TO ADA STANDARDS AND

CREATE BICYCLE LANES ON LOCK STREET AND

WHITNEY STREET.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

28,700Preliminary Engineering 2021 TA *

25,700Right of Way 2021 TA *

1,028,728Construction 2025 TA *

$1,133,128

$1,083,128

$1,083,128 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 114 of 226Includes inflation and indirects using program

Page 133: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

FE EVERETT TURNPIKE

NASHUA (42594)

REALIGN EXIT 5E SOUTHBOUND OFF RAMP AND

TURNPIKE SOUTHBOUND ON RAMP.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

64,616Preliminary Engineering 2026 None-Other

1,114,080Construction 2030 None-Other

$1,178,696

$1,178,696

$1,178,696 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

KINSLEY STREET

NASHUA (42595)

PEDESTRIAN AND BICYCLE ACCESSIBILTY

IMPROVEMENT PROJECT

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

181,988Preliminary Engineering 2027 None-Other

1,490,460Construction 2030 None-Other

$2,039,800

$1,672,448

$1,672,448 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$367,352

Page 115 of 226Includes inflation and indirects using program

Page 134: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

RTE 111/101A

NASHUA (42596)

BRIDGE REHABILITATION OF 2 BRIDGES OWNED

BY BOTH NASHUA & HUDSON. BR #110/068 &

109/068.

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

242,651Preliminary Engineering 2027 None-Bridge

3,308,300Construction 2030 None-Bridge

$3,550,951

$3,550,951

$3,550,951 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BROAD STREET PARKWAY

NASHUA (42717)

CONSTRUCT A NEW INTERCHANGE ALONG THE

BROAD STREET PARKWAY TO CONNECT TO

FRANKLIN ST AND FRONT ST

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

137,978Preliminary Engineering 2026 None-Other

27,596Right of Way 2027 None-Other

1,352,196Construction 2028 None-Other

$1,517,771

$1,517,771

$1,517,771 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 116 of 226Includes inflation and indirects using program

Page 135: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

NASHUA (42882)

INTERSECTION & ROADWAY IMPROVEMENTS AT

THE CANAL ST/FRANKLIN ST/MAIN ST

INTERSECTION.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

225,000Preliminary Engineering 2021 CMAQ *

26,420Right of Way 2023 CMAQ *

1,320,977Construction 2023 CMAQ *

$1,572,396

$1,572,396

$1,572,396 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH CAPITOL CORRIDOR

NASHUA-MANCHESTER-CONCORD (40818)

DESIGN, ENVIRONMENTAL REVIEW, AND

FINANCIAL PLAN FOR COMMUTER RAIL

EXTENSION FROM MA TO NH

Route/Road

Scope

Program

RAIL

TIER 6

Category

Strategy

1,542,000Other 2021 FTA5307_NHDOT

$5,042,000

$1,542,000

$1,542,000 $3,500,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 117 of 226Includes inflation and indirects using program

Page 136: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

GREGG MILL ROAD

NEW BOSTON (14771)

BRIDGE REPLACEMENT GREGG MILL RD OVER

SOUTH BRANCH PISCATAQUOG RIVER - BR.

#132/138

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

162,956Preliminary Engineering 2024 SAB *

5,432Right of Way 2024 SAB *

540,471Construction 2024 SAB *

667,283Construction 2025 SAB *

$1,376,142

$1,376,142

$1,376,142 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

TUCKER MILL ROAD

NEW BOSTON (15505)

BRIDGE REPLACEMENT-TUCKER MILL ROAD OVER

MID BR. PISCATAQUOG-BR. #087/150

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

167,519Preliminary Engineering 2025 SAB *

5,584Right of Way 2025 SAB *

555,604Construction 2025 SAB *

685,967Construction 2026 SAB *

$1,414,674

$1,414,674

$1,414,674 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 118 of 226Includes inflation and indirects using program

Page 137: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 13

NEW BOSTON (27729)

CULVERT REPLACEMENT FOR RED LIST BRIDGE

CARRYING NH 13 OVER COCHRANE BROOK (BR NO

122/120)

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

179,252Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

245,694Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

1,262,869Construction 2025 Bridg-T3-4-Rehab-Rcn

$1,687,815

$1,687,815

$1,687,815 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 1B

NEW CASTLE - RYE (16127)

BRIDGE REPLACE, SINGLE LEAF BASCULE BRIDGE,

NH 1B OVER LITTLE HARBOR (RED LIST) BR NO

066/071

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

7,124,040Construction 2021 Bridg-HIB-Rehab-Rcn

$12,326,545

$7,124,040

$7,124,040 $5,202,505Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 119 of 226Includes inflation and indirects using program

Page 138: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

WENTWORTH ROAD NH1B BEACH HILL ROAD

NEALS PIT LANE

NEW CASTLE (42517)

CONSTRUCT BICYCLE SHOULDERS AND SW

ALONG WENTWORTH RD, NH 1B FROM BEACH

HILL RD. TO NEALS PIT LN

Route/Road

Scope

Program

ROADSIDE

TIER 6

Category

Strategy

18,504Preliminary Engineering 2021 TA *

20,560Right of Way 2021 TA *

357,417Construction 2023 TA *

$432,481

$396,481

$396,481 $36,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 1A & 1B

NEW CASTLE-RYE (41713)

BICYCLE AND PEDESTRAIN SAFETY

ACCOMMODATIONSON NH 1A & 1B.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

179,252Preliminary Engineering 2023 None-Highway

189,430Preliminary Engineering 2025 None-Highway

131,402Right of Way 2025 None-Highway

2,426,839Construction 2028 None-Other

$2,926,922

$2,926,922

$2,926,922 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 120 of 226Includes inflation and indirects using program

Page 139: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SMITH CROSSING

NEW HAMPTON (25365)

REMOVAL OF BRIDGE CARRYING SMITH

CROSSING OVER NH RAILROAD (240/104) (RED

LIST)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 6

Category

Strategy

28,270Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

315,717Construction 2025 Bridg-T3-4-Rehab-Rcn

$426,487

$343,987

$343,987 $82,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RTE 103A

NEW LONDON (42877)

EXPAND THE NEW LONDON PARK AND RIDE LOT

CREATING APPROXIMATELY 50 ADDITIONAL

PARKING SPACES

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 4

Category

Strategy

143,000Preliminary Engineering 2021 CMAQ *

11,000Right of Way 2021 CMAQ *

633,248Construction 2022 CMAQ *

$787,248

$787,248

$787,248 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 121 of 226Includes inflation and indirects using program

Page 140: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 108

NEWFIELDS - NEWMARKET (28393)

BRIDGE REHABILITATIONS, ADDRESS BRIDGES

CARRYING NH 108 OVER BMRR BRIDGE NUMBERS

127/081 & 125/054

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

56,540Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

5,812,312Construction 2022 Bridg-T1-2-Rehab-Rcn

$6,429,852

$5,868,852

$5,868,852 $561,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16, US 4 & SPAULDING TURNPIKE

NEWINGTON - DOVER (11238Q)

RECONSTRUCT SPAULDING TPK FROM LBB TO

DOVER TOLL BOOTH & EXIT 6 INTERCHANGE

(INCL. NEW SOUNDWALLS)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

9,569,361Construction 2021 TPK *

$70,643,719

$9,569,361

$9,569,361 $61,074,359Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 122 of 226Includes inflation and indirects using program

Page 141: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SPAULDING TURNPIKE / LITTLE BAY BRIDGES

NEWINGTON - DOVER (11238S)

REMOVE THE SUPERSTRUCTURE GENERAL

SULLIVAN BR & PROVIDE THE MOST COST

EFFECTIVE BIKE/PED CONNECTION

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

12,740,000Construction 2022 TPK *

10,305,121Construction 2023 TPK *

6,890,232Construction 2024 TPK *

$29,935,353

$29,935,353

$29,935,353 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16 (SPAULDING TURNPIKE)

NEWINGTON (11238U)

HIGHWAY AND BRIDGE MAINTENANCE FACILITY

CONSTRUCTION BETWEEN EXIT 3 AND 4 ALONG

NH 16

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

3,258,760Construction 2021 TPK *

$7,125,084

$3,258,760

$3,258,760 $3,866,324Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 123 of 226Includes inflation and indirects using program

Page 142: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 16

NEWINGTON (11238V)

ENVIRONMENTAL REMEDIATION AT THE FORMER

NEWINGTON COUNTRY STORE SITE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

10,280Preliminary Engineering 2021 TPK *

10,568Preliminary Engineering 2022 TPK *

10,864Preliminary Engineering 2023 TPK *

$134,674

$31,712

$31,712 $102,963Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SAND HILL ROAD

NEWPORT (20006)

SAND HILL ROAD OVER BROOK - BR. #154/129 -

BRIDGE REPLACEMENT

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

25,700Preliminary Engineering 2021 SAB *

2,056Right of Way 2021 SAB *

47,802Construction 2021 SAB *

77,674Construction 2022 SAB *

$153,232

$153,232

$153,232 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 124 of 226Includes inflation and indirects using program

Page 143: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 108

NEWTON (29617)

IMPROVEMENTS TO ROWE'S CORNER (MAPLE

AVE, AMESBURY RD)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

56,540Right of Way 2021 None-Highway

916,878Construction 2022 None-Highway

$1,303,418

$973,418

$973,418 $330,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

POND STREET

NEWTON (41436)

ADDRESS THE RED LIST BRIDGE CARRYING POND

STREET OVER PAR IN THE TOWN OF NEWTON

(064/107)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

89,626Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

30,712Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

129,823Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

1,371,948Construction 2028 Bridg-T3-4-Rehab-Rcn

$1,622,108

$1,622,108

$1,622,108 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 125 of 226Includes inflation and indirects using program

Page 144: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NEW HAMPSHIRE DEPT OF ENVIRONMENT

NHDES (42875)

PURCHASE & INSTALL 3 ELECTONIC VEHICLE

CHARGING STATIONS, 2 IN CONCORD AND 1 IN

FRANCONIA NOTCH.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

239,730Construction 2022 CMAQ *

$239,730

$239,730

$239,730 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US ROUTE 1

NORTH HAMPTON (24457)

SUPERSTRUCTURE REPLACEMENT OF BRIDGE

CARRYING US 1 OVER BOSTON & MAINE RR (RED

LIST BR NO 148/132)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

5,088,600Construction 2021 Bridg-T1-2-Rehab-Rcn

$6,436,100

$5,088,600

$5,088,600 $1,347,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CHURCH MAIN STATE STREETS

NORTHUMBERLAND (42510)

RENOVATION/REPLACEMENT OF APPROXIMATELY

6300 LINEAR FEET OF VILLAGE SIDEWALK TO ADA

STANDARDS

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

62,657Preliminary Engineering 2021 TA *

12,336Right of Way 2021 TA *

895,723Construction 2024 TA *

$1,095,716

$970,716

$970,716 $125,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 126 of 226Includes inflation and indirects using program

Page 145: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SCHOOL ST/US 4/US 202

NORTHWOOD (42628)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

266,916Preliminary Engineering 2027 None-Other

33,364Right of Way 2027 None-Other

724,926Construction 2030 None-Other

$1,025,207

$1,025,207

$1,025,207 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RT 4 & 152

NORTHWOOD-NOTTINGHAM (41595)

INTERSECTION SAFETY IMPROVEMENTS TO THE

US 4/NH 152 INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

298,753Preliminary Engineering 2023 None-Highway

189,430Preliminary Engineering 2025 None-Highway

126,287Right of Way 2025 None-Highway

3,728,268Construction 2028 None-Highway

$4,342,738

$4,342,738

$4,342,738 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 127 of 226Includes inflation and indirects using program

Page 146: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 152

NOTTINGHAM (40612)

BRIDGE REHAB OR REPLACE OF THE RED LIST

BRIDGE CARRYING NH 152 OVER NORTH RIVER

(BR NO 141/127)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

58,123Right of Way 2022 Bridg-T3-4-Rehab-Rcn

921,354Construction 2024 Bridg-T3-4-Rehab-Rcn

$1,429,477

$979,477

$979,477 $450,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 25A

ORFORD (40366)

BRIDGE REPLACEMENT IS ANTICPATED FOR THE

BRIDGE CARRYING NH ROUTE 25A OVER

BRACKETT BROOK (217/112)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

113,080Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

2,261,600Construction 2021 Bridg-T3-4-Rehab-Rcn

$2,759,680

$2,374,680

$2,374,680 $385,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 128 of 226Includes inflation and indirects using program

Page 147: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

ARCHERTOWN ROAD

ORFORD (41151)

BRIDGE REPLACEMENT -ARCHERTOWN ROAD

OVER JACOBS BROOK-BR. NO. 080/120

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

154,200Preliminary Engineering 2021 SAB *

10,280Right of Way 2021 SAB *

545,354Construction 2021 SAB *

729,709Construction 2022 SAB *

$1,439,543

$1,439,543

$1,439,543 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 25A

ORFORD (41390)

BRIDGE REHAB OR REPLACEMENT OF THE

BRIDGE CARRYING NH ROUTE 25A OVER BAKER

POND BROOK (219/112)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

113,080Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

116,246Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

18,427Right of Way 2024 Bridg-T3-4-Rehab-Rcn

1,298,229Construction 2026 Bridg-T3-4-Rehab-Rcn

$1,655,983

$1,545,983

$1,545,983 $110,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 129 of 226Includes inflation and indirects using program

Page 148: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 16 / NH 25

OSSIPEE (14749)

NH 16/NH 25; REPLACE THREE RED LIST BRIDGES,

137/299, 137/297, 152/268 & RESURFACE APPROX

3.2 MILES.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

2,319,851Construction 2021 Bridg-T1-2-Rehab-Rcn

539,000Construction 2021 Pave-T2-Rehab

8,180Construction 2021 NON-PAR (other)

$21,505,291

$2,867,031

$2,867,031 $18,638,259Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16

OSSIPEE (41251)

PAVEMENT REHAB AND DRAINAGE UPGRADES

INCLUDING IMPROVEMENTS AT MT. SHAW RD.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

41,120Preliminary Engineering 2021 Pave-T2-Rehab

1,743,467Construction 2021 Pave-T2-Rehab

1,113,871Construction 2022 Pave-T2-Rehab

$3,053,458

$2,898,459

$2,898,459 $154,999Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 130 of 226Includes inflation and indirects using program

Page 149: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

MAIN STREET

PELHAM (16145)

MAIN ST OVER BEAVER BROOK - BR

REPLACEMENT (BR. NO. 110/090) AND CULV

REPLACEMENT (BR. NO. 111/090)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

73,502Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

66,842Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

25,095Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

49,405Right of Way 2022 Bridg-T3-4-Rehab-Rcn

2,174,921Construction 2023 Bridg-T3-4-Rehab-Rcn

$2,668,776

$2,389,764

$2,389,764 $279,012Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

OLD BRIDGE STREET OVER BEAVER BROOK

PELHAM (29450)

BRIDGE REHABILITATION-OLD BRIDGE ST OVER

BEAVER BROOK-BR. #109/081

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

137,382Preliminary Engineering 2022 SAB *

63,407Right of Way 2022 SAB *

797,872Construction 2022 SAB *

500,000Construction 2023 SAB *

$1,498,661

$1,498,661

$1,498,661 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 131 of 226Includes inflation and indirects using program

Page 150: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 128 & SHERBURNE RD

PELHAM (41751)

