Tender Addendum Notice
Tender Notice Published In Daily Navbharat Times Mumbai dated 10.02.2016 for the
Following Tenders be read as under:
1. Tender Document for Supply & Installation of Office & Laboratory Furniture and
2. For Supply,Installation & Commissioning of 13 passenger Lift (capacity-884kgs) for
Quality Evaluation Lab and Training Center Building of M/s. Spices Board Govt. of
India, EL-184, TTC MIDC, Mahape, NaviMumbai.
The date for the sale of the Tender document has been extended upto 8th March 2016
from the office of the Spices Board or Downloading from the website of the Spices
Board.
The Receipt of duly filled &Completed Tenders as called for must reach the office of the
Spices Board Navi Mumbai office by 11th March 2016 up to 16.30 Hrs.
The Pre-Bid Meeting for the above mentioned Tenders is arranged on 9th March 2016 ,
12.00 PM at Office of The Spices Board NaviMumbai.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
1 IL&FS Cluster Development Initiative Limited
SPICES BOARD, NAVI MUMBAI,
MAHARASHTRA
Tender Document For
Supply, Installation, “SUPPLY &
INSTALLATION OF Office & laboratory
Furniture, for Quality Evaluation Lab and Training
Centre Building of
M/s. Spices Board,
Govt. of India,
EL 184, TTC MIDC, Mahape,
Navi Mumbai
Tender No: Spices Board/QC/Lab Furniture/ 15-16/ 01
BID DOCUMENT
Project Management Consultant (PMC)
IL&FS Cluster Development Initiative Limited
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
2 IL&FS Cluster Development Initiative Limited
Spices Board, Ministry of Commerce & Industry, Govt of India invites Sealed Tender from reputed Indian manufacturers, their authorized dealers/sole selling agents/ stockist for Supply of “Various Laboratory & Office Furniture item as per attached annexure – I Make: Standard approved make such as Godrej, Khira, Or Equivalent” as per details shown in the Annexure-I on the following terms & conditions, so as to reach the undersigned on or before 26/02/.2016 (16.30 hrs.): A demand draft of Rs. 5000/- (Rupees Five thousand Only) towards non-refundable tender fee and EMD / Bid Security for Rs. 1,50,000/- is to be submitted with the tender otherwise your tender will be rejected. Please see clause no. 16, 17 & 18 of this tender notice. The Tender Document will be available on all working days at the office of M/s. Spices Board, Ministry of Commerce and Industries, Govt. of India, Banking Complex II, 3rd floor, sector 19 A, Turbhe, Vashi, Navi Mumbai, - 400703. From 10.02.2016 to 18.02.2016 1. Please send your sealed tender(s)/quotation(s) preferably by Registered / Speed Post or submit in the office of the Spices Board, Navi Mumbai on any working day between 10.00 hrs. to 16.00 hrs. against receipt / acknowledgement on or before the last date. (26.02.2016) Tender(s) brought after the closing date and time will not be entertained Tender(s)/ Quotation(s) through fax /e-mail will not be entertained. The quoted rates should be valid up to 30.05.2016. The Pre-bid meeting is scheduled on 19.02.2016 at 14.00 Hrs. At Office of The Spices Board, at Navimumbai. . 2. The envelope containing the quotation/ tender should be properly sealed (preferably wax/ cello tape seal) and super scribed as “Sealed Tender against Tender Call Notice NO. Spices Board/QC/Lab Furniture/ 15-16/ 01 dated 10/2/2016 FOR “SUPPLY & INSTALLATION OF Office & laboratory Furniture, due on 26.02.2016 (16.00 HRS.) If the envelope containing the quotation is not sealed and marked as above, the Purchaser will assume no responsibility for its misplacement or premature opening. 3. The above quotation(s) will be opened on 26.02.2016 (16.00 HRS) in the office of Spices Board as mentioned below. The interested Vendor(s) or their authorized agents may remain present during opening of quotation, if they desire so, at their own expenses. 4. If the above stated opening or closing date(s) happens to be Govt. holiday(s)/ BANDH, the submission/opening of the tender will be on the next working day as per the time scheduled. 5. The number and quantities mentioned in the Tender Notice are tentative and Spices Board reserves the right to increase or decrease the quantities according to the requirement. The same may be increased / decreased according to the
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
3 IL&FS Cluster Development Initiative Limited
requirement. The Dy Director, SPICES BOARD has the right to divide/split the supply / installation of items as deemed fit. Decision of the Dy. Director of Spices Board in deciding the contract will be final and binding on all Vendors/Bidders. Priority of selection will be given to those firms who have quoted for all items of this tender with required specification. 6. This is EPC contract and shall be including of all charges such as Supply/ Transfer/ Fixing and installation in position at Lab with all taxes and duties etc. complete. No Extra charge other than quoted will be admissible in any case. 7. Manufacturer’s name, make, model, catalogue/part No./Code No. etc. of each item if any should be clearly mentioned. If imported, the name, address, phone, fax and e-mail (if any) of the Beneficiary/Manufacturer and authorized Indian agent (if you are a sub-agent) should be mentioned. 8. Document supporting both past and present status of both the Manufacturer and Supplier should be enclosed. Authorization Certificate of the concerned company in your favour (or in favour of your firm through your principal dealer if you are a sub-agent) to sell /service/giving Annual Maintenance Service for the above item(s) should be enclosed along with the tender. If you are a sub-agent of a principal dealer of the main company, then a letter from the principal dealer for giving direct service/AMC to Spices Board, by them should be enclosed otherwise your tender(s) / quotation(s) will be rejected. Valid proofs of any orders received from various Govt. /Semi-Govt. /P.S.U. etc. for the same furniture. The satisfactory supply and installation certificate duly issued by the competent authority of the said organizations should be enclosed with the tender. Other than the rates quoted by the firms, priority of selection will be given on basis of these credential certificates. 9. Payment will be made after successful fixing/installation and satisfactory performance. No advance payment can be made for supply of the above items. The security deposit shall be deducted @ 5% of the gross amount . . The security deposit shall be released to the agency on satisfactory completion of the work i.e. after completion of free Maintenance Period of 1 year from the date of handing over.. However advance @20 % of the contract value can be made only against bank guarantee of 110% of advance value. 10. (Deleted) 11. Technical literatures, brochures etc. supporting the above specifications or facilities. The Bidders/Vendors are requested to highlight/underline the specifications in the Technical Brochure as per the specification wanted by SPICES BOARD. The company should submit all relevant drawings & sketches of each product separately in line with specifications along with the bid. 12. Please enclose your Valid up-to-date ITCC, STCC, PAN Card and Tax Index No. (TIN) allotment copy. Sales tax/ Service tax/ VAT returns/ ITR for last 3 years.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
4 IL&FS Cluster Development Initiative Limited
Enclose your Income tax and sales Tax clearance certificate. In case you are charging excise duty, please submit a copy of the excise license issued in your favour. 13. Any difference or variations for better specification from our specification should be clearly mentioned. Brochure/ Technical literature containing the detailed specification of the models quoted should be enclosed. Give detail specification of all parts and accessories to be supplied with merits and demerits. 14. Committee of Spices Board would inspect the premises wherein similar furniture’s are offered and installed to confirm the suitability of the supplies to the purchaser (Spices Board). 15. Service facility beyond guarantee/warranty period i.e. after sales service condition/Annual Maintenance Contract may be indicated clearly including the cost of such service and name of the firm, their financial position and past performance. Any difference or variation in the brand name or specification from our specification should be clearly mentioned. Brochure/ Technical literature containing the detailed specification of the models quoted should be enclosed. Give detail specification of all parts and accessories to be supplied 16. Non-refundable Tender Fee: A demand draft of Rs. 5000/- (Rupees Five Thousand Only) towards non-refundable tender fee in the form of A/C payee Demand Draft/ Banker’s Cheque of a commercial bank in favour of “Spices Board” payable at Mumbai must be deposited along with the tender. 17. EARNEST MONEY DEPOSIT (EMD)/ BID SECURITY: The EMD/ Bid Security are required to protect the Purchaser against the risk of Bidder's conduct, which would warrant the security's forfeiture. An earnest money of Rs. 1,50,000/- in shape of A/C payee Demand Draft/ Banker’s Cheque of a commercial bank in favour of “Spices Board” payable at Mumbai must be deposited along with the tender. The EMD should normally remain up to 30.05.2016. Please mention the item name & no. of the tender, your company name and address in the back side of the EMD draft for our reference. The EMD to the unsuccessful Bidder(s)/Vendor(s) will be returned to them at the earliest (within 30 days) after expiry of the final bid validity (30.05.2016) or latest on or before the 30th day of the award of the contract or order whichever is earlier without any interest. The earnest money of the successful Bidder/Vendor will be returned to them without any interest after completing the successful installation. . 18. Tender(s) without appropriate Tender fee & EMD will be summarily rejected. The EMD/ Bid Security may be forfeited: (a) If a Bidder withdraws, modifies, revises, deviates from its bid or any of the terms and conditions of this tender enquiry document during the period of bid validity specified by the Bidder on the Bid Form; or (b) In case of a successful Bidder, fails to furnish order acceptance within 10 days.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
5 IL&FS Cluster Development Initiative Limited
19. Modification and Withdrawal of Bids (Prior to deadline only): The Bidder may modify or withdraw its bid after the bid's submission; provided that written notice of the modification or withdrawal is received by the Purchaser prior to the deadline prescribed for submission of bids. The Bidder's modification or withdrawal notice shall be prepared, sealed, marked and dispatched. No bid may be modified subsequent to the deadline for submission of bids. No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration of the period of bid validity specified by the Bidder on the bid form. Withdrawal of a bid during this interval may result in the Bidder's forfeiture of its bid security. 20. Opening and Evaluation of Bids: (i) The Purchaser will open all Bids, in the presence of Bidders' representatives who choose to attend, on 26th feb .2016 at 16.30 hrs if possible. (ii) During evaluation of bids, the Purchaser may, at its discretion, ask the Bidder for a clarification of its bid. The request for clarification and the response shall be in writing and no change in prices or substance of the bid shall be sought, offered or permitted. (iii) Preliminary Examination: The Purchaser will examine the bids to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed, and whether the bids are generally in order. Bids from suppliers, without proper Authorization from the manufacturers shall be treated as nonresponsive and rejected. (iv) Arithmetical errors in the financial bids will be rectified on the following basis. If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected. If the supplier does not accept the correction of errors, its bid will be rejected. If there is a discrepancy between the price quoted in words and figures, the rate quoted in words will be taken as final and shall be binding on the agency. (v) The Purchaser may waive any minor informality, non-conformity, or irregularity in a bid, which does not constitute a material deviation, provided such a waiver, does not prejudice or affect the relative ranking of any Bidder. (vi) Prior to the detailed evaluation, the Purchaser will determine the substantial responsiveness of each bid to the bidding documents. For purposes of these Clauses, a substantially responsive bid is one, which conforms to all the terms and conditions of the bidding documents without material deviations. Deviations from or objections or reservations to critical provisions such as those concerning Bid Security/ Performance Security, Warranty, Force Majeure, Applicable law and Taxes & Duties, etc., will be deemed to be a material deviation. (vii) If a bid is not substantially responsive, it will be rejected by the Purchaser and may not subsequently be made responsive by the Bidder by correction of the non- conformity.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
6 IL&FS Cluster Development Initiative Limited
21. Contacting the Purchaser: No Bidder shall contact the Purchaser on any matter relating to its bid, from the time of the bid opening to the time the Contract is awarded. If the bidder wishes to bring additional information to the notice of the purchaser, it should do so in writing. Any effort by a Bidder to influence the Purchaser in its decisions on bid evaluation, bid comparison or contract award may result in rejection of the Bidder's bid and forfeiture of the EMD without prejudice to any other action against such bidder as deemed fit by the Purchaser. 22. Liquidated damages/Penalty: The date of delivery mentioned in any order should be strictly adhered to otherwise, the Director, SPICES BOARD reserves the right not to accept the delivery in part or full and to claim the liquidated damages/Penalty at 1% per week or part thereof subject to a maximum of 10% of the total value of the supply order which may be deducted from the bill. 23. Partial shipment: Not permitted. 24. If supply is not completed within the stipulated period and no extension at the period of supply is applied for and granted, Dy. Director, Spices Board reserves the right to make purchase from any other sources without sending any intimation of cancellation of the order placed with the vendors. If the tender(s) fail to execute the order(s) within the time period, as indicated in the tender/order for supplies or as mutually agreed to, the order will be cancelled. They will also be liable for all damages sustained by the Institute for non supply including the liability to pay any difference between the prices accepted by him and those ultimately paid by the Spices Boar for the articles purchases. The Dy. Director, Spices Board will assess such damages and his decision in the matter will be final. 25. The contract for supply cannot be sublet without the permission of the Dy. Director of Spices Board. The article supplied and installed should strictly confirm to the mentioned specification, grades etc. and accepted by SPICES BOARD. If any of the articles supplied by the tendered are found to be bad or unsound, unmerchantable, inferior in quality, or not in accordance with the description or otherwise faulty for unfit for use or unwholesome, the price or prices, of such article has already been made to the tender, shall be refundable. If the payment has not been made, the tender will not be entitled to any payment whatsoever for such articles. Incomplete tenders/ tenders without required documents will be rejected. Tenders submitted after the closing date and time will not be entertained. 26. Any cheating or forgery found at any moment, the Dy. Director, Spices Board resource the right to forfeit the EMD or Security money and empowered to take legal action as deemed fit. 27. Please note that the items should be supplied and installed within 65 days from the date of order. 28. The Dy. Director, Spices Board reserves the right to accept/reject any/all the tenders in part or in full without assigning any reason thereof.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
7 IL&FS Cluster Development Initiative Limited
29. In the event of any dispute or difference(s) between the vendee SPICES BOARD and the vendor(s) arising out of non-supply of material or supplies not found according to the specifications or any other cause whatsoever relating to the supply or purchase order before or after the supply has been executed, shall be referred to the Dy. Director, SPICES BOARD who may decide the matter himself or may appoint arbitrator(s) under the arbitration and conciliation Act 1996. The decision of the arbitrator shall be final and binding on both the parties. The place of arbitration and the language to be used in arbitral proceedings shall be decided by the arbitrator. All disputes shall be subject to Navi Mumbai Jurisdiction only. 30. In incomparable situation, the committee may negotiate price with the qualified bidder before awarding the offer. 31. The court situated at Navi Mumbai shall have jurisdiction to decide any dispute or litigation if arises in future beyond the above mentioned rules and regulations. The resultant contract will be interpreted under Indian Laws.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
8 IL&FS Cluster Development Initiative Limited
Scope of Work (Basis of Work & Quality Assurance) A. Supply and Installation of Office & laboratory furniture. This includes delivery to SPICES BOARD, loading &unloading the consignment and transporting it from the place of storage to the installation site, installation the same following best practices approved. B. Removal of debris, dirt and rubbish accumulated as a result of installation/ commissioning of the office & laboratory furniture and accessories and leaving the premises clean and orderly. C. Participants in the quotation process have to clarify any deviation to the specified design, construction or materials. Without such clarifications, sealed quotations to SPICES BOARD will not be construed as being in total conformance to the requirements of the specification. D. The selected manufacturer must warrant for a minimum period of one-year starting (date of acceptance of the goods or occupancy, whichever comes first) that all products sold under the contract referenced above shall be free from defects in material and workmanship. The supplier should also replace the damaged parts either during transit / installation and warranty period. E. Under standard laboratory working conditions, the furniture supplied and part thereof are expected to be corrosion free. F. The Suppliers should submit copies of suitable documents in support of their reputation, credentials and past performance about the product (Various Furniture items as per attached annexure – I Make: Standard approved make such as Godrej, Khira, Or Equivalent which they have supplied to premier testing laboratories. G. The tender documents should be completed in all respects giving full details of the furniture models being quoted against each parameter, as given in tender. Merely writing yes/no will not suffice. The manufacturer has to mention additional features/deviations if any from technical specifications in remarks column. H. The tender document not providing desired details or not meeting technical specification in totality is liable to be rejected at sole discretion of SPICES BOARD. I. The manufacturing date of furniture should not be older than six months from the date of purchase order. Old stocks must not be supplied. J. The responsibility of any damage caused during transit/erection and warranty period will solely lie with vendor. Vendor has to replace damaged parts if any maximum within 15 days of notice given by SPICES BOARD. K. Any deviation in the material and the specifications from the accepted terms may liable to be rejected and the suppliers need to supply all the good s in the specified
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
9 IL&FS Cluster Development Initiative Limited
form to the satisfaction/ specifications specified in the Purchase order and demonstrate at the their own cost. L. The prices quoted are final inclusive of supply, transpiration and installation, warranty etc. Complete and no other amount quoted would be admissible in any event. I/ We hereby undertake to abide by all the rules and regulations formulated by SPICES BOARD and mentioned in the Sealed Tender Notice No. Spices Board/QC/ Lab Furniture/ 15-16/01 dated10.02.2016 of Spices Board, Navi Mumbai. I/ we also undertake to follow the final decision taken by the Director, SPICES BOARD in case of any dispute in future.
Name of the Vendor/Bidder: Name of the Manufacturer Address: Tel. No(s).: Fax No(s).: Mobile: Email: Signature (Authorized signatory): Seal of the Firm In case the supplier requires any elucidation regarding the tender documents, they are requested to attend the pre Bid meeting scheduled on 19.02.2016 at 14.00 hr in the office of Spices Board at Banking Complex, 2nd Floor, Sector 19 A, Turbhe, Vashi-400703, Or submit the queries through e-mail at [email protected] on or before 10:00 hrs, 19.02.2016. N.B: The Bidders must send offers only in the price format attached with this tender notice in their letter head duly accepting the term & conditions mentioned and should enclose this tender notice duly signed in each page along with their quotation as a token of their acceptance of the terms & conditions of SPICES BOARD failing which the offer will be summarily rejected.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
10 IL&FS Cluster Development Initiative Limited
TENDER FORM FORMAT (PRICE/ FINANCIAL BID - INDIGENOUS SUPPLIES)
(Sealed Tender No. Spices Board/QC/Lab Furniture/ 15-16/01 dated 10.02.2016)
Name & Address of the Manufacturer :
Tel. No(s): Fax No(s): E-mail: Website: Name & Address of the Dealer/ Bidder :
Tel. No(s): Fax No(s): E-mail: Website:
Marketed by (if other than the Dealer/Manufacturer) :
Tel. No(s): Fax No(s): E-mail: Website: Communication details of the concerned contact person to whom all references shall be made regarding this tender enquiry. [NOTE: Any changes after submission of Tender documents, please update Spices Board, Navi Mumbai.] a.) Full Name : b.) Complete Postal Address: c.) Telephone No.: d.) Fax No.: e.) Mobile No.: f.) E-mail: g.) Website Address: TAN/ PAN No. of the Bidder : ……………………………………………… CST/ TIN No. of the Bidder : ……………………………………………….
Whether You are a Govt. Agency/NSIC : Yes/No
Central Public Sector Enterprises
(If the product be in quoted is actually manufactured by them and the product is registered with these agencies. Enclose valid proofs) Cost of the Tender enclosed: Yes/No a.) Name of the Bank & branch:______________________ b.) Amount: .5000/- c.) Demand Draft No./Date: EMD details: 1, 50,000/-…………. D.D. No……………………………… Date……………………… Issuing Bank & Branch:_______________________________ Last validity date of the enclosed DD _____________
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
11 IL&FS Cluster Development Initiative Limited
FORM – I Format for Submitting the Tender
The Dy. Director (Mktg), Spice Board, Banking Complex II, I Floor, Sector 19 A, Vashi, Navi Mumbai – 400 703, Maharashtra Sir,
Sub: Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre
The undersigned, having read and examined in detail all the documents for Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at plot no EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane. The details of our firm along with the documents forming part of the EoI are given below.
1 Name of the Agency
2 Address of the Agency
3 Name & Designation of the contact person to whom all references shall be made regarding this tender.
4 Address of the person to whom all references shall be made regarding this tender
5 Telephone (with STD code)
6 Mobile No. of the contact person
7 E-mail of the contact person
8 Fax No. (with STD code)
We have enclosed the followings: Statement of Applicant in Form –II Details of similar projects done by the Applicant in Form-III Details of Financial status of the applicant in Form –IV Manufacturers Auhorization in Form –V Declaration in General in Form - VI Last 3 year’s balance sheet / Audited Statements of Accounts Other information sought in the scope of work. Bid Processing fee & EMD We hereby declare that our offer is made in good faith and the information contained is true and correct to the best of our knowledge and belief.
Yours faithfully, (Signature of the Authorised Representative)
Date (Name )
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
12 IL&FS Cluster Development Initiative Limited
Form No. – II STATEMENT OF APPLICANT
1 Name of the Applicant
2 Address of Head Office: Telephone No. : Fax No. : E-mail Address:
3 Branch Office Address (if any) Telephone No. : Fax No. : E-mail Address:
4 Place & date of establishment Place. Date.
5 Branch of Specialization: Main line of business
a) ………………. Since b) ………………. Since c) ………………. Since
6 Name and Address of Lead Member
7 Name and Address (s) of other Constituent Member(s)
a) ………………………………… b) ………………………………… c) …………………………………
8 Total Number and Category of Permanent Employees
8.1 Total Number of Employees
8.2 Total number of Technical Persons
8.3 Total number of specialists
(Place and Date) (Name & Signature of Authorised Representative)
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
13 IL&FS Cluster Development Initiative Limited
FORM -III
DETAILS OF EXPERIENCE IN THE FIELD OF IMPLEMENTATION OF SIMILAR PROJECTS
Sl. No
Name of the Project With Project Location
Name & address of the Client
Date of Completion of the Project
Whether the Project is
Description of the project
Any other Information.
In Progress
Commissioned
1
2
3
4
5
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
14 IL&FS Cluster Development Initiative Limited
FORM-IV
FINANCIAL STATUS OF THE APPLICANT Fill in the blanks for each of the last three fiscal years, duly certified by Chartered or Public Accountant 1. Turnovers during last 3 years:
Amount in Rs. 2013 2014 2015
(Signature of Applicant)
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
15 IL&FS Cluster Development Initiative Limited
FORM-V
MANUFACTURERS' AUTHORIZATION FORM (To be submitted in Manufacturer’s Letter Head)
No. _______________________________
Date
To
The Dy. Director (Mktg), Spice Board, Banking Complex II, I Floor, Sector 19 A, Vashi, Navi Mumbai – 400 703, Maharashtra
Dear Sir:
We
___________________________________________who are established and
reputable manufacturers of_____________________________having factories
at________________________
(address of factory) do hereby authorize M/s
(Name and address with contact details like Tel. No(s)/Fax/E--‐mail etc.
Of Agent) to submit a bid, negotiate and receive the order from you against
your Sealed Limited Tender No ...........................................................................
We hereby extend our full guarantee and warranty as per the condition o f
the above tender for the goods and services offered by the above firm. We
would facilitate the bidder on a regular basis with technology/product updates.
Yours faithfully,
Authorized Signatory
(Having the power of Attorney on behalf of the
Manufacturer)
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
16 IL&FS Cluster Development Initiative Limited
FORM-VI
DECLARATION-GENERAL (To be submitted in Manufacturers / Bidders Letter Head)
Sealed Tender No
To
The Dy. Director (Mktg), Spice Board, Banking Complex II, I Floor, Sector 19 A, Vashi, Navi Mumbai – 400 703, Maharashtra
WE HEREBY DECLARE THAT WE HAVE READ & UNDERSTOOD ALL THE GENERAL TERMS & CONDITIONS TECHNICAL SPECIFICATIONS ETC. MENTIONED IN THE ABOVE TENDER AND THE SAME IS ACCEPTABLE TO US AND WE WILL ABIDE BY THE SAME.
Signature with Seal of the Bidder NAME OF BIDDER: __________________
Place: Date
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
17 IL&FS Cluster Development Initiative Limited
TERMS AND CONDITIONS
1. Name & Address of the Manufacturer/Dealer: (To whom purchase order will be addressed) Telephone No(s): Fax No(s):
E---mail:
Website: 2. Payment Condition: Only trough A/C. Payee Cheque/Demand draft /RTGS on supply and installations. 3. (A) Guarantee/ Warranty (At least 3 year guarantee/ warranty should be given from the date of successful installation / fixing at SPICES BOARD, Navi Mumbai.) 4. Validity of the Tender : ````````````````` (Minimum up to 30.05.2016) 5. Delivery & Installation Period : …………. Days / Months ( 65 days) 6. (Rupees_________________________________) The following documents in original (Self-attested with rubber seal, in case of Xerox copies) should be enclosed along with the bid. In case of Xerox copy, original documents for the following should be produced whenever required; otherwise tender submitted will be rejected at any moment 1.Technical literatures, brochures etc. Supporting the above specifications or facilities. The Bidders / Vendors are requested to highlight / underline the specifications in the Technical Brochure as per the specification of Spices Board.. The company should submit all relevant drawings & sketches of each product separately in line with specifications along with the bid. 2. Authorization Certificate of the concerned company in your or in favour of your firm through your principal dealer if you are a sub-agent to sale / service / giving
Annual Maintenance Service for the above item(s) should be enclosed along with the
tender; otherwise the same will be rejected. If you are a sub-agent of a principal
dealer of the main company, then a letter from the principal dealer for giving direct service/AMC to Dy. Director, Spices Board by them should be enclosed otherwise your offer will be rejected. 3. Document supporting both past and present status of both the Manufacturer and
Supplier.
4. Valid up---to---date ITCC, STCC, PAN Card and Tax Index No.(TIN) allotment
copy. Sales tax/Service tax/ VAT returns/ITR for last 3 years.
Spices Board/QC /Lab Furniture / 15-16/ 01 Tender Document for Laboratory & Office Furniture
18 IL&FS Cluster Development Initiative Limited
5. Valid proofs of any orders received from various Govt./Semi-- Govt./P.S.U. etc. for the similar furniture. The satisfactory supply and installation certificate duly issued by the competent authority of the said organizations should be enclosed with the tender. Other than the rates quoted by the firms, priority of selection will be given on basis of these credential certificates. The committee may visit the similar installations/manufacturing units to access the suitability to SB. 6. Service facility beyond guarantee/warranty period i.e. after sales service condition/Annual Maintenance Contract may be indicated clearly including the cost of such service and name of the firm, their financial position and past performance who will give the same service. Any difference or variation in the brand name or specification from our specification should be clearly mentioned. Brochure/ Technical literature containing the detailed specification of the mode ls quoted should be enclosed. Give detail specification of all parts and accessories to be supplied
Head Sub Head
1 Basement.
1.01Emergency Shower
& Eye Wash
Emergency Shower and Eye wash with two angled heads, hand-held.In Polyarylamide,
reinforced with glassfi bres.Trigger operated with BALLOFIX® included for regulation of
water.Min. inlet pressure, dynamic: 1.5 bar / 22 psi flow. Including installation.
No 1
Amount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
2 First Floor
2.01 Wet Lab / 1Shower & Eye
Wash
Emergency Shower and Eye wash with two angled heads, hand-held.In Polyarylamide,
reinforced with glassfi bres.Trigger operated with BALLOFIX® included for regulation of
water.Min. inlet pressure, dynamic: 1.5 bar / 22 psi flow. Including installation.