INTERSECTION IMPROVEMENTS AT THE

INTERSECTION OF NH128 & SHERBURNE RD AND

MAMMOTH & NH111A

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

796,700Construction 2021 CMAQ *

819,008Construction 2022 CMAQ *

$1,994,887

$1,615,708

$1,615,708 $379,179Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 202 / NH 101

PETERBOROUGH (15879)

BRIDGE REPLACEMENT AND WIDENING FOR TCP,

US 202 & NH 101 OVER CONTOOCOOK RIVER (RED

LIST)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

9,080,111Construction 2021 Bridg-T1-2-Rehab-Rcn

248,584Construction 2021 NON-PAR (other)

1,273,466Construction 2022 Bridg-T1-2-Rehab-Rcn

$11,773,249

$10,602,160

$10,602,160 $1,171,089Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 132 of 226Includes inflation and indirects using program

Page 151: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US ROUTE 202 AND NH ROUTE 123

PETERBOROUGH (27712)

BRIDGE REPLACEMENT OF BRIDGE CARRYING US

202 AND NH 123 OVER CONTOOCOOK RIVER

(108/116)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

226,160Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

232,492Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

119,501Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

122,847Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

232,492Right of Way 2022 Bridg-T1-2-Rehab-Rcn

6,314,344Construction 2025 Bridg-T1-2-Rehab-Rcn

$7,632,838

$7,247,838

$7,247,838 $385,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SHAW ROAD

PITTSFIELD (14972)

BRIDGE REPLACEMENT OVER KELLY BROOK

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

98,500Preliminary Engineering 2027 SAB *

6,066Right of Way 2027 SAB *

303,314Construction 2027 SAB *

311,806Construction 2028 SAB *

$719,687

$719,687

$719,687 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 133 of 226Includes inflation and indirects using program

Page 152: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 125

PLAISTOW - KINGSTON (10044E)

RECONSTRUCT NH 125: ANTICIPATED 3 LANES,

FROM SOUTH OF TOWN LINE NORTHERLY

APPROX 1.8 MI

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

113,080Preliminary Engineering 2021 Other Fed Aid

791,560Right of Way 2021 Other Fed Aid

6,302,912Construction 2023 Other Fed Aid

6,258,906Construction 2024 Other Fed Aid

$17,200,958

$13,466,458

$13,466,458 $3,734,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 121A / MAIN STREET

PLAISTOW (40641)

MAIN STREET TRAFFIC CALMING AND SAFETY

IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

56,540Preliminary Engineering 2021 None-Highway

55,146Right of Way 2023 None-Highway

1,015,994Construction 2025 None-Highway

$1,237,681

$1,127,681

$1,127,681 $110,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 134 of 226Includes inflation and indirects using program

Page 153: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 125

PLAISTOW (40645)

SIGNAL COORDINATION AND CONTROL ALONG

CORRIDOR FROM MASS S/L TO OLD COUNTY

ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

298,753Preliminary Engineering 2023 None-Highway

56,147Right of Way 2025 None-Highway

984,241Construction 2026 None-Highway

$1,339,141

$1,339,141

$1,339,141 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HIGHLAND ST

PLYMOUTH (41583)

RECONSTRUCTION & INTERSECTION

IMPROVEMENTS TO HIGHLAND STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

82,290Preliminary Engineering 2022 None-Highway

12,285Right of Way 2024 None-Highway

1,296,263Construction 2025 None-Highway

$1,390,837

$1,390,837

$1,390,837 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 135 of 226Includes inflation and indirects using program

Page 154: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

US 1 BYPASS

PORTSMOUTH, NH - KITTERY, ME (15731)

BRIDGE REPLACEMENT, US 1 BYPASS OVER

PISCATAQUA RIVER (SARAH MILDRED LONG

BRIDGE) (RED LIST)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

2,827,000Right of Way 2021 Bridg-HIB-Rehab-Rcn

2,906,156Right of Way 2022 Bridg-HIB-Rehab-Rcn

$221,903,602

$5,733,156

$5,733,156 $216,170,446Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-95

PORTSMOUTH, NH - KITTERY, ME (16189)

PRESERVATION OF BRIDGE OVER PISCATAQUA

RIVER (HIGH LEVEL BRIDGE)

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

10,300,000Construction 2021 TRR *

714,157Construction 2022 TRR *

$53,738,844

$11,014,157

$11,014,157 $42,724,687Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 136 of 226Includes inflation and indirects using program

Page 155: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-95

PORTSMOUTH, NH - YORK, ME (16189B)

ITS IMPROVEMENTS TO I-95 FROM PORTSMOUTH,

NH TO YORK, ME

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

3,072,251Construction 2021 TRR *

1,579,137Construction 2022 TRR *

$5,918,532

$4,651,389

$4,651,389 $1,267,143Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 1

PORTSMOUTH (29640)

US RTE 1 IMPROVEMENTS (1.7 MI.) FROM

CONSTITUTION DR TO WILSON RD & FROM OCEAN

RD TO WHITE CEDAR DR

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,162,462Preliminary Engineering 2022 None-Highway

3,754,754Right of Way 2022 None-Highway

5,420,438Construction 2025 None-Highway

$11,602,654

$10,337,654

$10,337,654 $1,265,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 137 of 226Includes inflation and indirects using program

Page 156: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

PORTSMOUTH INTERNATIONAL AIRPORT

PORTSMOUTH (40562)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

1,243,880Other 2021 Airport Improvement

6,458,124Other 2022 Airport Improvement

11,105,156Other 2023 Airport Improvement

6,700,755Other 2024 Airport Improvement

6,888,376Other 2025 Airport Improvement

6,727,188Other 2026 Airport Improvement

7,892,219Other 2027 Airport Improvement

7,420,991Other 2028 Airport Improvement

5,128,591Other 2029 Airport Improvement

2,636,096Other 2030 Airport Improvement

$62,201,373

$62,201,373

$62,201,373 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAPLEWOOD AVENUE

PORTSMOUTH (40642)

COMPLETE STREETS IMPROVEMENTS ON

MAPLEWOOD AVENUE FROM CONGRESS STREET

TO VAUGHAN STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

25,700Preliminary Engineering 2021 None-Highway

54,319Preliminary Engineering 2023 None-Highway

27,431Right of Way 2023 None-Highway

585,455Construction 2025 None-Highway

$742,904

$692,904

$692,904 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 138 of 226Includes inflation and indirects using program

Page 157: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

MARKET STREET - RR

PORTSMOUTH (40644)

RAILROAD CROSSING UPGRADE ON MARKET

STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

82,456Preliminary Engineering 2023 None-Highway

43,569Right of Way 2025 None-Highway

761,411Construction 2026 None-Highway

$887,436

$887,436

$887,436 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MARKET ST/RUSSELL ST

PORTSMOUTH (42608)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

236,042Preliminary Engineering 2026 None-Other

62,361Right of Way 2028 None-Other

1,096,236Construction 2029 None-Other

$1,394,639

$1,394,639

$1,394,639 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 139 of 226Includes inflation and indirects using program

Page 158: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

GRAFTON DRIVE

PORTSMOUTH (42611)

INTERSECTION IMPROVEMENTS ON GRAFTON

DRIVE BY PORTSMOUTH TRANSPORTATION

CENTER & PEASE GOLF COURSE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

118,021Preliminary Engineering 2026 None-Other

527,219Construction 2030 None-Other

$645,240

$645,240

$645,240 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

INTERNATIONAL DR/MANCHESTER

SQ/CORPORATE DR

PORTSMOUTH (42612)

SIGNALIZATION OF INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

90,994Preliminary Engineering 2027 None-Other

296,561Construction 2030 None-Other

$387,555

$387,555

$387,555 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 140 of 226Includes inflation and indirects using program

Page 159: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PORTSMOUTH (42874)

PURCHASE AND INSTALL FOUR ELECTRIC

CHARGING STATIONS FOR ELECTRIC VEHICLES.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

5,000Preliminary Engineering 2021 CMAQ *

45,000Construction 2022 CMAQ *

$50,000

$50,000

$50,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NEW HAMPSHIRE AVE/ARBORETUM DR/PEASE

BLVD

PORTSMOUTH (42879)

CONSTRUCT RIGHT TURN LANE ON THE

NORTHBOUND DIRECTION OF NEW HAMPSHIRE

AVE INTERSECTION

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

40,000Preliminary Engineering 2021 CMAQ *

391,095Construction 2024 CMAQ *

$431,095

$431,095

$431,095 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 141 of 226Includes inflation and indirects using program

Page 160: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

WHIPPLE HILL RD OVER ROARING BROOK

RICHMOND (29055)

BRIDGE REPLACEMENT-WHIPPLE HILL RD OVER

ROARING BROOK-BR. #065/083

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

207,399Preliminary Engineering 2021 SAB *

5,140Right of Way 2021 SAB *

1,170,121Construction 2021 SAB *

$1,382,660

$1,382,660

$1,382,660 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

TULLY BROOK RD OVER TULLY BROOK

RICHMOND (29056)

BRIDGE REHAB-TULLY BROOK RD OVER TULLY

BROOK-BR. #155/066

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

137,382Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

321,791Construction 2023 SAB *

450,302Construction 2024 SAB *

$914,759

$914,759

$914,759 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 142 of 226Includes inflation and indirects using program

Page 161: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

WELLINGTON RD

RINDGE (22652)

BRIDGE REPLACEMENT-WELLINGTON ROAD OVER

CONVERSEVILLE BROOK-BR. #154/069

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

493,440Construction 2021 SAB *

$1,038,440

$493,440

$493,440 $545,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SKYHAVEN AIRPORT

ROCHESTER (40575)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

352,261Other 2022 Airport Improvement

1,907,190Other 2023 Airport Improvement

372,264Other 2024 Airport Improvement

637,813Other 2025 Airport Improvement

327,836Other 2026 Airport Improvement

1,348,060Other 2027 Airport Improvement

207,871Other 2028 Airport Improvement

320,537Other 2029 Airport Improvement

395,414Other 2030 Airport Improvement

$5,869,247

$5,869,247

$5,869,247 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 143 of 226Includes inflation and indirects using program

Page 162: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 125 AND LOWELL STREET

ROCHESTER (40647)

INTERSECTION SAFETY IMPROVEMENTS AT THIS 5

WAY INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

191,202Preliminary Engineering 2023 None-Highway

101,030Right of Way 2025 None-Highway

1,765,592Construction 2026 None-Highway

$2,057,823

$2,057,823

$2,057,823 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CHARLES ST/NH125/OLD DOVER RD

ROCHESTER (42625)

INTERSECTION IMPROVEMENTS-REASSESSMENT

OF TURNING LANE ALIGNMENT&VEHICLE ACCESS.

UPDATE SIDEWALK.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

354,063Preliminary Engineering 2026 None-Other

31,181Right of Way 2028 None-Other

2,636,096Construction 2030 None-Other

$3,021,339

$3,021,339

$3,021,339 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 144 of 226Includes inflation and indirects using program

Page 163: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

OAK STREET

ROLLINSFORD - DOVER (42578)

ADDRESS RED LIST BRIDGE (069/046) CARRYING

OAK STREET OVER PAR BETWEEN ROLLINSFORD

AND DOVER

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

119,501Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

184,271Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

129,823Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

66,729Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

66,729Right of Way 2027 Bridg-T3-4-Rehab-Rcn

2,669,159Construction 2027 Bridg-T3-4-Rehab-Rcn

$3,236,212

$3,236,212

$3,236,212 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BUFFALO ROAD OVER BROOK

RUMNEY (27162)

BRIDGE REPLACEMENT-BUFFALO RD OVER

BROOK-BR. #093/082

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

137,382Preliminary Engineering 2023 SAB *

5,284Right of Way 2023 SAB *

355,079Construction 2023 SAB *

441,068Construction 2024 SAB *

$938,813

$938,813

$938,813 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 145 of 226Includes inflation and indirects using program

Page 164: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

SALEM TO MANCHESTER (10418X)

FINAL DESIGN (PE) AND ROW FOR I-93 SALEM TO

MANCHESTER CORRIDOR POST SEPTEMBER 4,

2014

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

163,966Preliminary Engineering 2021 Other Fed Aid

$8,930,921

$163,966

$163,966 $8,766,955Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633)

DEBT SERVICE PROJECT FOR I-93 CAPACITY

IMPROVEMENTS - NORTHERN PROJECTS

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

2,147,107Construction 2021 SB367-4-CENTS

2,195,000Construction 2022 SB367-4-CENTS

2,195,000Construction 2023 SB367-4-CENTS

2,197,986Construction 2024 SB367-4-CENTS

2,192,014Construction 2025 SB367-4-CENTS

23,405,706Construction 2026 SB367-4-CENTS

23,405,706Construction 2027 SB367-4-CENTS

23,405,706Construction 2028 SB367-4-CENTS

23,405,706Construction 2029 SB367-4-CENTS

23,405,706Construction 2030 SB367-4-CENTS

$226,110,017

$127,955,637

$127,955,637 $4,531,556Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$93,622,824

Page 146 of 226Includes inflation and indirects using program

Page 165: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800A)

MAINLINE, EXIT 1-STA 1130 & NH38 (SALEM),

BRIDGES 073/063 & 077/063 BOTH RED LIST-DEBT

SERV 13933D

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

6,410,959Construction 2021 GARVEE Debt Service

539,572Construction 2021 RZED

6,406,313Construction 2022 GARVEE Debt Service

464,358Construction 2022 RZED

6,396,934Construction 2023 GARVEE Debt Service

362,483Construction 2023 RZED

6,370,041Construction 2024 GARVEE Debt Service

269,079Construction 2024 RZED

6,368,631Construction 2025 GARVEE Debt Service

139,025Construction 2025 RZED

$49,772,025

$33,727,395

$33,727,395 $16,044,630Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 147 of 226Includes inflation and indirects using program

Page 166: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800B)

I-93 EXIT 5 INTERCHANGE RECONSTRUCTION

(LONDONDERRY) - DEBT SERVICE FOR PROJECT

14633F

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

6,975,745Construction 2021 GARVEE Debt Service

587,107Construction 2021 RZED

6,970,689Construction 2022 GARVEE Debt Service

505,267Construction 2022 RZED

6,960,485Construction 2023 GARVEE Debt Service

394,417Construction 2023 RZED

6,931,223Construction 2024 GARVEE Debt Service

292,784Construction 2024 RZED

6,929,688Construction 2025 GARVEE Debt Service

151,272Construction 2025 RZED

$56,173,764

$36,698,677

$36,698,677 $19,475,088Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 148 of 226Includes inflation and indirects using program

Page 167: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800C)

EXIT 3 AREA, PROJECT INITIATED TO TRACK

GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO

THE 13933N PROJECT

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

2,375,555Construction 2021 GARVEE Debt Service

199,936Construction 2021 RZED

2,373,833Construction 2022 GARVEE Debt Service

172,066Construction 2022 RZED

2,370,358Construction 2023 GARVEE Debt Service

134,317Construction 2023 RZED

2,360,393Construction 2024 GARVEE Debt Service

99,706Construction 2024 RZED

2,359,871Construction 2025 GARVEE Debt Service

51,515Construction 2025 RZED

$18,268,809

$12,497,551

$12,497,551 $5,771,258Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 149 of 226Includes inflation and indirects using program

Page 168: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800F)

I-93 EXIT 3 AREA -NB ML CONNECTIONS, NB

RAMPS & NH 111A RELOCATION - DEBT SERVICE

PROJECT FOR 13933H

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

718,363Construction 2021 GARVEE-11

60,460Construction 2021 RZED

717,842Construction 2022 GARVEE-11

52,032Construction 2022 RZED

716,792Construction 2023 GARVEE-11

40,617Construction 2023 RZED

713,778Construction 2024 GARVEE-11

30,151Construction 2024 RZED

713,620Construction 2025 GARVEE-11

15,578Construction 2025 RZED

$35,721,206

$3,779,234

$3,779,234 $31,941,972Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 28

SALEM (12334)

RECONSTRUCT DEPOT INTERSECTION NH28

(BROADWAY) AND NH 97 (MAIN STREET) ADD

TURN LANES ON NH28 MUPCA

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

1,542,000Construction 2021 Other Fed Aid

$12,233,530

$1,542,000

$1,542,000 $10,691,530Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 150 of 226Includes inflation and indirects using program

Page 169: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

SALEM (42884)

IMPROVE SIGNAL OPERATION AT 28

INTERSECTIONS TO IDENTIFY HARDWARE AND

SOFTWARE UPGRADES NEEDED.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

200,000Preliminary Engineering 2021 CMAQ *

1,303,649Construction 2024 CMAQ *

111,679Construction 2025 CMAQ *

$1,615,328

$1,615,328

$1,615,328 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RTE 28

SALEM (42885)

CONSTRUCT RAIL TRAIL ALONG NH 28 FOR

APPROXIMATELY 1 MILE.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

514,000Construction 2022 CMAQ *

528,392Construction 2023 CMAQ *

$1,042,392

$1,042,392

$1,042,392 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 151 of 226Includes inflation and indirects using program

Page 170: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-93

SANBORNTON-NEW HAMPTON (41705)

PAINTING I-93 BRIDGES BETWEEN SANBORNTON

AND NEW HAMPTON

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

2,452,796Construction 2022 Bridg-T1-2-Main-Pres

$2,492,396

$2,452,796

$2,452,796 $39,600Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PHILLIPS ROAD OVER EXETER RIVER

SANDOWN (41412)

BRIDGE REPLACEMENT-PHILLIPS ROAD OVER

EXETER RIVER-BR. #093/109

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

109,193Preliminary Engineering 2027 SAB *

6,066Right of Way 2027 SAB *

364,280Construction 2027 SAB *

449,313Construction 2028 SAB *

$928,852

$928,852

$928,852 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 152 of 226Includes inflation and indirects using program

Page 171: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 1A

SEABROOK - HAMPTON (15904)

Reconstruction of the bridge over Hampton River-

[BRPPI*6601]

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

1,507,526Preliminary Engineering 2021 Bridg-HIB-Rehab-Rcn

1,192,105Preliminary Engineering 2022 Bridg-HIB-Rehab-Rcn

594,603Right of Way 2021 Bridg-HIB-Rehab-Rcn

10,177,358Construction 2023 Bridg-HIB-Rehab-Rcn

16,001,202Construction 2024 Bridg-HIB-Rehab-Rcn

13,918,584Construction 2025 Bridg-HIB-Rehab-Rcn

22,763,211Construction 2026 Bridg-HIB-Rehab-Rcn

$69,302,618

$66,154,590

$66,154,590 $3,148,028Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 1

SEABROOK (41712)

CAPACITY IMPROVEMENTS ON US 1 BETWEEN

NEW ZEALAND ROAD AND THE HAMPTON FALLS

TOWN LINE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

100,244Right of Way 2021 NON-PAR (other)

100,244Right of Way 2021 None-Other

1,249,330Construction 2023 NON-PAR (other)

1,218,264Construction 2023 None-Other

$2,968,081

$2,668,081

$2,668,081 $300,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 153 of 226Includes inflation and indirects using program

Page 172: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

SEABROOK BRANCH RAIL CORRIDOR

SEABROOK (42609)

MULTI-USE PATH ON FORMER B & M RAILROAD

TRACKS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

142,800Preliminary Engineering 2027 None-Other

1,243,973Construction 2030 None-Other

$1,386,773

$1,386,773

$1,386,773 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US ROUTE 2

SHELBURNE (40363)

BRIDGE REHABILITATION OF RED LIST BRIDGE

CARRYING US ROUTE 2 OVER PEA BROOK (BR NO

049/089)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

1,743,694Construction 2022 Bridg-T1-2-Rehab-Rcn

$2,043,694

$1,743,694

$1,743,694 $300,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 154 of 226Includes inflation and indirects using program

Page 173: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NORTH ROAD

SHELBURNE (40551)

BRIDGE REHABILITATION OF THE BRIDGE

CARRYING NORTH ROAD OVER ANDROSCOGGIN

RIVER (BR NO 075/113)

Route/Road

Scope

Program

BRIDGES

TIER 4

Category

Strategy

245,694Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

252,574Preliminary Engineering 2025 Bridg-T3-4-Rehab-Rcn

4,284,156Construction 2026 Bridg-T3-4-Rehab-Rcn

$5,277,424

$4,782,424

$4,782,424 $495,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 2

SHELBURNE (42599)

CULVERT UPGRADES

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

442,004Preliminary Engineering 2025 None-Other

133,458Right of Way 2027 None-Other

2,045,025Construction 2029 None-Other

$2,620,488

$2,620,488

$2,620,488 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 155 of 226Includes inflation and indirects using program

Page 174: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 9 (HIGH STREET), BLACKWATER RD, INDIGO

HILL RD

SOMERSWORTH (40646)

INTERSECTION SAFETY IMPROVEMENTS; NH

ROUTE 9, BLACKWATER ROAD, INDIGO HILL ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

116,246Preliminary Engineering 2022 None-Highway

140,414Right of Way 2023 None-Highway

2,586,906Construction 2025 None-Highway

$3,173,566

$2,843,566

$2,843,566 $330,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PORTIONS ON HIGH STREET, MEMORIAL DRIVE,

CEMETERY RD.

SOMERSWORTH (41363)

CONST SIDEWALKS ON HIGH ST, MEMORIAL DR,

CEMETERY RD, UPGRADE CROSSWALK ACROSS

HIGH ST, CONST PATH

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

895,902Construction 2021 TA *

$1,048,304

$895,902

$895,902 $152,402Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HIGHT STREET / ROUTE 108

SOMERSWORTH (41741)

SIGNAL OPTIMIZATION ON HIGH STREET / ROUTE

108 CORRIDOR

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

635,818Construction 2021 CMAQ *

$716,068

$635,818

$635,818 $80,250Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 156 of 226Includes inflation and indirects using program

Page 175: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

HIGH STREET & WEST HIGH STRRET

SOMERSWORTH (42627)

PEDESTRIAN IMPROVEMENTS TO CONNECT

SCHOOLS TO THE DOWNTOWN.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

140,936Preliminary Engineering 2028 None-Other

1,340,455Construction 2030 None-Other

$1,481,391

$1,481,391

$1,481,391 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

STATEWIDE

STATE CAPITAL BUDGET RAIL & AIRPORT ACQUISITION (41539)

STATE CAPITAL BUDGET FUNDING FOR

ACQUISITION OF RAILROAD & AIRPORT

PROPERTIES

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

56,540Right of Way 2021 None-Other

$332,648

$56,540

$56,540 $276,108Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BLUE STAR (I-95), F.E. EVERETT & SPAULDING

TURNPIKE

STATEWIDE GUARDRAIL REPAIR (42444)

CENTRAL AND EASTERN TURNPIKES

GUARDAIL/FENCE REPAIR ON AS NEEDED BASIS.

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

112,495Construction 2021 NON-PAR (other)

$225,990

$112,495

$112,495 $113,495Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 157 of 226Includes inflation and indirects using program

Page 176: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATEWIDE

STATEWIDE STRIPING (TURNPIKES) (41823)

STATEWIDE STRIPING (TURNPIKES)

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

233,356Construction 2021 TRR *

$386,356

$233,356

$233,356 $153,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE, RED LIST BRIDGES (40817)

TO REHABILITATE AND RECONSTRUCT STATE RED

LIST BRIDGES

Route/Road

Scope

Program

RED LIST BRIDGES

ALL TIERS

Category

Strategy

950,000Preliminary Engineering 2028 Other Fed Aid

950,000Preliminary Engineering 2029 Other Fed Aid

950,000Preliminary Engineering 2030 Other Fed Aid

50,000Right of Way 2028 Other Fed Aid

50,000Right of Way 2029 Other Fed Aid

50,000Right of Way 2030 Other Fed Aid

$3,000,000

$3,000,000

$3,000,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 158 of 226Includes inflation and indirects using program

Page 177: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

STATEWIDE (28956)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPS/STRIPES ALONG STATE

ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

23,900Preliminary Engineering 2023 HSIP *

589,666Construction 2024 HSIP *

$613,567

$613,567

$613,567 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

STATEWIDE

STATEWIDE (40581)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

154,200Other 2021 Airport Improvement

158,518Other 2022 Airport Improvement

162,956Other 2023 Airport Improvement

744,529Other 2024 Airport Improvement

172,209Other 2025 Airport Improvement

177,031Other 2026 Airport Improvement

181,988Other 2027 Airport Improvement

187,084Other 2028 Airport Improvement

192,322Other 2029 Airport Improvement

197,707Other 2030 Airport Improvement

$2,328,544

$2,328,544

$2,328,544 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 159 of 226Includes inflation and indirects using program

Page 178: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

STATEWIDE (40843)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

22,616Preliminary Engineering 2021 HSIP *

542,784Construction 2021 HSIP *

$565,400

$565,400

$565,400 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE (40844)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

23,249Preliminary Engineering 2022 HSIP *

557,982Construction 2022 HSIP *

$581,231

$581,231

$581,231 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 160 of 226Includes inflation and indirects using program

Page 179: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

STATEWIDE (40845)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

23,900Preliminary Engineering 2023 HSIP *

573,605Construction 2023 HSIP *

$597,506

$597,506

$597,506 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE (42878)

UPGRADES TO 10 LOCATIONS STATEWIDE THAT

MAY INCLUDE FLASHING YELLOW ARROW&

OPTIMIZED SIGNAL TIMING.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

67,848Preliminary Engineering 2022 CMAQ *

497,552Construction 2022 CMAQ *

$565,400

$565,400

$565,400 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE-SPR (26962U)

IMPROVED PRACTICES FOR DETERMINING THE

INFILTRATION CHARACTERISTICS OF SOILS FOR

STORMWATER BMPS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

18,965State Planning Research 2021 SPR2

$123,510

$18,965

$18,965 $104,545Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 161 of 226Includes inflation and indirects using program

Page 180: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 16

STATEWIDE-SPR (26962W)

LOG JAM MONITORING

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

11,303State Planning Research 2021 SPR2

5,812State Planning Research 2022 SPR2

$110,587

$17,116

$17,116 $93,471Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE-SPR (26962Y)

ASSESSMENT OF EMBEDDED CULVERT LOW

FLOW HYDRAULICS

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

12,646State Planning Research 2021 SPR2

$82,352

$12,646

$12,646 $69,706Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE-SPR (26962Z)

USE OF SMART ROCKS TO IMPROVE SLOPE

DESIGN

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

17,004State Planning Research 2021 SPR2

$110,737

$17,004

$17,004 $93,733Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 162 of 226Includes inflation and indirects using program

Page 181: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

STATEWIDE (WLDFL)

NATIVE WILDFLOWER AND LILAC PLANTINGS.

STATEWIDE

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

10,000Preliminary Engineering 2021 NON-PAR (other)

10,000Preliminary Engineering 2022 NON-PAR (other)

10,000Preliminary Engineering 2023 NON-PAR (other)

10,000Preliminary Engineering 2024 NON-PAR (other)

10,000Preliminary Engineering 2025 NON-PAR (other)

10,000Preliminary Engineering 2026 NON-PAR (other)

10,000Preliminary Engineering 2027 NON-PAR (other)

10,000Preliminary Engineering 2028 NON-PAR (other)

10,000Preliminary Engineering 2029 NON-PAR (other)

10,000Preliminary Engineering 2030 NON-PAR (other)

40,000Construction 2021 NON-PAR (other)

40,000Construction 2022 NON-PAR (other)

40,000Construction 2023 NON-PAR (other)

40,000Construction 2024 NON-PAR (other)

40,000Construction 2025 NON-PAR (other)

40,000Construction 2026 NON-PAR (other)

40,000Construction 2027 NON-PAR (other)

40,000Construction 2028 NON-PAR (other)

40,000Construction 2029 NON-PAR (other)

40,000Construction 2030 NON-PAR (other)

$700,000

$500,000

$500,000 $200,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 163 of 226Includes inflation and indirects using program

Page 182: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH108/BUNKER HILL AVENUE

STRATHAM (41711)

SIGNALIZATION, TURN LANES AND INTERSECTION

REALIGNMENT AT THE NH108/ BUNKER HILL

INTERSECTION.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

150,001Preliminary Engineering 2021 None-Other

89,626Preliminary Engineering 2023 None-Other

31,572Preliminary Engineering 2025 None-Other

63,143Right of Way 2025 None-Other

1,068,792Construction 2027 None-Other

$1,403,133

$1,403,133

$1,403,133 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CRANE HILL ROAD

SUGAR HILL (24218)

REPLACE CRANE HILL RD BRIDGE OVER GALE

RIVER-BR. #202/128

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

154,200Preliminary Engineering 2021 MOBRR *

5,140Right of Way 2021 MOBRR *

968,189Construction 2021 MOBRR *

1,127,397Construction 2022 MOBRR *

$2,254,926

$2,254,926

$2,254,926 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 164 of 226Includes inflation and indirects using program

Page 183: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 12

SURRY (41470)

ADDRESS BRIDGE CARRYING NH 12 OVER NHRR

(ABD) IN THE TOWN OF SURRY (082/040)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

84,810Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

896,259Construction 2023 Bridg-T1-2-Rehab-Rcn

$1,063,569

$981,069

$981,069 $82,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89

SUTTON - NEW LONDON (40511)

PAVEMENT JOINT NORTH OF EXIT 10 TO

PAVEMENT JOINT AT EXIT 11. INCLUDES EXIT 11

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

178,380Preliminary Engineering 2021 Pave-T1-Rehab

122,250Preliminary Engineering 2022 Pave-T1-Rehab

59,461Right of Way 2021 Pave-T1-Rehab

61,125Right of Way 2022 Pave-T1-Rehab

7,500,000Construction 2022 GARVEE-21

$7,921,216

$7,921,216

$7,921,216 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 165 of 226Includes inflation and indirects using program

Page 184: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-89 NB

SUTTON (41466)

BRIDGE REHAB, BRIDGE CARRYING I-89 NB OVER

NH 114 IN THE TOWN OF SUTTON (109/145)

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

226,160Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

116,246Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

1,792,517Construction 2023 Bridg-T1-2-Rehab-Rcn

$2,134,923

$2,134,923

$2,134,923 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89

SUTTON (42419)

REHABILITATE FROM MM 24.2 TO MM 28.7

INCLUDING THE RAMPS FOR EXIT 10

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

16,400,000Construction 2022 GARVEE-21

$16,840,000

$16,400,000

$16,400,000 $440,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 32

SWANZEY (27692)

ADDRESS RED LIST BRIDGE (149/072) CARRYING

NH ROUTE 32 OVER MARTIN BROOK IN THE TOWN

OF SWANZEY

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

1,511,201Construction 2022 Bridg-T3-4-Rehab-Rcn

$1,861,201

$1,511,201

$1,511,201 $350,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 166 of 226Includes inflation and indirects using program