Nos 1
2.02 Anti Vibration table
Features: 5Hz natural frequency built-in air isolators.
Active self leveling and passive pump up versions.
Highly rigid laminated construction with damping core.
Low cost, easy to install and free from maintenance.
Ideal for laboratories and clean rooms, will meet Class 10
Nos 3
Support base having provision to evacuate tapped chemical vapor inside. Base dimensions:
1500 mm W X 700 mm D X 900 mm H Inside Fume Hood working volume: 1400 mm W X 600
2.03 Fume HoodWithout
Duct
1500 mm W X 700 mm D X 900 mm H Inside Fume Hood working volume: 1400 mm W X 600
mm D X 1000 mm H Bed size: 1400 mm W X 600 mm D Design Basis: - American Design
Standard: ASHRAE11- 1995 All tests including “Tracer gas containment test” passed. European
Design Standard: EN-14175- 2003 „Inner Plane Containment test‟ passed. Design Structure:-
Aerodynamic, Floor mounted Powder coating: - Pre-treated with 7 tank chemical processes and
powder coated with highly chemical resistant epoxy Colors having dry film thickness of 70 to 80
microns. Passes all conformity performance tests as per IS standards.
Superstructure: - Galvanized Iron (GI) as per IS 277: 2003 standard of · 1.0 mm thickness for all
sheet metal paneling , 1.5 mm for corner post, 1.2 mm for back pillars
Front Top Panel:- Easily openable hinged Top Toughened Glass Panel (5.5. mm) for easy
access to Flow Control Valve and Electrical Lighting fixtures for maintenance.
Nos 2 As per Drawing
Floor Mounted Size:- 1000mmL x 700mm W x 1800 mm, Full Height Chemical Storage: Having
provision for air vent connection to evacuate tapped chemical vapor inside. Superstructure: -
2.04Chemical Cup
Board
provision for air vent connection to evacuate tapped chemical vapor inside. Superstructure: -
Galvanized Iron (GI) as per IS 277: 2003 standard of 1.0 mm thickness for all sheet metal
paneling , 1.5 mm for corner post, 1.2 mm for back pillars. Ht Adjustable Inner Shelves & Fume
Chamber as detailed out in drawing. Size:- 1000mmL x 700mm W x 1800 mmH.
Nos 1 As per Drawing
2.05 Exhaust Hood Flexible
Alsident Spot Extract/ Flexible Exhaust: Exhaust Arm , P.P.Hood 385mm Dia , Celing Colums ,
Centrifugal Blower (1HP Or As suitable) , PP Ducting Charges (Running Mtr)(6") Ceiling
Mounted 3 Joints, Reach:2550mm. Quote wrt location indicated in Layout.
Nos 3
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Size: 17000(L) X 750 (D) x 800 (H) in L Shape matching with Layout dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
2.06 LT-1 Sink Unit
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS (TATA-Steelium) / Essarbox frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent. Drawer Glides: The drawer should have Telescopic Glides for smooth
movment. Handles: Furniture should have rust proof Non-metaliic PP handles . Cabinets shall be
detachable mounted on lockable wheels and all interior arrangements of shelves and drawers as
specified in drawings. Provision of Storage cabinets (4+4 Nos) , suitable to position
indicated.
RM 17.00 As per drawing.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (4 Sinks to be
provided.)
e.) Eye wash with two angled heads, hand-held.In Polyarylamide, reinforced with glassfi
bres.Trigger operated with BALLOFIX® included for regulation of water.Min. inlet pressure,
dynamic: 1.5 bar / 22 psi flow.
Size: 3000 (W) x 1200 (D) x 800 (H)
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
2.07 LT-3
profile.
b.)Entire structure should be MS box frame of 35 x 35 mm is used for main frame structure as
detailed out in drawing. CO2 welded & finished with highly chemical resistant epoxy powder
coating.
c)The storage Cabinets are made of CRCA 18 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The cabinets are
inter-connected with spacer which strenghtenes the Capsal sheet lining on the edges of doors
and drawers for sound over all structure of the table / bench. The hinges will be Godrej / MAPLA
make or equvilent. Drawer Glides: The drawer should have Telescopic Glides for smooth
movment. Handles: Furniture should have rust proof Non-metaliic PP handles . Cabinets shall be
detachable mounted on lockable wheels and all interior arrangements of shelves and drawers as
specified in drawings.
Nos 3.00As per drawing.
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
2.08
Sample
Preparation / Fume Hoode With Duct
Support base having provision for air vent connection to evacuate tapped chemical vapor inside.
Base Cabinet dimensions: 1500 mm W X 700 mm D X 900 mm H Inside Fume Hood working
volume: 1400 mm W X 600 mm D X 1000 mm H Bed size: 1400 mm W X 600 mm D Design
Basis: - American Design Standard: ASHRAE11- 1995 All tests including “Tracer gas
containment test” passed. European Design Standard: EN-14175- 2003 „Inner Plane
Containment test‟ passed. Design Structure:- Aerodynamic, Floor mounted Powder coating: -
Pre-treated with 8 tank chemical processes and powder coated with highly chemical resistant Nos 2.00 As per Drawing2.08 Preparation /
3
Fume Hoode With Duct Pre-treated with 8 tank chemical processes and powder coated with highly chemical resistant
epoxy Colors having dry film thickness of 70 to 80 microns. Passes all conformity performance
tests as per IS standards.
Superstructure: - Galvanized Iron (GI) as per IS 277: 2003 standard of · 1.0 mm thickness for all
sheet metal paneling , 1.5 mm for corner post, 1.2 mm for back pillars
Front Top Panel:- Easily openable hinged Top Toughened Glass Panel (5.5. mm) for easy
access to Flow Control Valve and Electrical Lighting fixtures for maintenance.
Nos 2.00 As per Drawing
Size –W-6100 mm, D-750 mm, H-800
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS box frame of 35 x 35 mm is used for main frame structure as
2.09 LT-1
b.)Entire structure should be MS box frame of 35 x 35 mm is used for main frame structure as
detailed out in drawing. CO2 welded & finished with highly chemical resistant epoxy powder
coating.
c)The storage Cabinets are made of CRCA 18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent. Drawer Glides: The drawer should have Telescopic Glides for smooth
movment. Handles: Furniture should have rust proof Non-metaliic PP handles . Cabinets shall be
detachable mounted on lockable wheels and all interior arrangements of shelves and drawers as
specified in drawings. Provision of Storage cabinets (4 Nos) , suitable to position indicated.
RM 6.10 As per Drawing.
2.10 UV-VIS / 6 Anti Vibration table
Features: 5Hz natural frequency built-in air isolators.
Active self leveling and passive pump up versions.
Highly rigid laminated construction with damping core. Nos 32.10 UV-VIS / 6 Anti Vibration table Highly rigid laminated construction with damping core.
Low cost, easy to install and free from maintenance.
Ideal for laboratories and clean rooms, will meet Class 10
Nos 3
2.11 LT-2
Size- 2500 (W) X1000 (D) X 800 (H) mm .
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS(TATA-Steelium) / Essar- box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The hinges will
be Godrej / MAPLA make. Drawer Glides: The drawer should have Telescopic Glides for smooth
Nos 2 As per drawing.
movment. Handles: Furniture should have rust proof Non-metaliic PP handles . Cabinets shall be
detachable mounted on lockable wheels and all interior arrangements of shelves and drawers as
specified in drawings.
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Head Sub Head .
2.12AAS- ICP MS
room / 7Exhaust Hood Fixed
Alsident Spot Extract/ Fixed Exhaust: Exhaust Arm , SS .Hood 385mm Dia , Ceilng Columns ,
Centrifugal Blower (1HP/ As suitable) , SS Ducting Charges (Running Mtr)(6"), Reach: 1500mm
Or suitable as per layout.
Nos 2
Size - 3000 (W) X 1200 (D) X 800 (H) mm.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS (TATA-Steelium) / Essar- box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
2.13 LT -7
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. Door Hinges:
The hinges will be Godrej / MAPLA make or equvilent unless specified. Drawer Glides: The
drawer should have Telescopic Glides for smooth movment. Handles: Furniture should have rust
proof Non-metaliic PP handles . Cabinets shall be detachable mounted on lockable wheels and
all interior arrangements of shelves and drawers as specified in drawings.
d.)Polypropylene Cup Sinks of size 300mm X 300mm : Moulded polypropylene cup drains shall
be moulded in one-piece of acid-resistant polyethylene. They shall have an integral mounting
flange and an integral tailpiece with an 1-1/2" I.P.S. male straight thread outlet.
Nos 2 As per Drawing
2.14LCMS
ROOM / 9Exhaust Hood Flexible
Alsident Spot Extract/ Flexible Exhaust: Exhaust Arm , P.P.Hood 385mm Dia , Celing Colums ,
Centrifugal Blower (1HP Or As suitable) , PP Ducting Charges (Running Mtr)(6") Ceiling
Mounted 3 Joints, Reach:2550mm
Nos 5
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Size- 2500 (W) X 1200 (D) X 800 (H) mm.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
2.15 LT -4
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS (TATA-Steelium) / Essar- box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The hinges will
be Godrej / MAPLA make. Drawer Glides: The drawer should have Telescopic Glides for smooth
movment. Handles: Furniture should have rust proof Non-metaliic PP handles . Cabinets shall be
detachable mounted on lockable wheels and all interior arrangements of shelves and drawers as
specified in drawings.
Nos 5 As per drawing.
2.16 LT -5
Size- 2000 (W) X 1000 (D) X 800(H) mm.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS (TATA-Steelium) / Essar- box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. Door Hinges:
The hinges will be Godrej / MAPLA make or equvilent unless specified. Drawer Glides: The
drawer should have Telescopic Glides for smooth movment. Handles: Furniture should have rust
proof Non-metaliic PP handles . Cabinets shall be detachable mounted on lockable wheels and
all interior arrangements of shelves and drawers as specified in drawings.
Nos 6 As per drawing.
2.17 GCMS / 11 Exhaust Hood Flexible
Alsident Spot Extract/ Flexible Exhaust: Exhaust Arm , P.P.Hood 385mm Dia , Celing Colums ,
Centrifugal Blower (1HP Or As suitable) , PP Ducting Charges (Running Mtr)(6") Ceiling
Mounted 3 Joints, Reach:2550mm. Quote wrt location indicated in Layout. Nos 1
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
2.18 LT -5
Size- 2000 (W) X 1000 (D) X 800(H) mm.
a.) Table top formed out of 20mm thk prepolished
granite stone. The exposed edges of top to be rounded and mirror polished of approved profile.
b.)Entire structure should be MS (TATA-Steelium) / Essar.- box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating. Nos 4 As per Drawing
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The hinges will
be Godrej / MAPLA make or equvilent unless specified. Drawer Glides: The drawer should have
Telescopic Glides for smooth movment. Handles: Furniture should have rust proof Non-metaliic
PP handles. Cabinets shall be detachable mounted on lockable wheels and all interior
arrangements of shelves and drawers as specified in drawings.
2.19Wash room /
12
Shower & Eye
Wash
Emergency Shower and Eye wash with two angled heads, hand-held.In Polyarylamide,
reinforced with glassfi bres.Trigger operated with BALLOFIX® included for regulation of
water.Min. inlet pressure, dynamic: 1.5 bar / 22 psi flow. Including installation.
Nos 1
3Second
FloorFloor
3.01Sample
Room / 2Antivibration Table
Features: 5Hz natural frequency built-in air isolators.
Active self leveling and passive pump up versions.
Highly rigid laminated construction with damping core.
Low cost, easy to install and free from maintenance.
Ideal for laboratories and clean rooms, will meet Class 10
Nos 1
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Size: 11000(L) X 750 (D) x 800 (H) in L Shape matching with Layout dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
3.02 LT-1 Sink Unit
profile.
b.)Entire structure should be MS (TATA-Steelium) / Essar. box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20/18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent unless specified. Drawer Glides: The drawer should have Telescopic Glides
for smooth movment. Handles: Furniture should have rust proof Non-metaliic PP handles .
Cabinets shall be detachable mounted on lockable wheels and all interior arrangements of
shelves and drawers as specified in drawings. Provision of Storage cabinets (3+3 Nos) ,
suitable to position indicated.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
RM 11.00 As per Drawing.
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (2 Sinks to be
provided.)
Size- 2.5X1.2X0.8 Mtr.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
3.03 LT-6
b.)Entire structure should be MS (TATA-Steelium) / Essar box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The hinges will
be Godrej / MAPLA make or equvilent unless specified. Drawer Glides: The drawer should have
Telescopic Glides for smooth movment. Handles: Furniture should have rust proof Non-metaliic
PP handles . Cabinets shall be detachable mounted on lockable wheels and all interior
arrangements of shelves and drawers as specified in drawings.
Nos 2 As per Drawings.
3.04
Media
Preparation Anti Vibration table
Features: 5Hz natural frequency built-in air isolators.
Active self leveling and passive pump up versions.
Highly rigid laminated construction with damping core. Nos 13.04 Preparation
/3
Anti Vibration table Highly rigid laminated construction with damping core.
Low cost, easy to install and free from maintenance.
Ideal for laboratories and clean rooms, will meet Class 10
Nos 1
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Size: 5500(L) X 750 (D) x 800 (H) in L Shape matching with Layout dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
3.05 LT-1 Sink Unit
b.)Entire structure should be MS box frame of 35 x 35 mm is used for main frame structure as
detailed out in drawing. CO2 welded & finished with highly chemical resistant epoxy powder
coating.
c)The storage Cabinets are made of CRCA 20/18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent unless specified. Drawer Glides: The drawer should have Telescopic Glides
for smooth movment. Handles: Furniture should have rust proof Non-metaliic PP handles .
Cabinets shall be detachable mounted on lockable wheels and all interior arrangements of
shelves and drawers as specified in drawings. Provision of Storage cabinets (3 Nos) ,
suitable to position indicated.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
RM 5.5 As per Drawing.
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (1 Sinks to be
provided.)
Size: 5500(L) X 750 (D) x 800 (H) in L Shape matching with Layout dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS box frame of 35 x 35 mm is used for main frame structure as
detailed out in drawing. CO2 welded & finished with highly chemical resistant epoxy powder
coating.
3.06Sterilization
/ 5LT-1 Sink Unit
coating.
c)The storage Cabinets are made of CRCA 20/18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent unless specified. Drawer Glides: The drawer should have Telescopic Glides
for smooth movment. Handles: Furniture should have rust proof Non-metaliic PP handles .
Cabinets shall be detachable mounted on lockable wheels and all interior arrangements of
shelves and drawers as specified in drawings. Provision of Storage cabinets (3 Nos) ,
suitable to position indicated.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (2 Sinks to be
RM 5.5 As per Drawing.
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (2 Sinks to be
provided.)
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Size: 3900(L) X 750 (D) x 800 (H) in L Shape matching with Layout dimentions.
3.07Bacterial
Culture / 6LT-1 Sink Unit
Size: 3900(L) X 750 (D) x 800 (H) in L Shape matching with Layout dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS(TATA-Steelium) / Essar. box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20/18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent unless specified. Drawer Glides: The drawer should have Telescopic Glides
for smooth movment. Handles: Furniture should have rust proof Non-metaliic PP handles .
Cabinets shall be detachable mounted on lockable wheels and all interior arrangements of
shelves and drawers as specified in drawings. Provision of Storage cabinets (2 Nos) ,
RM 3.90 As per Drawing.
shelves and drawers as specified in drawings. Provision of Storage cabinets (2 Nos) ,
suitable to position indicated.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (1 Sinks to be
provided.)
Size- 2000 (W) X 1000 (D) x 800 (H) mm.
3.08 Biosafety / 7 LT -5
a.) Table top formed out of 20mm thk prepolished
granite stone. The exposed edges of top to be rounded and mirror polished of approved profile.
b.)Entire structure should be MS(TATA-Steelium) / Essar. box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The hinges will
be Godrej / MAPLA make or equvilent unless specified. Drawer Glides: The drawer should have
Telescopic Glides for smooth movment. Handles: Furniture should have rust proof Non-metaliic
PP handles . Cabinets shall be detachable mounted on lockable wheels and all interior
arrangements of shelves and drawers as specified in drawings.
Nos 4 As per Drawing
Head Sub HeadAmount Remarks.
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/Nos
.Qty. Rate.
Size-Size: (2.650 + 5.500) W X 0.750 (D) x 0.800 (H) in L Shape matching with Layout
dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
3.09Incubators
room / 8LT-1 Sink Unit
b.)Entire structure should be MS (TATA-Steelium) / Essar. box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20/18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent unless specified. Drawer Glides: The drawer should have Telescopic Glides
for smooth movment. Handles: Furniture should have rust proof Non-metaliic PP handles .
Cabinets shall be detachable mounted on lockable wheels and all interior arrangements of
shelves and drawers as specified in drawings. Provision of Storage cabinets (1 + 3 Nos) ,
suitable to position indicated.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
RM
2.65 +
5.5 RM
Each
As per Drawing
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (1 + 1 Sinks
Provision.)
Size-Size: (2.650 + 5.500) W X 0.750 (D) x 0.800 (H) in L Shape matching with Layout
dimentions.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent.The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS (TATA-Steelium) / Essar. box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
3.10Incubators
room / 9LT-2 Sink Unit
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20/18 Gauge (TATA-Steelium) / Essar. Standared
Cabinet size of 750 (D) , 680 H (Excluding Wheels) 1000 L Steel in panel construction. Cabinets
will have sandwitched doors & drawers filled with profile. The hinges will be Godrej / MAPLA
make or equvilent unless specified. Drawer Glides: The drawer should have Telescopic Glides
for smooth movment. Handles: Furniture should have rust proof Non-metaliic PP handles .
Cabinets shall be detachable mounted on lockable wheels and all interior arrangements of
shelves and drawers as specified in drawings. Provision of Storage cabinets (1 + 3 Nos) ,
suitable to position indicated.
d.)Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel) make
which have large and extra deep bowls for bulky utensils to be used in required areas. They have
non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with the
worktops made of graite. They also have sloping drain board for easy drainage and special
RM
2.65 +
5.5 RM
Each
As per Drawing
worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink location as detailed out in drawings. (1 + 1 Sinks
Provision.)
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi Mumbai, Dist. Thane
Head Sub HeadAmount Remarks.Sr No Location
Item Item Desciption
Unit/Nos
.Qty. Rate.
3.11Washing
Room / 10Sink Unit
Single bowl SS sink having self holding frame/stand of height 0.80 mtr of approved material
including installation as per location shown in the drawing.. The sink unit shall be with drain
board, Swivel tap, bottle trap etc complete of indian range of reputed company (Jayna, Jaguar,
Nirali). Stainless steel sinks with drain boards:Sinks of SS 304 (18% chrome and 8% nickel)
make which have large and extra deep bowls for bulky utensils to be used in required areas.
They have non – rusting, easy to maintain, hygienic and satin/matte finish and can be fitted with
the worktops made of graite. They also have sloping drain board for easy drainage and special
coupling to stop hot or soapy water. Sink Unit to be covered and closed at bottom side with front
side door openable for maintenance
Nos 2
3.12Instrumentat
ion / 11LT -5
Size- 2.0X1.0x0.8 mtr.
a.) Table top formed out of 20mm thk prepolished granite stone. All Granite joints will be filled in
with Silicon sealent. The exposed edges of top to be rounded and mirror polished of approved
profile.
b.)Entire structure should be MS(TATA-Steelium) / Essar box frame of 35 x 35 mm is used for
main frame structure as detailed out in drawing. CO2 welded & finished with highly chemical
resistant epoxy powder coating.
c)The storage Cabinets are made of CRCA 20 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cabinets will have sandwitched doors & drawers filled with profile. The hinges will
be Godrej / MAPLA make or equvilent unless specified. Drawer Glides: The drawer should have
Telescopic Glides for smooth movment. Handles: Furniture should have rust proof Non-metaliic
PP handles . Cabinets shall be detachable mounted on lockable wheels and all interior
Nos 6 As per Drawing
PP handles . Cabinets shall be detachable mounted on lockable wheels and all interior
arrangements of shelves and drawers as specified in drawings.
3.13Wash room /
13
Shower & Eye
Wash
Emergency Shower and Eye wash with two angled heads, hand-held.In Polyarylamide,
reinforced with glassfi bres.Trigger operated with BALLOFIX® included for regulation of
water.Min. inlet pressure, dynamic: 1.5 bar / 22 psi flow. Including installation.
Nos 1
Head Sub Head
1 Basement.
1.02Slotted Angle
Racks
Slotted angle (of size 50X50x6 mm) adjustable steel rack - Size 4’x 6’x 1.5’,with MS sheet (18
gauge) with adjustable shelves of required length and width of ht. (+/-) 15" size each. The steel
rack will be painted with 2 coats of approved shade Oil Paint (spray painting) after one coat of No 1
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
Racks rack will be painted with 2 coats of approved shade Oil Paint (spray painting) after one coat of
anticorrosive primer paint.
2 Ground Floor.
2.01 Reception / SRDComputer
Table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank proess. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 7
2.02 GapTable Top with required structure as above(without storage cabinet) to fit the Gap. As per
drawing layout.Nos 1
drawing layout.
2.03 Office Table
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 1
2.04
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 6
2.05Stationery
Chair
Godrej Halo Series of visitor type Or Equivalent. CUSHIONED CHAIRS WITH ARMREST.
CRCA steel structure with epoxy powder coating ,100 microns by phosphating and 7 tank
process.
Nos 4
2.06 Cup boards- Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 1
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
2.07
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
2.08 Sofa Set
Full Cushion Sofa Set 3+1+1 with 40 density foam and standard quality approved cloth cover
with steel legs and inside hard wood (processed rubber, sal, teak wood) frame. 1 SS frame and
10 mm Toughened glass top teepoy (of size 750mm X 450mm x 450mm ) should be provided
along with sofa set. to be made with.
Nos 1
2.09Lab Incharge
Room
Executive
Table
Executive Table Size –W-1500 mm, D-600 mm, H-750, made of CRCA TATA Steelium /
Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal (20 mm X
20 mm) or equivalent circular section) with epoxy powder coating ,100 microns by phosphating
and 7 tank proess having one side 3 drawer other 2 drawer with storage cabinet below, Storage
Cabinet with door of 18 SWG.
Table top of laminated MDF or Teakwood. Polished rounded edge Glass of 10 mm thk saint-
gobain make table top.
Nos 1
2.10Executive
Chair
Godrej Monarch Series of High Back Or Equivalent. Revolving type with Hydraulic
setting - aaporx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm Seat Height (S H) 46-52
cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
2.11 Cup boards- L Shape
Size –W-(2300 +900) mm, D-450 mm, H-600
The Cup Boards with partitions made of CRCA 18 Gauge (TATA-Steelium) / Essar. Steel in
panel construction for cabinet body and doors with Epoxy powder coating 100 microns by
phosphating and 7 tank proess chemical tratment. Sliding / doors with hinges / handles /
locking arrangement.
Nos 1
2.12Stationery
Chair
Godrej Halo Series of visitor type Or Equivalent. CUSHIONED CHAIRS WITH ARMREST.
CRCA steel structure with epoxy powder coating ,100 microns by phosphating and 7 tank
process.
Nos 3
2.14Chemical Bulk
Storage/ SRD
Sample
Collection
Trolly
Portable trolly of Size W 500 x D 450 x L 600 mm with SS body with handle , rollers with lockig
system etc complete.Nos 3
2.15Sample
Storage
Size –W (400) mm, D-450 mm, H-2200 (7 storage of 300 mm Ht Each)
MS body (18 gauge) with epoxy powder coated, 100 microns by phosphating and 7 tank
process. Size 400 mm x 450 mm x 2100mm. 1 Unit of 7 storage cabinets of 300 mm ht each
with individual locking arrangement.
Units in Nos33
2.16Compressor
Room
SL Angle
Racks
Slotted angle (of size 50X50x6 mm) adjustable steel rack - Size 4’x 6’x 1.5’,with MS sheet (18
gauge) with adjustable shelves of required length and width of ht. (+/-) 15" size each. The steel
rack will be painted with 2 coats of approved shade Oil Paint (spray painting) after one coat of
anticorrosive primer paint.
Nos 2
3 First Floor
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
3.1 Wet Lab / 1SL Angle
Racks
Slotted angle (of size 50X50x6 mm) adjustable steel rack - Size 4’x 6’x 1.5’,with MS sheet (18
gauge) with adjustable shelves of required length and width of ht. (+/-) 15" size each. The steel
rack will be painted with 2 coats of approved shade Oil Paint (spray painting) after one coat of Nos 43.1 Wet Lab / 1
Racks rack will be painted with 2 coats of approved shade Oil Paint (spray painting) after one coat of
anticorrosive primer paint.
Nos 4
3.3Computer
Table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank proess. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 2
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with 3.4 Office Table
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 1
3.5
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 3
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have 3.6 Cup boards- Full Ht
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 3
3.7 Stools
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The casting ring is supported by 100 x 100 , 4mm square pipe. The Pitch of the 12.5 m which is
the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
The Nylone bush will be for the legs. Backrest of approved shape and material of ht. min.
200mm to be provided.
Nos 12
Sample
Preparation / 3
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
3.14 Cup Boards- Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have Nos 13.14 Cup Boards- Full Ht
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 1
3.15 Stools
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The casting ring is supported by 100 x 100 , 4mm square pipe. The Pitch of the 12.5 m which is
the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
The Nylone bush will be for the legs. Backrest of approved shape and material of ht. min.
200mm to be provided.
Nos 4
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
3.18 lab Staff roomComputer
Table
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank proess. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 5
3.19 Office Table
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 5
3.2 Cup boards- Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 2
3.21 Almirah
Storewel Godrej make Or Equivalent with locker full Width (w) 915 mm, Depth (D) 485 mm,
Height (H) 1980 mm. structure with epoxy powder coating ,100 microns by phosphating and 7
tank process .
Nos 2
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
3.22
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 5
3.23Stationery
Chair
Godrej Halo Series of visitor type Or Equivalent. CUSHIONED CHAIRS WITH ARMREST.
CRCA steel structure with epoxy powder coating ,100 microns by phosphating and 7 tank
process.
Nos 5
3.24Lab Incharge
Room
Executive
Table
Executive Table Size –W-1500 mm, D-600 mm, H-750, made of CRCA TATA Steelium /
Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal (20 mm X
20 mm) or equivalent circular section) with epoxy powder coating ,100 microns by phosphating
and 7 tank process having one side 3 drawer other 2 drawer with storage cabinet below,
Storage Cabinet with door of 18 SWG.
Table top of laminated MDF or Teakwood. Polished rounded edge Glass of 10 mm thk saint-
gobain make table top.
Nos 1
3.25Executive
Godrej Monarch Series of High Back Or Equivalent. Revolving type with Hydraulic
setting - aaporx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm Seat Height (S H) 46-52 Nos 13.25Executive
Chairsetting - aaporx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm Seat Height (S H) 46-52
cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
3.26 Cup boards- L Shape
Size –W-(2300 +900) mm, D-450 mm, H-600
The Cup Boards with partitions made of CRCA 18 Gauge (TATA-Steelium) / Essar. Steel in
panel construction for cabinet body and doors with Epoxy powder coating 100 microns by
phosphating and 7 tank proess chemical tratment. Sliding / doors with hinges / handles /
locking arrangement.
Nos 1
3.27Stationery
Chair
Godrej Halo Series of visitor type Or Equivalent. CUSHIONED CHAIRS WITH ARMREST.
CRCA steel structure with epoxy powder coating ,100 microns by phosphating and 7 tank
process.
Nos 3
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
3.28 UV-VIS / 6Computer
Table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank proess. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 1
3.29 Office Table
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 1
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
3.3
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 3
Chairarrangement.
3.31 Cup boards- Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 1
3.32
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
3.34 Stools
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The casting ring is supported by 100 x 100 , 4mm square pipe. The Pitch of the 12.5 m which is
the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
The Nylone bush will be for the legs. Backrest of approved shape and material of ht. min.
200mm to be provided.
Nos 4
3.36AAS- ICP MS
room / 7Comuter table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank proess. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 1
furnished with computer Table.
3.37
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 3
3.4 Server Room / 8Computer
Table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank process. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 2
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
3.41
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 2
arrangement.
3.42 LCMS ROOM / 9Computer
Table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank process. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 2
3.43 Office Table
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is Nos 13.43 Office Table provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 1
3.44
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 12
3.45 Cup boards- Full Ht.
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have Nos 43.45 Cup boards- Full Ht.
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 4
3.46
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
3.5 GCMS / 11SL Angle
Racks
Slotted angle (of size 50X50x6 mm) adjustable steel rack - Size 4’x 6’x 1.5’,with MS sheet (18
gauge) adjustable shelves of required length and width of ht. (+/-) 15" size each. The steel rack
will be painted with 2 coats of approved shed oil paint (spray painting) after one coat of
anticorrosive primar paint.
Nos 3
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
Computer
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
3.51Computer
Table
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank process. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 1
3.52 Office Table
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 1
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
3.53
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 4
3.54 Cup boards- Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 2
Semi Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
3.55
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
4 Second Floor
4.01 Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 2
Coat Change Cup boards
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
4.02Full Ht
Hanger
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
Nos 2
Room /1Cup boards
HangerGodrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Provision for Hanger to be made within.
4.03 Sample Room / 2 Cup boards- Full Ht
Size –W-900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 3
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The casting ring is supported by 100 x 100 , 4mm square pipe. The Pitch of the 12.5 m which is
4.04 Stools the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
The Nylone bush will be for the legs. Backrest of approved shape and material of ht. min.
200mm to be provided.
Nos 8
4.08Media
Preparation /3Cup boards- Full Ht
The Cup Boards are made of CRCA 18 Gauge (TATA-Steelium) / Essar. Steel in panel
construction. Cup Board will have sandwitched doors filled with profile and having 6/8 mm plain
glass (Saint Gobain make ). Door Hinges: The hinges will be Godrej / MAPLA make or
equvilent unless specified. Handles: Furniture should have rust proof Non-metalic PP handles
and locking arrangement. Provision for Ht adjustable shelves to be made.
Nos 1
4.09 Stools
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The casting ring is supported by 100 x 100 , 4mm square pipe. The Pitch of the 12.5 m which is
the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
Backrest of approved shape and material of ht. min.
Nos 2
The Nylone bush will be for the legs. Backrest of approved shape and material of ht. min.
200mm to be provided.
4.12
Media
Preparation "B"
/4
Cup boards- Full Ht
The Cup Boards of Size –W-900 mm, D-450 mm, H-1800 are made of CRCA 18 Gauge (TATA-
Steelium) / Essar. Steel in panel construction. Cup Board will have sandwitched doors filled
with profile and having 8 mm plain glass (Saint Gobain make ). Door Hinges: The hinges will be
Godrej / MAPLA make or equvilent unless specified. Handles: Furniture should have rust proof
Non-metalic PP handles and locking arrangement. Provision for interanl shelves Height
adjustable to be made.
Nos 1
4.13 Stools
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The casting ring is supported by 100 x 100 , 4mm square pipe. The Pitch of the 12.5 m which is
the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
The Nylone bush will be for the legs. Backrest of approved shape and material of ht. min.
200mm to be provided.
Nos 2
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
4.14Sample
Storage
Size –W (400) mm, D-450 mm, H-2200 (7 storage of 300 mm Ht Each)
MS body (18 gauge) with epoxy powder coated, 100 microns by phosphating and 7 tank
process. Size 400 mm x 450 mm x 2100mm. 1 Unit of 7 storage cabinets of 300 mm ht each
with individual locking arrangement.
Nos11+11
=22
with individual locking arrangement.
4.17 Biosafety / 7 Stools
Size – 15" H 18.25 a stainless steel diameter 12" over a using cassing ring (Ht. Adjustable).
The costing ring is supported by 100 x 100 4mm square pipe. The Pitch of the 12.5 m which is
the 4 rings made up stainless stell pipe with diameter and manufactured by thickness 1.2 mm.
The Nylone bush will be legs. Backrest of min. 200mm to be provided.
Nos 4
4.22Instrumentation /
11Office Table
Godrej Model T 101 Or Equivalent: Office table approx. Size –W-1200 mm, D-600 mm, H-
750. to be made up of CRCA TATA Steelium / Essar Steel medium weight (Box Material-
vertical (35 mm X 35mm) and Horizontal (20 mm X 20 mm) or equivalent circular section) with
epoxy powder coating ,100 microons by phosphating and 7 tank proess. Storage Cabinet with
provision for3 drawers of 6" high each on right side included. The Table/ storage Frame is
made of 18 SWG. Table Top: The top could be of MDF of 20mm thk. with both side laminated.
Nos 1
4.23
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 5
4.24 Cup boards- Full Ht
Size –W 900 mm, D-450 mm, H-1800
Cup Boards made of CRCA 18 Gauge (TATA-Steelium) / Essar Steel in panel construction with
epoxy powder coating ,100 microns by phosphating and 7 tank proess.. Cup Board will have
sandwich doors filled with profile and having 8 mm plain glass (Saint Gobain make ). Hinges of
Godrej / MAPLA make. Shall be of rust proof Non-metalic/SS handles with locking
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
Nos 2
arrangement and have adjustable shelves of same material as mentioned above of ht. 350mm.
4.25
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 1
4.27
Work Sheet
Preparation
Room/ 12
Computer
Table
Computer table Size –W-1200 mm, D-600 mm, H-750mm to be made up of one drawer and
one keyboard with self arrangement for printer and storage unit made up of CRCA TATA
Steelium / Essar Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal
(20 mm X 20 mm) or equivalent circular section) with epoxy powder coating ,100 microons by
phosphating and 7 tank process. Storage Cabinet with door Provision is made of 18 SWG MS
sheet. The top of MDF of 20mm thk plywood with both side lamination. CPU trolly to be
furnished with computer Table.
Nos 10
Head Sub Head
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
4.28
Computer
Chair / lab
Chair
Godrej Kubix Model of Mid back Or Equivalent. Revolving type with Hydraulic setting for
height adjustment - (Approx. Width 65 cm, Depth 65 cm, Height 100 - 109 cm ) Seat Height (S
H) 45-52 cm ,Moulded seat with Back, with five legs on wheel support with locking
arrangement.
Nos 10
arrangement.
5 Third Floor
5.01 Training RoomTraining
Chairs
Godrej Training Chair Series of Model No 7004 with Desklet Or Equivalent: Made of CRCA
steel of approved make with cushion for seating and back and provision to access writing
notes.
Nos 66
5.02
Semi
Executive
Chair
Godrej Kubix Model of High back Series Or Equivalent. Revolving type with Hydraulic
setting for ht adjustment - (approx. Width 72.5 cm, Depth 72.5 cm, Height 100 - 109 cm)
Seat Height (S H) 46-52 cm, Moulded seat with Back, with five legs on wheel support.
Nos 4
Training Table to be mounted on Platform assepmbly of size 4000 X 2500 to raise the ht up to
5.03Platform with
podium
Training Table to be mounted on Platform assepmbly of size 4000 X 2500 to raise the ht up to
200mm for seating arrangement of Trainer/ Guest. Platform to be of wooden / processed wood
or equivalent sufficient to cater the strength. Platform to include podium of size 400 mm X 400
mm x 1500 mm with self arangement for mike and supporting accessories etc.
No 1
5.04 Training Table
Training Table Size –W-3000 mm, D-600 mm, H-750, made of CRCA TATA Steelium / Essar
Steel medium weight (Box Material- vertical (35 mm X 35mm) and Horizontal (20 mm X 20
mm) or equivalent circular section) with epoxy powder coating, 100 microns by phosphating
and 7 tank proess. Table top to be made up of MDF or Teakwood with self arrangement for
Microphone. Table Top to cover Glass of 10 mm thk Saint-Gobain make with polished round
edge.
Nos 1
Godrej Encarta Series Or equivalent : Conference Table of seating capacity 20 or More of all
5.05Conference
Room
Conference
Table
Godrej Encarta Series Or equivalent : Conference Table of seating capacity 20 or More of all
wood Modular Design, Closed Interaction Module of MDF Top with Membrane foil coated
with layer of polyurethane for better scratch and wear resistanc. Optional wire management
facility. Easy to install and detachable assembly for optimisation of space.
Nos 1
5.06Conference
Chairs
Godrej Halo Series of Revolving Visitor Type (19 Nos) + Very High Back (1 No) Or
Equivalent. Revolving type with Hydraulic setting for Ht adjustment - Approx. Width 70
cm, Depth 70 cm, Height 90 - 102 cm Seat Height (S H) 46-52 cm, cushioned chair with five
legs of steel on twin wheel castors for ease of Movement.
Nos 19+1
5.07 Dining Room Dining TableGodrej make of Cantina / Café Pod Series or Equivalent. Top provision of MDF / Rubber
wood/ SS Steel with foldable option. Size 800 x 800 x 745 (H) Nos 10
Supply and Installation of the laboratory furniture for proposed Quality Evaluation Laboratory cum Training Centre at Plot No EL-184, TTC Industrial area, Mahape, Navi
Mumbai, Dist. Thane
Head Sub Head
Mumbai, Dist. Thane
Sr No LocationItem
Item DesciptionUnit/N
os.Qty. Rate. Amount Remarks.
5.08 Dining Chairs
Godrej STAQ Series of Model No 4012 XW Or Equivalent: Made of CRCA steel of approved
make with Seating arrangemnet in range of natural veners of Rubber Wood, Teak wood /
Mahagony.
Nos 40
5.09
Staff
Accomodation
room
Single Bed
Godrej Opal Series Or Equivalent: Size 1800 (L) x 900 (W) x 450 (H). Bed Stead is made of
a combination of MS steel Tubes and Pre-laminated Particle board. Bed accessories to include
the Pillow, Bed Sheet, Mattress and Soft Bed, quantity 1 each of required size to cater single
person.
Nos 8
The Cup Boards of Size –W-900 mm, D-450 mm, H-1800 are made of CRCA 18 Gauge (TATA-
5.10Cup Board for
Dreser
The Cup Boards of Size –W-900 mm, D-450 mm, H-1800 are made of CRCA 18 Gauge (TATA-
Steelium) / Essar. Steel in panel construction. Cup Board will have sandwitched doors filled
with profile and having 8 mm plain glass (Saint Gobain make ). Door Hinges: The hinges will be
Godrej / MAPLA make or equvilent unless specified. Handles: Furniture should have rust proof
Non-metalic PP handles and locking arrangement. Provision for Hanger to be made within..
Nos 8
Miscellaneous
6.01 Ground/ floor. Supply and fixing of standard qulaity/branded White Notice Board of Size 1200 mm X 600 mm. Nos 1
6.02
Ground/First/S
econd & Third Supply and fixing of standard qulaity/branded White Notice Board of Size 900 mm X 600 mm. Nos 4
floor.
6.03
Ground/First/S
econd & Third
floor.
Supply and fixing of standard qulaity/branded paper pin up Board of Size 600mm X 600 mm. Nos 8
6.05 Training Room Supply and fixing of standard qulaity/branded White Notice Board of Size 1500 mm X1200 mm. Nos 1
~1) (2) ~ ~ ~ ~ ~ ~) (9 RCC RETAIN~OWALL
~-----m=~~~~~~~~~~~~~~~~RiF~~~~~~~~~~~~~~~ZZ7Dp;JH?i-~@
~I I ~~~~ I ~ I +~H~NDU I I I :::: ~PFE
~~ I I SIWl
:c - - Eh- - © ~ DD2 0 I I I I
~ SHO'MRAND
~~~ ~~ .~ ~ ~ I I I I I I ;
D I
J '=.;::' .. ,...._] fl \! fl \1 fl \! : ---· -tt® I I I I I ~r:-: ..
g . G _ PNG _ NG ..... ~
\I 111 \/ I \/ 111 \/ I \/ 111 \/ I SW3 Ill I 1~
~----W!:z?lZZ2~~~1Dii~~miil~~~zz;m~mii~~~~~mii~~moiz~~~~~~~~EZZ?lZ~&----L® RETAINING WALL
i, 5700 5700 5700 BASE 5700 5700 5700 i,
® ® ® ® ®
NOTES:
1. All specifications given in the tender document shall be followed. 2. Contractor shall submit fabrication shop drawings for approval before execution of works. 3. Contractor shall submitt as-built final drawings after completion of work.
PROJECT CONSULTANT CLIENT ASSOCIATE ARCHITECT & PLANNER PROJECT TITLE DRAWING TITLE SCALE@A3
B IL&FS CLUSTER DEVELOPMENT SPICES BOARD
~ THE NOVARCH REVA HT NG 25-11-15 QUALITY EVALUATION LABORATORY BASEMENT PLAN N.T.S.
INITIATIVE LIMITED An:hitecls & Engineers CUM TRAINING CENTER AT N t"!...- ___
Ministry of Commerce and lndusb1es, 'WWW.novarcharchltecls.com FIRST DATE 1$T FLOOR, NTBCL BUILDING, Govt of India E·B70, e-ment, C R Partl: ISSUE AF NG 02-06-15 PLOT NO. EL-114, _,C ~ GOOD FOR CONSTRUCTION 25-11-15 rs TOU. PLAZA, DND FLYWAY, New Delli-110019 1TC INDUSTRIAL AREA. VIL.I.AGE NOIDA-201301, INDIA Ph:+El1-11-41329292 REVISION DRAWN CHECKED DATE NAVI MUMBAI PROJECT No. I DRAWING No. REVISION
AD/l/ND/156-2 AD/156-2:02 A
,------------------------------------, ! I"'.,
~ I I I I
I"'.,
~ 111 I I
§ ...
I I I I I I I I I I I
Siil l'lliE-l hl I I I I I I Pl.Ull SIWT
I II Ill_ Ill_ I I I I I I I I I I I I I I
I I I I I I I I I I I
~--T--EH . - . - . - . . . -·---===-m--~ -I \ PitmG I \ PMKltG I \ PAAl(N;
I I
~ , : I
Omo o -,"1@ COMPRESSOR ROOM \ I I ~I I I ~P OOWNro amm R1Dt I jl~ 5800X~ \I ~ A ~I i..----..-~-' ,1.--_..J
"!'ff,- - - ~ M
'
E SIWT
1:11c: S'N.l
D Eh- i*&**&J~ v.tll" ~
~
I l.M I I o~I ~ 0 0 i M>i: ~ f
~I 1 ~ -
:1"'
-: D jtrro1 g +,, .!:::::::I-: ..... ~
y 0 0 o0 •
1---RECEPOON I SRD
-....
' "
rJ.R PARKN; - 10 Noa
-+- t
rm
SW3
~
WASTE DISPOSIL IRfA 5500 x 5500
w (In)
W.~i:~I
o o o o o I 8W3
EFFWENT lROOUENT Pl.ANT 5700 x 5500
•Q I
1® I
I ~ I '- _J , , / ....... \ I / ....... \ !-\ " / ....... \ /-\ I /..,.., .. \ 1-\
- - - -~~~r---,zz:~flzEl~!::k:ZZE~l'ZZffJ------t--®
I ;xNUST
RS
I -- --- ------PLU•G DUCf a PUJlllNG Dtx:T
L 5700 5700 5700 5700 5700 §! 5700 5700 ~~-- ------ ---~~--- -------- ----
©
PROJECT CONSULTANT
B IL&FS CLUSTER DEVELOPMENT INITIATIVE LIMITED
1$T FLOOR, NTBCL BUILDING, TOU. PLAZA, ONO FLYWAY, NOIDA-201301, INDIA
® ®
CLIENT
SPICES BOARD Ministry of Commerce and lndusb1es,
Govt of India
ASSOCIATE ARCHITECT & PLANNER
~ THE NOVARCH An:hitecls & Engineers 'WWW.novarcharchlt.ec:ts.com
E·B70, e-ment, C R Partl: New Delli-110019 Ph:+El1-11-41329292
D ® ([) GROUND FLOOR PLAN
PROJECT TITLE
® NOTES:
1. All specifications given in the tender document shall be followed. 2. Contractor shall submit fabrication shop drawings for approval before execution of works. 3. Contractor shall submitt as-built final drawings after completion of work.
DRAWING TITLE SCALE@A3
N.T.S. REV A HT NG 25-11-15 QUALITY EVALUATION LABORATORY i,;G;;R;.;O~U~Nn;D:...:F..:L..:.0..:.0_R_P_LAN ____ trur-rc--I 1--.==--------------,cuMTRAININGCENTERAT N DATE
FIRST Af= NG 02_0G-1S PLOTNO.EL-184,MIDC ~ GOODFORCONSTRUCTION 25-11-15 ISSUE 1TC INDUSTRIAL AREA. VIL.I.AGE PROJECT No. DRAWING No. REVISION
REVISION DRAWN CHECKED DATE NAVI MUMBAI AD/l/ND/156-2 AD/156-2:03 A
:::c u ~ 0 CL
w c::::i ~
E E
0 0
~
I I I ~- ~~ I
100L, df D - ~D ~I) ([D (51) - ~I) dfD I
STAIR CASE-2 (9'D 17. /
1 1 Glazing I I Glazing I i j j · • • ·
I
I
D)~"' ""I I I I I I I I I I i i i i I ' ' I
11::1 l' 1u- u '.", ""/"'., ... ' W3 " """" """:..::. ~ "" w• ,, ,, ,, """"""" "" ~ """" ! "" W4 """" !............ W4 .......... ! I """ ,, ,, """" """" I I
D L I ~ 'x/ ~ l Q ' I Q I O Q , / Q -o ' /;Jpooi;(r'' I ~ I I I I ~ h h J~J,o~ ' "" ~; I @
11 1111111 eyewash chemical cupbo~rd ~ :,;~HAFl-.. ,;; fume vhood fume "hood ~ .,. -"; ', ~ 0 Balance bench ~ ~ - ~ ~ V4 I\ PIUM SHAFT ~ I VJ /, eyewash & shower I // // I CJ D P13 ~ ~ z::z:;
-9
I= ~I I 3
I ~ I o / ' r- - - _,_ '- -1
_g P5 P12 00 0 - ~ a D 1111111 .;,//, 1 , -'- I _. en t:: '----- ~1 "I"\/ T =
0
FE ~ ~ ~ SAMPLE PREPARATION § UV- lilS 8!_ V3 oJ.l;: ~~ \ / .5
3': ~ D g D g IF.El D g IF.El 9300 x 5500 E P13 CJ 5500X5500 , )\~~ x ~ I Q) D -g_ D -g_ D .0 ~ '-- // I \ (.!) ~ a a ~ oo2 c.. LAB iNcHARGE § CJ 111111 CJ D <0 .. / ~ (} / '.
I -D = D = D = D 3100X5500 E D V3 -~ [::'. =
;!:::: ;!:::: _. c: D D D D t:: / '\ ~ II k 1111111 : : ·: ~ 8!. - // // ~
I II ~ -g I D -g D I -g D 8!. .. ~ D AASANDICPMS 0 V3 -~~ ~ DNC= ~ zz:::z; G PIPE _ I Part1t1on I ~ I ~ ~~ 1 r........... 5600 xssoo / ~., V4 \/ SHAFT
I' I J - LL - - D 11G\ 1,.~ci>1 ~ +.II \ ,,,,. I ,\' ~ .,. I CJ I CJ I CJ'l"l'I '....,. ~d ' ' .. 1-F"' ... ·H ·"' DD' ddl 'D1(G I I , .... ... '.: ·1 © 15500 x 8800 P5 CJ D 0 0 0 0 ~ Toughened glass ~~) '-
I
: WETLAB P~ P10 P11 I ougnened g ass P11 Toughened glass p11 ·~ I /\ ~ I
·n; - LAB STAFF ROOM r;. ~ CORRIDOR 2375 WIDE I
01 0 0 0 ...... " I' LO ......
I I-, 0 0 Acid Roo~ O D 7100 X 3100 ~ W3
TI Unit 0 0 0 0 D1(G ~ 1111111 I 1 I i I I I I I rvJ I cupboard ~ 0 PB Partition rn PB ~ 01 V7/?/?4/?/?/?1' /? /? /? f </ /? /?~ I
I I I l'Ortit1on P4 II l'ortit1on P4 DD1 P7 F.E a D = I I P4 I Toughened glass P4 l::'. I I I -~ 2:3 CORRIDOR 2400 WIDE I DD1 (G) I [] I ~ I ~ CHEMICAL STORE
002 2000x1000 2000x1000 - 0 0 Jm
I 5700 x 2400 CORRIDOR 2200 WIDE a D w
3
Rl I I HPLC/LC~S IF.El SERVERROOM I
, Sample storage wall Toughened glass ci: I I " ,, ,, ,, '· ,, ,, ,, 77 ,, rh" A / // ,, ,, r• • ----,..,,.., n rAJ1(G fl 14325X90C0 5600X2900
OP1 ,, ,, vr-1 r ,, ,, ,, ,, ,, I tJ ::T rh ® - I - [::'. J ~ Ll I I .J - L .J _,___ ,, . / ,, ,, ,, ,, ,, ,, ,, , r B ·n; C =:::io• j
1(fre) ~ EMERGENCY D3 HAN~6~:~ 0 ~ O fFE 2
coox1ooo 2000x1
1DOO 2DOOx10<0 2DOOx10CO :¥:~ ~ ~ ~ D I
n ~-=:I EYEWASH D ri ge ri ge riage
I
--, UP ?-;:::) SHOWER & 2100 x 1&iti"- [.§ ~ I 11 I I r,, //7777,, // // PLUMBING W' I
o I " " o5J [] GC 2000x100~ Pi .Q I I I DUCT HPLC I LCMS o 'FIRE ·~ - ,, 2000x1000 GC _ :!§ I' \ I VJ "' ca 6000 X 5700
LO I V' \/ LIFT // // // //7777 // ... 05 ~ // // // // // /A r'ii '---- GC I GCMS J'..1 [l_ 0 0 0 0 !:::
g' /\ ;n~ ~ 12 g ~I "§ u~u .in 1JUCT\ WC ? ' / ~ _ 8200 X 5700 _;;
I
<.!:> • T '// //,. W E B•x 1 ~ LADI ~ )~~";P( ~ ~ GENTS (: ~ GC GC ~ 2500x1: 00 2500x1200 IF.EI 2500x1200 2500x1200 251 ox1200 IF.EI L _ - - - - - - J ? ,me/ LL TOILEl ~ / ' ' /. ' D6 TOILET - 8 2ooox1000 2ooox1001 r;; LCMS LCMS LCr.t s LCMS L ~MS W' I
~ V' X we D6 :: // // /~ ,.. ~ D6 G f // che~ical "Upt oard ij J // // \ ,I ,I I x' ,ifluc1\ ~ 00\ ~u 1./3 ;A~Z l:JQ X~: -;:: va ',,l/ t 0 0 0 V3 "1 '/ 0 0
1, ' V5 1~>1<71J N.i/f.f""' - I, ~ / / ) " " I // // . // // /////A I//////////,, // // // // r iL i' m... UL'\ I I I V2 11 I 11 I I //I I u. I I // , I V/ // I // Y/ 4J r // ifi r ~ ®
Glazing l--=jll 1 11 I 11 I
5700 5700 5700 Lt- '" 1 ...
/ /
/
---I-- --I---
" ) 'P\ -.
I/ /
--l--
. I . .... L I Glazing Glazing Glazing 1 Glazing
--- ---
5700 /
1,.
PLUM.Blli..G...DUCL_
5700
- - --45 00- -
FIRST FL PLAN
'------
1 ... 5700 /
--l--
)
---
/ 1 ...
•
PLUMBING... DUCL_
5700
I '------
5700 i_J 1 ...
/
--l--
7
• CHEMISTRY LAB AND INSTRUMENTATION LAB
NOTES:
1. All specifications given in the tender document shall be followed. 2. Contractor shall submit fabrication shop drawings for approval before execution of works. 3. Contractor shall submitt as-built final drawings after completion of work.
PROJECT CONSUL TANT CLIENT ASSOCIATE ARCHITECT & PLANNER REVB HT NG 07-01-16 I PROJECT TITLE DRAWING TITLE SCALE @A3
N.T.S. 8 IL&FS CLUSTER DEVELOPMENT INITIATIVE LIMITED
1 ST FLOOR, NTBCL BUILDING, Clusters TOLL PLAZA, DND FLYWAY,
NOIDA-201301, INDIA
SPICES BOARD
Ministry of Commerce and Industries,
Govt of India ~ THE NOVARCH Architects & Engineers www.novarcharchitects.com
E-870, Basement, C R Park New Delhi-110019 Ph:+91-11-41329292
REV A HT NG 25-11-15 QUALITY EVALUATION LABORATORY FIRST CUM TRAINING CENTER AT N ISSUE AF NG 02-06-15 PLOT NO. EL-184, MIDC ~
f---------------------1 TTC INDUSTRIAL AREA, VILLAGE REVISION DRAWN CHECKED DATE NAVI MUMBAI
FIRST FLOOR PLAN PURPOSE
GOOD FOR CONSTRUCTION
PROJECT No. I DRAWING No. AD/l/ND/156-2 AD/156-2:04
DATE 7-01-16
REVISION B
,- -, r1 I I I I
r1 r1 r1 r1 r1 r• r• r• I I I I
I 1
I ID M M M ~ ~ M ~ 'F.-V ~ fu fu ~ u ~
1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 ootfloo 1 I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
STAIR CASE-2 ® ~I-PLUM SHAFT I I GI . I I GI • I I I I I I I I I I ! ! az1ng ! ! azmg ! ! I I I I I I I I : : : :
W'.1 W3 II W3 W3 II w~ II w~ W'.1 II W3 W'.1 II II' iii IL v r- ~ - // // // // // 117.7 // ,/ // ~ •• // //7777 // 'A // // // // // // // // // //,., 7T77 // // // // v Jr/// // //77 /I // // // // // h '/ // // // // // -, @ rn"',1 i 0 0 0 L~ 0 0 L~A~ : ii ~~'i CJ ,~ I CJ I I ' 3ZPsa~ ' LO< L~ I ~, V4 ~~ l
JJ_ STERl41ZER // / D l-,, // ///;/ I I D I -- -'-I DD
2 V3 ~ plO-SAFETY CABINS V3 - \ r- - -1 1
~I
II ~I 1
STERILIZATION ROOMS 9200 x 5500
t: - - //// 1 I
P19 8!_ P21 DD2 ~ 'j:: up \ / t------'f c: D D P23 P24 - INCUBATORS ~ ~ v: .j%,_ b \ I ,____
~ ( D BIO SAFETY CABINS c: 111111 . 14600 X5500 ~ ~ 1/-.,.."'< II. x ca ANTEROOM S400X 5500 D .Q ANTEROOM r//./'. /////. I\ a.. 2050X4100 'f§ 225DX4100 ~"°' j:: / \1
D1 - - 8!. D v: ~ b l\
c:n c: ·;;:::; 0
(.!)