Page 185: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CHRISTIAN HILL ROAD OVER NHRR

SWANZEY (41403)

BRIDGE REPLACEMENT-CHRISTIAN HILL ROAD

OVER NHRR-BR. #098/122

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

195,320Preliminary Engineering 2024 SAB *

51,400Right of Way 2024 SAB *

699,039Construction 2024 SAB *

699,040Construction 2025 SAB *

$1,644,801

$1,644,801

$1,644,801 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

ASHUELOT TRAIL CHESHIRE TRAIL

SWANZEY (42511)

CONSTRUCT MULTI-USE PATH ON ABANDONED

RAIL CORRIDORS ASHUELOT TRAIL AND IMPROVE

CHESHIRE TRAIL

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

25,700Preliminary Engineering 2021 TA *

1,028Right of Way 2021 TA *

752,718Construction 2024 TA *

$829,446

$779,446

$779,446 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 167 of 226Includes inflation and indirects using program

Page 186: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 113A

TAMWORTH (41434)

ADDRESS RED LIST BRIDGE CARRYING NH 113A

OVER SWIFT RIVER IN THE TOWN OF TAMWORTH

(061/091)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

113,080Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

1,195,011Construction 2023 Bridg-T3-4-Rehab-Rcn

$1,418,091

$1,308,091

$1,308,091 $110,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 49

THORNTON (40613)

DECK REPLACEMENT AND SCOUR PROTECTION

FOR THE BRIDGE CARRYING NH 49 OVER MAD

RIVER (BR NO 239/152)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

226,160Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

4,913,887Construction 2024 Bridg-T3-4-Rehab-Rcn

$5,590,047

$5,140,047

$5,140,047 $450,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 168 of 226Includes inflation and indirects using program

Page 187: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

MAIN/SCHOOL STREET

TILTON (42600)

INTERSECTION SAFETY IMPROVEMENTS

(ROUNDABOUT)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

614,236Preliminary Engineering 2024 None-Other

333,645Right of Way 2027 None-Other

1,496,544Construction 2029 None-Other

$3,063,548

$2,444,425

$2,444,425 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$619,123

Phase Year Funding

NH ROUTE 12

TROY (40370)

BRIDGE REPLACEMENT OF BRIDGE CARRYING NH

12 OVER S BRANCH ASHUELOT RIVER (BR NO

089/114)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

108,110Right of Way 2021 Bridg-T1-2-Rehab-Rcn

3,427,456Construction 2023 Bridg-T1-2-Rehab-Rcn

$4,472,380

$3,535,566

$3,535,566 $936,814Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 169 of 226Includes inflation and indirects using program

Page 188: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH ROUTE 12

TROY (40371)

BRIDGE REPLACEMENT OF THE BRIDGE (BR NO

096/091) CARRYING NH ROUTE 12 OVER NHRR

(ABD)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

118,921Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

5,026,936Construction 2023 Bridg-T1-2-Rehab-Rcn

$6,150,061

$5,145,857

$5,145,857 $1,004,204Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BRIDGE STREET

WALPOLE, NH - ROCKINGHAM, VT (41720)

VILAS BRIDGE REHABILITATION OVER THE

CONNECTICUT RIVER.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

478,005Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

434,550Preliminary Engineering 2023 NON-PAR (other)

32,456Right of Way 2026 Bridg-T3-4-Rehab-Rcn

29,505Right of Way 2026 NON-PAR (other)

4,783,571Construction 2028 Bridg-T3-4-Rehab-Rcn

4,470,464Construction 2029 NON-PAR (other)

$10,228,550

$10,228,550

$10,228,550 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

50% funding needed from other sources.Comments

$0

Page 170 of 226Includes inflation and indirects using program

Page 189: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

I-89

WARNER - SUTTON (15747)

PAVEMENT REHAB FROM MM 20.5 TO MM 24.2

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

15,100,000Construction 2021 GARVEE-21

$15,595,000

$15,100,000

$15,100,000 $495,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 127

WARNER (15907)

NH 127 OVER WARNER RIVER - BRIDGE

REPLACEMENT

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

2,091,980Construction 2021 Bridg-T3-4-Rehab-Rcn

$2,416,480

$2,091,980

$2,091,980 $324,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 103

WARNER (40622)

DECK REPLACEMENT FOR THE RED LIST BRIDGE

CARRYING NH 103 OVER I-89 NB (BR NO 202/136)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

1,195,011Construction 2023 Bridg-T3-4-Rehab-Rcn

$1,445,011

$1,195,011

$1,195,011 $250,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 171 of 226Includes inflation and indirects using program

Page 190: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

LULL ROAD OVER PEACOCK BROOK

WEARE (14338)

BRIDGE REPLACEMENT-LULL RD OVER PEACOCK

BROOK - BR. #082/045

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

118,021Preliminary Engineering 2026 SAB *

5,901Right of Way 2026 SAB *

219,519Construction 2026 SAB *

225,665Construction 2027 SAB *

$569,106

$569,106

$569,106 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 77

WEARE (41471)

ADDRESS BRIDGE CARRYING NH 77 OVER CANAL 2

CHOATE BROOK IN THE TOWN OF WEARE

(159/178)

Route/Road

Scope

Program

BRIDGES

TIER 4

Category

Strategy

116,246Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

122,847Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

129,823Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

266,916Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

3,429,870Construction 2028 Bridg-T3-4-Rehab-Rcn

$4,065,702

$4,065,702

$4,065,702 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 172 of 226Includes inflation and indirects using program

Page 191: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CLOTHESPIN BRIDGE ROAD OVER BLACKWATER

RIVER

WEBSTER (40810)

BRIDGE REPLACEMENT-CLOTHESPIN BRIDGE

ROAD OVER BLACKWATER RIVER-BR. #121/103

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

281,539Preliminary Engineering 2024 SAB *

16,006Right of Way 2024 SAB *

869,099Construction 2024 SAB *

869,099Construction 2025 SAB *

$2,035,744

$2,035,744

$2,035,744 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 127

WEBSTER (41429)

ADDRESS RED LIST BRIDGE CARRYING NH 127

OVER BLACKWATER RIVER IN THE TOWN OF

WEBSTER (099/123)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

310,970Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

232,492Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

116,246Right of Way 2022 Bridg-T3-4-Rehab-Rcn

3,487,387Construction 2022 Bridg-T3-4-Rehab-Rcn

$4,284,596

$4,147,096

$4,147,096 $137,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 173 of 226Includes inflation and indirects using program

Page 192: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

HAZEN ROAD

WHITEFIELD (16025)

BRIDGE REHABILITATION-HAZEN RD OVER JOHNS

RIVER-BR. #159/098

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

34,874Preliminary Engineering 2022 SAB *

5,284Right of Way 2022 SAB *

78,477Construction 2022 SAB *

121,956Construction 2023 SAB *

$240,591

$240,591

$240,591 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MT. WASHINGTON REGIONAL AIRPORT

WHITEFIELD (40578)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

542,556Other 2021 Airport Improvement

352,261Other 2022 Airport Improvement

543,187Other 2023 Airport Improvement

62,045Other 2024 Airport Improvement

287,016Other 2025 Airport Improvement

606,627Other 2027 Airport Improvement

623,613Other 2028 Airport Improvement

1,068,456Other 2029 Airport Improvement

1,464,497Other 2030 Airport Improvement

$5,550,257

$5,550,257

$5,550,257 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 174 of 226Includes inflation and indirects using program

Page 193: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

LANCASTER RD

WHITEFIELD (41582)

ROADWAY RECON & SAFETY IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

116,246Preliminary Engineering 2022 None-Highway

94,715Preliminary Engineering 2025 None-Highway

6,314Right of Way 2025 None-Highway

3,416,524Construction 2027 None-Highway

$3,633,800

$3,633,800

$3,633,800 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 101

WILTON - MILFORD - AMHERST - BEDFORD (13692D)

TRAFFIC AND SAFETY IMPROVEMENTS

CONSISTENT WITH THE INTENT OF THE 2002

CORRIDOR STUDY

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

478,603Preliminary Engineering 2021 Other Fed Aid

2,895,720Construction 2022 Other Fed Aid

4,182,540Construction 2023 Other Fed Aid

$8,931,863

$7,556,863

$7,556,863 $1,375,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 175 of 226Includes inflation and indirects using program

Page 194: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

KING BROOK ROAD

WILTON (15767)

BRIDGE REHABILITATION-KING BROOK RD OVER

KING BROOK-BR. #074/060

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

531,887Construction 2021 SAB *

$1,184,287

$531,887

$531,887 $652,400Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

OLD COUNTY FARM ROAD

WILTON (15768)

BRIDGE REPLACEMENT-OLD COUNTY FARM RD

OVER BLOOD BROOK-BR. #060/118

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

51,663Preliminary Engineering 2027 SAB *

5,740Right of Way 2027 SAB *

195,170Construction 2027 SAB *

195,000Construction 2028 SAB *

$447,573

$447,573

$447,573 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 176 of 226Includes inflation and indirects using program

Page 195: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STAGE COACH ROAD

WILTON (26201)

BRIDGE REPLACEMENT-STAGE COACH RD OVER

BURTON POND-BR. #086/142

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

99,716Preliminary Engineering 2021 SAB *

6,682Right of Way 2021 SAB *

81,212Construction 2021 SAB *

193,391Construction 2022 SAB *

$381,001

$381,001

$381,001 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 28 AND ROULSTON ROAD

WINDHAM (40665)

INTERSECTION IMPROVEMENTS, ROULSTON ROAD

AND NH ROUTE 28 (ROCKINGHAM ROAD)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

87,185Preliminary Engineering 2022 None-Highway

20,913Preliminary Engineering 2023 None-Highway

30,712Preliminary Engineering 2024 None-Highway

11,050Right of Way 2025 None-Highway

1,390,893Construction 2026 None-Highway

$1,540,752

$1,540,752

$1,540,752 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 177 of 226Includes inflation and indirects using program

Page 196: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

CASTLE HILL ROAD OVER BEAVER BROOK

WINDHAM (41632)

BRIDGE REPLACEMENT-CASTLE HILL RD OVER

BEAVER BROOK-BR. #057/051

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

308,400Construction 2021 SAB *

$622,812

$308,400

$308,400 $314,412Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 28

WOLFEBORO (29615)

IMPROVEMENTS FROM NH 109 TO ALTON TOWN

LINE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

668,416Right of Way 2022 None-Highway

7,555,823Construction 2024 None-Highway

1,525,738Construction 2025 None-Highway

$10,655,544

$9,749,977

$9,749,977 $905,567Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 175

WOODSTOCK (27713)

BRIDGE REHAB OF RED LIST BRIDGE CARRYING

NH 175 OVER PEMIGEWASSET RIVER (177/148)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

3,685,415Construction 2024 Bridg-T3-4-Rehab-Rcn

$4,635,415

$3,685,415

$3,685,415 $950,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 178 of 226Includes inflation and indirects using program

Page 197: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NH 175 & I-93 SB AND NB & I-93 RAMP

WOODSTOCK-LINCOLN (42534)

SCOUR REPAIRS AT WOODSTOCK 195/093 (NH175

OVER PEMI) AND SCOUR PROTECTION AT 3 I-93

BRS. IN LINCOLN

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

593,670Construction 2021 Bridg-T1-2-Main-Pres

$1,088,670

$593,670

$593,670 $495,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NATIONAL SUMMER TRANSPORTATION INSTITUTE

PROGRAM (STATEWIDE PROGRAMMATIC) (NSTI)

PROGRAMMATIC PROJECT AS A COOPERATIVE

PROJECT AGREEMENT (CPA) WITH THE

UNIVERSITY OF NEW HAMPSHIRE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

20,000Other 2021 NSTI

20,000Other 2022 NSTI

50,000Other 2023 NSTI

50,000Other 2024 NSTI

50,000Other 2025 NSTI

50,000Other 2026 NSTI

50,000Other 2027 NSTI

50,000Other 2028 NSTI

50,000Other 2029 NSTI

50,000Other 2030 NSTI

Total $440,000

NoneComments

Page 179 of 226Includes inflation and indirects using program

Page 198: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (ADA)

UPGRADES TO SIDE WALKS, CURB RAMPS, AND

SIGNALS TO BE COMPLIANT WITH ADA LAWS.

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

70,000Preliminary Engineering 2021 ADA-Trans

70,000Preliminary Engineering 2023 ADA-Trans

70,000Preliminary Engineering 2025 ADA-Trans

70,000Preliminary Engineering 2027 ADA-Trans

70,000Preliminary Engineering 2029 ADA-Trans

10,000Right of Way 2021 ADA-Trans

10,000Right of Way 2023 ADA-Trans

10,000Right of Way 2025 ADA-Trans

10,000Right of Way 2027 ADA-Trans

10,000Right of Way 2029 ADA-Trans

340,000Construction 2022 ADA-Trans

340,000Construction 2024 ADA-Trans

340,000Construction 2026 ADA-Trans

340,000Construction 2028 ADA-Trans

340,000Construction 2030 ADA-Trans

Total $2,100,000

NoneComments

Page 180 of 226Includes inflation and indirects using program

Page 199: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS AIRPORTS

PROGRAM (STATEWIDE PROGRAMMATIC) (AIR)

AIRPORT IMPROVEMENT AND MAINTENANCE

PROJECTS FUNDED BY THE AIRWAY

TOLL(AVIATION FUEL FEE)

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

225,000Other 2021 AIR

225,000Other 2022 AIR

225,000Other 2023 AIR

225,000Other 2024 AIR

225,000Other 2025 AIR

225,000Other 2026 AIR

225,000Other 2027 AIR

225,000Other 2028 AIR

225,000Other 2029 AIR

225,000Other 2030 AIR

Total $2,250,000

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-BMT-BD)

PRESERVATION OF STATE OWNED BRIDGES

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

1,088,800Construction 2021 BET-BMT-BD

1,500,000Construction 2022 BET-BMT-BD

1,500,000Construction 2023 BET-BMT-BD

1,500,000Construction 2024 BET-BMT-BD

1,500,000Construction 2025 BET-BMT-BD

1,500,000Construction 2026 BET-BMT-BD

1,500,000Construction 2027 BET-BMT-BD

1,500,000Construction 2028 BET-BMT-BD

1,500,000Construction 2029 BET-BMT-BD

1,500,000Construction 2030 BET-BMT-BD

Total $14,588,800

NoneComments

Page 181 of 226Includes inflation and indirects using program

Page 200: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS BRIDGE SITE STATEWIDE

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-BMT-HQ)

STATEWIDE BETTERMENT PROGRAM FOR BRIDGE

PRESERVATION, REHABILITATION AND

RECONSTRUCTION

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

750,000Construction 2021 BET-BMT-HQ

750,000Construction 2022 BET-BMT-HQ

750,000Construction 2023 BET-BMT-HQ

750,000Construction 2024 BET-BMT-HQ

750,000Construction 2025 BET-BMT-HQ

750,000Construction 2026 BET-BMT-HQ

750,000Construction 2027 BET-BMT-HQ

750,000Construction 2028 BET-BMT-HQ

750,000Construction 2029 BET-BMT-HQ

750,000Construction 2030 BET-BMT-HQ

Total $7,500,000

NoneComments

Phase Year Funding

ALL STATE HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-DRG-HQ)

INCLUDES DRAINAGE STRUCTURE REPAIR OR

REPLACEMENT ON ALL STATE HIGHWAYS.