GAS PIPE SHAFT STERILIZ;.!\ P18 P2U s ~ ~ / "-' j:: 11
1111111 0 0 U 0 DD2 DD2 DJ2
V: (~~, j:: ~o•C = ~ C 1 ,1 I I D fy1 '" Partitioo PartitioJY Partition I L Partition 1 P37 / ~, N I v
4 )(D I 'J I I' I 'x'~ _J -- DD2 [3EJ ID I~ P46 L 0 ~ •v Ii I P1;r-I ID ~l..J I •v r-r;:;r cuoooafds LLJ Ill / DD"\ r ,, ID i:: I ,, ,, ,, ,, // A I ©
I
I r~" In • . .c1 F'o ~ 1- , , . ~,1l--'ll0 '--' •.• , , ,,
i ~ D P16 ~ SAMPLE, MEDIA PREPARATION ~D2 SAMPLE srnRAGE ! 11 1 1 1 1 11 11 1 1 '/ ·- 570DX3500 ro D 0 D ~
W3
01 0 0 0 ....-- r--. t--. LO ....--
I I B 11000 3500 a. CJ 1425 I I. 1025 I DD2 ~ ~ SAMP E, MEDIA PREPAllATION D D 0 0 1
I A DECONTAMINATltN I ~ a 5500 x 5100 CJ D O a LA3~ KILLING ~
I I ' u; 0 1== 0 D D D DD D D D P15 Partition Q ~ s: INSTRUMENTATION 4400 x 5700 ~
c I ~ P16 = Tr! .. ,,:-,~, ni<><><> D2 IP13 8!_ ~ PCR, VIDAS etc I P36 I ~ -~ !ij 16 1 ougnened glass t"1:> P1:i 1 _} """"""' 7900 x 8300 c: ~
~~ ITTOOX~ ro ~ o«l ~ ~ a.. ~
(/ (/ (/ (/ (/ (/ (/d
~ en D ~ P2 CHANGE CJ D WORK SHEET PREPRATION ~ )2 0 0 J5 ~
I ..c: CORRIDOR 1800 WIDE 1500 X 2000 'E
~~ I~~ ~ BJ : -..:, ,, ,, ,, ,, 77 // // ,_, A OP1 ,, " // ,, ,, ,, : '-- ,, -OP1 v ,, ,, ,, ,, LAJP25 -~ ~ft P28 h - .... h - i:: .,_ UU1 1-J 1-J D1 ,, ,, b lii P2€ COAT CHANGE - ,,.. ,,
I V,:Dmj DJ HANDICAPPE[ 33oox51oo:YD~ P33 lJ >t'J' ~ ._ S:: EMERGENCY TOIL.~ J = r-..- ~:::ia• re ~ . P29 .,_
ct D1 ( ) V,: ~ SHOWER & 2100 X 1 D6 c: 0 0 PLUMBING ~ ~ 0 U EYEWASH ~ P3 J5 _ WASHING
A2) : I :~ - ~ ~ 1850WIDE 2000X1350 I 8!. ..... I 0 D I = IY
00 I' FIRE v, ~ D5 l2 V,: D2 0 0 I D1 I== Db
I ~/ V3 -- A
[O \/ LIFT // // // // // // // 1 D5 ,/ ,, // // // // / l""ii Partition P34 DD1 (G) Partition P34 Toughened glass P34 ~ Partition P34
g . . "'%/\ ~d ~IES ~~AUST/ ,, Co ll: ·- .. •.• ~ ,/ ,, c -tl Mt l 'l UCT w E • ~ 6 ILET /,. ' / V,: ~~ GENTS DD1
-- .,..._,_ -- ,-:. \ELEC; LL ,-:. / ' -
~
W3
dj ! ®
W3
~
W3
I (.!) L J // // 0 )( 1250 ~ SH0' ~ 1 BOO X 250 De TOILET(; STERILE CORRIDOR DD1
::::; ~ V3x ~~ ::: // // /~ ~c D6 (; // /-:. "// //] P39 ,1 ·~ S AA.Y'"'• - '/ "/
\ J, J, I x, ,, ,,,, ~,~ct, ,, ,, ,,,,,,V,: ox125 11 03 .~~;,~ ,, x~ ,, ~ ,, ,,,, ,,,. vt '--:,~ v3 J2~J1 n1j r+4 I .; I 11 1 1 v2 1 1 I 11 vo v1 11 11 v2 11 . ffi- v , " L1-J L1-J I @
~
Glazing I
I/ '1TU1
1 ... ---
/
• STAIR CASE-1
PROJECT CONSUL TANT
8 IL&FS CLUSTER DEVELOPMENT INITIATIVE LIMITED
1 ST FLOOR, NTBCL BUILDING, Clusters TOLL PLAZA, DND FLYWAY,
NOIDA-201301, INDIA
I/ "JTUU 1,.
---I--- --+-----
, 2'A .
CLIENT
SPICES BOARD
Ministry of Commerce and Industries,
Govt of India
rrvu
Glazing 1 Glazing Glazing 1 Glazing
I/ OIVV -- ---t"
L_PLUMBING DUCT
- ---fifOe---
---I--- - - - -----45eoo-k SECOND FLOOR PLAN.-~
MICROBIOLOGY LAB ·5
- t;--- - 5"100
----+-----
,
-- ---t"
lo
L_PLUMBING DUCT
- --fifOe-- - t--- - 5TOO 1,.
--- --- --- ----+---- --- --- --- I/ 7
NOTES:
1. All specifications given in the tender document shall be followed. 2. Contractor shall submit fabrication shop drawings for approval before execution of works. 3. Contractor shall submitt as-built final drawings after completion of work.
ASSOCIATE ARCHITECT & PLANNER REV B HT NG 7-01-16 PROJECT TITLE DRAWING TITLE SCALE @A3
N.T.S.
~ THE NOVARCH Architects & Engineers www.novarcharchitects.com
E-870, Basement, C R Park New Delhi-110019 Ph:+91-11-41329292
REV A HT NG 25-11-15 QUALITY EVALUATION LABORATORY FIRST CUM TRAINING CENTER AT N ISSUE AF NG 02-06-15 PLOT NO. EL-184, MIDC ~
f---------------------1 TTC INDUSTRIAL AREA, VILLAGE REVISION DRAWN CHECKED DATE NAVI MUMBAI
SECOND FLOOR PLAN PURPOSE
GOOD FOR CONSTRUCTION
PROJECT No. DRAWING No. AD/l/ND/156-2 AD/156-2:05
DATE
07-01-16 REVISION
B
n1- - - - - - - - - - - - - 4 -!mrln.IEl$1NJIC;- - - - - 6 - - - - - !mnm.la$RMllillH - - - - 9 la$Rtill.Ni
~oo m• ~~-I I I INCIJNED GIAOO ltna!ED GL.AZN; I I I I I I I I I I I I ---·- - -·( I 000 000 I BAL~~DE STAIR CASE-2
Im ooo ooo i 1 I 00 0 0 0 0 - - TERRACE - ~ FW1 ooo 601 ~ -TERRACE
000 000 , ' 0 0 I a ~~~ ~~
8 1 1 ooo ooo W3 11ootx4<Kkl 1 '<Joo ·r &;I 1 ooo ooo a o w m I
ooo ooo M 1 W3
I ooo ooo 808 :.:: 'C QO.Q..-Q - -, I I I I 000 000 UPSAN>BAITTRYROON l I
oo::__ooo "' 1
571lO x 11400 ""' I Toughened glass
I I I 0 I ~DOR2!imWDE I I I CORRJDOR2500WllE I I W3 I ~1 ~ !'-.. IC .....
EMERGENCY - D4 ~ I =3; ~ W3 I
~~-J~J-~~~r==i3"~~~~1!1:::::::::::1l~~ AFFACCOMODATI v ~ i ·r i - 3lD1,!'!'-X41D1~___L_Jlf--'-'"""'-"9 I IC ' i:li I KITCIEN PANTRY All> STORE I
5800 x 5600 W3 FW1 FW1 FW1 FW1
BALCONY BAl.<XM' BALCONY BALCONY
.... L 3!Dl x 15111 3500 x 1500 35111 x 1500 35111 x 15111 n I ' 'I' V2
·~ Yl Vil Vl I YI Yl I ., 'Kol I
I -~ 11 I I L I I L-I ~ I 5700 I PUi.BINS?f£" ' 5700 ' PWB~-ffB I 5700 I I I
.1 JSTAIR CASE-1
PROJECT CONSUL TANT
8 IL&FS CLUSTER DEVELOPMENT INITIATIVE LIMITED
1ST FLOOR, NTBCL BUILDING, TOLl. PLAZA, DND FLYWAY, NOIDA-201301, INDIA
® 3
CLIENT
SPICES BOARD
Ministry of Commerce and lndusbies, Govt of India
~
ASSOCIATE ARCHITECT & PLANNER
~ THE NOVARCH Architecls & Engineers www.novarcharchilllcls.com
E-870, e-m•nt. c R Park ,._ 0..1-110019 Ph:-+91-11-41329292
-:s ®nmw FLOOR PLAN (j)
PROJECTTnlE
-B
'I
9
NOTES:
1. All specifications given in the tender document shall be followed. 2. Contractor shall submit fabrication shop drawings for approval before execution of works. 3. Contractor shall submltt as-bullt flnal drawings after completion of work.
DRAWING TITLE SCALE@A3
N N.T.S. REV A HT NG 25-11-15 QUALITY EVALUATION LABORATORY 1-,.T;.:,H~IRD~rl"FL_o_o_R_P_LA _____ "tn.ii'i'E'----, CUM TRAINING CENTERAT ~ DATE
FIRST 02-06-15 PLOT NO. EL -184. MIDC GOOD FOR CONSTRUCTION 25-11-15 ISSUE AF NG TTC INDUSTRIAL AREA, VILLAGE PROJECT No. DRAWING No. REVISION
REVISION DRAWN CHECKED DATE NAVI MUMBAI AD/l/ND/156-2 AD/156-2:06 A
L T-2 Single side Island table with Granite top & detachabale Cabinet (2.5 x 1 x0.8) 20 mm BOARD WITH POWER POINT AT 300 nwn HT.
2500
GRANITE COUNTER TOP CABlllET UNIT ON WHEELS 700X 7511
CABlllET UNIT ON WHEELS 700X750 MAIN 11.Eft.eERS
MS BOX SECTlONS W:::::::::=::=-=-=-===-=-=-:=::W:=-.:===~-=-==-~::::::1~-=-==--=-=-=-=~::W.:d:::J-__J35mmx35rrm
PLAN ABOVE COUNTER
MAIN MEWERS MS BOX SECTIONS GRANllE COUNTER
CABlllETUNIT ON WHEELS 700X750 35mmx3&Tm TOP 20 1111'1
=
a a
BRACING MEMBERS MS BOX SECTION 35mmx3&rm
PP@300mmhl
~
SECTIONAL FRONT ELEVATION
COUNlER TOP201111'1
=
a a
150 mm DRAWER
PLAN BELOW COUNTER
GRANllE COUNTER TOP 201111'1
20 nwn BOARD WITH POWER~__,, POINTAT300 mm HT.
p
MAIN 11.Eft.eERS ,_>-----MS BOX SECT10NS
35mm><35rrm
lt::===l l====it-+-BRACING MEMBERS MS BOX SECTllll
SECTIONAL SIDE ELEVATION
COUNTER TOP 20rnn
50mmDRAWER
35mmx3!inm
DOUBLE SHUTlER STORAGE
NOTEll: STORAGE l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdamnslt WHE'''"" shall befdo!Mld. """"' z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• afl•comp1c1onotwutt. CABINET UNIT
AllOc:IATE ARC:lllTECI' al'UltNR PROJECTlTllE D~'MNGTlnE
11.&1'9 Q.USTlft cevB.Cl'M!NI' IN11ATIVE LMIB>
SPICES BOAAD
~ THE NOVARCH QUAUTY EVALUATION LMOMnJR'I FURNllVRE DE'llllUH.1Z
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 20130UG\
Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
A-do a rnai-_,, ___ E•JV,••n•.CRM Ntw DtllM1CID11 Pl< .. 1-1141'•JR
FRST ISSle HT NG
RElllSICN DRAWN CHECKED
CUM TRAINING c:EMERR 08·12·1& PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllCIN
TTC INDUSTlllAL AIE'A "1UNIE PROIECl'No. DRAWING No. 111\lE NAVll&I~ l.Dll.IND/168-2 ADl11i8-2~
SCltl..E OA3 N.T.S.
08-12-16 REVISION .
LT-3 Double side Island table with detachable Cabinet (Without gap) on both sides
MAIN MEMBERS MS BOX SECTIONS 35mmX35mn
=
0 0
~nm
COUNTER TOP
PLAN ABOVE COUNTER
COUNTER TOP 2<mn
=
0 0
CABINET !JillT ON WHEELS 850X550
0 0
SECTIONAL FRONT ELEVATION
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlheundlrdamnslt shall be fdo!Mld. z. contnictcr shal umt falrk111Dnllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI" IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 201301.ta.\
C:UBll'
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
COUNTER TOP 20 irm
AllOc:IATE ARC:lllTECI' aP&NNR lHE NOVARCH A-do a rnai_,,...-.-..... E•JV,••n•.CRM Ntw DtllM1CID11 Pl< .. 1-1141'•JR
-
1nM
CABINET UNIT
- -DRAWERlMIT ONWtEELS 850X550 ~
Si ~
~ - .. - -
1nM 1nm
PLAN BELOW COUNTER
COUNTER TOP 2<mn
SECTIONAL SIDE ELEVATION
MAIN MEMBERS 1+-+-- MS BOX SECTIONS
35mmX35mn
B CING MEMBERS MS BOX SECTION 35mmx35mn
c ROSSBRAQNG M
13 S BOX SECTIONS
SmmX35mn
'
MAIN MEMBERS MS BOX SECTIONS 35mmX35mn
PROJECTlTllE
QUAUTY EVALUATION LMOMnJR'I >--=F=RS=:r~------------<cuM TRAINING c:EMERR
D~'MNG TlllE FURNllVRE DE'DllW.LTI
SCltl.E OA3 N.T.S.
ISSle HT NG 8-12-1& PLOT NO. B.·1114, •DC 1-----------------1TTCINDUST111ALAIEA~UNIE
RElllSICN DRAWN CHECKED 111\lE NAV1 -~
CIOODFORCONS1lllCllCIN 8-12-16 PROJECT No. DRAWING No.
l.Dll.IND/168-2 ADl11i8-2:91 REVISION -
L T-4 Single side Island table with granite top (2.5 x 1.2 x0.8}- backside partly closed with 100mm baord for provision of Power Point 20 mm BOARD WITH POWER
POINT AT 300 mm HT. 2500
GRANITE COUNTER TOP
-..,...--;. CROSS BRAaNG
lii:===::....=.===....=...._==:..==...:;ii::=''=-=-==:...==.:==='iii'=.,=..._==::....:!:..==_=...._==:=:jjl.t-_=1+-µ~:!::nsECTIONS
CABlllET UNIT MAIN MEMBERS ON WHEELS METAL BOX SECTIONS
PLAN ABOVE COUNTER
CABlllETUNIT 20 mm BOARD AT ON \'I/HEELS
GRANITE COUNTER TOP THE BAa< 700 X 750
= =
0 0 0 0 ~PP@300mm
SECTIONAL FRONT ELEVATION
COUNTER TOPZlrrm
l
lif::=-::=:-==-==1111:= == == =:111~-7DD_X_ZS!_ ::::::P~rt--'35mmX3&Tm
1250 1250
PLAN BELOW COUNTER
GRANITE COUNTER TOP
20mmBOARD WllH POWER_-"-----H POINTAT300
MAIN MEMBERS +----+--+--METAL BOX SECTIONS
mm HT.
SECTIONAL SIDE ELEVATION
35mmX3&Tm
= 150 mm DRAWER COUNTER TOP 20rrm
NOTEll: 1. All 119eclftcatlons llll'lfllnlheundlrdomnn shall be fdo!Mld. z. COntnictcr shll smmt fllrlntlonllhap draw!np for approval betare-uanof~ 3. contnictcr shll smmtt aHiult lrwl ltlWln• aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI' IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 201301,ta.\
C:UBIT
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
0 0 DOUBLE SHUTlER STawE
AllOc:IATE ARC:lllTECI' al'UltNR lHE NOVARCH A-do a rnai_,,...-.-..... E•JV,••n•.CRM Ntw DtllM1CID11 ""'1-1141'••
STORAGE
CABINET UNIT PROJECTlTllE
QUAUTY EVALUATION LMOMnlR'I >--=F=RS=:r~------------1cuM TRAINING c:EMERR
ISSle HT NG 8·12·1& PIDTNO. B.·1114, •DC 1----------------1TTCINDUST111ALAIEA~UNIE
RElllSICN DRAWN CHECKED 111\lE NAV1 -~
FURNllVRE DE'llll ... LT4
CIOODFORCONS1lllCllCIN
OA3 N.T.S.
8-12-16 REVISION .
NQTEI: 1, All apeclfleftlona given lnthelllndtrdoalmalt ahell be foluwld, 2, CDnt!KtGr ahelaubMt~bratlDnlhop drewlnga for epprovel ~.a:utlDnof-'s. a. CDnt!KtGr ahelaub!Ntt »bultftnehlr..,rnp efhreompletbn of wort.
P!!!D.ECT CQNIULTANI'
B 11.AFS CWSTER DEVELOPLENI' INTIATIVE UUTED
161' FLOOR, NTBCLllJl.DllG, Cl~- TOLL PLAZA, DNDFLWlll.Y,
NOIDA • 20180!,IUlll'.
L T-5 Single side Island table with Granite top andetachable Cabinet (2 x 0.8 x1)backside partly closed with 1 OOmm baord for provision of Power Point
GRANITE COUNTER TOP
PLAN ABOVE COUNTER
GRANITE COUNTER TOP
,---CABINET UN ON WHEELS 550X600
20 mm BOARDWllH POWER POINTAT300 mm hl
------ 1d' r CROSS BRACING METAL BOX SECTIONS 5mmX35mm
MAIN MEMBERS METAL BOX SECTIONS
It'. .• •F= I' Id I ,35mmX35mm
----t--
PLAN BELOW COUNTER
GRANITE COUNTER TOP
n 1 1
n 1 nr." f ·1 '""' ,,,,,,
1 ~ -1 CABINET UNIT
= = ON WHEELS 20mmBOARD WITH POWER
MAIN MEMBERS t-1--+--+-- METAL BOX SECTIONS
35mmX35mm
a 550X700
~
SECTIONAL FRONT ELEVATION
COUNTER TOP 20 mm
= 150
CABINET UNIT
CUEN!' AIBOCIATE A!ICllTECT a PLANNER
POINT AT300 m_m____,1
HT.
CROSS BRACING r-1 METAL BOX SECTIONS 35mmX35mm
SECTIONAL ELEVATION
PRlllECl'TinE DRAW!NGTinE FURMlURE IE'IMJM.11
8CA!ECIA1 N.T.S.
1 SPICES BOARD Mlnlsb)'ofCommeaend rnc1u--. GIMof lndla ~
THE NO/ARCH _..,,. E'n ....
.._ .. ,,.,..,..~ Eelll,-(;R,._._.,t_.
f-==----------------1 QU&UTY EVALUATION' *ll>*iGW FIRST CWI 'IRMMNG CBlllRU ISSUE HT NG 0&-1Z.15 PLOTIG.B.-llf,lmC
N - MlE I
~ GOOD FOR C0191~ 06-1Z.15 f--------------...:..:. _ __:_i TTC IMIUllTRIAL _..,WI 0 REVISION DRAWN CHECKED DATE w ..._.. Plr4~U-tt:Jlil3iR PROJECT NIL I DRAWING Na. REVISION
AD/IN)/15&'2 AQll~m
L T-6 Central table with Granite top-Both Side detachable Cabinet (2.5 x 1 .2 x 0.8)
GRANITE COUNTER TOP
PLAN ABOVE COUNTER CABINET UNIT ON WHEELS 1500X500
r = 11¢:::= --CAB=IN=ET=UN=l=T=ON=WH=EB.S== ==1==111
1500X500
11 11
IF== E=======~======3= ~ 11 11
PLAN BELOW COUNTER
GRANITE COUNTER TOP GRANITE COUNTER TOP MAIN MEMBER
E"":::::===j~~~~~~~~~~~=::=:::=::ff METALBOXSECTIONS +-------+-'35mmX35mm
CROSS BRACING METAL BOX SECTIONS
jj:':=::=::::=~========-~::::+--i35mmX35mm
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdamnslt shall be fdo!Mld. z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI" IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 201301.ta.\
= =
a = a
=
CROSS BRACING METAL BOX SECTIONS
MAIN MEMBER METAL BOX SECTIONS
L-~~1-~=~~-L~~~i--~~~35mmX35mm l=========-========~t.i-~f--l35mmX35mm
SECTIONAL ELEVATION
C:UBll'
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
= =
a =
=
AllOc:IATE ARC:lllTECI' aP&NNR lHE NOVARCH A-do a rnai_,,...-.-..... E•JV,••n•.CRM Ntw DtllM1CID11 Pl< .. 1-1141'•JR
a
CABINET UNIT
SECTIONAL ELEVATION
COUNTER TOP 20mm
DRAWER
PROJECTlTllE
QUAUTY EVALUATION LMOMnJR'I >--=F=RS=:r~------------icuM TRAINING c:EMERR
ISSle HT NG 08-12-1& PLOT NO. B.·1114, •DC 1---------------1TTCINDUST111ALAIEA~UNIE
RElllSICN DRAWN CHECKED 111\lE NAV1 -~
D~'MNGTlnE FURNllVRE DE'llllUH.11
CIOODFORCONS1lllCllCIN PROJECT No. DRAWING No.
l.Dll.IND/168-2 ADl11i8-2:94
SCltl..E OA3 N.T.S.
08-12-16 REVISION -
L T-7 Single side Island table with granite top (3 x 1.2 x0.8)- Provision of Sink& Power 20 mm BOARD WITH POWER
Point (backside partly closed with 1 OOmm baord for provision of Power Point) - - - - I POINT AT 300 nm HT.
GRANITE COUNTER TOP
l SINK J
PLAN ABOVE COUNTER
GRANITE COUNTER TOP
a a
SJ ~K PP@3Cnnmhl
~ 100mm l:lKIRTING LJ
ot'>NI ann 'WVI
CABlllETUNIT ON WHEELS 700X750
l ~ =
a a
~
L QM
~
GRANITE COUNTER TOP
2DmmBClllRD WITH POWER POINT AT 300nm HT.
SIN<
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!Mld. z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlllt lrwl ltlWln• SECTIONAL FRONT aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI' IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 201301,ta.\
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
AllOc:IATE ARC:lllTECI' al'UltNR
~ lHE NOVARCH A-do a rnai-
FRST _,, ___ E•JV,••n•.CRM ISSle Ntw DtllM1CID11 Pl< .. 1-1141'•JR RElllSION
SIN<
----1- CROSS BRACNG
CABlllET UNIT ON WHEELS 700X 7511
METAL BOX SECTIONS I +--+--+--'35mmX3&Tm
MAIN MEMBERS METAL BOX SECTIONS
:::::;;Iii ----- --- --=--= :::ij:=-::.=.=.:---=-=-=-=:::it==l===*-_J 35mmX3&Tm
CROSS BRACING GRANITE COUNTER TOP METAL BOX SECTIONS
==;:;ii:==========:::::i~=t-~5mmX3&Tm 20 nm BOARD WllHPOWER
--11
POINTAT300 mm HT. MAIN MEMBERS
I+--<>--+-METAL BOX SECTIONS 111=============1'i!!I 35mmX3&Tm
HT NG
DRAWN CHECKED
SECTIONAL SIDE ELEVATION
CROSS BRACING METAL BOX SECTIONS 35mmX3&Tm
PROJECTlTllE
QUAUTY EVALUATION LMOMnlR'I CUM TRAINING c:EMERR
08·12·1& PLOT NO. B.·1M. •DC TTC INDUSTlllAL AIE'A "1UNIE
111\lE NAVll&I~
D~'MNGTlnE FURNllVRE DE'llllUH.17
CIOODFORCONS1lllCllCIN PROIECl'No. DRAWING No.
l.Dll.IND/168-2 ADl11i8-2~
SCAl..E@A3
N.T.S.
08-12-16 REVISION .
L T-7 Single side Island table with granite top (3 x 1.2 x0.8)- Provision of Sink& Power 20 mm BOARD WITH POWER
Point (backside partly closed with 1 OOmm baord for provision of Power Point) - - - - I POINT AT 300 nm HT.
GRANITE COUNTER TOP
l SINK J
PLAN ABOVE COUNTER
GRANITE COUNTER TOP
a a
SJ ~K PP@3Cnnmhl
~ 100mm l:lKIRTING LJ
ot'>NI ann 'WVI
CABlllETUNIT ON WHEELS 700X750
l ~ =
a a
~
L QM
~
GRANITE COUNTER TOP
2DmmBClllRD WITH POWER POINT AT 300nm HT.
SIN<
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!Mld. z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlllt lrwl ltlWln• SECTIONAL FRONT aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI' IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 201301,ta.\
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
AllOc:IATE ARC:lllTECI' al'UltNR
~ lHE NOVARCH A-do a rnai-
FRST _,, ___ E•JV,••n•.CRM ISSle Ntw DtllM1CID11 Pl< .. 1-1141'•JR RElllSION
SIN<
----1- CROSS BRACNG
CABlllET UNIT ON WHEELS 700X 7511
METAL BOX SECTIONS I +--+--+--'35mmX3&Tm
MAIN MEMBERS METAL BOX SECTIONS
:::::;;Iii ----- --- --=--= :::ij:=-::.=.=.:---=-=-=-=:::it==l===*-_J 35mmX3&Tm
CROSS BRACING GRANITE COUNTER TOP METAL BOX SECTIONS
==;:;ii:==========:::::i~=t-~5mmX3&Tm 20 nm BOARD WllHPOWER
--11
POINTAT300 mm HT. MAIN MEMBERS
I+--<>--+-METAL BOX SECTIONS 111=============1'i!!I 35mmX3&Tm
HT NG
DRAWN CHECKED
SECTIONAL SIDE ELEVATION
CROSS BRACING METAL BOX SECTIONS 35mmX3&Tm
PROJECTlTllE
QUAUTY EVALUATION LMOMnlR'I CUM TRAINING c:EMERR
08·12·1& PLOT NO. B.·1M. •DC TTC INDUSTlllAL AIE'A "1UNIE
111\lE NAVll&I~
D~'MNGTlnE FURNllVRE DE'llllUH.17
CIOODFORCONS1lllCllCIN PROIECl'No. DRAWING No.
l.Dll.IND/168-2 ADl11i8-2~
SCAl..E@A3
N.T.S.
08-12-16 REVISION .
FUME HOOD
COUNTER TOP
PLAN ABOVE COUNTER
DOUBLE SHUTTER CABINET
DOUBLE SHUTTER CABINET
PLAN BELOW COUNTER
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlheundlrdomnslt shall be fdo!Mld. z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI" IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 201301.ta.\
C:UBll'
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
I FUME HOOD
FUME CHAMBER
.l--IJ_ ____ ___:::::::::::_ ____ ==tt-GLASS SHUTTER
PP@ 1000mm ht PP@ 1000m ht ~COUNTERTOP20mm ~
= =
D D D D
100 mm SKIRTING
FRONT ELEVATION
AllOc:IATE ARC:lllTECT al'UltNR lHE NOVARCH A-do a rnai_,,...-.-..... E•JV,••n•.CRM Ntw DtllM1CID11 Pl< .. 1-1141'•JR
FRST ISSle
RElllSICN
HT
DRAWN
NG
200mm DRAWER
DOUBLE SHUTTER CABINET
DOUBLE SHUTTER CABINET
SIDE SECTION
PROJECTlTllE D~'MNGTlnE
QUAUTY EVALUATION LMOMnlR'I FURNllVRE DETAlaaRlllE HOOD
CUM TRAINING c:EMERR 08-12-1& PLOT NO. B.·1M. •DC
TTC INDUSTlllAL AIE'A "1UNIE CIOODFORCONS1lllCllON
PROIECl'No. DRAWING No. CHECKED 111\lE NAVll&I~ l.Dll.IND/168-2 ADl11i8-2:M
SCAl..E@A3
N.T.S.
08-12-16 REVISION -
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdamnslt shall be fdo!Mld. z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI' IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 20130UG\
CHEMICAL CUP BOARD
STORAGE
PLAN
CUBll' AllOCIATE ARClllTECI' al'UltNR
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
lHE NOVARCH A-do a rnai_,,...-.-..... E•JV,••n•.CRM Ntw DtllM1CID11 Pl< .. 1-1141'•JR
FRST ISSle
RElllSICN
ELEVATION
HT NG
DRAWN CHECKED
FUME CHAMBER
GLASS PANELS
PROJECTlTllE D~'MNGTlnE SCAl..E@A3
QUAUTY EVALUATION LMOMnlR'I FURNllVRE DETAILIHHllllCW. N.T.S. CUPBOA!m
CUM TRAINING CIMERR 08-12-1& PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllCIN 08-12-16 TTC INDUSTlllAL AIE'A "1UNIE
111\lE NAVll&I~ PROIECl'No. DRAWING No. REVISION l.Dll.IND/168-2 ADl11i8-2:97 -
LT-1 SECOND FLOOR
DECONTAMINATION ROOM - 5.5M (ONE SINK UNll) FIRST FLOOR INCUBATOR ROOM - 5.5M (ONE SINK UNll) WET LAB - 8.5 M (ONE SINK UNll) MEDIA PREPARATION ROOM - 5.8 M (ONE SINK UNll)
BACTERIA CULTURE - 3.9 M (ONE SINK UNll) INCUBATOR ROOM - 2.6M (ONE SINK UNll)
UM
GRANITE COUNtmTOP [SINK]
~
A'lM t'JIV\
PLAN ABOVE COIMTER
CAN BE LEFT FOR LEO SPACE OR UJLIZED FOR STORAGE UM
MAIN t.Et.eERS MS BOX SECTION9 36mmX31inm
CABl\IEJ lNT CABl\IET lNT CABINErlNT
~ ONWl-EELS ONWl-EELS ONWIEELS SINK BlllX 7111 BlllX 7111 BlllX 7111
BRAQNG MEt.eERS
- ---- ------- ----- - - MS BOX SECTION ---- ----- ----- 36mmx31inm
~ 1A?!li. tA?!li. 1A?olii.
PLAN BELOW COIMTER
CAN BE LEFT FOR LEO SPACE CABINErlNT ONWIEELS
OR UJLIZED FOR STaWE GRANITE COUNTER TOP 20 nm BlllX 7111 ~ - r
• ~ ~ = = =
0 0 0 0 0 0 i ~ SI K
NOTEll: MAIN t.Et.eERS l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdamnslt 100mn SKRllNG
>- MS BOX SECTIONS LJ L J L J L shall be fdo!Mld. lllV\ lllV\
~ 36mmX31inm
z. contnictcr shll umt fllrk111Dnllhap draw!np for approval betare-uanof~ 1A.,,;. u.,,;. tA'X. t'JIV\ 3. contnictcr shll umtt aHiult lrwl ltlWln• aft• complclon ofwuk. FRONT ELEVATION
PRO.IECI' C:Ol•L'IMI' C:UBll' AllOc:IATE ARC:lllTECI' al'UltNR PROJECTlTllE D~'MNGTlnE SCAl..E@A3
B 11.&1'9 Q.USTlft ce\IB.Cl'M!NI' SPICES BOAAD
~ lHE NOVARCH QUAUTY EVALUATION LMOMnJR'I FURNllVRE DETAla.a. LTI· N.T.S.
ONE llNKLNnl IN11ATIVE LMIB> A-do a rnai-
FRST CUM TRAINING c:EMERR Mlrtl11J llfOmnenie ..i 1rm1111-.
_,, ___ - Ul\11:
l&T FLOOR. NTBQ.81.1Jlt«1 GIMllflrdl E•JV,••n•.CRM ISSle HT NG 08-01-18 PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllCIN 08-01-18 Ta.I. PLAZA. DN>FLW91Y. Ntw DtllM1CID11 TTC INDUSTlllAL AIE'A "1UNIE
PROJECT No. 11 DRAWING No. REVISION
NOIDA • 201301.IG\ Pl< .. 1-1141'•JR RElllSICN DRAWN CHECKED 111\lE NAVll&I~ l.Dll.IND/168-2 ADl11i8-2:W -
LT-1 SECONDRDOR
SAMPLE STORAGE ROOM 11125rml ...... A4"7 'll;ll 4133 1"""
x o~ OIWtlECQINTBHOP - o~ ~ TABLE TOP TOE CUT GRAMlE CllJNTERTOP
. '""" CAHBEIEFrFCRLB381W:E - CAHBEIEFrFCRLm&Plll:E ORU1LllEDFCR811>1W3E CCl.IUI ORU1LllEDFCRSl'OMOE llAllll!-
ua •coc 8ECllON8
' < _...., ~ErUNT ClefiErUNT CMlfiErUNT
/ CMfiErUNT CMfiErUNT CMfiErUNT
SIM< PNWHEEl.8 CNWHEEl.8 ONWltEEl.8 ONWltEEl.8 ONWHEEl.8 ONWHEEl.8 SINK boox11lD IDDX"lllD IDDXlllJ IDDXlllJ IDDXlllJ IODXlllJ
t!W:Nlll!--- -- -- -- -- llHOX8ECllON
~ ~ lllnnslllnn
....... ....... ....... ..... ...... ...... ......
- -CAHBEIEFrFCRLB3SPM:E I ORU1LllEDFCR811>1W3E 9 CAHBEIEFrFCRLmBl'lll:E
----, GRANITE COUNTERTCP20nm ORU1LllEDFCR811>MOE
0 I = I = = = = I
= 0 I 0 0 0 0 0 0 0 0 0 0 0 0
81 K I 81 K llAllll!-llHCOC 8E.CllClll
9 -n~Rnm
·~mm I l u L J L J L J L J L '""mm
...... ....... ....... ....... .. .., ...... ...... ...... ...... ''"""
NOTEll: FRONT ELEVATION
l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!MJd. z. COntnictcr shal umt falrklllonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• aft• complclon ofwuk.
PRO.IECI' C:Ol•L'IMI' C:UBll' AllOc:IATE ARC:lllTECI' al'UltNR PROJECTlTllE D~'MNGTlnE SCltl..E OA3
B 11.&1'9 Q.USTlft ce\IB.Cl'M!NI" SPICES BOAAD
~ lHE NOVARCH QUAUTY EVALUATION LMOMnlR'I FURNllVRE DETAla.a. LTI· N.T.S.
lWO llNKLNnlA IN11ATIVE LMIB> A-do a rnai-
FRST CUM TRAINING c:EMERR Mlrtl11J llfOmnenie ..i 1rm1111-.
_,, ___ - Ul\11:
l&T FLOOR. NTBQ.Bl.IJlt«1 GIMllflrdl E•JV,••n•.CRM ISSle HT NG 08.01-18 PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllON 08-01-11 TOLL PLAZA. DN>FLW91Y. Ntw DtllM1CID11 TTC INDUSTlllAL AIE'A VIUNIE
PROJECT No. 11 DRAWING No. REVISION
NOIDA • 20130UG\ Pl< .. 1-1141'•JR RElllSICN DRAWN CHECKED 111\lE NAVIMU~ l.Dll.IND/168-2 ADl11i8-2:100 .
L T-1 SECOND FLOOR
NOTEll:
l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!Mld.
STERILIZATION ROOM - 5.5M (TWO SINK UNITS) UNI
(Sit« J GRANITE COlMERTOP (SINK J ~
t'ltln ':HM t'llVI
PLAN ABOVE COlMER
MAIN l\Et.eERS
R:===============::::::pi::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;::==========:::pi::::==========::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;~F===============:::W=t--MSBQXSEC'TIONS 3&mmX3&ml
Sit« CABl\IET lNT ONWl-EELS 7111X 7111
CABl\IET lNT ONWl-EELS 7111X 7111
0 0
PLAN BELOW COlMER
GRANITE COUNTERTOP20nrn
CABINET lNT ONWIEELS 7111X 7111
CABINETlNT ONWIEELS 7111X 7111
0 0
SINK
z. asntnictcr shahmmt fatrk111onllhap FRONT ELEVATION draw!np for approval betare-uanof~ 3. Osntnictcr shal smmtt aHiult lrwl ltlWln• aft• complclon ofwuk.
11.&1'9 Q.USTlft ce\IB.Cl'M!NI' IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOIDA • 20130UG\
SPICES BOAAD Mlrtl11J llfOmnenie ..i 1rm1111-. GIMllflrdl
AllOc:IATE ARQllTECI" al'UltNR
~ lHE NOVARCH A-do a rnai-_,, ___
FRST E•JV,••n•.CRM ISSle HT Ntw DtllM1CID11 Pl< .. 1-1141'•JR RElllSICN DRAWN
PROJECTlTllE D~'MNGTlnE
QUAUTY EVALUATION LMOMnlR'I FURNllVRE DETAla.a. LTI· lWO llNKLNnlB
CUM TRAINING c:EMERR
NG 08.01-18 PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllON TTC INDUSTlllAL AIE'A "1UNIE
PROIECl'No. DRAWING No. CHECKED 111\lE NAVll&I~ l.Dll.IND/168-2 ADl11i8-2:100
SCltl..E OA3 N.T.S.
08-01-11 REVISION -
L T-1 FIRST FLOOR WET LAB - 8.3M (THREE SINK UNITS)
Ii>< L
EJ TABLE TOP TO BE CUT
EJ (SI~ J !
t'lnn tR'JJ;. I o:i1;n t?nn .,,.,.n t?nn
Ro:l?I;
MAIN MEMllERB
IF================:pi::::::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;::::pi::::::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;::::pr::::::::::::""lF================:pi::::========:::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;PF========::;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;iPF=================llf=\--MBBOXBEcnCNB 8!5nlnX3&ml
SN<
0 0
9 I(
uarrnn ~~ ... -t'lnn
NOTEll: l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!Mld. z. COntnictcr shal umt falrk11Jonllhap draw!np for approval betare-uanof~ 3. COntnictcr shal umtt aHlult lrwl ltlWln• aft• complclon ofwuk.
IL&f'9 a.USTlft ce\IB.Cl'M!NI' IN11ATIVE LMIB>
l&T FLOOR. NTBQ.81.1Jlt«1 Ta.I. PLAZA. DN>FLW91Y. NOJDA • 20130UG\
-
Cl\BINETIHT ON WHEELS 800X7111
=
0 0
J
MA
L - -
Cl\BINETIHT ON WHEELS 800X7111
=
0 0
J L
onA
SN<
~ ... 8
0 0
~ 9 I( ... 8 -
lWmnl
o:IR1; 1 t Ill:
C:UBll' AllOCIATE ARClllTECI' aP&NNR
SPICES BOAAD Mlrtllly llfQmnenie lnl lrmllll-. GIMllflrdl
lHE NOVARCH A-do a rnai_,,...-.-..... E•JV,••n•.CRM Ntw DtllM1CID11 Pl< .. 1-1141'•JR
FRST ISSle HT
RElllSION DRAWN
J
Cl\BINETIHT ON WHEELS 800X11JO
=
0 0
L
1')A.t
NG 08.01-18
CHECKED 111\lE
Cl\BINETIHT ONWHEELB 800X11JO
91~
===t:....:===-=~~-=-::-::.... -==-:;-=..:=-=-=-:...=:;IJ!=f--BRl\QNG MEMllERB MB BOX BEcnON
Cl\BINETIHT ONWHEELB 8,!JOX71JO
• =
0 0
0 0
91 I<
l~Uiiucl&Tm
MAIN MEMllERB MB BOX BEcnCNB 8llnlnXll&ml
J L 1wmm
1')A.t 1')ftft
PROJECTlTllE D~'MNGTlnE SCltl..E OA3 QUAUTY EVALUATION LMOMnJR'I FURNllVRE DETAla.a. LTI· N.T.S.
Tiii&: llNK Lft1111 CUM TRAINING c:EMERR PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllCIN 08-01-11 TTC INDUSTlllAL AIE'A VIUNIE
PROIECl'No. DRAWING No. REVISION NAVll&I~ l.Dll.IND/168-2 ADl11i8-2:101 -
LT-1 FIRST FLOOR SAMPLE PREPARATION ROOM - 6.1 M (NO SINK UNITS)
GRANllE COUNTER TOP ~
lttM
PLAN ABOVE COUllTER
CAN BE LE" FOR LEG SPACE OR UTILIZED FORsroRAGE
MAIN MEMERS -MS BOX SECllONS 35mmX35nm
CABINET UNIT CABINET UNIT CABINETlNT CABINET UNIT lia ON WHEELS ON WHEELS ON WHEELS ON WHEELS 700X700 700X700 700X700 700X7DO
-- BRACING MEM3ERS -- MS BOX SECllON 1!i.1R 1!i.1R t!i.tR t!i.tl!. 3Smmc35nm
RtM
PLAN BELOW COUNTER
CAN BE LE" FORLEGSPACE CABINET UNIT OR UTILIZED FORsroRAGE ON WHEELS
- GRANITE COUNTER TOP :2D rnn 700X7DO -
= = = =
0 0 0 0 0 0 0 0 I~
~
LJ 1~1A LJ t~tlt ti;.~R L ti;.tR
L -
NOTEll: RtM
l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!Mld. SECTIONAL FRONT z. contnictcr shll umt fllrklllonllhap ELEVATION draw!np for approval betare-uanof~ 3. contnictcr shll umtt aHiult trwl ltlWln• aft• complclon ofwuk.
PRO.IECI' C:Ol•L'IMI' C:UBll' AllOc:IATE ARC:lllTECI' al'UltNR PROJECTlTllE D~'MNGTlnE SCltl..E OA3
B 11.&1'9 Q.USTlft ce\IB.Cl'M!NI" SPICES BOAAD
~ lHE NOVARCH QUAUTY EVALUATION LMOMnlR'I FURNllVRE DETAla.a- LTI· N.T.S.
NO mi«UNTill IN11ATIVE LMIB> A-do a rnai-
FRST CUM TRAINING c:EMERR Mlrtl11J llfOmnenie ..i 1rm1111-.
_,, ___ - Ul\11:
l&T FLOOR. NTBQ.81.1Jlt«1 GIMllflrdl E•JV,••n•.CRM ISSle HT NG 08.01·18 PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllON O!Mlt-11 Ta.I. PLAZA. DN>FLW91Y. Ntw DtllM1CID11 TTC INDUSTlllAL AIE'A "1UNIE
PROJECT No. 11 DRAWING No. REVISION
NOIDA • 201301.IG\ Pl< .. 1-1141'•JR RElllSICN DRAWN CHECKED 111\lE NAVll&I~ l.Dll.IND/168-2 ADl11i8-2:102 .
LT-1 FIRST FLOOR WET LAB - 8.175M (ONE SINK - ONE EYEWASH UNIT)
17!! mn ?m AU.II. ll7!i 'nM
~ x ~ x x -'
TABLE TOP TOBE CUT
(SIN<] J (FOR EYEWMH) J
~ '.ABLE TOP TO IE CUT •ABLE TOP TO BE CUT ftS PER COl.U.!N) (ftS Pet COLWN)
J2ii t'Jllll ntn
]H7!i PLAN ABOVE COLN"ER
MAIN r.EteERS MS BOX SECTIONS
6 "/
~ 86mmX8finm
/"-. "' CABl\IET lNT CABl\IET lNT CABINETlNT CABINETlNT
~ l.t.llT ONWl-EELS ONWIEELS SIN< ONWIEELS ONWIEELS BlllX 7111 BlllX 7111 BlllX 7111 BlllX 7111
- - ....__ - - - - BRAaNa MEt.eER
~ MS BOX SECTION 36mmx31inm
10'.J 1~ 1'UIQ 1~ Atn 11l.1 11!iCI ]H7!i
PLAN BELOW COLN"ER ~
-.-I ' ~
/ /
~ CABl\IET lNT I
CABINETlNT 3 ONWl-EELS 8 ONWIEELS
8 BlllX 7111 BlllX 7111 r GRANITE COUN1&tTOP20nm r
' a a ' = = = = 0 0 0 0 I 0 0 0 0
~ . SI IC 3 ... . MAIN r.Et.eERS
"~" . 8 MS BOX SECTIONS 36mmX31inm
LJ LJ L J L 1uu mm ,...,. ,.,,... J L J L ~ 10'.J 1'UIQ 1'UIQ 111l1 A1R 113..1 11!iCI
11.17i;.
NOTEll: FRONT ELEVATION l. All 19eclftcatlon1 rlll'lfllnlhetsldlrdomnslt shall be fdo!Mld. z. contnictcr shll umt fllrklllonllhap draw!np for approval betare-uanof~ 3. contnictcr shll umtt aHiult lrwl ltlWln• aft• complclon ofwuk.
PRO.IECI' C:Ol•L'IMI' C:UBll' AllOc:IATE ARC:lllTECI" al'UltNR PROJECTlTllE D~'MNGTlnE SCltl..E OA3
B 11.&1'9 Q.USTlft ce\IB.Cl'M!NI" SPICES BOAAD
~ lHE NOVARCH QUAUTY EVALUATION LMOMnlR'I
FURNllVRE DETAI ... LTI·Ol'IE N.T.S. IN11ATIVE LMIB> A-do a rnai- CUM TRAINING c:EMERR
llNK AND ONE EYEWMH INT Mlrtl11J llfOmnenie ..i 1rm1111-.
_,, ___ FRST - Ul\11:
l&T FLOOR. NTBQ.81.1Jlt«1 GIMllflrdl E•JV,••n•.CRM ISSle HT NG 02-02-18 PLOT NO. B.·1M. •DC CIOODFORCONS1lllCllON 02-02-11 Ta.I. PLAZA. DN>FLW91Y. Ntw DtllM1CID11 TTC INDUSTlllAL AIE'A "1UNIE PROIECTNo. DRAWING No. REVISION NOIDA • 201301.IG\ Pl< .. 1-1141'•JR RElllSICN DRAWN CHECKED 111\lE NAVll&I~ l.Dll.IND/168-2 ADl11i8-2:107 .
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
1 IL&FS Cluster Development Initiative Limited
SPICES BOARD, NAVI MUMBAI,
MAHARASHTRA
Quotation Document For
Supply, Installation, Testing &
Commissioning of 13 Passengers (capacity 884 Kg)
Lift for Quality Evaluation Lab and Training
Center Building of
M/s. Spices Board,
Govt. of India,
EL 184, TTC MIDC, Mahape,
Navi Mumbai
Tender No: Spices Board/QC/Lab Lift / 15-16/ 02
BID DOCUMENT
.
Project Management Consultant
IL&FS cluster Development Initiative Limited
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
2 IL&FS Cluster Development Initiative Limited
LIST OF CONTENTS
1. TERMS & CONDITIONS
2. SPECIAL CONDITIONS
3. GUARANTEE PROFORMA
4. LIST OF INDIAN STANDARDS
5. LIST OF ACT / BYE-LAWS
6. SPECIFICATION FOR PASSENGER LIFT
7. SPECIAL FEATURES
8. APPENDIX-V-TECHNICAL PARTICULARS TO BE FURNISHED BY
QUOTATIONER
9. SCHEDULE OF RATES
10. TECHNICAL SPECIFICATIONS
11. ABSTRACT OF COST
12. LIST OF APPROVED MAKES
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
3 IL&FS Cluster Development Initiative Limited
TERMS & CONDITIONS
i) Quotations are invited by M/s. Spices Board Ministry of commerce and Industries
(Govt. Of India), Banking complex II, 3rd Floor, Sector 19 A, Turbhe, Vashi, Navi
Mumbai, 400703, India. From the eligible agencies for the work of Supply,
Installation, Testing & commissioning of 13 Passengers (Capacity 884 Kg) 5 floors,
Lift.
ii) The Quotation form comprises of
'Terms and Conditions', ‘Special Conditions’, Appendix I to V’, ‘Technical
Specifications’ & 'Schedule of Quantities' etc.
iii) The Quotationers are advised to submit their quotation after carefully examining
'Terms and Conditions', ‘Special Conditions’, ‘
Appendix I to V’, ‘Technical Specifications’& 'Schedule of Quantities'
Etc.
iv) The registered name and address of the agency along with telephone, fax, e-mail
number, if any, should be furnished.
v) The Quotationers are advised to visit and examine the site/building of works and its
surroundings and obtain for themselves on their own responsibility all information
that may be necessary to prepare their quotation. The cost of any such visit shall be
entirely at the Questioner’s own expense and nothing extra is admissible on this
account.
vi) The rate quoted by the agency should be inclusive of all statutory taxes such as,
Excise Duty, Sales Tax, Freight, Insurance, Octroi,
Etc. if any and nothing extra is payable on this account.
vii) Deleted.
A demand draft of Rs. 1,000/- (Rupees Five Hundred Only) towards non-
refundable tender fee An amount of Rs. 50,000/- as EMD amount is to be deposited in
the form of DD/Pay Order favoring M/s. Spices Board, along with the quotation
documents.
The Earnest Money of unsuccessful Quotationers will be refunded after the
award of work to successful quotation.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
4 IL&FS Cluster Development Initiative Limited
viii) The earnest money of the successful Quotationers will be retained as security
deposit and shall be refunded after completion of free Maintenance Period of 1 year
from the date of satisfactory completion of works.
ix) The Quotationers should furnish the list of works executed by the firm & the
financial statement/ balance sheet for last three years.
x) The Quotationers should furnish a copy of PAN No., Tin No, Sales Tax No., and
PF No. Service Tax No. as applicable. The Quotationers should also furnish Income
Tax clearance Certificate (ITCC) for the previous years.
In case PF No. is not furnished, the selected Quotationers shall be required to provide
declaration in Performa 36 B with PF challan for employees deployed for this
assignment.
xi) Each page of the 'Terms and Conditions', ‘Special Conditions’, ‘Appendix I to V’,
‘Technical Specifications’& 'Schedule of Quantities'
Etc. should be duly stamped, signed and dated by the agency while submitting their
offer.
xii) Completed quotations in all respects placed in a SEALED COVER super scribed
Quotation Document For Supply, Installation, Testing & Commissioning
of 13 Passengers (capacity 884 Kg) Lift for Quality Evaluation Lab and
Training Center Building of
M/s. Spices Board,Govt. of India, EL 184, TTC MIDC, Mahape, Navi
Mumbai.,
And should be submitted to,
Director,
M/s. Spices Board,
Ministry of Commerce and Industries, Govt. of India,
Banking Complex II, 3rd floor, sector 19 A, Turbhe, Vashi,
Navi Mumbai, - 400703
xiii) The last date for receipt of completed quotation 26/02/2016 till 16.00 PM.
xiv) The Pre-bid meeting is scheduled on 19.02.2016 at 14.00 Hrs. At Office of The
Spices Board, at Navimumbai.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
5 IL&FS Cluster Development Initiative Limited
The Quotations will be opened at 16.00 PM hours on 26/02/2016
At the office of M/s. Spice Board,
Ministry of Commerce and Industries, Govt. of India,
Banking Complex II, 3rd floor, sector 19 A, Turbhe, Vashi,
Navi Mumbai, - 400703
In the presence of Quotationers or their representatives, who may wish to be present
on the occasion.
xv) No consideration will be given to the quotation received after the stipulated time
and no request for extension will be allowed/entertained for submission of the
quotations. Any quotation received by fax/e-mail will not be accepted and shall be out
rightly rejected.
xvi) Conditional quotations received from any agency shall be rejected straight away.
xvii) Director, M/s. Spice Board does not bind itself to accept the lowest quotation
and reserves the right to reject any or all other quotations received without assigning
any reasons thereof.
xviii) The quotation shall remain valid and open for acceptance for a period of 90
days from the date of receipt of completed quotation.
xix) The 'Terms and Conditions', ‘Special Conditions’, ‘
Appendix I to V’, ‘Technical Specifications’& 'Schedule of Quantities'
Will form part of Work Order to be issued by M/s. Spices Board.
xx) The date of start of work shall be reckoned from the next day after the date of
issue of Work Order by Director, M/s. Spices Board. The work should be initiated
latest by this day.
xxi) The Work Order, if issued to any agency, shall be cancelled without any
reference to the agency, if the works to be organized within the deadline specified at
S. No. xx above is not adhered. Further, Director, M/s. Spices Board will be at liberty
to forfeit the Earnest Money in
Part or full in case the deadline specified in S.No. xx above is not adhered.
xxii) The agency should quote firm rates inclusive of all taxes /duties, transportation,
approval, etc. and no hike in rates will be granted on account of any reasons,
whatsoever.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
6 IL&FS Cluster Development Initiative Limited
xxiii) The work or any part of the work will not be assigned or sublet to any other
agency, without the written consent of Director, M/s. Spices Board.
xxiv) If at any time after commencement of the work, Director, M/s. Spices Board
shall for any reason whatsoever not require the whole of the work as specified in the
Schedule of Quantities to be carried out, Director, M/s. Spices Board shall have the
right for the curtailment of the work as originally provided in the Schedule of
Quantities. The contractor shall have no claim to any profit or advantage which he
might have derived from the execution of this work in full, but which he could not
derive in consequence of the full contract not having
been carried out.
xxv) The Escalation shall not be payable for any reasons, whatsoever. The prices
quoted shall be firm and final during the currency of the contract.
xxvi) Deleted.
xxvii) Settlement of Dispute & Arbitration
a) In the event of any question, dispute And/or difference whatsoever arising
under This Agreement or in connection there with including any question to
existence, meaning and interpretation of any clause of this Agreement or any
alleged breach thereof, the same shall be settled as far as possible by mutual
discussions and consultations between the parties to this Agreement.
b) In the event of any question dispute and/or difference remains unresolved after
exercising the option at clause-xxvii (a); the issue will be settled, as far as
possible by Director, M/s. Spices Board.
c) Any dispute not resolved by Director, M/s. Spices Board, shall be settled
through arbitration duly appointed by Director, M/s. Spices Board as per
Arbitration and Conciliation Act 1996 or statutory modification or re-
enactment thereof and rules made there under and for the time being in force
shall apply to the Arbitration proceedings under this clause.
i) Arbitration cost will be borne jointly & equally by both parties to the
Agreement.
ii) For settlement of any dispute between the parties as may not be
Resolved through the provisions in clauses- xxvii (a) to (c) and as may
Eventually have to have recourse to a court of law, the same shall be
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
7 IL&FS Cluster Development Initiative Limited
Under the jurisdiction of the courts at Navi Mumbai.