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

500,000Construction 2021 BET-DRG-HQ

500,000Construction 2022 BET-DRG-HQ

500,000Construction 2023 BET-DRG-HQ

500,000Construction 2024 BET-DRG-HQ

500,000Construction 2025 BET-DRG-HQ

500,000Construction 2026 BET-DRG-HQ

500,000Construction 2027 BET-DRG-HQ

500,000Construction 2028 BET-DRG-HQ

500,000Construction 2029 BET-DRG-HQ

500,000Construction 2030 BET-DRG-HQ

Total $5,000,000

NoneComments

Page 182 of 226Includes inflation and indirects using program

Page 201: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BETTERMENT

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-FA-HQ)

WORK THAT IS TO BE COMPLETED BY MEANS OF

FORCE ACCOUNT INCLUDING SMALL

EMERGENCIES & UNPLANNED WORK

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

1,200,000Construction 2021 BET-FA-HQ

1,200,000Construction 2022 BET-FA-HQ

1,200,000Construction 2023 BET-FA-HQ

1,200,000Construction 2024 BET-FA-HQ

1,200,000Construction 2025 BET-FA-HQ

1,200,000Construction 2026 BET-FA-HQ

1,200,000Construction 2027 BET-FA-HQ

1,200,000Construction 2028 BET-FA-HQ

1,200,000Construction 2029 BET-FA-HQ

1,200,000Construction 2030 BET-FA-HQ

Total $12,000,000

NoneComments

Phase Year Funding

STATE HIGHWAYS IN D1

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-1)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FISCAL YEAR AND

FROST HEAVE DAMAGE

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2021 BET-RL-1

400,000Construction 2022 BET-RL-1

400,000Construction 2023 BET-RL-1

400,000Construction 2024 BET-RL-1

400,000Construction 2025 BET-RL-1

400,000Construction 2026 BET-RL-1

400,000Construction 2027 BET-RL-1

400,000Construction 2028 BET-RL-1

400,000Construction 2029 BET-RL-1

400,000Construction 2030 BET-RL-1

Total $4,000,000

NoneComments

Page 183 of 226Includes inflation and indirects using program

Page 202: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATE HIGHWAYS IN D2

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-2)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2021 BET-RL-2

400,000Construction 2022 BET-RL-2

400,000Construction 2023 BET-RL-2

400,000Construction 2024 BET-RL-2

400,000Construction 2025 BET-RL-2

400,000Construction 2026 BET-RL-2

400,000Construction 2027 BET-RL-2

400,000Construction 2028 BET-RL-2

400,000Construction 2029 BET-RL-2

400,000Construction 2030 BET-RL-2

Total $4,000,000

NoneComments

Phase Year Funding

STATE HIGHWAYS IN D3

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-3)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D3

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2021 BET-RL-3

400,000Construction 2022 BET-RL-3

400,000Construction 2023 BET-RL-3

400,000Construction 2024 BET-RL-3

400,000Construction 2025 BET-RL-3

400,000Construction 2026 BET-RL-3

400,000Construction 2027 BET-RL-3

400,000Construction 2028 BET-RL-3

400,000Construction 2029 BET-RL-3

400,000Construction 2030 BET-RL-3

Total $4,000,000

NoneComments

Page 184 of 226Includes inflation and indirects using program

Page 203: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATE HIGHWAYS IN D4

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-4)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D4

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2021 BET-RL-4

400,000Construction 2022 BET-RL-4

400,000Construction 2023 BET-RL-4

400,000Construction 2024 BET-RL-4

400,000Construction 2025 BET-RL-4

400,000Construction 2026 BET-RL-4

400,000Construction 2027 BET-RL-4

400,000Construction 2028 BET-RL-4

400,000Construction 2029 BET-RL-4

400,000Construction 2030 BET-RL-4

Total $4,000,000

NoneComments

Phase Year Funding

STATE HIGHWAYS IN D5

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-5)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D 5

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2021 BET-RL-5

400,000Construction 2022 BET-RL-5

400,000Construction 2023 BET-RL-5

400,000Construction 2024 BET-RL-5

400,000Construction 2025 BET-RL-5

400,000Construction 2026 BET-RL-5

400,000Construction 2027 BET-RL-5

400,000Construction 2028 BET-RL-5

400,000Construction 2029 BET-RL-5

400,000Construction 2030 BET-RL-5

Total $4,000,000

NoneComments

Page 185 of 226Includes inflation and indirects using program

Page 204: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATE HIGHWAYS IN D6

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-6)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D6

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2021 BET-RL-6

400,000Construction 2022 BET-RL-6

400,000Construction 2023 BET-RL-6

400,000Construction 2024 BET-RL-6

400,000Construction 2025 BET-RL-6

400,000Construction 2026 BET-RL-6

400,000Construction 2027 BET-RL-6

400,000Construction 2028 BET-RL-6

400,000Construction 2029 BET-RL-6

400,000Construction 2030 BET-RL-6

Total $4,000,000

NoneComments

Phase Year Funding

INTERSECTIONS ON STATE HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-SEU-HQ)

UPGRADING CAPABILITY, MODERNIZING, &

TOADDRESS ADDED PHASING OF TRAFFIC SIGNAL

EQUIP. STATEWIDE

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

100,000Construction 2021 BET-SEU-HQ

100,000Construction 2022 BET-SEU-HQ

100,000Construction 2023 BET-SEU-HQ

100,000Construction 2024 BET-SEU-HQ

100,000Construction 2025 BET-SEU-HQ

100,000Construction 2026 BET-SEU-HQ

100,000Construction 2027 BET-SEU-HQ

100,000Construction 2028 BET-SEU-HQ

100,000Construction 2029 BET-SEU-HQ

100,000Construction 2030 BET-SEU-HQ

Total $1,000,000

NoneComments

Page 186 of 226Includes inflation and indirects using program

Page 205: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATEWIDE HWYS & BRIDGES IN ALL DISTRICTS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-STAL-HQ)

VARIOUS REPAIR PROJECTS THAT ARE

APPROVED THAT DO NOT ORIGINATE IN ANY

OTHER PLANNED BET PROGRAM.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

4,500,000Construction 2021 BET-STAL-HQ

4,500,000Construction 2022 BET-STAL-HQ

4,500,000Construction 2023 BET-STAL-HQ

4,500,000Construction 2024 BET-STAL-HQ

4,500,000Construction 2025 BET-STAL-HQ

4,500,000Construction 2026 BET-STAL-HQ

4,500,000Construction 2027 BET-STAL-HQ

4,500,000Construction 2028 BET-STAL-HQ

4,500,000Construction 2029 BET-STAL-HQ

4,500,000Construction 2030 BET-STAL-HQ

Total $45,000,000

NoneComments

Page 187 of 226Includes inflation and indirects using program

Page 206: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (BRDG-HIB-M&P)

MAINTENANCE AND PRESERVATION EFFORTS FOR

HIGH INVESTMENT BRIDGES

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

100,000Preliminary Engineering 2021 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2022 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2023 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2024 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2025 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2026 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2027 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2028 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2029 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2030 Bridg-HIB-Main-Pres

20,000Right of Way 2021 Bridg-HIB-Main-Pres

20,000Right of Way 2022 Bridg-HIB-Main-Pres

20,000Right of Way 2023 Bridg-HIB-Main-Pres

20,000Right of Way 2024 Bridg-HIB-Main-Pres

20,000Right of Way 2025 Bridg-HIB-Main-Pres

20,000Right of Way 2026 Bridg-HIB-Main-Pres

20,000Right of Way 2027 Bridg-HIB-Main-Pres

20,000Right of Way 2028 Bridg-HIB-Main-Pres

20,000Right of Way 2029 Bridg-HIB-Main-Pres

20,000Right of Way 2030 Bridg-HIB-Main-Pres

86,080Construction 2021 Bridg-HIB-Main-Pres

68,213Construction 2022 Bridg-HIB-Main-Pres

1,233,340Construction 2023 Bridg-HIB-Main-Pres

2,800,000Construction 2024 Bridg-HIB-Main-Pres

2,800,000Construction 2025 Bridg-HIB-Main-Pres

2,800,000Construction 2026 Bridg-HIB-Main-Pres

2,800,000Construction 2027 Bridg-HIB-Main-Pres

2,800,000Construction 2028 Bridg-HIB-Main-Pres

3,500,000Construction 2029 Bridg-HIB-Main-Pres

3,500,000Construction 2030 Bridg-HIB-Main-Pres

Total $23,587,633

NoneComments

Page 188 of 226Includes inflation and indirects using program

Page 207: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 1-2 BRIDGES

PROGRAM (STATEWIDE PROGRAMMATIC) (BRDG-T1/2-M&P)

MAINTENANCE & PRESERVATION OF TIER 1 & 2

BRIDGES.

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

86,920Preliminary Engineering 2021 Bridg-T1-2-Main-Pres

98,866Preliminary Engineering 2022 Bridg-T1-2-Main-Pres

96,034Preliminary Engineering 2023 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2024 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2025 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2026 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2027 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2028 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2029 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2030 Bridg-T1-2-Main-Pres

25,000Right of Way 2021 Bridg-T1-2-Main-Pres

25,000Right of Way 2022 Bridg-T1-2-Main-Pres

25,000Right of Way 2023 Bridg-T1-2-Main-Pres

25,000Right of Way 2024 Bridg-T1-2-Main-Pres

25,000Right of Way 2025 Bridg-T1-2-Main-Pres

25,000Right of Way 2026 Bridg-T1-2-Main-Pres

25,000Right of Way 2027 Bridg-T1-2-Main-Pres

25,000Right of Way 2028 Bridg-T1-2-Main-Pres

25,000Right of Way 2029 Bridg-T1-2-Main-Pres

25,000Right of Way 2030 Bridg-T1-2-Main-Pres

3,113,324Construction 2021 Bridg-T1-2-Main-Pres

1,122,844Construction 2022 Bridg-T1-2-Main-Pres

7,900,000Construction 2023 Bridg-T1-2-Main-Pres

5,328,074Construction 2024 Bridg-T1-2-Main-Pres

8,000,000Construction 2025 Bridg-T1-2-Main-Pres

8,000,000Construction 2026 Bridg-T1-2-Main-Pres

8,000,000Construction 2027 Bridg-T1-2-Main-Pres

8,000,000Construction 2028 Bridg-T1-2-Main-Pres

11,375,000Construction 2029 Bridg-T1-2-Main-Pres

11,375,000Construction 2030 Bridg-T1-2-Main-Pres

Total $73,446,062

NoneComments

Page 189 of 226Includes inflation and indirects using program

Page 208: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 3-4 BRIDGES

PROGRAM (STATEWIDE PROGRAMMATIC) (BRDG-T3/4-M&P)

MAINTENANCE AND PRESERVATION OF TIER 3 & 4

BRIDGES.

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

93,460Preliminary Engineering 2021 Bridg-T3-4-Main-Pres

91,877Preliminary Engineering 2022 Bridg-T3-4-Main-Pres

30,499Preliminary Engineering 2023 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2024 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2025 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2026 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2027 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2028 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2029 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2030 Bridg-T3-4-Main-Pres

10,000Right of Way 2021 Bridg-T3-4-Main-Pres

10,000Right of Way 2022 Bridg-T3-4-Main-Pres

10,000Right of Way 2023 Bridg-T3-4-Main-Pres

10,000Right of Way 2024 Bridg-T3-4-Main-Pres

10,000Right of Way 2025 Bridg-T3-4-Main-Pres

10,000Right of Way 2026 Bridg-T3-4-Main-Pres

10,000Right of Way 2027 Bridg-T3-4-Main-Pres

10,000Right of Way 2028 Bridg-T3-4-Main-Pres

10,000Right of Way 2029 Bridg-T3-4-Main-Pres

10,000Right of Way 2030 Bridg-T3-4-Main-Pres

3,400,000Construction 2021 Bridg-T3-4-Main-Pres

1,842,300Construction 2022 Bridg-T3-4-Main-Pres

3,400,000Construction 2023 Bridg-T3-4-Main-Pres

2,271,528Construction 2024 Bridg-T3-4-Main-Pres

3,500,000Construction 2025 Bridg-T3-4-Main-Pres

3,500,000Construction 2026 Bridg-T3-4-Main-Pres

3,500,000Construction 2027 Bridg-T3-4-Main-Pres

3,500,000Construction 2028 Bridg-T3-4-Main-Pres

5,940,000Construction 2029 Bridg-T3-4-Main-Pres

5,940,000Construction 2030 Bridg-T3-4-Main-Pres

Total $37,459,664

NoneComments

Page 190 of 226Includes inflation and indirects using program

Page 209: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CBI)

COMPLEX BRIDGE INSPECTION (PARENT)

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

250,000Other 2021 CBI *

250,000Other 2022 CBI *

250,000Other 2023 CBI *

250,000Other 2024 CBI *

250,000Other 2025 CBI *

250,000Other 2026 CBI *

250,000Other 2027 CBI *

250,000Other 2028 CBI *

250,000Other 2029 CBI *

250,000Other 2030 CBI *

Total $2,500,000

NoneComments

Page 191 of 226Includes inflation and indirects using program

Page 210: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CMAQ)

CONGESTION MITIGATION AND AIR

QUALITY(CMAQ) (ANNUAL PROJECT)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

448,500Preliminary Engineering 2021 CMAQ *

182,152Preliminary Engineering 2022 CMAQ *

250,000Preliminary Engineering 2023 CMAQ *

250,000Preliminary Engineering 2024 CMAQ *

250,000Preliminary Engineering 2025 CMAQ *

250,000Preliminary Engineering 2026 CMAQ *

250,000Preliminary Engineering 2027 CMAQ *

250,000Preliminary Engineering 2028 CMAQ *

250,000Preliminary Engineering 2029 CMAQ *

250,000Preliminary Engineering 2030 CMAQ *

6,500Right of Way 2021 CMAQ *

0Right of Way 2022 CMAQ *

39,077Right of Way 2023 CMAQ *

100,000Right of Way 2024 CMAQ *

100,000Right of Way 2025 CMAQ *

100,000Right of Way 2026 CMAQ *

100,000Right of Way 2027 CMAQ *

100,000Right of Way 2028 CMAQ *

100,000Right of Way 2029 CMAQ *

100,000Right of Way 2030 CMAQ *

41,773Construction 2021 CMAQ *

257,442Construction 2022 CMAQ *

1,217,565Construction 2023 CMAQ *

1,695,080Construction 2024 CMAQ *

5,065,230Construction 2025 CMAQ *

5,176,909Construction 2026 CMAQ *

5,176,909Construction 2027 CMAQ *

5,176,909Construction 2028 CMAQ *

5,176,909Construction 2029 CMAQ *

5,176,909Construction 2030 CMAQ *

491,697Other 2021 CMAQ *

429,000Other 2022 CMAQ *

1,200,000Other 2023 CMAQ *

1,200,000Other 2024 CMAQ *

Page 192 of 226Includes inflation and indirects using program

Page 211: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

1,200,000Other 2025 CMAQ *

1,200,000Other 2026 CMAQ *

1,200,000Other 2027 CMAQ *

1,200,000Other 2028 CMAQ *

1,200,000Other 2029 CMAQ *

1,200,000Other 2030 CMAQ *

Total $48,058,561

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CMAQ-FTA)

FUNDS TRANSFERRED FROM CMAQ TO FTA.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