The language for the Arbitration shall be in English.
xxviii) The contractor shall be governed as per the provision of the Contract Labour
(Regulation and Abolition) Act, 1970, and of the Contract Labour (Regulation and
Abolition ) Central Rules, 1971 & any other amendments issued thereof.
xxix) The tax at source & other deductions, if any as per the statutory requirements
shall be deducted as per the Government of India’s
Norms as applicable from time to time.
xxx) The successful agency is responsible to pay compensation for any Injuries and
damage of persons, property, animals or things, within or outside the site, arising out
of his operations or of any sub-agency, nominated or otherwise or out of any actions
of his employees, agents or representatives. M/s. Spices Board shall not bear any cost
whatsoever on this account.
xxxi) The time period stipulated for completion of work is 45 days reckoned from the
Next day after the date of issue of Work Order by M/s. Spices Board.
xxxii) Payment terms,
The payment to the agency shall be regulated as below :
S.No
Stages of Works
Percentage Payable
{On Awarded Cost}
i) An advance amount on signing of an Agreement and
against submission of equivalent amount of Bank
Guarantee from a Nationalized Bank.
20%
ii) On receipt/delivery of materials at site (Bank
Guarantee, as received at S.No. (i) above will be
released after receipt of complete materials at
site).
60%
iii) On successful installation, testing/completion,
commissioning and handing over of the lift along
with all test certificate/warranty certificate of
All equipments.
10 %
iv) On submission of Lift License issued by Lift
Inspectorate
10%
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
8 IL&FS Cluster Development Initiative Limited
The payments of the work will be released to the agency in reasonable time not
exceeding fifteen working days from the date of receipt of bills at Office of M/s. Spice
Board, Cochin. After certification by IL&FS Project Management Consultant,
Mumbai.
M/s. Spice Board on request of the contractor may release an amount
upto 60% of the amount of initial scrutiny as far as admissible within 07 days of the
receipt of contractors running account bill. The balance amount of the bill shall be
released within fifteen (15) days of the release of initial scrutiny amount.
The decision of M/s. Spice Board in the matter of release of advance amount shall be
final & binding.
xxxiii) Security Deposit
The security deposit shall be deducted @ 5% of the gross amount of each running bill
till the sum along-with the sum already deposited as earnest money, will amount to
security deposit of 5% of the quoted value of the work. The security deposit shall be
released to the agency on satisfactory completion of the work i.e. after completion of
Free Maintenance Period of 1 year from the date of handing over.
xxxiv) Submission of Bank Guarantee towards warranty
Bank Guarantee equivalent to 5% of the contract value shall be submitted towards
warranty which shall remain valid for a period of 1 year from the date of handing
over.
xxxv) Compensation for delay
If the agency fails to complete the assigned job with the specified time period then the
agency is liable for compensation @ 0.2% per day of delay of the total quoted cost to
be computed on per day basis. Provided always that the total amount of compensation
for delay to be paid under this condition shall not exceed 10% of the Quoted Value of
Work.
xxxvi) Extra Items/Substituted Items.
In case the extra items/substituted items has been cropped up, the same shall be
processed as per the rates specified in the DSR 2015/latest electrical DSR. For the
items not specified in the DSR-2013/ latest electrical DSR, the same shall be process
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
9 IL&FS Cluster Development Initiative Limited
as per the prevailing market rates after submission of original copy of the
receipt/vouchers for the materials purchased by the contractor. The payment for extra
Items shall be paid @ 50% on the rates submitted by the contractor till the rates are
finally approved by M/s. Spices Board.
xxxvii) Environment & Health Safety
The agency while executing the assignment should considered all environmental &
health safety precautions so as to abide as per the norms prescribed in the IS standard
or any other statutory regulation.
xxxviii)
Deleted.
xxxix)
The agency to submit Environmental Protection measures being undertaken at its
premises for production of items.
xi)
The supplier to submit Environmental Policy/Consents for prevention of pollution for
Air, Water & authentic of hazardous waste if available.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
10 IL&FS Cluster Development Initiative Limited
SPECIAL CONDITIONS
1. GENERAL STANDARDS –
These standards are intended to describe a quality elevator system using all new
equipment, parts, materials, components installation, and service techniques. This is a
lump sum contract. Any item which is essential for the completion of the job but
inadvertently not mentioned in the Schedule of Quantities shall have to be executed
by the vendor within the quoted rate.
1.1 Standards and Design Criteria—
The following elevator standards and design criteria are for the guidance of the
elevator system Quotationer in understanding features and facilities, and the quality of
after sales services required for the Project.
The successful contractor shall regard these standards and specifications describing a
complete, functioning system with necessary intelligence, flexibility and riding
comfort provided herein.
Nothing in these specifications shall be taken to state or imply “work by
Others’ except where specifically so mentioned. The Quotationer shall, at the time of
quotation, clearly indicate features and facilities, which he is unable to provide or
modifications or any alternate system he wants to offer. Such features & facilities
shall be clearly identified at the time of submitting his offer.
The cost of such items for materials, equipment, and labour shall also be identified
separately.
2. GOVERNING CODES AND PERMITS.
2.1 Code (Imported Equipment)
Elevator equipment shall be furnished and installed in accordance with A.N.S.I. /
A.S.M.E. A17.1/CENEN 81-1 Japanese Codes including latest supplement. The
Elevator Quotationers shall inform the owning Company of any intended or required
variations from the code requirements described above.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
11 IL&FS Cluster Development Initiative Limited
No degradation of ANSI/ASME/CENEN 81-1 requirements is acceptable simply on
the basis of the local code requirement. It is acceptable only when the
ANSI/ASME/CENEN 81-1 code is in direct conflict with local code requirements and
where the latter is more stringent than the former.
2.2 Code (Local Equipment)
Elevator equipment shall comply with the following codes including latest
modifications / additions / alterations, if any.
a. Code of Practice for installation, operation and maintenance of electric
passenger and good lifts. IS: 14665:2000.
b. List of Indian Standards mentioned in Appendix-III.
c. List of Acts / Bye-Laws mentioned in Appendix-IV.
2.3 Permits and Inspections.
The successful Quotationer shall obtain all permits / license at their cost and pay for
any and all fees required for the inspection, approval and commissioning of their
installation and the license shall be in the name of Director, M/s. Spices Board.
All costs associated with obtaining necessary permits should be included in the price.
3. PROJECT EXECUTION AND MANAGEMENT
The successful contractor shall ensure that senior planning and erection personnel
from its organization are assigned exclusively for this project. The successful
contractor shall appoint one senior supervisor posted at site on full time basis.
4. GUARANTEE, MAINTENANCE
4.1 Guarantee.
The successful contractor shall guarantee all equipment parts, materials and
workmanship furnished for the installation. The contactor warrants replacing for a
period of 12 months from the date of acceptance.
All failed parts or parts exhibiting unusual wear and tear during guarantee period shall
be replaced without any cost to the M/s. Spices Board. Such replacement shall be
factory approved new, equal or better than original.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
12 IL&FS Cluster Development Initiative Limited
All labour, tools, materials, transportation, insurance, etc. required in performance of
guarantee work shall be at the successful contractor’s expense.
4.2 Maintenance
The successful contractor shall maintain the elevator system in a first class and safe
manner during guarantee period. Such maintenance shall be for the entire elevator
system except when failure occurs due to work performed by others. Responsibility
essentials daily inspection by the supervisor / technician and unlimited call back
service including nights, weekends and holidays.
Apart from the above this maintenance shall include 1 (one) visit by Engineer per
week for the first 6 months from the date of acceptance of the elevator system. Call
back service shall be provided for emergencies, and responded within 2 hrs.
Engineer’s visits for the next six months shall be not less than 1 (one) visit every per
fortnight with visit timings adjusted so as not to coincide during regular working
hours period with the busiest usage period. Call back service shall be responded
within 2 hours. Emergency call back service for trapped passengers shall be
responded to within 10
Minutes. There shall be no compensation for call back service regardless of the
hour/day, etc.
The successful contractor shall maintain the elevator system in a professional, first
class manner and keep and maintain elevator motor room and equipment in a neat
workman like order.
The successful contractor shall anticipate demand on supplies and parts and keep an
inventory of a reasonable number of spare parts, at their own cost, on site in a self-
provided lockable metal cabinet.
5. DRAWINGS.
Before commencing work, the contractor shall prepare and submit all drawings for lift
in required number necessary to show the general arrangement and details of lift
installation, electrical, etc. to M/s. Spices Board.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
13 IL&FS Cluster Development Initiative Limited
Maximum headroom and space conditions shall be maintained at all points. Where
headroom appears inadequate, the successful contractor shall notify to the authorized
appointed by M/s. Spice Board,
Before proceeding with the installation. In case installation is carried out without
notifying, the work shall be rejected and successful contractor shall rectify the same at
his own cost.
The successful contractor shall examine all architectural, structural and other services
drawings before starting the work. Any changes found essential to coordinate
installation of his work with other services and trades, shall be made with prior
approval of the Project
Manager, M/s. Spices Board without additional cost to the Owner. The data given in
the drawings and specifications is as exact as could be procured, but its accuracy is
not guaranteed.
The vendor shall provide catalogue for Hall level indicators to be provided in the
landings as well in the lift car. The final selection for the same shall be carried by the
Consultant/ M/s. Spice Board during execution.
Shop drawings shall be submitted for approval sufficiently in advance of planned
delivery and installation of any material to allow Consultant / Architect ample time of
scrutiny. No claims for extension of time shall be entertained because of any delay in
the work due to his failure to produce shop drawings at the right time, in accordance
with the
Approved program.
Manufacturer’s drawings, catalogues, pamphlets and other documents submitted for
approval shall be in four sets. Before supply & installation of lift or lift accessories,
agency shall submit samples to Architect/ consultant appointed By M/s. spices Board.
6. PAINTING.
All exposed metal work furnished under these specifications, unless otherwise
specified, shall be shop and properly painted. Shop coats of paint that have become
marred during shipment or erection, shall be cleaned off with mineral sprits, wire
brushed and spot painted over the affected areas, then coated with enamel paint to
match the finish over the adjoining shop painted surface.
7. STRUCTURAL REQUIREMENTS
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
14 IL&FS Cluster Development Initiative Limited
The successful contractor shall clearly indicate the structural and electrical
requirements for the installation of elevators. Machine room, shaft and pit shall be
provided by the M/s. Spice Board. Other preparation work and all items of supply and
installation in
The hoist way shall be the responsibility of the successful contractor.
8. EXCLUSIONS
Any items excluded from the offer, but functionally required, shall be clearly defined
and listed by the successful contractor, giving description of the items, quantity and
estimated
Cost and the reason for excluding the items.
9. TOOLS AND TACKLES
All tools, tackles, supports, scaffolding and staging etc. required for erection and
assembly of the equipment and installation covered by the contract shall be provided
by the successful contractor himself. In addition, all other materials such as
foundation bolts, nuts, etc., required for the installation of the equipment shall also be
provided by the successful contractor at his cost.
10. TESTING AND HANDING OVER
i) The successful contractor shall carry out test run of the installation in the presence
of representatives of M/s. Spice Board to establish satisfactory functioning of the
installation.
ii) The Installations shall be handed over to the Project Manager after satisfactory
testing along with six sets of completion documents each consisting of:
a) Detailed equipments data and catalogues.
b) Manufacturer’s maintenance chart including check chart and Lubrication chart.
c) Set of “AS INSTALLED DRAWINGS” showing layouts, equipment details,
electrical power & control wiring diagrams etc.
d) Test Certificates for major equipments.
e) All the necessary/statutory approval from commencing to commissioning of lift
to be obtained from Chief Inspector of Lift or other authorities.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
15 IL&FS Cluster Development Initiative Limited
f) Certificate from the Project Manager that the successful contractor has cleared
the site of all debris and litter caused by them during the Construction and
made up all damages, if any, done by them for the buildings/ equipments.
iii) Submission of the above documents shall form a pre-condition for the final
acceptance of the installation and final payment.
11. SAFETY PRECAUTIONS.
i) A competent and authorized supervisor/Erector shall be on the site whenever the
successful contractor men are at work. The supervisor/Erector should ensure that all
plant and machinery used on the site are rendered safe for working and meet with the
Indian or International safety standards applicable for the use and
Operation of such machinery. The supervisor/erector should also ensure that the
workmen at site are made to use safety appliances such as safety belts, life lines,
helmets, etc.
ii) It is entirely the responsibility of the successful contractor to practice the principles
of ‘SAFETY FIRST’ during the entire tenure of work with adequate insurance
covering injury or death to workmen, loss by theft or damage to materials and
property and third party.
iii) The successful contractor should clear the site of all debris every day to avoid
accidents. In case this is not done, the Owner may engage necessary labor to maintain
the cleanliness of the premises and removal of debris and recover all or part of the
expenditure so incurred from the successful contractor.
iv) Successful contractor shall at his own cost ensure that all of his personnel,
employees, workmen and other associated persons working with him at site are
adequately insured as per labour laws and statutory provisions. The successful
contractor shall be responsible for all injuries/damages to men, materials and
properties etc., which may arise from the operations or negligence of himself and/or
his sub- contractor and indemnify M/s. Spices Board for all such expenses, which
shall be Solely to successful contractor’s own account.’
v) Provision shall be made during construction for proper guarding and protection of
hoist way and temporary barricading of hoist way entrances to be done by the
successful contractor.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
16 IL&FS Cluster Development Initiative Limited
12. STORAGE AT SITE
The successful contractor shall have to make his own arrangements for
accommodation of staff, safe custody of materials, etc.
13. WORK BY OTHER AGENCIES
The following associated civil and electrical work is being carried out by M/S. Spices
Board through other Agencies:
a) Machine Room: As per Drawing and actual site condition.
b) Hoist Way: As per Drawing and actual site condition.
c) Door Opening: As per Drawing and actual site condition.
d) Power supply shall be provided by M/s. Spices Board for installation of lift. Except
for items of exclusion mentioned above, all items/materials/equipments required for
completion and functioning of the installation in all respect are deemed to be included
in the scope of this work whether specifically mentioned or not.
14. MISCELLANEOUS.
The following shall be in the scope of the elevator successful contractor and it shall be
his responsibility to arrange the items in order to complete the installation.
1. M S Scaffolding.
2. All minor buildings works such as chipping of surfaces, cutting and finishing of
walls/floors/partitions etc. shall be responsibility of lift successful contractor.
3. All minor buildings works such as chipping of surfaces, cutting and finishing of
walls/floors/partitions etc. shall be responsibility of lift successful contractor.
4. All steel items included except architraves foundation & support and lifting
hook in the machine room.
5. Stainless Steel Jamb Panel & sill Angles.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
17 IL&FS Cluster Development Initiative Limited
15. QUALITY ASSURANCE PROGRAM & TEST PROCEDURE FOR
ACCEPTANCE
Following test procedures shall be carried out prior to acceptance of elevator system:
a) Test to determine that the insulation resistance between power and control lines
and earth is as per specified IS codes.
b) Test to determine that the earthing of all conduit, switch, casings and similar metal
works is continuous and of low resistance.
c) Test to determine that the motor, brake, control equipment and door locking
devices and limit switches function correctly.
d) Brake to be tested to check whether it can sustain a car at rest with 25% of contract
load.
e) Test to determine that the lift car raises and lowers rated load.
f) Test to determine that the lift car achieves the contract speed.
g) Test to determine that the safety gear stops the lift with the rated load.
h) Test for rated power against actual power consumption under full load.
i) Check for current drawn by each elevator during starting and full load operation.
j) Sound level check for motors.
k) Visual inspection for all components.
Besides the above, successful contractor shall submit his standard quality
assurance program and test acceptance procedures for reference of Project
Manager / Services Consultant.
16. COMPREHENSIVE MAINTENANCE
The successful contractor may be required to carry out all inclusive maintenance of
the entire system for a period of five years beyond the free maintenance period of 1
year. The
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
18 IL&FS Cluster Development Initiative Limited
Successful contractor shall quote for the comprehensive maintenance as per Sub-head
II of the schedule of work.
The award of work & Agreement for the same is carried out separately. The same
shall not be considered for the purpose of evaluation of the quotation.
Scope
The AMC shall cover all the items installed by the successful contractor including
consumable like gaskets, rings, broken / damaged parts, etc.
17. INSPECTION AND TESTING
The Owner shall carry out inspection and testing at manufacturer’s works for item
elevators for this contract. No equipment shall be delivered without prior written
confirmation from Consultant/ Architect appointed by the M/s. Spices Board.
The Quotationer shall provide all necessary instruments and labour for testing, shall
make adequate records of test procedures and readings, shall repeat any tests
requested by the Consultant/Architect and shall provide test certificate signed by a
properly authorized person.
If it is proved that the installation or part thereof is not satisfactorily carried out,
then the Quotationer shall be liable for the rectification
and retesting of the same as called for by the Consultant/Architect whose decision as
to what constitutes a satisfactory test shall be
final.
18. INSURANCE
The successful Quotationer shall at his own expense, arrange for insurance policies,
such as workmen compensation policy and Contractor’s All Risk Policy in the amount
of the Contract effective from the date of commencement of work until final
completion, against
All of the following risks.
i) Injuries and damage of persons, property, animals or things, within or
outside the site, arising out of his operations or of any sub-contractors,
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
19 IL&FS Cluster Development Initiative Limited
nominated or otherwise or out of any actions of his employees, agents or
representatives.
ii) Injuries to his or any sub-contractor employees.
iii) Damage to or loss of property, equipment, and materials at site, of the
Owner, Contractor and all sub-contractors, as a result of natural causes such
as lighting, storm, flood, rain, fire, earthquake, explosion, landslide, etc
iv) Damage and injuries to persons, property and materials arising out of riot
and civil commotion, theft, sabotage malicious acts, terrorist activities, etc.
v) No certificate of payment shall be issued by the consultant/Architect if the
contractor fails to arrange for total insurance cover.
vi) The contractor shall reinstate in a manner approved by the Project Manager,
all damage of every sort entirely at his cost, so as to deliver up to the Owner
the whole of the works complete and perfect in all respects and so certified
by the consultant/Architect.
vii) The contractor shall reinstate in a manner approved by the
Consultant/Architect, all damage of every sort entirely at his cost, so as to
deliver up to the Owner the whole of the works complete and perfect in all
respects and so certified by the consultant/Architect and also be made good
or otherwise satisfy all clause for damage to property of third parties.
viii) The contractor shall be responsible for anything within his control and for
all risks and consequences, which are not included in the purview of the
insurance policies.
ix) The insurance shall be extended until final completion.
x) The contractor undertakes not to cancel any insurance policy or reduce its
scope without the written consent of the consultant/Architect.
19. EARNEST MONEY (SECURITY MONEY)
19.1 While submitting Technical bid, the BIDDER shall deposit an amount
of Rs. 50,000/-as Earnest Money / Security Deposit, with the M/s. Spices Board
through any of the following instruments:
(i) Account Payee Bank Draft or a Pay Order in favour of M/s. Spices Board,
Govt. of India.
(ii) A confirmed guarantee by an Indian Nationalized Bank, promising
payment of the guaranteed sum to the M/s. Spices Board on demand within
three working days without any demur whatsoever and without seeking any
reasons whatsoever. The demand for payment by the M/s. Spices Board
shall be treated as conclusive proof of payment.
(iii) Any other mode or through any other instrument (to be specified in the Bid
Document).
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
20 IL&FS Cluster Development Initiative Limited
19.2 The instrument for Earnest Money / Security Deposit made shall be valid up
to the specified period and the bidder shall be liable keep the said instrument valid for
such extended period as the case may be for satisfactory performance of the terms of
Tender above the referred till the complete conclusion of the contractual obligations to
the complete satisfaction of both the BIDDER and the M/s. Spices Board, including
warranty period, whichever is later.
19.3 In case of the successful BIDDER a clause would also be incorporated in
the Article pertaining of performance Bond in the corresponding contract governing
such agreement that the provisions of sanctions for violation shall be applicable for
encashment of the performance Bank Guarantee deposited to wards forfeiture of said
amount in case of a decision by the M/s. Spices Board to forfeit the same without
assigning any reason for imposing such sanction.
19.4 No interest shall be payable by the M/s. Spices Board to the BIDDER on
Earnest Money/Security Deposit for the period of its currency.
20. SANCTIONS FOR VIOLATIONS
20.1 Any breach of the aforesaid provisions by the BIDDER or any one employed by
it or acting on its behalf (whether with or without the knowledge of the (BIDDER)
shall entitle the M/s. Spices Board to take all or any one of the following actions,
wherever required:
(i) To immediately call off the pre contract negotiations without assigning any
reason or giving any compensation to the BIDDER. However, the
proceedings with the other BIDDER(s) would continue.
(ii) The Earnest Money Deposit (in pre-contract stage) and/or Security Deposit /
Performance Bond (Bank Guarantee) (after the contract is signed) shall
stand forfeited either fully or partially, as decided by the M/s. Spices Board
and the BUYER shall not be required to assign any reason therefore.
(iii) To immediately cancel the contract, if already signed, without giving any
compensation to the BIDDER.
(iv) To recover all sums already paid by the M/s. Spices Board, and in case of an
Indian BIDDER with interest thereon at 2% higher than the prevailing
Prime Lending Rate of State Bank of India, while in case of a BIDDER
from a country other than India with interest thereon at 2% higher than the
LIBOR as the case may be. If any outstanding payment is due to the
BIDDER from the M/s. Spices Board in connection with any other contract
for any other stores or on any account whatsoever and by whatsoever name
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
21 IL&FS Cluster Development Initiative Limited
called, such outstanding payment could also be utilized to recover the
aforesaid sum and interest there to.
(v) To encash the advance bank guarantee and performance bond/warranty
bond, if furnished by the BIDDER, in order to recover the payments,
already made by the M/s. Spices Board, along with interest.
(vi) To cancel all or any other Contracts with the BIDDER. The BIDDER shall
be liable to pay compensation for any loss or damage to the M/s. Spices
Board resulting from such cancellation /rescission and the M/s. Spices
Board shall be entitled to deduct the amount so payable from the money(s)
due to the BIDDER.
(vii) To debar the BIDDER from participating in future bidding processes of the
Government of India for a minimum period of five years, which may be
further extended at the discretion of the M/s. Spices Board.
(viii) To recover all sums paid in violation of this Pact by BIDDER(s) to any
middleman or agent or broker with a view to securing the contract. To
recover all sums paid in violation of this Pact by BIDDER(s) to any
middleman or agent or broker with a view to securing the contract.
(ix) In cases where irrevocable Letters of Credit have been received in respect of
any contract signed by the M/s. Spices Board with the BIDDER, the same
shall not be opened.
(x) Forfeiture by way of encashment of Performance Bond in case of a decision
by the M/s. Spices Board to forfeit the same without assigning any reason
for imposing sanction for violation of this Pact.
20.2 The M/s. Spices Board will be entitled to take all or any of the actions
mentioned at Para 20.1(i) to (x) of this Pact also on the Commission by the BIDDER
or any one employed by it or acting on its behalf (whether with or without the
knowledge of the BIDDER), of any offence as defined in Chapter IX of the Indian
Penal code, 1860 or Prevention of Corruption Act, 1988 or any other statute enacted
for prevention of corruption.
20.3 The decision of the M/s. Spices Board to the effect that a breach of the
provisions of this Pact has been committed by the BIDDER shall be final and
conclusive on the BIDDER. However, an Independent Monitor(s) shall be appointed
by M/s. Spices Board, incase of breach of the provisions of the pact.
21. FALL CLAUSE
21.1 The bidder undertakes that he has not quoted lower rate for item rate offered in
the present rate prevalent on that particular date in respect of any other
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
22 IL&FS Cluster Development Initiative Limited
Ministry/Govt/PSU.In case the same is found the difference amount to be recovered
by M/s. Spices Board from the bidder.
23. INDEPENDENT MONITORS
23.1 An Independent monitor (s) shall be appointed by M/s. Spices Board, incase
of breach of the provisions of the pact.
23.2 The task of the Monitors shall be to review independently and objectively,
whether and to what extent the parties comply with the obligations under this Pact.
23.3 The Monitors shall not be subject to instructions by the representatives of the
Parties and perform their functions neutrally and independently.
23.4 Both the parties accept that the Monitors have the right to access all the
documents relating to the project / procurement, including minutes of meetings.
23.5 As soon as the Monitor notices, or has reason to believe, a violation of this
Pact, he will so inform the Authority designated by the M/s. Spices Board.
23.6 The BIDDER(s) accept that the Monitor has the right to access without
restriction to all Project documentation of the M/s. Spices Board. Including that
provided by the BIDDER. The BIDDER will also grant the Monitor, upon his request
and demonstration of a valid interest, unrestricted and unconditional access to his
project documentation. The same is applicable to Sub bidders. The
Monitor shall be under contractual obligation to treat the information and documents
of the BIDDER/Sub bidder(s) with confidentiality.
23.7 The M/s. Spices Board will provide to the Monitor sufficient information
about all meetings among the parties related to the Project provided such meetings
could have an impact on the contractual relations between the parties. The parties will
offer to the Monitor the option to participate in such meetings.
23.8 The Monitor will submit a written report to the designated Authority of
BUYER/Secretary in the Department/within 8 to 10 weeks from the date of reference
or intimation to him by the M/s. Spices Board / BIDDER and, should the occasion
arise, submit proposals for correcting problematic situations.