2,200,000Other 2021 CMAQ-FTA

2,200,000Other 2022 CMAQ-FTA

2,200,000Other 2023 CMAQ-FTA

2,200,000Other 2024 CMAQ-FTA

2,200,000Other 2025 CMAQ-FTA

2,200,000Other 2026 CMAQ-FTA

2,200,000Other 2027 CMAQ-FTA

2,200,000Other 2028 CMAQ-FTA

2,200,000Other 2029 CMAQ-FTA

2,200,000Other 2030 CMAQ-FTA

Total $22,000,000

NoneComments

Page 193 of 226Includes inflation and indirects using program

Page 212: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (COAST5307)

COAST OPERATING, ADA, CAPITAL PREVENTIVE

MAINTENANCE, PLANNING, FTA 5307 FUNDS

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

2,696,691Other 2021 COAST5307

2,750,625Other 2022 COAST5307

2,805,638Other 2023 COAST5307

2,861,750Other 2024 COAST5307

2,918,985Other 2025 COAST5307

2,977,365Other 2026 COAST5307

3,036,912Other 2027 COAST5307

3,097,651Other 2028 COAST5307

3,159,604Other 2029 COAST5307

3,222,796Other 2030 COAST5307

Total $29,528,017

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CORRST)

CORRIDOR STUDIES STATEWIDE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

315,000Other 2021 CORRST

700,000Other 2022 CORRST

700,000Other 2023 CORRST

700,000Other 2024 CORRST

700,000Other 2025 CORRST

700,000Other 2026 CORRST

700,000Other 2027 CORRST

700,000Other 2028 CORRST

700,000Other 2029 CORRST

700,000Other 2030 CORRST

Total $6,615,000

NoneComments

Page 194 of 226Includes inflation and indirects using program

Page 213: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CRDR)

CULVERT REPLACEMENT/REHABILITATION &

DRAINAGE REPAIRS (ANNUAL PROJECT)

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

9,536Preliminary Engineering 2021 CRDR *

7,003Preliminary Engineering 2022 CRDR *

100,000Preliminary Engineering 2023 CRDR *

100,000Preliminary Engineering 2024 CRDR *

100,000Preliminary Engineering 2025 CRDR *

200,000Preliminary Engineering 2026 CRDR *

200,000Preliminary Engineering 2027 CRDR *

200,000Preliminary Engineering 2028 CRDR *

200,000Preliminary Engineering 2029 CRDR *

200,000Preliminary Engineering 2030 CRDR *

25,000Right of Way 2021 CRDR *

25,000Right of Way 2022 CRDR *

7,075Right of Way 2023 CRDR *

25,000Right of Way 2024 CRDR *

30,000Right of Way 2025 CRDR *

30,000Right of Way 2026 CRDR *

30,000Right of Way 2027 CRDR *

30,000Right of Way 2028 CRDR *

30,000Right of Way 2029 CRDR *

30,000Right of Way 2030 CRDR *

1,293,334Construction 2021 CRDR *

1,870,000Construction 2022 CRDR *

925,941Construction 2023 CRDR *

1,071,493Construction 2024 CRDR *

1,870,000Construction 2025 CRDR *

3,765,000Construction 2026 CRDR *

3,765,000Construction 2027 CRDR *

3,765,000Construction 2028 CRDR *

3,765,000Construction 2029 CRDR *

3,765,000Construction 2030 CRDR *

5,000Other 2021 CRDR *

5,000Other 2022 CRDR *

5,000Other 2023 CRDR *

5,000Other 2024 CRDR *

Page 195 of 226Includes inflation and indirects using program

Page 214: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

5,000Other 2025 CRDR *

5,000Other 2026 CRDR *

5,000Other 2027 CRDR *

5,000Other 2028 CRDR *

5,000Other 2029 CRDR *

5,000Other 2030 CRDR *

Total $27,484,382

NoneComments

Phase Year Funding

DISADVANTAGED BUSINESS ENTERPRISE

PROGRAM (STATEWIDE PROGRAMMATIC) (DBE)

IN HOUSE ADMINISTRATION OF THE FHWA

SUPPORTIVE PROGRAM: "DBE COMPLIANCE

MONITORING (ANNUAL PROGRAM)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

65,000Other 2021 DBE

65,000Other 2022 DBE

65,000Other 2023 DBE

65,000Other 2024 DBE

65,000Other 2025 DBE

65,000Other 2026 DBE

65,000Other 2027 DBE

65,000Other 2028 DBE

65,000Other 2029 DBE

65,000Other 2030 DBE

Total $650,000

NoneComments

Page 196 of 226Includes inflation and indirects using program

Page 215: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATEWIDE

PROGRAM (STATEWIDE PROGRAMMATIC) (ENV-POST-CON)

ENVIRONMENTAL COMMITMENTS FOR

POST-CONSTRUCTION OBLIGATIONS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

100,000Other 2021 ENV-POST-CON

100,000Other 2022 ENV-POST-CON

100,000Other 2023 ENV-POST-CON

100,000Other 2024 ENV-POST-CON

100,000Other 2025 ENV-POST-CON

100,000Other 2026 ENV-POST-CON

100,000Other 2027 ENV-POST-CON

100,000Other 2028 ENV-POST-CON

100,000Other 2029 ENV-POST-CON

100,000Other 2030 ENV-POST-CON

Total $1,000,000

NoneComments

Page 197 of 226Includes inflation and indirects using program

Page 216: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FLAP)

IMPROVING TRANSPORTATION FACILITIES THAT

ACCESS FEDERAL LANDS WITHIN NH {FLAP}

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

50,000Preliminary Engineering 2021 FLAP

50,000Preliminary Engineering 2022 FLAP

50,000Preliminary Engineering 2023 FLAP

50,000Preliminary Engineering 2024 FLAP

50,000Preliminary Engineering 2025 FLAP

50,000Preliminary Engineering 2026 FLAP

50,000Preliminary Engineering 2027 FLAP

50,000Preliminary Engineering 2028 FLAP

50,000Preliminary Engineering 2029 FLAP

50,000Preliminary Engineering 2030 FLAP

25,000Right of Way 2021 FLAP

25,000Right of Way 2022 FLAP

25,000Right of Way 2023 FLAP

25,000Right of Way 2024 FLAP

25,000Right of Way 2025 FLAP

25,000Right of Way 2026 FLAP

25,000Right of Way 2027 FLAP

25,000Right of Way 2028 FLAP

25,000Right of Way 2029 FLAP

25,000Right of Way 2030 FLAP

275,000Construction 2021 FLAP

275,000Construction 2022 FLAP

275,000Construction 2023 FLAP

275,000Construction 2024 FLAP

275,000Construction 2025 FLAP

275,000Construction 2026 FLAP

275,000Construction 2027 FLAP

275,000Construction 2028 FLAP

275,000Construction 2029 FLAP

275,000Construction 2030 FLAP

Total $3,500,000

NoneComments

Page 198 of 226Includes inflation and indirects using program

Page 217: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

BOSTON URBANIZED AREA (UZA)

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5307)

BOSTON URBANIZED AREA (UZA) FTA SECTION

5307 APPORTIONED FUNDS FOR NHDOT TRANSIT

PROJECTS.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

1,489,652Other 2021 FTA5307_NHDOT

3,085,894Other 2022 FTA5307_NHDOT

3,141,060Other 2023 FTA5307_NHDOT

3,197,164Other 2024 FTA5307_NHDOT

3,254,219Other 2025 FTA5307_NHDOT

3,312,240Other 2026 FTA5307_NHDOT

3,371,242Other 2027 FTA5307_NHDOT

3,431,239Other 2028 FTA5307_NHDOT

3,333,055Other 2029 FTA5307_NHDOT

3,420,216Other 2030 FTA5307_NHDOT

Total $31,035,981

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5310)

CAPITAL, MOBILITY MGMT, AND OPERATING FOR

SENIORS & INDIVIDUALS W/ DISABILITIES - FTA

5310 PROGRAM

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

1,399,600Other 2021 FTA5310

1,447,592Other 2022 FTA5310

1,496,543Other 2023 FTA5310

1,546,474Other 2024 FTA5310

1,597,404Other 2025 FTA5310

1,649,352Other 2026 FTA5310

1,702,339Other 2027 FTA5310

1,756,386Other 2028 FTA5310

1,756,386Other 2029 FTA5310

1,756,386Other 2030 FTA5310

Total $16,108,462

NoneComments

Page 199 of 226Includes inflation and indirects using program

Page 218: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5311)

NONURBANIZED AREA (RURAL) FORMULA

PROGRAM - FTA SECTION 5311 PROGRAM

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

8,937,099Other 2021 FTA5311

9,115,841Other 2022 FTA5311

9,298,158Other 2023 FTA5311

9,484,121Other 2024 FTA5311

9,673,803Other 2025 FTA5311

9,867,279Other 2026 FTA5311

10,064,625Other 2027 FTA5311

10,265,918Other 2028 FTA5311

10,471,236Other 2029 FTA5311

10,680,661Other 2030 FTA5311

Total $97,858,741

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5339)

CAPITAL BUS AND BUS FACILITIES - FTA 5339

PROGRAM FOR STATEWIDE PUBLIC

TRANSPORTATION

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

5,546,514Other 2021 FTA5339

5,657,444Other 2022 FTA5339

5,770,593Other 2023 FTA5339

5,886,005Other 2024 FTA5339

6,003,725Other 2025 FTA5339

6,123,799Other 2026 FTA5339

6,246,275Other 2027 FTA5339

6,371,201Other 2028 FTA5339

6,498,625Other 2029 FTA5339

6,628,597Other 2030 FTA5339

Total $60,732,778

NoneComments

Page 200 of 226Includes inflation and indirects using program

Page 219: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (GRR)

GUARDRAIL REPLACEMENT [FEDERAL AID

GUARDRAIL IMPROVEMENT PROGRAM] (ANNUAL

PROJECT)

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

150,000Preliminary Engineering 2021 GRR *

150,000Preliminary Engineering 2022 GRR *

150,000Preliminary Engineering 2023 GRR *

150,000Preliminary Engineering 2024 GRR *

150,000Preliminary Engineering 2025 GRR *

150,000Preliminary Engineering 2026 GRR *

150,000Preliminary Engineering 2027 GRR *

150,000Preliminary Engineering 2028 GRR *

150,000Preliminary Engineering 2029 GRR *

150,000Preliminary Engineering 2030 GRR *

5,000Right of Way 2021 GRR *

5,000Right of Way 2022 GRR *

5,000Right of Way 2023 GRR *

5,000Right of Way 2024 GRR *

5,000Right of Way 2025 GRR *

5,000Right of Way 2026 GRR *

5,000Right of Way 2027 GRR *

5,000Right of Way 2028 GRR *

5,000Right of Way 2029 GRR *

5,000Right of Way 2030 GRR *

1,880,000Construction 2021 GRR *

1,880,000Construction 2022 GRR *

1,880,000Construction 2023 GRR *

1,880,000Construction 2024 GRR *

1,880,000Construction 2025 GRR *

1,880,000Construction 2026 GRR *

1,880,000Construction 2027 GRR *

1,880,000Construction 2028 GRR *

1,880,000Construction 2029 GRR *

1,880,000Construction 2030 GRR *

Total $20,350,000

NoneComments

Page 201 of 226Includes inflation and indirects using program

Page 220: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (HSIP)

HIGHWAY SAFETY IMPROVEMENT PROGRAM

(HSIP)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

501,224Preliminary Engineering 2021 HSIP *

476,751Preliminary Engineering 2022 HSIP *

452,200Preliminary Engineering 2023 HSIP *

500,000Preliminary Engineering 2024 HSIP *

500,000Preliminary Engineering 2025 HSIP *

500,000Preliminary Engineering 2026 HSIP *

500,000Preliminary Engineering 2027 HSIP *

500,000Preliminary Engineering 2028 HSIP *

500,000Preliminary Engineering 2029 HSIP *

500,000Preliminary Engineering 2030 HSIP *

150,000Right of Way 2021 HSIP *

150,000Right of Way 2022 HSIP *

150,000Right of Way 2023 HSIP *

150,000Right of Way 2024 HSIP *

150,000Right of Way 2025 HSIP *

150,000Right of Way 2026 HSIP *

150,000Right of Way 2027 HSIP *

150,000Right of Way 2028 HSIP *

150,000Right of Way 2029 HSIP *

150,000Right of Way 2030 HSIP *

7,135,497Construction 2021 HSIP *

8,501,099Construction 2022 HSIP *

3,705,430Construction 2023 HSIP *

8,469,415Construction 2024 HSIP *

9,059,081Construction 2025 HSIP *

9,059,081Construction 2026 HSIP *

9,059,081Construction 2027 HSIP *

9,059,081Construction 2028 HSIP *

9,059,081Construction 2029 HSIP *

9,059,081Construction 2030 HSIP *

200,000Other 2021 HSIP *

200,000Other 2022 HSIP *

200,000Other 2023 HSIP *

200,000Other 2024 HSIP *

Page 202 of 226Includes inflation and indirects using program

Page 221: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

200,000Other 2025 HSIP *

200,000Other 2026 HSIP *

200,000Other 2027 HSIP *

200,000Other 2028 HSIP *

200,000Other 2029 HSIP *

200,000Other 2030 HSIP *

Total $90,596,102

NoneComments

Phase Year Funding

LOCAL TECHONOLGY ASSISTANCE PROGRAM

PROGRAM (STATEWIDE PROGRAMMATIC) (LTAP)

LOCAL TECHONOLGY ASSISTANCE PROGRAM

(LTAP) ADMINISTERED BY THE TECHNOLOGY

TRANSFER CENTER @ UNH

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

150,000State Planning Research 2021 LTAP

150,000State Planning Research 2022 LTAP

150,000State Planning Research 2023 LTAP

150,000State Planning Research 2024 LTAP

150,000State Planning Research 2025 LTAP

150,000State Planning Research 2026 LTAP

150,000State Planning Research 2027 LTAP

150,000State Planning Research 2028 LTAP

150,000State Planning Research 2029 LTAP

150,000State Planning Research 2030 LTAP

Total $1,500,000

NoneComments

Page 203 of 226Includes inflation and indirects using program

Page 222: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (MOBRR)

MUNICIPAL OWNED BRIDGE REHABILITATION &

REPLACEMENT PROJECTS (MOBRR PROGRAM)

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

41,839Preliminary Engineering 2021 MOBRR *

41,880Preliminary Engineering 2022 MOBRR *

67,035Preliminary Engineering 2023 MOBRR *

56,411Preliminary Engineering 2024 MOBRR *

73,358Preliminary Engineering 2025 MOBRR *

50,001Preliminary Engineering 2026 MOBRR *

50,000Preliminary Engineering 2027 MOBRR *

100,000Preliminary Engineering 2028 MOBRR *

100,000Preliminary Engineering 2029 MOBRR *

100,000Preliminary Engineering 2030 MOBRR *

19,860Right of Way 2021 MOBRR *

15,000Right of Way 2022 MOBRR *

25,000Right of Way 2023 MOBRR *

14,136Right of Way 2024 MOBRR *

25,000Right of Way 2025 MOBRR *

25,000Right of Way 2026 MOBRR *

25,000Right of Way 2027 MOBRR *

18,934Right of Way 2028 MOBRR *

25,000Right of Way 2029 MOBRR *

25,000Right of Way 2030 MOBRR *

247,811Construction 2021 MOBRR *

242,603Construction 2022 MOBRR *

235,003Construction 2023 MOBRR *

290,957Construction 2024 MOBRR *

957,406Construction 2025 MOBRR *

1,441,006Construction 2026 MOBRR *

2,500,000Construction 2027 MOBRR *

1,411,230Construction 2028 MOBRR *

1,909,247Construction 2029 MOBRR *

4,500,000Construction 2030 MOBRR *

Total $14,633,717

NoneComments

Page 204 of 226Includes inflation and indirects using program

Page 223: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (MTA5307)

MTA OPERATING, ADA, CAPITAL PREVENTIVE

MAINTENANCE, PLANNING UTILIZING FTA SECTION

5307 FUNDS.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

4,248,230Other 2021 MTA5307

4,413,922Other 2022 MTA5307

4,503,968Other 2023 MTA5307

4,590,869Other 2024 MTA5307

4,684,514Other 2025 MTA5307

4,779,483Other 2026 MTA5307

4,847,949Other 2027 MTA5307

4,943,644Other 2028 MTA5307

5,043,709Other 2029 MTA5307

5,145,802Other 2030 MTA5307

Total $47,202,090

NoneComments

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

PROGRAM (STATEWIDE PROGRAMMATIC) (MTA5310)

CART FUNDING FOR SENIORS AND INDIVIDUALS

WITH DISABILITIES. ANNUAL FTA SECTION 5310

APPORTIONMENT.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

150,714Other 2021 CART5310

153,728Other 2022 CART5310

156,803Other 2023 CART5310

159,939Other 2024 CART5310

163,138Other 2025 CART5310

166,401Other 2026 CART5310

169,729Other 2027 CART5310

173,123Other 2028 CART5310

176,586Other 2029 CART5310

180,117Other 2030 CART5310

Total $1,650,278

NoneComments

Page 205 of 226Includes inflation and indirects using program

Page 224: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

PROGRAM (STATEWIDE PROGRAMMATIC) (MTA5339)

CART FUNDING FOR CAPITAL VEHICLES AND

EQUIPMENT. ANNUAL FTA SECTION 5339

APPORTIONMENT.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

48,371Other 2021 CART5339

49,339Other 2022 CART5339

50,325Other 2023 CART5339

51,332Other 2024 CART5339

52,359Other 2025 CART5339

54,474Other 2026 CART5339

55,563Other 2027 CART5339

56,675Other 2028 CART5339

57,808Other 2029 CART5339

58,964Other 2030 CART5339

Total $535,210

NoneComments

Phase Year Funding

NASHUA TRANSIT SYSTEM (NTS)

PROGRAM (STATEWIDE PROGRAMMATIC) (NTS5307)

FTA 5307 FORMULA FUNDS FOR CAPITAL

PLANNING, PREVENTATIVE MAINTENANCE, ADA &

OPERATING ASSISTANCE

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

2,423,167Other 2021 NTS5307

2,471,631Other 2022 NTS5307

2,521,063Other 2023 NTS5307

2,571,485Other 2024 NTS5307

2,622,914Other 2025 NTS5307

2,675,373Other 2026 NTS5307

2,728,880Other 2027 NTS5307

2,783,458Other 2028 NTS5307

2,839,127Other 2029 NTS5307

2,895,909Other 2030 NTS5307

Total $26,533,007

NoneComments

Page 206 of 226Includes inflation and indirects using program

Page 225: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

NASHUA TRANSIT SYSTEM (NTS)

PROGRAM (STATEWIDE PROGRAMMATIC) (NTS5310)

TRADITIONAL/NONTRADITIONAL 5310 PROJECTS

IMPROVING MOBILITY OF SENIORS & INDIVIDUALS

W/DISABILITIES

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

88,583Other 2021 NTS5310

90,355Other 2022 NTS5310

92,162Other 2023 NTS5310

94,005Other 2024 NTS5310

95,886Other 2025 NTS5310

97,803Other 2026 NTS5310

99,759Other 2027 NTS5310

101,754Other 2028 NTS5310

103,790Other 2029 NTS5310

105,865Other 2030 NTS5310

Total $969,962

NoneComments

Phase Year Funding

NASHUA TRANSIT SYSTEM (NTS)

PROGRAM (STATEWIDE PROGRAMMATIC) (NTS5339)

FTA 5339 FORMULA FUNDS FOR BUS AND BUS

RELATED EQUIPMENT & FACILITIES CAPITAL

PROJECTS

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

190,214Other 2021 NTS5339

194,019Other 2022 NTS5339

197,899Other 2023 NTS5339

201,857Other 2024 NTS5339

205,894Other 2025 NTS5339

210,012Other 2026 NTS5339

214,212Other 2027 NTS5339

218,497Other 2028 NTS5339

222,867Other 2029 NTS5339

227,324Other 2030 NTS5339

Total $2,082,795

NoneComments

Page 207 of 226Includes inflation and indirects using program

Page 226: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

OJT/SS

PROGRAM (STATEWIDE PROGRAMMATIC) (OJT/SS)

ON THE JOB TRAINING FOR MINORITY AND

WOMEN TO REACH JOURNEYMAN STATUS IN THE

CONSTRUCTION INDUSTRY.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

30,000Other 2021 OJT/SS

30,000Other 2022 OJT/SS

30,000Other 2023 OJT/SS

30,000Other 2024 OJT/SS

30,000Other 2025 OJT/SS

30,000Other 2026 OJT/SS

30,000Other 2027 OJT/SS

30,000Other 2028 OJT/SS

30,000Other 2029 OJT/SS

30,000Other 2030 OJT/SS

Total $300,000

NoneComments

Page 208 of 226Includes inflation and indirects using program

Page 227: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 1 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T1-RESURF)

RESURFACE TIER 1 HIGHWAYS

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

300,000Preliminary Engineering 2021 Pave-T1-Resurf

300,000Preliminary Engineering 2022 Pave-T1-Resurf

300,000Preliminary Engineering 2023 Pave-T1-Resurf

300,000Preliminary Engineering 2024 Pave-T1-Resurf

300,000Preliminary Engineering 2025 Pave-T1-Resurf

300,000Preliminary Engineering 2026 Pave-T1-Resurf

300,000Preliminary Engineering 2027 Pave-T1-Resurf

300,000Preliminary Engineering 2028 Pave-T1-Resurf

300,000Preliminary Engineering 2029 Pave-T1-Resurf

300,000Preliminary Engineering 2030 Pave-T1-Resurf

11,684,600Construction 2021 Pave-T1-Resurf

12,250,000Construction 2022 Pave-T1-Resurf

12,250,000Construction 2023 Pave-T1-Resurf

12,250,000Construction 2024 Pave-T1-Resurf

12,250,000Construction 2025 Pave-T1-Resurf

12,250,000Construction 2026 Pave-T1-Resurf

12,250,000Construction 2027 Pave-T1-Resurf

12,250,000Construction 2028 Pave-T1-Resurf

16,200,000Construction 2029 Pave-T1-Resurf

16,200,000Construction 2030 Pave-T1-Resurf

Total $132,834,600

NoneComments

Page 209 of 226Includes inflation and indirects using program

Page 228: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 2 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T2-REHAB)

REHAB OF TIER 2 ROADS.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

83,880Preliminary Engineering 2021 Pave-T2-Rehab

125,000Preliminary Engineering 2022 Pave-T2-Rehab

125,000Preliminary Engineering 2023 Pave-T2-Rehab

125,000Preliminary Engineering 2024 Pave-T2-Rehab

125,000Preliminary Engineering 2025 Pave-T2-Rehab

125,000Preliminary Engineering 2026 Pave-T2-Rehab

125,000Preliminary Engineering 2027 Pave-T2-Rehab

125,000Preliminary Engineering 2028 Pave-T2-Rehab

125,000Preliminary Engineering 2029 Pave-T2-Rehab

125,000Preliminary Engineering 2030 Pave-T2-Rehab

30,000Right of Way 2021 Pave-T2-Rehab

30,000Right of Way 2022 Pave-T2-Rehab

30,000Right of Way 2023 Pave-T2-Rehab

30,000Right of Way 2024 Pave-T2-Rehab

30,000Right of Way 2025 Pave-T2-Rehab

30,000Right of Way 2026 Pave-T2-Rehab

30,000Right of Way 2027 Pave-T2-Rehab

30,000Right of Way 2028 Pave-T2-Rehab

30,000Right of Way 2029 Pave-T2-Rehab

30,000Right of Way 2030 Pave-T2-Rehab

217,533Construction 2021 Pave-T2-Rehab

1,386,129Construction 2022 Pave-T2-Rehab

2,500,000Construction 2023 Pave-T2-Rehab

2,500,000Construction 2024 Pave-T2-Rehab

2,500,000Construction 2025 Pave-T2-Rehab

2,500,000Construction 2026 Pave-T2-Rehab

2,500,000Construction 2027 Pave-T2-Rehab

2,500,000Construction 2028 Pave-T2-Rehab

4,500,000Construction 2029 Pave-T2-Rehab

4,500,000Construction 2030 Pave-T2-Rehab

Total $27,112,542

NoneComments

Page 210 of 226Includes inflation and indirects using program

Page 229: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 2 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T2-RESURF)

RESURFACING TIER 2 ROADWAYS

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

800,000Preliminary Engineering 2021 Pave-T2-Resurf

800,000Preliminary Engineering 2022 Pave-T2-Resurf

300,000Preliminary Engineering 2023 Pave-T2-Resurf

300,000Preliminary Engineering 2024 Pave-T2-Resurf

300,000Preliminary Engineering 2025 Pave-T2-Resurf

300,000Preliminary Engineering 2026 Pave-T2-Resurf

300,000Preliminary Engineering 2027 Pave-T2-Resurf

300,000Preliminary Engineering 2028 Pave-T2-Resurf

300,000Preliminary Engineering 2029 Pave-T2-Resurf

300,000Preliminary Engineering 2030 Pave-T2-Resurf

25,000Right of Way 2021 Pave-T2-Resurf

25,000Right of Way 2022 Pave-T2-Resurf

25,000Right of Way 2023 Pave-T2-Resurf

25,000Right of Way 2024 Pave-T2-Resurf

25,000Right of Way 2025 Pave-T2-Resurf

25,000Right of Way 2026 Pave-T2-Resurf

25,000Right of Way 2027 Pave-T2-Resurf

25,000Right of Way 2028 Pave-T2-Resurf

50,000Right of Way 2029 Pave-T2-Resurf

50,000Right of Way 2030 Pave-T2-Resurf

16,355,505Construction 2021 Pave-T2-Resurf

19,550,000Construction 2022 Pave-T2-Resurf

20,400,000Construction 2023 Pave-T2-Resurf

20,400,000Construction 2024 Pave-T2-Resurf

23,175,000Construction 2025 Pave-T2-Resurf

23,175,000Construction 2026 Pave-T2-Resurf

23,175,000Construction 2027 Pave-T2-Resurf

23,175,000Construction 2028 Pave-T2-Resurf

25,650,000Construction 2029 Pave-T2-Resurf

25,650,000Construction 2030 Pave-T2-Resurf

Total $225,005,505

NoneComments

Page 211 of 226Includes inflation and indirects using program

Page 230: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 3-4 ROADS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T3/4-REHAB)

REHAB OF TIER 3 & 4 ROADS.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 3

Category

Strategy

2,750,000Construction 2021 Pave-T3-4-Rehab

2,750,000Construction 2022 Pave-T3-4-Rehab

2,750,000Construction 2023 Pave-T3-4-Rehab

2,750,000Construction 2024 Pave-T3-4-Rehab

2,750,000Construction 2025 Pave-T3-4-Rehab

1,375,000Construction 2026 Pave-T3-4-Rehab

1,375,000Construction 2027 Pave-T3-4-Rehab

1,375,000Construction 2028 Pave-T3-4-Rehab

1,375,000Construction 2029 Pave-T3-4-Rehab

1,375,000Construction 2030 Pave-T3-4-Rehab

Total $20,625,000

NoneComments

Page 212 of 226Includes inflation and indirects using program

Page 231: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TIER 3/4 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T3/4-RESUR)

RESURFACING TIER 3 AND 4 ROADWAYS.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 3

Category

Strategy

205,000Preliminary Engineering 2025 Pave-T3-4-Resurf

205,000Preliminary Engineering 2026 Pave-T3-4-Resurf

205,000Preliminary Engineering 2027 Pave-T3-4-Resurf

205,000Preliminary Engineering 2028 Pave-T3-4-Resurf

205,000Preliminary Engineering 2029 Pave-T3-4-Resurf

205,000Preliminary Engineering 2030 Pave-T3-4-Resurf

35,000Right of Way 2025 Pave-T3-4-Resurf

35,000Right of Way 2026 Pave-T3-4-Resurf

35,000Right of Way 2027 Pave-T3-4-Resurf

35,000Right of Way 2028 Pave-T3-4-Resurf

35,000Right of Way 2029 Pave-T3-4-Resurf

35,000Right of Way 2030 Pave-T3-4-Resurf

9,188,056Construction 2021 Pave-T3-4-Resurf

18,350,000Construction 2022 Pave-T3-4-Resurf

18,350,000Construction 2023 Pave-T3-4-Resurf

18,350,000Construction 2024 Pave-T3-4-Resurf

27,360,000Construction 2025 Pave-T3-4-Resurf

16,235,000Construction 2026 Pave-T3-4-Resurf

16,235,000Construction 2027 Pave-T3-4-Resurf

16,235,000Construction 2028 Pave-T3-4-Resurf

17,485,000Construction 2029 Pave-T3-4-Resurf

17,485,000Construction 2030 Pave-T3-4-Resurf

Total $176,713,056

NoneComments

Page 213 of 226Includes inflation and indirects using program

Page 232: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (PVMRK)

STATEWIDE PAVEMENT MARKING ANNUAL

PROJECT

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

5,000Preliminary Engineering 2021 PVMRK

5,000Preliminary Engineering 2022 PVMRK

5,000Preliminary Engineering 2023 PVMRK

5,000Preliminary Engineering 2024 PVMRK

5,000Preliminary Engineering 2025 PVMRK

5,000Preliminary Engineering 2026 PVMRK

5,000Preliminary Engineering 2027 PVMRK

5,000Preliminary Engineering 2028 PVMRK

5,000Preliminary Engineering 2029 PVMRK

5,000Preliminary Engineering 2030 PVMRK

3,095,000Construction 2021 PVMRK

3,095,000Construction 2022 PVMRK

3,095,000Construction 2023 PVMRK

3,095,000Construction 2024 PVMRK

3,095,000Construction 2025 PVMRK

3,095,000Construction 2026 PVMRK

3,095,000Construction 2027 PVMRK

3,095,000Construction 2028 PVMRK

3,095,000Construction 2029 PVMRK

3,095,000Construction 2030 PVMRK

Total $31,000,000

NoneComments

Page 214 of 226Includes inflation and indirects using program

Page 233: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (RCTRL)

RECREATIONAL TRAILS FUND ACT- PROJECTS

SELECTED ANNUALLY

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

1,562,500Other 2021 RECTRAILS

1,562,500Other 2022 RECTRAILS

1,562,500Other 2023 RECTRAILS

1,562,500Other 2024 RECTRAILS

1,562,500Other 2025 RECTRAILS

1,562,500Other 2026 RECTRAILS

1,562,500Other 2027 RECTRAILS

1,562,500Other 2028 RECTRAILS

1,562,500Other 2029 RECTRAILS

1,562,500Other 2030 RECTRAILS

Total $15,625,000

NoneComments

Page 215 of 226Includes inflation and indirects using program

Page 234: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATEWIDE RAILROAD CROSSINGS