24. FACILITATION OF INVESTIGATION
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
23 IL&FS Cluster Development Initiative Limited
In case of any allegation of violation of any provisions of this Pact or payment of
commission, the M/s. Spices Board or its agencies shall be entitled to examine all the
documents including the Books of Accounts of the BIDDER and the BIDDER shall
provide necessary information and documents in English and shall extend all possible
help for the purpose of such examination.
25. LAW AND PLACE OF JURISDICTION
This Pact is subject to Indian Law. The place of performance and jurisdiction is the
seat of the M/s. Spices Board.
26. OTHER LEGAL ACTIONS
The actions stipulated in this Integrity Pact are without prejudice to any other
legal action that may follow in accordance with the provisions of the extant law in
force relating to any civil or criminal proceedings.
27. VALIDITY
27.1 The validity of this Integrity Pact shall be governed by the terms of the
Tender ________________________ towards complete execution of the contract to
the satisfaction of both the M/s. Spices Board and the BIDDER/Seller, including
warranty period, whichever is later. In case BIDDER is unsuccessful, this Integrity
Pact shall expire after six months from the date of the signing of the contract awarding
the tender with successful bidder.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
24 IL&FS Cluster Development Initiative Limited
27.2 Should one or several provisions of this Pact turn out to be invalid; the
remainder of this Pact shall remain valid. In this case, the parties will strive to come to
an agreement to their original intentions.
The parties hereby sign this Integrity Pact at ________ on __________.
M/s. Spices Board, CHIEF EXECUTIVE OFFICER
Name of the Officer BIDDER
Designation
Witness. Witness.
1. _____________________ 1. ____________________
2. ______________________ 2. ____________________
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
25 IL&FS Cluster Development Initiative Limited
GUARANTEE PROFORMA
GUARANTEE FOR ELEVATOR INSTALLATION.
We hereby guarantee Elevator System, which we have installed in the Complex described below:
Building – M/s. Spices Board, Quality lab and Training center building,
Address – Plot No. EL-184, TTC MIDC, Mahape, Navi Mumbai,
For a period of ONE YEAR from the date of acceptance of the total installation. We agree to
repair or replace to the satisfaction of M/s. spices Board, any or all such work that may prove
defective in workmanship, equipment or materials within that period, ordinary wear and tear and
unusual abuse or neglect excluded, together with any other work, which may be damaged or
displaced in so doing. In the event of our failure to comply with the above mentioned conditions
within a reasonable time, after being notified in writing, we collectively and separately, do
hereby authorize M/s. Spices Board to proceed to have the defects repaired and made good at our
expense, and we shall pay the cost and charges thereof, immediately upon demand.
We also hereby undertake to test the entire installation on following the completion of the
installation, to check and do everything necessary to ensure that the specified conditions in is
maintained, that all systems are properly balanced, that all controls are calibrated accurately, and
that all units are functioning satisfactorily and safely.
Signature of the Quotationer.
Seal
Date
Remarks i) This form is included in the document only for the information of Quotationer. Only the successful Quotationer
will in due course be required to complete this form.
ii) Stamp Duty of this Agreement will be borne by the successful Quotationer.
iii) The Bond is to be submitted separately by the successful Quotationer on a non-judicial stamp paper of Rs. 100/-
(One Hundred) only.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
26 IL&FS Cluster Development Initiative Limited
LIST OF INDIAN STANDARDS CONNECTED WITH LIFT INSTALLATIONS
1 . IS-14665 (Part 2) Sec-1:
2000
Code of Practice for installation, operation &
maintenance of electric passenger & goods
lifts
2 IS-14665 (Part 2) Sec-2:
2000
Code of practice for installation, operation &
maintenance of electric service lift.
3 IS-14665 (Part 3) Sec-1:
2000
Safety Rules Section 1 Passenger & Good
Lifts.
4 IS-14665 (Part 3) Sec-2:
2000
Safety Rules Section-2- Service Lifts
5 IS-14665 (Part 1) 2000 Outline dimension for electric lifts
6 IS-14665 (Part 5) : 1999 Inspection Manual for Electric Lifts
7 IS-14665 (Part 4) Sec-1 to
9: 2001
Electric Traction Lifts – Components
8 IS-4289 (Part-i): 1984
Reaffirmed 1991
Specification for lifts cables
9 IS-1173-1978 Reaffirmed
1987
Specification for hot rolled and slit steel tee
bars
10 IS-7443-1974 Reaffirmed
1991
Method of loading rating of worm gear
11 IS-7403-1974 Reaffirmed
1991
Code of practice for selection of standard
worm and helical gear box
12 IS-4218(Part-II)1976
Reaffirmed 1996
Isometrics screw threads
13 IS-2147-1962 Degree of protection provided by enclosure
for low voltage switchgear and control gear
14 IS-1271-1985 Reaffirmed
1990
Classification of insulating materials for
electrical machinery & apparatus in relation
to their thermal stability in service.
15 IS-3043-1987 Code of practice for earthing
16 IS-1646-1997 Electrical installation Fire Safety of Building
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
27 IL&FS Cluster Development Initiative Limited
17 IS-694-1990 PVC insulated electric cable for working
voltage upto & including 1100 volts
18 IS-732-1989
Code of practice for electrical wiring &
installation
19 IS-1554-1988 (Part-i) PVC insulated (Heavy Duty) electric cables
for working voltage upto & including 1100
volts
20 IS-3480-1966 Flexible steel conduits for electrical wiring
21 IS-3837-1976 Accessories for rigid steel conduit for
electrical wiring
22 IS-5133-1969 (Part 1) Boxes for the enclosure of electrical
accessories
23 IS-5216-1982 (Part-1) Guide for safety procedures & practices
in electrical work.
24 IS-5578 & 11353-1985 Marking & arrangement of bus bars
25 IS-8130-1984 Conductors for insulated electric cables
and flexible cords
26 IS-8623-1977 (Part-1) Factory built assemblies of switchgear
and control gear for voltages upto and
including 1000 V AC and 1200 VDC
27 IS-8828-1996 Miniature Circuit Breakers
28 IS-9537-1981 Rigid steel conduits for electrical wiring
(second revisions)
29 IS-10810-1998 Methods of test for cables
30 IS-12640-1988 Earth Leakage Circuit Breakers
31 IS-13947-1993 Moulded Case Circuit Breakers
32 IS-13947-1993 General requirement for switchgear &
control gear for voltage not exceeding
1000 volts.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
28 IL&FS Cluster Development Initiative Limited
LIST OF ACT / BYE-LAWS.
The lift installations shall also be governed by the following Acts/Bye-laws/Codes as amended
up to date in addition to the codes specified in the tender:
1. National Building Code of India – 2005
2. Indian Electricity Act – 2003
3. Indian Electricity Rule – 1956
4. Local Lift Act.
5. Building Bye-Laws.
6. Local Fire Prevention and Fire Safety Rule.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
29 IL&FS Cluster Development Initiative Limited
Specification for Passenger Lift
Sr. No Description Specification
1 Type of lifts Passenger
As per Specification enclosed.
2 No. Of lift 01
3 Type and capacity 13 passengers – 884 kgs.
4 Speed 1.0 m (as suite to site)
5 Drive Micro processor based AC variable voltage
variable frequency(vvvf)
6 Location of m/c room Top of lift shaft
7 Travel 18.00 mts.(appx)
8 Serving -1, 0,1, 2, & 3 floor
9 No. of stops 05 **
10 Well size Suit to existing well *
11 Power supply 415 v three phase 50 cycles ac-existing. 4
wire.
12 Auxiliary Single phase 220v 50 cycles ac-existing
13 Car size As per Lift well size.
14 Position of counter weight At the back of the car
15 Pit depth As per existing*
16 Head room As per existing*
17 Car enclosure Car ceiling Stainless steel scratch proof
(moon rock
finish)
Car panels Stainless steel scratch proof (moon rock
finish)
Car flooring PVC flooring/recess 20mm
Car illumination CFL lights
18 No. of entrance One location front
19. Car entrance Automatic center opening door in stainless
steel scratch proof (moon rock finish)
20 Door safety Full height infra red curtain
21 Landing entrance Automatic center opening door in S.S
hairline finish
22 Clear opening 800 mm (w) x 2000 mm (h)
23)
23 Control Simplex selective collective with/without
Attendant
24 Car Good quality of high strength, safety and
fine finish bottons with required numbers of
segments with 25 mm display surface
mounted or as per manufacturer’s standard
Landing Good quality of high strength, safety and
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
30 IL&FS Cluster Development Initiative Limited
fine finish bottons with required no of
segments with 25 mm display surface
mounted or as per manufacturer’s standard
As per Specification enclosed.
25 Operational and safety features: To be provided
26 Battery operated emergency light and
alarm bell
To be provided
27 Call register signal and VF door
operator
To be provided
28 Overload warming indicator To be provided
29 Firemans switch To be provided
30 Automatic rescue device To be provided
31 Infra red door screen To be provided
32 Digital floor position indicator in the car
and at all landings
To be provided
33 Travel direction indicator in the car
and at all landings
To be provided
34 Fan (regular fan) To be provided
35 Half height mirror and handrail on two
sides
To be provided
36 Scaffolding To be provided
37 Minor building work To be provided
38 Sill angle To be provided
39 Lift license To be provided
40 Free service for one year To be provided
Note:
(i) * size of lift well, pit depth & head room to be checked at site by intending
Quotationer before quoting
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
31 IL&FS Cluster Development Initiative Limited
SPECIAL FEATURES:
1. Emergency Alarm
2. Facia Plate
3. Phase Fireman Drive
4. Way Hands Free Press & Speak Intercom
5. Full height infra red safety curtains.
6. Pit Ladder
7. Emergency Light With Rechargeable Battery
8. Adjustable Guide Shoes.
9. Micro Movement LED Based Buttons.
10. +10% to -10% voltage fluctuation withstand capacity.
11 Over Speed Governor
12 Safety Car Door Lock
13 Partial Height Car Operating Panel
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
32 IL&FS Cluster Development Initiative Limited
Appendix-V
Technical Particulars to be furnished by Quotationer.
Sr.
No Particular of Details
A. General.
1. Name of Manufacture
2. Country of Manufacture
3. Capacities(Persons/Weight)
4. Service
5. Speed of Travel
6. Height of Travels
7. No. of floor served
8. No. of openings
9. Position of Counterweights
10. Type of Leveling Method.
B. Machine.
1. Position of Machine
2. Motor
3. Electric supply particulars for which
suitable for operation
C Brake.
1. Type
D. Car and Doors
1. Outside dimensions of Car
2. Inside clear dimensions of Car
3. Construction of Car
4. Design/Type of enclosure of Car
5. Details of floorings
6. Attachment and fitting inside the Car
7. Car Doors :
a. Size.
b. Operation.
c. Construction, Design and Finish.
8. Lending Doors:
a. Size.
b. Operation.
c. Construction, Design and Finish.
E. Safety Devices
F. Other Safeties included in the offer
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
33 IL&FS Cluster Development Initiative Limited
1.
Car Safety-type
2. Counter weight Safety-type
3. Door interlocks in Car-type
4. Door locks in landing-type F. Other Safeties included in the offer
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
34 IL&FS Cluster Development Initiative Limited
QUALITY EVALUATION LABORATORY, Plot EL-184, MIDC, TTC
INDUSTRIAL AREA,
VILLAGE - NAVI MUMBAI
SCHEDULE OF RATES
Name of Work: Purchase of Passenger Lift for QC Lab, Mumbai for Spices
Board
S.NO. ITEM QTY UNIT RATE AMOUNT
1.0 LIFTS : (13 Passanger Elevator) without
Machine Room at the Top of Lift Shaft.
Concrete Shaft size - 2m x 3m approx.
Design, Supply, Installation, Testing,
Commissioning and Handing over of 13
Passenger (884 kg) Lift without Machine
Room at the Top of Lift Shaft having Contract
speed of 1.0 MPS serving different floors in
the existing lift shaft as per specifications,
drawings and requirement.
a) Speed : 1.0 MPS
b) Floors : FIVE
c) Landing : 5 (-1,0,1,2,3,)
d) Travel : 18 Meter (Approx)
e) Stops & Opening : 5 (all on the same side)
f) Controller : AC variable voltage & variable
frequency
g) AutomaticRescue Device complete with
VRLA maintenance free batteries as required.
h) Operation : Microprocessor based single
automatic push button / Quadraplex collective
selective with / without attendant.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
35 IL&FS Cluster Development Initiative Limited
S.NO. ITEM QTY UNIT RATE AMOUNT
i) Power - 415 V, 3 phase, 50 Hz, 4 wires
system.
j) TYPE OF DOORS
-
CAR : Power Operated, Centre Opening
Horizontal sliding, combination of stainless
steel vandal resistant & other stainless steel
finish as per manufacturer (with one hour fire
rating).
-
LANDING DOORS : Power Operated, Centre
Opening horizontal sliding, combination of
stainless steel vandal resistant & other
stainless steel finish as per manufacture (with
one hour fire rating).
-
Temper proof infra-red full width and full
height of the opening as curtain.
k) Construction design and finish of the car body
as per specification.
l) Car and Car Doors shall be of elegant design
and shall comprise the standard features
required for passenger elevator.
m) The ceiling of the car shall be false ceiling
with combination of stainless steel vandal
resistant & other stainless steel frame with
recessed fluorescent luminaries and
pressurized exhaust fan on the ceiling.
n) The Flooring shall be of Polished Granite of
20mm thickness. Granite shall be supplied &
fitted by others on site. The Colour & Pattern
of Granite shall be decided by the Architect
Later on.
o) The floor level inside the car and in the hoist
way entrance shall be matched.
p) The car and hoist way entrance doors shall be
openable simultaneously as per the registered
call.
q) Provision of locking control in automatic or
attendant position
r) Provision of overload audio visual indicator
s) Provision of call register signal
t) Provision of battery operated emergency light
and alarm bell
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
36 IL&FS Cluster Development Initiative Limited
S.NO. ITEM QTY UNIT RATE AMOUNT
u) Provision of Floor annunciator with music
v) Fire man switch
w) Braille Switches
x) Elevators shall be monitored though Elevator
Monitoring System
y) Provision of Floor Indication inside the Lift
with up & down arrows
z) Provision of Lift Oposition Indicator with up
& down arrows in each floor landing
za) Provision of Handgrip Rail of Single Line of
Hairling Finished Stainless steel
zb) Provision of Mirror on Rear wall of Lift Car.
The Lift Contractor shall test leveling gear on
load and off load to ensure car leveling
accuracy withi9n standard limits.
zc) Provisions in terms of potential free / other
relevant contacts shall be provided in the lifts
& its accessories for th following as per
specifications. The provisions shall be
internally wired completely and brought out at
an accessible point using terminal blocks.
i) Elevator Fault / Trip Signal
ii) Elevator car alarm signal
iii) Power Available and failure status
iv) Elevator under maintenance signal
v) Elevator floor position
vi) Door Fully closed signal
vii) Emergency fire operation
viii) Emergency stop
ix) Remote control signal for parking on / off
operation.
x) Any other status
Rate shall include all implied / allied items for
complete commissioning of lifts including lift
inspectorate's approval & requirements. 1 Nos.
TOTAL
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
37 IL&FS Cluster Development Initiative Limited
TECHNICAL SPECIFICATIONS
1. PASSENGER ELEVATORS & SERVICE ELEVATORS
Elevators covered by this specification shall be provided, installed, tested,
commissioned, certified and approved as per statutory requirements by Lift Inspectorate.
Notes:
a) All elevators described herein shall be connected to normal as well as emergency power. One
Fireman’s switch for each set of elevator shall also be provided.
b) Elevator shall incorporate short duration emergency lighting in each cab, which shall be local
dry cell rechargeable battery and necessary relays. Light output shall be minimum 50 LUX at
floor level.
c) All wires used for the project shall be FRLS type
d) Traveling cables shall be multi core with high conductivity stranded conductor
Specifically design for lift.
2. HOIST GEAR
Hoisting machines for Passenger elevators and Service Elevators shall be geared type.
2. EMERGENCY CRANKING.
The hoisting machines shall be provided with a set of special tools including a hand
crank or its equal to allow release of hoist brake and provide for manual movement of the car
incase of emergency. These tools shall be hung up on a tool board fitted to a wall in the elevator
machine room, with instructions for their use clearly written on the board both in English and the
local language. The elevator system supplier shall qualify his bid with respect to manual
cranking. An automatic switch shall be provided to interrupt power to the elevator mains upon
withdrawal of crank and on manual resetting of power monitor switch, power shall be restored
automatically.
4. BRAKE
Brakes with non-asbestos lining shall be spring loaded closed and shall open
electrically.Brake shall be applied following down using variable input frequency to insure
smooth stops after elevator has come to rest.
5. AUTOMATIC SELF-LEVELLING
The elevator shall be provided with automatic self-leveling feature that shall bring the
elevator car level to within +3 mm of the landing floor regardless of load or direction of travel.
The automatic self-leveling feature shall correct for over travel and rope stretch.
6. HOISTWAY MATERIALS
All hoistway materials shall be non-flammable except travel cable cladding, which
shall be flame resistant. All other electrical cables shall be flame resistant and housed in metal
conduit or other metal enclosures.
7. HOISTWAY ENTRANCES
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
38 IL&FS Cluster Development Initiative Limited
For each landing served, lift vendor shall furnish and install a complete passenger
elevator hoist way entrance. Each entrance shall have center opening horizontal sliding type
flush doors of hollow metal construction, extruded aluminum sill with anti slip grooving on the
surface, door hanger supports and hanger cover.
8.HOISTWAY DOORS.
Sheave type two point suspension ball bearing door hangers and tracks shall be
furnished for each hoistway opening. Sheaves shall not be less than 58 mm diameter and
adjustable ball bearing rollers shall take up thrust of the doors.
Each car and hoistway door leaf shall be fitted with minimum two nos. Teflon or nylon gibes as
bottom door stabilizers.
9. CAR AND HOISTWAY DOOR OPERATOR
For each elevator door PWM-DC operator shall be furnished to simultaneously open
the car and hoistway doors when the car is at a landing. The doors shall be closed simultaneously
by motor power. Emergency key provision shall be made to open doors at top and bottom
landing from outside of the hoistway.
In the event of interruption of electric power or failure of the door operator, it shall not be
possible to open the car door manually from within the car.
An electric contact for the car door shall be provided, which shall prevent elevator
movement away from the landing unless the door is in the closed position. Each hoistway door
shall be equipped with a positive electromechanical interlock and auxiliary door closing device
so that the elevator can be operated only after the interlock circuit is established.
The doors shall open automatically while the car is leveling at the respective
landing. The doors shall automatically close after a predetermined time interval has elapsed, but
the momentary pressure of the “door open” button provided in the car shall reverse the motion
and reopen the doors and reset the time interval unless overridden by the electronic door monitor.
10. PHOTO ELECTRIC MONITORS
An Electronic Door Monitor device shall be installed on each elevator. This device
shall monitor traffic across the threshold of the door and shall initiate door closing 2 seconds
after interruption, thus overriding door open period.
11. DOORS
Doors, threshold and door hangers shall be, as a system, fire rated for not less than 2.0
hour.
12. CAR TOP STATION
A car top operating station comprised of key operated switch and constant pressure
up/down buttons shall be provided on each elevator. Car shall respond to up/down command at
inspection speed. The elevator Quotationer shall provide electrical fixture of 40 watt enclosed
fluorescent or dust proof 100W incandescent switched from car top station.
13. CAR-FRAME AND SAFETY.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
39 IL&FS Cluster Development Initiative Limited
A car-frame fabricated from formed or structural steel members shall be provided with
adequate bracing to support the platform and car enclosures. The car safety shall be integral with
car-frame, or shall be mounted on the bottom members of the car-frame, and shall be of the
flexible guide clamp type designed to stop and hold a fully loaded car, which exceeds descending
speed. Safeties shall conform to ANSI/ASME/CENEN-81 or local codes, if more stringent.
14. SPEED GOVERNOR.
The car safety shall be operated by a mechanical centrifugal speed governor located in
the machine room at the top of the hoistway. The governor shall actuate a switch when excessive
descending speed occurs, disconnecting power to the hoist motor and applying the brake prior to
deployment of the safeties. Governor sheave in elevator pit shall be enclosed in a wire cage to a
height of 2.40 m.
15. WIRING
All wiring and electrical interconnections shall comply with governing codes.
Insulated wiring shall have flame retardant and moisture proof outer covering, and shall run in
metal conduit, tubing or approved electrical raceways. Traveling cables shall be flexible and
suspended to relieve strain on individual conductors. A minimum of 10% spare conductors shall
be provided in traveling cable.
16. VOLTAGE FLUCTUATIONS
All electrical equipments supplied by the lift Quotationer shall withstand incoming
supply voltage fluctuations of ± 20%. Any external voltage stabilizer required to achieve this
resilience shall be included in the quoted price.
17. HOISTWAY OPERATING DEVICES
Redundant series wired terminal stopping devices shall be provided to slow down and
stop the car automatically at the terminal landings. Resetting a tripped device shall be done
manually only.
18. PIT SWITCH
An emergency stop switch shall be located in the pit which when operated shall stop
the car regardless of position in the hoistway.
19. BUFFERS
Buffers shall be installed in the pit as a means for slowing and stopping the car and
counterweight at the bottom limits of travel, in compliance with ANSI/ASME/CENEN-81 or
local code, if more stringent. Clearance from underside of car resting on a fully compressed
buffer shall be not less than 1.20m. buffer shall be designed for design speed + 15%. Spring
buffers shall be provided for the Passenger elevators for speeds upto 1.5 mps.
20. GUIDE RAILS
Steel elevator guide rails shall be installed to guide the car and counterweight,
erected plumb and securely fastened to the building structure, filled and filed to ensure smooth
joints. The guide rail shall be minimum 16 mm, tongued and grooved type.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
40 IL&FS Cluster Development Initiative Limited
21. GUIDES
Rubber encased coil spring tension adjusted roller guides shall be provided for
Passenger elevators mounted on top and bottom of the car frame, and on top and bottom of the
counterweight frame to engage their respective guide rails. Passenger elevators shall have sliding
guides on car and counterweights.
22. CABLE ANCHOR
Cable shall conform to ANSI/ASME/CENEN-81 and shall anchor to the frame by
means of an equalizing device to insure uniform cable loading.
23. TRAVELLING CABLE
Traveling cable shall be secured to the cars underside. Cable shall be clear of all
obstructions while car is in motion. Cable jacket shall be rated for immersion in water, salt water
and oil. Jacket restraint shall minimize strain on conductor.
24. INTERLOCKS
Hoistway openings shall be provided with electro-mechanical locks.
25. COUNTERWEIGHT
A structural steel frame with cast iron or steel plate filler weights shall be
furnished to provide proper counterbalance for smooth and economical operation.
26. COUNTERWEIGHT GUARD
A metal counterweight guard shall be furnished and installed at the bottom of the
hoistway, and shall wrap around counterweight rails for a height of no less than 1.80 m in order
to protect accidental contract.
27. ROPES
The hoist ropes shall be traction steel of size, construction and number to insure
proper operation of the elevator and give satisfactory and safety assurance. Governor ropes shall
be steel. All ropes shall consist of at least eight strands wound about a hemp core center. All
ropes shall conform to ANSI/ASME/CENEN-81 or more restrictive governing codes or
regulations. The minimum factor of safety for ropes should be 10.
28. PLATFORM
The car platform shall be stainless steel plate. The entire platform shall rest on
rubber pads, so designed to form an isolating cushion between the car and car-frame. Platform
deflection shall be limited to maximum 3 mm under maximum normal operating conditions.
Platform shall conform to ANSI/ASME/CENEN-81 or more restrictive local codes.
29. OVER-LOAD FEATURE
Passenger elevators shall be fitted with the load weighing feature to illuminate
“Over-Load” fixture and defeat the car’s operating circuits when car load reaches 110% or more
of rated load. Car platform may require stiffening to minimize margin of error resulting from
excessive deflection. Overload fixture and / or circuit defeat for passenger elevators shall
conform to governing code.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
41 IL&FS Cluster Development Initiative Limited
30. ACCELERATION / DECLARATION
Shall be linear and smooth. Stops shall be without cable oscillations.
31. NOISE LEVELS
Noise from all stationary equipment shall not intrude into adjoining areas by more
than 15 dB. Noise from moving equipment including door operation, car motion, fan, wind,
etc.shall not intrude into adjoining corridors by more than 20 dB and adjoining occupied areas by
not more than 10 dB. (All octave bands).
Noise level inside the car shall not exceed 50 db without lift fan running.
Noise level inside the car shall not exceed 55 dB in case of door opening / closing. The noise
level shall be measured at ‘Zero Activity’.
32. LATERAL QUAKING & VERTICAL VIBRATIONS
Lateral quaking and vertical vibrations should not exceed 20 gal and 85 dB
respectively.
Quotationer to demonstrate these parameters at site with performance analyzer.
33. CAR LEVELLING
Car shall reduce traveling speed, stop and open doors. Car leveling shall be within ± 3
mm for passenger elevators of landing threshold with load range of 0-100%.
34. EMERGENCY CAR LIGHTING & INTERCOM.
Provision shall be made in the car operation station of passenger elevators. Necessary
wires shall be included in the car traveling cable. Communications cables and connections to the
building service system shall be furnished and installed by others. Elevator Quotationer shall
provide hands free type communication unit built-in the car operating panel. The other units shall
be placed in lift machine room and main control station on ground floor. All cabling shall be
done by Elevator Quotationer and supply of communication unit shall also be in scope of
elevator Quotationer.
35. PROVISION FOR SPEAKERS (ALL CARS)
Emergency speakers shall be provided by Quotationer. Elevator Quotationer shall provide
conductors in traveling cable. Speakers shall be connected to the background music system to
emergency paging system by the low tension Quotationer. Elevator Quotationer shall provide all
cables and conduits and terminate same at elevator motor room for continuation by low tension
Quotationer.
36. CAR POSITION INDICATOR
The position of the car in the hoistway shall be shown by illuminating the corresponding
landing at which the car is stopped or passing. All voice announcement system shall be provided
in the car to announce the position of
The elevator in the hoist way as the car passes or stops at floors served by the elevators.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
42 IL&FS Cluster Development Initiative Limited
37. LIGHTING
The cab manufacturer shall make all provisions for installation of lighting fixtures
including integration of emergency lighting fixtures.
38. HALL BUTTONS
For passenger elevators these shall be provided at each terminal landing. A single micro
movement push button shall be provided at top most and ground floor landing, two micro
movement buttons on a single plate shall be provided at each intermediate floor. When a hall call
is registered by momentary pressure on a landing button, that button shall become illuminated
and remain illuminated until the call is answered.
39. CALL BUTTON
Selection for call buttons shall be as per manufacturer’s standard selection. The
catalogues of the buttons offered shall be submitted along with the tenders.
40. FIXTURE FINISHES
The metal faceplates of the signal and operating fixtures in the cars and at the landings,
and the metal accessories in the cars, shall be hair line / moor rock stainless steel or as selected
by Consultant. The push button fixtures at the landings shall be of design approved by the
Consultant. All fixtures form and finishes, etc. are subject to the Client approval at the time of
placing the order.