PROGRAM (STATEWIDE PROGRAMMATIC) (RRRCS)

RECONSTRUCTION OF CROSSINGS, SIGNALS, &

RELATED WORK (ANNUAL PROJECT)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

250,000Preliminary Engineering 2021 RR-RCS *

250,000Preliminary Engineering 2022 RR-RCS *

250,000Preliminary Engineering 2023 RR-RCS *

250,000Preliminary Engineering 2024 RR-RCS *

250,000Preliminary Engineering 2025 RR-RCS *

250,000Preliminary Engineering 2026 RR-RCS *

125,000Preliminary Engineering 2027 RR-RCS *

125,000Preliminary Engineering 2028 RR-RCS *

125,000Preliminary Engineering 2029 RR-RCS *

125,000Preliminary Engineering 2030 RR-RCS *

5,000Right of Way 2021 RR-RCS *

5,000Right of Way 2022 RR-RCS *

5,000Right of Way 2023 RR-RCS *

5,000Right of Way 2024 RR-RCS *

5,000Right of Way 2025 RR-RCS *

5,000Right of Way 2026 RR-RCS *

5,000Right of Way 2027 RR-RCS *

5,000Right of Way 2028 RR-RCS *

5,000Right of Way 2029 RR-RCS *

5,000Right of Way 2030 RR-RCS *

925,000Construction 2021 RR-RCS *

925,000Construction 2022 RR-RCS *

925,000Construction 2023 RR-RCS *

925,000Construction 2024 RR-RCS *

925,000Construction 2025 RR-RCS *

925,000Construction 2026 RR-RCS *

925,000Construction 2027 RR-RCS *

925,000Construction 2028 RR-RCS *

925,000Construction 2029 RR-RCS *

925,000Construction 2030 RR-RCS *

5,000Other 2021 RR-RCS *

5,000Other 2022 RR-RCS *

5,000Other 2023 RR-RCS *

5,000Other 2024 RR-RCS *

Page 216 of 226Includes inflation and indirects using program

Page 235: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

5,000Other 2025 RR-RCS *

5,000Other 2026 RR-RCS *

5,000Other 2027 RR-RCS *

5,000Other 2028 RR-RCS *

5,000Other 2029 RR-RCS *

5,000Other 2030 RR-RCS *

Total $11,350,000

NoneComments

Phase Year Funding

STATEWIDE RAILROAD LINES

PROGRAM (STATEWIDE PROGRAMMATIC) (RR-REVOLV)

RAILROAD REVOLVING LOAN

Route/Road

Scope

Program

RAIL

ALL TIERS

Category

Strategy

1,500,000Construction 2022 RR-REVOLV

1,500,000Construction 2025 RR-REVOLV

1,500,000Construction 2028 RR-REVOLV

Total $4,500,000

NoneComments

Page 217 of 226Includes inflation and indirects using program

Page 236: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATE-OWNED RAILROAD LINES

PROGRAM (STATEWIDE PROGRAMMATIC) (RR-RSA)

PERFORM CONSTRUCTION & MAINTENANCE ON

THE STATE-OWNED RAILROAD LINES PER RSA

228:60

Route/Road

Scope

Program

RAIL

TIER 2

Category

Strategy

50,000Preliminary Engineering 2021 RR-RSA-Funds

50,000Preliminary Engineering 2022 RR-RSA-Funds

50,000Preliminary Engineering 2023 RR-RSA-Funds

50,000Preliminary Engineering 2024 RR-RSA-Funds

50,000Preliminary Engineering 2025 RR-RSA-Funds

50,000Preliminary Engineering 2026 RR-RSA-Funds

50,000Preliminary Engineering 2027 RR-RSA-Funds

50,000Preliminary Engineering 2028 RR-RSA-Funds

50,000Preliminary Engineering 2029 RR-RSA-Funds

50,000Preliminary Engineering 2030 RR-RSA-Funds

450,000Construction 2021 RR-RSA-Funds

450,000Construction 2022 RR-RSA-Funds

450,000Construction 2023 RR-RSA-Funds

450,000Construction 2024 RR-RSA-Funds

450,000Construction 2025 RR-RSA-Funds

450,000Construction 2026 RR-RSA-Funds

450,000Construction 2027 RR-RSA-Funds

450,000Construction 2028 RR-RSA-Funds

450,000Construction 2029 RR-RSA-Funds

450,000Construction 2030 RR-RSA-Funds

100,000Other 2021 RR-RSA-Funds

100,000Other 2022 RR-RSA-Funds

100,000Other 2023 RR-RSA-Funds

100,000Other 2024 RR-RSA-Funds

100,000Other 2025 RR-RSA-Funds

100,000Other 2026 RR-RSA-Funds

100,000Other 2027 RR-RSA-Funds

100,000Other 2028 RR-RSA-Funds

100,000Other 2029 RR-RSA-Funds

100,000Other 2030 RR-RSA-Funds

Total $6,000,000

NoneComments

Page 218 of 226Includes inflation and indirects using program

Page 237: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (SAB)

STATE AID BRIDGE PROGRAMMATIC PROJECT

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

5,529Preliminary Engineering 2021 SAB *

17,541Preliminary Engineering 2022 SAB *

0Preliminary Engineering 2023 SAB *

0Preliminary Engineering 2024 SAB *

0Preliminary Engineering 2025 SAB *

0Preliminary Engineering 2026 SAB *

0Preliminary Engineering 2027 SAB *

121,325Preliminary Engineering 2028 SAB *

1,275,000Preliminary Engineering 2029 SAB *

1,275,000Preliminary Engineering 2030 SAB *

50,372Right of Way 2021 SAB *

58,123Right of Way 2022 SAB *

10,960Right of Way 2023 SAB *

0Right of Way 2024 SAB *

8,243Right of Way 2025 SAB *

395,551Right of Way 2026 SAB *

405,947Right of Way 2027 SAB *

388,602Right of Way 2028 SAB *

425,000Right of Way 2029 SAB *

425,000Right of Way 2030 SAB *

20,077Construction 2021 SAB *

235,330Construction 2022 SAB *

266,435Construction 2023 SAB *

235,711Construction 2024 SAB *

266,799Construction 2025 SAB *

133,717Construction 2026 SAB *

2,568,592Construction 2027 SAB *

3,589,254Construction 2028 SAB *

3,953,208Construction 2029 SAB *

6,800,000Construction 2030 SAB *

Total $22,931,316

NoneComments

Page 219 of 226Includes inflation and indirects using program

Page 238: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

STATE PLANNING & RESEARCH

PROGRAM (STATEWIDE PROGRAMMATIC) (SPR1)

STATE PLANNING & RESEARCH - PLANNING

ACTIVITIES COORDINATED BY NHDOT TO MEET

FEDERAL REGULATIONS

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

4,990,000State Planning Research 2021 SPR1

4,990,000State Planning Research 2022 SPR1

4,990,000State Planning Research 2023 SPR1

4,990,000State Planning Research 2024 SPR1

4,990,000State Planning Research 2025 SPR1

4,990,000State Planning Research 2026 SPR1

4,990,000State Planning Research 2027 SPR1

4,990,000State Planning Research 2028 SPR1

4,990,000State Planning Research 2029 SPR1

4,990,000State Planning Research 2030 SPR1

Total $49,900,000

NoneComments

Phase Year Funding

STATE PLANNING & RESEARCH

PROGRAM (STATEWIDE PROGRAMMATIC) (SPR2)

STATE PLANNING & RESEARCH - PART #2

"RESEARCH"

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

840,282State Planning Research 2021 SPR2

894,388State Planning Research 2022 SPR2

900,200State Planning Research 2023 SPR2

900,200State Planning Research 2024 SPR2

900,200State Planning Research 2025 SPR2

900,200State Planning Research 2026 SPR2

900,200State Planning Research 2027 SPR2

900,200State Planning Research 2028 SPR2

900,200State Planning Research 2029 SPR2

900,200State Planning Research 2030 SPR2

Total $8,936,270

NoneComments

Page 220 of 226Includes inflation and indirects using program

Page 239: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIES

PROGRAM (STATEWIDE PROGRAMMATIC) (STIC)

STIC INCENTIVES

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

125,000Other 2021 STIC

125,000Other 2022 STIC

125,000Other 2023 STIC

125,000Other 2024 STIC

125,000Other 2025 STIC

125,000Other 2026 STIC

125,000Other 2027 STIC

125,000Other 2028 STIC

125,000Other 2029 STIC

125,000Other 2030 STIC

Total $1,250,000

NoneComments

Page 221 of 226Includes inflation and indirects using program

Page 240: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (TA)

TRANSPORTATION ALTERNATIVES PROGRAM

(TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

19,360Preliminary Engineering 2021 TA *

215,000Preliminary Engineering 2022 TA *

315,950Preliminary Engineering 2023 TA *

215,950Preliminary Engineering 2024 TA *

315,950Preliminary Engineering 2025 TA *

315,950Preliminary Engineering 2026 TA *

315,950Preliminary Engineering 2027 TA *

315,950Preliminary Engineering 2028 TA *

315,950Preliminary Engineering 2029 TA *

315,950Preliminary Engineering 2030 TA *

2,725Right of Way 2021 TA *

127,650Right of Way 2022 TA *

127,650Right of Way 2023 TA *

127,650Right of Way 2024 TA *

127,650Right of Way 2025 TA *

127,650Right of Way 2026 TA *

127,650Right of Way 2027 TA *

127,650Right of Way 2028 TA *

127,650Right of Way 2029 TA *

127,650Right of Way 2030 TA *

5,672Construction 2021 TA *

77,654Construction 2022 TA *

147,946Construction 2023 TA *

51,896Construction 2024 TA *

284,593Construction 2025 TA *

2,748,400Construction 2026 TA *

2,748,400Construction 2027 TA *

2,748,400Construction 2028 TA *

2,748,400Construction 2029 TA *

2,748,400Construction 2030 TA *

Total $18,123,296

2 Projects On-Shelf for 2020 CON funding

HINSDALE (41365) FY21 - $0.5M

MERRIMACK (40300) FY21 - $1.0M

Comments

Page 222 of 226Includes inflation and indirects using program

Page 241: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TURNPIKES

PROGRAM (STATEWIDE PROGRAMMATIC) (TPK-R&R)

TURNPIKE RENEWAL & REHABILITATION

PROGRAM ON THE FEET, BLUE STAR &

SPAULDING TURNPIKES.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

3,927,425Construction 2021 TRR *

10,049,006Construction 2022 TRR *

14,400,000Construction 2023 TRR *

9,949,623Construction 2024 TRR *

13,600,000Construction 2025 TRR *

13,800,000Construction 2026 TRR *

14,100,000Construction 2027 TRR *

14,400,000Construction 2028 TRR *

14,700,000Construction 2029 TRR *

15,000,000Construction 2030 TRR *

Total $123,926,054

NoneComments

Phase Year Funding

TRANSPORTATION AND CIVIL ENGINEERING

PROGRAM

PROGRAM (STATEWIDE PROGRAMMATIC) (TRAC)

IMPLEMENT AND PARTICIPATE IN AASHTO TRAC

PROGRAM IN LOCAL HIGH SCHOOLS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

22,000Other 2021 TRAC

22,000Other 2022 TRAC

22,000Other 2023 TRAC

22,000Other 2024 TRAC

22,000Other 2025 TRAC

22,000Other 2026 TRAC

22,000Other 2027 TRAC

22,000Other 2028 TRAC

22,000Other 2029 TRAC

22,000Other 2030 TRAC

Total $220,000

NoneComments

Page 223 of 226Includes inflation and indirects using program

Page 242: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TRAINING

PROGRAM (STATEWIDE PROGRAMMATIC) (TRAIN)

ANNUAL TRAINING PROGRAM (ANNUAL PROJECT)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

250,000Other 2021 TRAIN

250,000Other 2022 TRAIN

250,000Other 2023 TRAIN

250,000Other 2024 TRAIN

250,000Other 2025 TRAIN

250,000Other 2026 TRAIN

250,000Other 2027 TRAIN

250,000Other 2028 TRAIN

250,000Other 2029 TRAIN

250,000Other 2030 TRAIN

Total $2,500,000

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (TRCK-WGHT-SFTY)

TRUCK WEIGHT SAFETY INSPECTION &

MAINTENANCE PROGRAM

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

100,000Other 2021 TRCK-WGHT-SFTY

100,000Other 2022 TRCK-WGHT-SFTY

100,000Other 2023 TRCK-WGHT-SFTY

100,000Other 2024 TRCK-WGHT-SFTY

100,000Other 2025 TRCK-WGHT-SFTY

100,000Other 2026 TRCK-WGHT-SFTY

100,000Other 2027 TRCK-WGHT-SFTY

100,000Other 2028 TRCK-WGHT-SFTY

100,000Other 2029 TRCK-WGHT-SFTY

100,000Other 2030 TRCK-WGHT-SFTY

Total $1,000,000

NoneComments

Page 224 of 226Includes inflation and indirects using program

Page 243: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

TRANSPORTATION SYSTEMS MANAGEMENT AND

OPERATIONS

PROGRAM (STATEWIDE PROGRAMMATIC) (TSMO)

STATEWIDE TRANSPORTATION SYSTEMS

MANAGEMENT AND OPERATIONS, ITS

TECHNOLOGIES, TRAVELER INFO

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

350,000Other 2021 TSMO

350,000Other 2022 TSMO

350,000Other 2023 TSMO

350,000Other 2024 TSMO

350,000Other 2025 TSMO

350,000Other 2026 TSMO

350,000Other 2027 TSMO

350,000Other 2028 TSMO

350,000Other 2029 TSMO

350,000Other 2030 TSMO

Total $3,500,000

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (UBI)

UNDERWATER BRIDGE INSPECTION (ANNUAL

PROJECT)

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

50,000Other 2021 UBI *

50,000Other 2022 UBI *

60,000Other 2023 UBI *

60,000Other 2024 UBI *

60,000Other 2025 UBI *

60,000Other 2026 UBI *

60,000Other 2027 UBI *

60,000Other 2028 UBI *

60,000Other 2029 UBI *

60,000Other 2030 UBI *

Total $580,000

NoneComments

Page 225 of 226Includes inflation and indirects using program

Page 244: TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 ......2020/07/24  · TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2021 - 2030 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR

Ten Year Plan 7/24/2020

2021 - 2030

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (USSS)

PROJECT TO UPDATE SIGNING ON STATE SYSTEM

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

30,000Preliminary Engineering 2021 USSS *

30,000Preliminary Engineering 2022 USSS *

30,000Preliminary Engineering 2023 USSS *

30,000Preliminary Engineering 2024 USSS *

30,000Preliminary Engineering 2025 USSS *

30,000Preliminary Engineering 2026 USSS *

30,000Preliminary Engineering 2027 USSS *

30,000Preliminary Engineering 2028 USSS *

30,000Preliminary Engineering 2029 USSS *

30,000Preliminary Engineering 2030 USSS *

500,000Construction 2021 USSS *

500,000Construction 2022 USSS *

500,000Construction 2023 USSS *

500,000Construction 2024 USSS *

500,000Construction 2025 USSS *

500,000Construction 2026 USSS *

500,000Construction 2027 USSS *

500,000Construction 2028 USSS *

500,000Construction 2029 USSS *

500,000Construction 2030 USSS *

Total $5,300,000

NoneComments

Page 226 of 226Includes inflation and indirects using program