41. CAB CLADDING AND FINISHES
Flooring shall be of as per technical data sheets with all seams for liquid tightness.
Walls shall be of stainless steel sheet. Interior finishes shall be moon rock finish stainless steel to
full height.
42. AUTOMATIC ELEVATOR RETRIEVAL SYSTEM
Elevators must be equipped with an automatic elevator retrieval system, which will
upon signal from the central fire alarm system or manually operated key switch, cause the
elevator to be dispatched automatically to the ground floor. Elevator shall, after discharging
passengers, close its doors and remain at the ground floor. All floor and car buttons shall be
rendered ineffective until the system is manually reset. A key operated switch shall be provided
at the ground floor to activate and reset the retrieval system manually.
a) Emergency operation shall return the elevator to a designated floor, most
commonly, the Lobby, by means of a signal from the automatic fire alarm system.
b) Cars traveling toward lobby shall express to lobby ignoring all car and hall calls. Cars
parked on intermediate floors shall close their doors and express to lobby. Cars parked at lobby
shall open their doors ignoring car and hall calls. All hall and car buttons shall extinguish and
shall accept no further hall or car registration.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
43 IL&FS Cluster Development Initiative Limited
a) Elevator shall, in addition and where allowed by code, be provided with a key
Operated switch where designated by the Consultant, for use by in-house fire
Brigade.
d) The elevator Quotationer shall cooperate with the fire alarm supplier / installer to agree
on divisional responsibilities.
43. INSPECTION OPERATION
A switch shall be provided in the car to permit operation of the elevator from top of the
car for inspection purposes, with car and hall buttons inoperative. Car shall travel at inspection
speed not exceeding 0.5 m/sec. Motion of car shall require constant pressure to directional
button.
44. INDEPENDENT SERVICE
A key operated switch shall be provided in the car operating station which, when
actuated, shall disconnect the elevator from the hall buttons and permit operation from the car
buttons only.
45. HOIST GEAR / ACCESSORIES
The machine shall be located directly above the hoistway. Foundation bolts shall be
provided by the elevator Quotationer for building into the foundation furnished by others.
Suitable beams shall be furnished for mounting deflector pulleys, if required by the elevator
Quotationer. Requirements for permanent lifting hooks hoisting beams and access batches shall
be indicated on the drawings by the elevator system, supplier / installer.
46. PASSENGER ELEVATORS
Passenger elevators shall conform to all details in these standards stipulated, unless otherwise
differently arranged hereunder.
46.1 Elevator Cab
Cab dimensions shall be as detailed under technical data of this tender.
The car sill shall be flush with finished floor. Sill to sill space shall be as per
Manufacturer’s standard and not exceeding 25mm.
46.2 Car Platform
Shall conform to ANSI/ASME/CENEN-81 specifications. To suppress the noise and
drumming effects, the floor must be stiffened and preferably lined with fire retarded plywood or
other material, which will suit the proposed finish. All finishing materials shall be fireproof or
fire resistant conforming to applicable codes.
The platform shall be mounted on rubber pads supported on an auxiliary steel frame
fastened to the car frame. This arrangement shall form an isolating cushion between the car and
frame for vibration and load weighing transducers.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
44 IL&FS Cluster Development Initiative Limited
46.3 Car Doors.
Car doors shall, unless specifically stated, be center parting, automatic power operated
with variable frequency door operator and electronic door detector. An infrared light source shall
be provided to monitor the door closing and function as a safety edge. Light system shall initiate
door closure about 2 seconds after last light beam interruption. Light sensor shall override
designated “door open period” on top and intermediate floors and shall on the lower level be
inactive until the car has been designated on “next up” and given signal to close its doors. Car
doors shall be hung plumb and even, to within 1 mm with minimum number of 4 Gibbs
Per leaf. Floor Gibbs shall be well fitted so as to prevent popping noise as a car passes structural
members. Hoistway doors shall be hung plumb and show a maximum 6 mm joint at sides, top
and bottom and 2 mm at centre joint. Narrow door frame or jamb panel shall be supplied by
elevator Quotationer. A soft chime shall ring prior to doors closing and opening.
46.4 Door Operation
Upon the car reaching landing speed in response to a hall or car call, a soft chime in the
car shall sound. Door opening shall commence when the car is 25 mm from the leveling. Door
open period shall be adjustable to within a range of + 1 second. Doors shall open at a nominal
speed of 1.20 m/sec. Closing speed shall be adjustable from 1.5 to 2.5 seconds or as demanded
by particular circumstances. Door open period of all floors Except lobby floor shall be shortened
to the extent that door closure will commence 2 seconds (field adjustable) following the sensor
beam interruption by the last boarding or disembarking passenger. This period shall be adjustable
to 1.5 seconds + 1.0 seconds. Normal door open period at lobby floor shall be monitored by the
car’s CPU. Door closure Shall override ‘door open period’ where car loading has reached by
pass limit.
a) Doors shall be arranged to remain open for a time period sufficient to meet
Handicapped requirements. (Optional).
b) The time interval for which the elevator doors remain open when a car stops at a
Landing shall be independently adjustable for response to car calls and response to
Hall calls.
c) An approved positive interlock shall be provided for each hoistway entrance, which shall
prevent operation of the elevator unless all doors for that elevator are secured and shall maintain
the doors in their closed position while the elevator is away from the landing. Emergency access
to the hoistway as required by governing codes shall be provided.
46.5 Monitor Door Operation
Stopping in response to hall or car call, doors shall be normally kept open for a
predetermined period of time. With Monitor operation, the door closing period is
automatically shortened to approximately 1.0 seconds. Time open period feature must be field
adjustable. Door open period shall be increased when the light ray senses a passenger leaving or
entering the car, thus eliminating necessary delay.
47. CAR OPERATING PANEL
The car operating panel shall contain a bank of micro movement illuminated buttons
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
45 IL&FS Cluster Development Initiative Limited
marked to correspond to the landings serviced. It shall include a series of push buttons
corresponding to the floors served, along with an emergency stop and switches required.
Operating panel shall incorporate the following: floor buttons, door open/close, emergency
stop/alarm, up/down in manual mode, man/auto key switch.
The emergency alarm button shall be connected to the 12 volt rechargeable battery
Circuit. A locked compartment integral with operating panel shall contain:
a) Auto/manual/inspection key operated switch
b) Up/down button
c) Fan switches
d) Synthesized voice announcements
On sounding of general fire alarm, the elevator shall, if in motion, express to the ground floor. If
stopped, the elevator shall open its doors and remain there until reset. Emergency talk-back
system shall be provided, installed in integral cabinet and connected to the EPABX by the low
tension Quotationer.
48. AUTOMATIC LOAD BYPASS
Transducers in the car platform shall monitor passenger load, which shall override
“preprogrammed door open period” and dispatch the loaded car from the low terminal. The load
weighing device shall also function in the same manner on all intermediate and top floors and in
addition shall express to the next car call and ignore all hall calls. Hall calls, which are bypassed
shall not be canceled. The automatic load bypass device shall be field adjusted for 50%-75% of
rated load.
48.1 Operation – One Car Simplex.
a) Operation shall be automatic by means of the car and landing buttons.
Stops registered by the momentary actuation of the car or landing buttons
Shall be made in order in which the landings are reached in each direction of
Travel after the buttons have been actuated. All stops shall be subject to the
Respective car or landing button being actuated sufficiently in advance of the
arrival of the car at that landing to enable the stop to be made.
b) “UP” landing calls shall be answered while the car is traveling in the up
direction and “DOWN” landing calls shall be answered while the car is
traveling down. The car shall reverse after the uppermost or lowermost car
or landing call has been answered and proceeds to answer calls and landing
calls registered in the opposite direction.
c) If a car without registered car calls arrive at a floor where both up and down
hall calls have registered, it shall initially respond to the hall call in the
Direction that the car was traveling. If no car call or hall call is registered for
Further travel in that direction, the car shall close its doors and immediately
Reopen them in response to the hall call in the opposite direction. Provided
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
46 IL&FS Cluster Development Initiative Limited
Direction lanterns shall indicate direction of travel.
49. ELEVATOR CAB
The cab manufacturer shall make provisions for ventilation inlets at the bottom of the cab
(concealed from Passenger’s view) and exhaust fan (concealed) at ceiling.
shall coordinate with electrical Quotationer to provide normal and emergency power and lighting
to each elevator.
50. EMERGENCY POWER OPERATION: AUTOMATIC SELECTION
The elevator contractor shall arrange to automatically return the elevators in absence of main
power supply to a pre-designated floor at full rated speed, on emergency power as battery
operated supplied by the contractor. This automatic emergency landing of elevator shall operate
after 30 seconds i.e. in case of DG supply not available.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
47 IL&FS Cluster Development Initiative Limited
ABSTRACT OF COST
S.No. Item Amount
(Rs.)
1.
Lift (Sub-head :I)
Total
(Rupees --------------------------------------------------------------------------------------------------------------
only}
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
48 IL&FS Cluster Development Initiative Limited
ABSTRACT OF COST
1. COMPREHENSIVE MAINTENANCE (Sub-head :II) Amount.
Comprehensive maintenance of lifts,
which include routine, preventive &
breakdown maintenance for period of
five years including repair /
replacement of work out items with
minimum down time & warranty &
guarantee of repaired / replaced items
after completion of one year of free
Guarantee period.
a) For the second year Nos. 1
b) For the third year Nos. 1
c) For the fourth year Nos. 1
d) For the fifth year Nos. 1
e) For the Sixth year Nos. 1
Note: The award of work for this item shall be carried out separately, if required. The same
Shall not be considered for the evaluation of Quotationer.
Spices Board/QC Lab /Lift / 15-16/ 02 Quotation inquiry for Supply and installation of Lift
49 IL&FS Cluster Development Initiative Limited
LIST OF APPROVED MAKES
S. No. Description Approved Make Approved Make
1. Lift as per specification JOHNSON, SCHINDLER, MITSUBISHI, KONE,
OTIS, THYSEENKRUP.
RAMP UP
RAMP UP
DN UP
UP DN
DN UP
UP DN
STIRRUPS
GREATER OF
COL. IN ELEVATION(TYP)
0.30L OR 0.30L1
Ld
+1
0d
Ld
+1
0d
IS
D
IA
O
F B
AR
.
LE
NG
TH
A
ND
d
DE
VE
LO
PE
ME
NT
WH
ER
E Ld IS
GREATER OF
0.30L OR 0.30L1
0.30L
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
DW1
OP1
RAMP 1 : 6
DD2
SW3
SW3
SW3
W3
SW3
SW3
SW3
SW3
COMPRESSOR ROOM5600 X 5500
D2
D1
D6D3
SW3
RS
D1
DD2
W3
W3
V
SW3
SW3
DD1
GENTSTOILET
WC1850 X 1250
D6
SIGNAGE
DD1 HALF GLAZED & HALF PANELLED DOUBLE DOOR 1800 x 2400
W31500 x 1400
SW31500 x 1400
STEEL WINDOW (cill= +1000)
V1
2250 x 600
VENTILATOR (ALUMINIUM) (cill = +1500)
OP1 OPENING 1500 x 2100
OP2 OPENING 900 x 2100
DW1 TOUGHENED GLASS DOOR WINDOW5500 x 3000
V2
750 x 600
W4
3000 x 1400
W5
3700 x 2800
DD2 HALF GLAZED & HALF PANELLED DOUBLE DOOR 1500 x 2400
RS ROLLING SHUTTER3000 x 2400
W21000 x 1400
ALUMINIUM WINDOW (cill lvl = +1000)
VENTILATOR (ALUMINIUM) (cill= +2100)
ALUMINIUM WINDOW (cill lvl = +1000)
ALUMINIUM WINDOW (cill lvl = +1000)
ALUMINIUM WINDOW (cill lvl = +100)
* Ground floor Doors D1/D3/D5/D6 to be made in steel
** Internal doors (marked on partitions) to be made as per partition drawings
V2
W2
V1
SW3
DD2
RAMP UP
UP
DN
UP
DN
DD2
HPLC / LCMS
AAS AND ICP MS
GC 2100x1000
GC
2100
x100
0
GC 2100x1000
GC 2100x1000
CH
EM
. S
TO
RA
GE
UV - VIS
CORRIDOR 2600 WIDE
5600 X 5500
W3 W4 W4
DD2
5500 X 5500
DD2DD2
DD2
DD2
DD2
DD1
DD1
D6
D6 D6
D6
D3
14600 X 9000
W3
W3
W3
W3
DD1
D5
OP1 OP1
2500x1200
LCMS
Acid Room
Unit
Balance bench
f
r
i
d
g
e
f
r
i
d
g
e
DD1
LCMS
2500x1200
LCMS
2500x1200
LCMS
2500x1200
HPLC
2500x750
HPLC
2500x750
HPLC
2500x750
HPLC
2500x750
2500x750 2500x750
LCMS
2500x1200
LCMS
2500x1200
HPLC HPLC
SERVER ROOM5600 X 2900
GC / GCMS8500 X 5700
DD2
fridge
LAB INCHARGE3100 X 5500
HPLC / LCMS6000 X 5700
D1
D5
f
r
i
d
g
e
f
r
i
d
g
e
fridge fridge
D6
Par
tition
Partition
Par
tition
PartitionToughened glassToughened glassToughened glass
Toug
hene
d glas
s
Par
tition
Par
tition Par
tition
Jali
Jali
D6
D6
D6
V2 V2V2
W3 W4
UP
DN DD2
UP
DN
DD2
C.S
.
tap
Water
GENTSTOILET
LADIESTOILET
EMERGENCYSHOWER &EYEWASH
INCUBATORSSTERILIZATION ROOMS
ANTEROOM
PCR, VIDAS etc
SAMPLE STORAGE
WORK SHEET PREPRATION
KILLING
WASHING
SAMPLE, MEDIA PREPARATION
BIO SAFETY CABINS
BIO-SAFETY CABINS
COAT CHANGE
STERILIZER
STERILIZER
5500 X 5700
CORRIDOR 2000 WIDE
CORRIDOR
9200 X 5500
2000 X 4100
DD2
W3 W3 W3 W3 W3
ANTEROOM2200 X 4100
11000 X 3500
8400 X 550014600 X 5500
DD2SAMPLE, MEDIA PREPARATION5700 X 3500
D6
D6
D6
WC1850 X 1250
WC1850 X 1250
D5
W3 W3
5700 X 8300
3300 X 5700
CHANGE1500 X 2000
1900 WIDE
STERILE CORRIDOR
D6
D6
CHANGE2000 X 1350
D27900 X 8300
DD2
4400 X 5700
DD2
6600 X 2400
D1
DD2
W3
W3
W3
W3
OP1 OP1
Incubator's
Incubator's
EXHAUSTSHAFT
SANITARYDUCT
D1
DD1DD1
DD2
DD2
DD2
DD2
DD2
DD2
DD2
DD2
DD2
D1
BACTERIAL
fridge
fridge
Incubator's
Incubator's
INSTRUMENTATION
DECONTAMINATION /
D2
D2
1800 X 1250D6
1800 X 1250 D6
TOILETHANDICAPPED
2100 X 1600D3
D5
WC
WC
CULTURES
Glaz
ing
D2
Toughened glass
Toughened glass
Toug
hene
d gla
ss
Partition Partition Partition Partition Partition
Par
tition
Par
tition
Par
tition
Par
tition
Par
tition
Par
tition
Par
tition
Par
tition
Partition
Partition Partition Partition
Toug
hene
d gla
ss
Partition
W3
EXHAUSTSHAFT
SANITARYDUCT
W3
V2 V2V2
Jali
Jali
UP
DN DD2
UP
DN
CORRIDOR 2500 WIDE
OP1
DD3
DD3
AHU OUTDOOR UNIT
11000 X 4000
DD3
CORRIDOR 2500 WIDE
UPS AND BATTERY ROOM
EXHAUSTSHAFT
SANITARYDUCT
DD3
W3W3
W3W3
W3
W3
FW1FW1
D4 D4
FW1FW1
D4 D4
W3
W3
D4
GENTSTOILETLADIES
TOILET
EMERGENCYSHOWER &EYEWASH
WC1850 X 1250 D6
WC1850 X 1250
D6
D5
EXHAUSTSHAFT
SANITARYDUCT
DD1
DD1
KITCHEN PANTRY AND STORE
5600 X 5500
W3
MULTI-PURPOSE ROOM
5500 X 8700
TRAINING ROOM
5700 X 11400
STAFF ACCOMODATION3500 X4000
BALCONY3500 X 1500
STAFF ACCOMODATION
BALCONY
STAFF ACCOMODATION3500 X4000
BALCONY3500 X 1500
STAFF ACCOMODATION3500 X4000
BALCONY3500 X 1500
D6 D6
OP2 OP2DRESSER
1800 X 2000
TOILET1800 X 3300
TOILET1800 X 3300
D6 D6
OP2 OP2DRESSER
1800 X 2000
TOILET1800 X 3300
TOILET1800 X 3300
DRESSER1800 X 2000
3500 X4000
3500 X 1500
DRESSER1800 X 2000
1800 X 1250
1800 X 1250 D6
TOILETHANDICAPPED
2100 X 1600D3
D5
WC
WC
750
22700
D6
D4
STORE2000X2000
D6
Toughened glass
Toug
hene
d glas
s
Toug
hene
d glas
s
BALCONY 2230 WIDE
SD1TERRACE TERRACE
EXHAUSTSHAFT
SANITARYDUCT
EXHAUSTSHAFT
SANITARYDUCT
V2 V2V2 V1 V1 V1 V1 W3
UP
DN
DN
DD2
~
C'
c:
LL
LL
c
I
TERRACE FLOCR -------
L•(+)17.000M.
THIRD FLOOR [T.O.C] -----------
L•(+)13.000M.
SEC(JllD FLOOR [f.O.G]
L • ( +)9. OOOM.
FIRST FLOOR [T.0.G]
= = ~
Q
Z::S: ~
= = ~
-------------------
L • ( +)5. OOOM.
PLINTH/GWJND FLOCR[T.0.G]
L•(+)1.000M.
C~· C·
~
2 3
OUTER R 1111 flfl:: '• H ::rs l\5UL11mN
NlllH Rc~lll," c;Hltlo -
4 5
Ac.'rLASllfl3~4¥F=~~ -----------+s~)-/ - c==t==
---- ;; -
I I I
~UZlllG I
I
-----11'' I,!®
I r~LJ L ~LLIN_;
------:-- \'1"\ •"""''1'"'"' • ,,., II",. '""'Iii I I I I I I I I I
______ L ____ _ I I I I
@ ® I ® I
11----+-++-RRCK W~ I
~" _,-J @!j
lN'l~C
cuoo1111; ci icrn
cc1m1c
',,~- rnlP CLRVED S-EET R~5'.D
G\ICK 'hALl
I I / ' c- - - - -1------+-;;~-
I "]'/ External lll3d
L• (±)0.000M.
BASEMENT FLOOR [T.O.G]
L • (-)2. 500M.
Q
~ '~
,---]
I
SCllIEIDUJJE
MARKITNG, MJRMF:'llR ~17'.JR
® cf.l:< LULU<I•
J5MSO<B "rnJhli.
@ W~B .35Dx~' Uf,GE 2DJxo
(@) w:s l5Dx5 Uf,GE 2DJxE,
@ W:B 45Dx5
r-~~,C;E 22'.JxE,
TCP OF LI FT ROOM [T.O.C] -------------
L•(•)19.000M.
TERRACE FLOCR
L•(+)17.000M.
= = = C""''I
~: = ~
THIRQ i:_u:o.Rj~Oc_C]_ __
L•(+)13.000M.
SE(;(}.lp _FL_(X)~ [T(lC]
L•(+)9.000M.
FIRST FLOOR [T.0.G]
L • ( +)5. OOOM.
= = ~
Q (_--::-;.
~
PLINTH/GROJND FLOCR[T.O.C]
L • ( +)1. OOOM. -1
I
I ' ' lntsrnal103d_ __________ -~cc-_cc L • ( +)0.750M. ~,
External lll3d
L• (±)0.000M.
,---1
I -~
= = ~') ("""",J
,--' BASEM_B'l_T_FL_(X)~[T.().(;j __ - - ~
L•(-)2.500M.
MARKITNG
@)
@
@
SCllIEIDUJJE
MJEMB'ER SIZJE 3::<:< COLU<I•
.io~dcA),~ n111Jhk,
W'R ,J50x5 Uf,GE 2DJxE·
W:B l5Dx5 '-.If.CE 2DJxo
W:B 45DxS r_,\~,CE 22~xb
I ,,>'
-----~L~~~~=J___ 11 I I I
I I I ~· " ,
'
I
2!!10 2LIO
' /r
fl_' \ D ) __ _/
~/00 J /DU
. I
If I 00 [C/C o- STEEL COLIJM1]
/1, ( c ) __ _/
.... ~ I B \I \'- - j/
!J/OJ . I
~ '
~ ( A ) ~/
PC c. CQLU~fl
[4c; p ~r rivll ri~~n (
MAIN FRAME CROSS SECTION ALDNG GRID ~ 1
LIFT Gill FD' m!D-2 ~--RCCDmG
OUTER POl)Flf- c s-rns '-_/,
mm w~1
K" FLASfll.t: lllllER ROOCllJG :l-EET'. HI 1 !1
1:•1IH :J.110ER1tlEnTDEEc1i1rnRMcoJ
I I I
\\ \ \ r-- mi' CURVED 'HEEi ',, I -
1G\
"""" : ' ' ' 1lim==I j -----+--- \ln c~:uH:ti: f ~ f !i:_tt:m: f f al+ mltl:i 1 Ill :itd I
0 0 0 ~ ® OC!----+-++--RP~k W~ I
JJ·il~C
C UIXI llJG 'HEET5 GLl\ZNI: I rn lll"', Ill wlll,.,J _____ _j--'-'-F=-=+I! I,., , • • "' :I "" ' ' ' ' ' I' w.:i::. I I I I .:l:.J1i.::t:. I -I -.1 I .::i::.m.:i::. ---+ltt-11 - • J:!IT:J I I 1:1AllllC
I I~ w lnOmrr RU SIN1 )
1 FLOOR Fl~ SH
I l / > _____ _J _______ ,~~-:___
I 1,,_///
I I
@>-_/ i
I
,.!Fl!IP 00\l ll Tl B\1ENEllT f_OC1\
~ ,'@
~ I /f D~TAITL-1
------l------T--1 I Ii I I ~ I I t
o.lO~' I c4rn I
2510 2L I 0 5700 571JD i. . . /1~70:J [
/! /1
'[ ;b1 oo [c/c o- STFFI coi u:~J I f I I i I .
~:n) (c) (B~) (A2) Ci~)
~ DECKl~c; SHEIT
~ rnlP CLRVW s-rn R=:l'.0
BllCt'MLL
R.C.C rnLU~fl
lio Per Civil ~'l ol_
MAillN FRAME CROSS SECTION ALO'JG GRID- 2 AND 3
2 3 5
'" a g Ii] 11 12
Il001llb18ll~ :'flJ. :~ FM=IE6=31 DRAWING CROSS REl'EIRENCJE:
Rio.,.,iiirnr_ N[. -- I oo IXITEF RIJclflllG 'iHEETS
lllSJL\Trnl
llf ,lH kl:DI I ~l: If ltl S
Effo~ti-ve :Frnm ~- (]l..0-H-Z::Hz "Jrrr'lwin~ Nri: !Rf'l!V. n8!iM'ip1iJ~',1
Pa,glf' No_ ,_ (])Jl llJ::<' D~ LJ.~[}[}~ H2: CENILII. ,\J!RM{{;D[I<J []pJ..\lf[NC C.F fL DO][ Pr..lN t..1' 11] l.2DDMJ. :WL]
~A-Doi H> CINJL\L IJ!&lili;Jlll[ITT ar,1wrnc f.F TI.00[ ru!I !ml f.F J'LOOR l~\l!JNC U[ 11 111 s.2m. M]
TERRACE FLOCR --------
L•(+)17.000M.
= ~
THIRD FLOOR [T.QC] ----------
L•(+)13.000M.
0 6 ~
ICP -IASllllG
.. q
CIA5S ~"l·EL
c c cc
110 i ', '@)
11-.l~L lllUll~ .~- rn~P Ci.FvE[ SH:ET
= ~ (®
111-~----+-r-f--FRICx VIAi I
------:----- H\ """rn'"" • "'"lllmee , , ""'"llil .. "" ~I, ... 1~1 I I I I I I I I
CLN'Jf,C
~~~~MCX)R_~~C[_ - - - - - - - -+------~ -----I I
Wrntl [ SI rn~
FIRSTFLOOR[T.O.q
= = ~
-------------------
L•(+)5.000M.
PLI NTH/GROJ ND FLOCR [T.QG]
L•(+)1.000M.
0
8 "¢
I
I
I = ~
L c"
I
----1--1 iS RAJ_J NG 1 ·~rn i CLISS l'AN IL
: ______ ~ 1@ 1r
0
'@ = = = ~
GU1ZIN[
I lillW ~~~mFl:~1; SLA8
@
~ CECkll.t: SH :Cf
'~- J11 \P CURVED SHU R~5m
Internal lll3d
L•(+)0.750M.
Elternal lll3d 0
SS
I / / ,-----~----- ~/l~OoL -
-----~r~~~==1-- 11 I I 1
1l~' DOWN -o Eftt~EllT lDCR = = = N
~+--.+-+--- R(C BEm ~ cl/1B [~s Psr Cr.ii Dcl1il]
L• (±)0.000M. '~
,---
BASEMENT FLOOR [T.QG]
L~ (-)2.SOOM.
' I
SCHEB U~E
MARIKTINI:
<® ({]? ,""Y
(iU' J
L~(+)17.000M.
THIRD FLOOR [T.QG] ----------
L ~ ( +)13 .OOOM.
SEC(JllD FLOOR [T.QC]
L•(+)9.000M.
lVI\ Mlfllf:IR ~ITZlf:
~l)X CULUNIJ J5D,JSIJ,B mm.Thx.
wrn J51Jx: FIAIJGE 2GD:d
wrn J51Jx: FIAIJGE 28D:d
WEB 4JDxo FLPJ~GE 2.2~i:<3
= 8 "
g ~ ~
~
Fli=IB.'f ~LCXJ_Rl~O_:_C]_ _________ _ L•(+)5.000M.
PLI NTH.IGROL ND FLOCR [T.QC] 0 ,_., ~
L•(+)1.000M.
E>d:ernal road
L~ (±)0.000M.
---1 I I L __
___ _j g uo N
,---' BASEM_EN_T_A,.Q1~[T,<l(;]_ - - - J
L~ (-)2.SOOM.
SCHEI: U~E
MIARIKTING &'JE MIBJl:JR SITZE
<@ BO:X: CCILIJNr·~
JJlhJLJJx~ mini h~.
@ WrB ,i5Dxc FIAIJGE 2JDd
(5°\) WEB 351Jx~
FINJCE 2JD:d
@ wrn 45Dx:
FINJCE 22S:d
6
ICP
: I I I I " ' ;
i i I I i
I ' I ' : 2J 0 i, 241G I C'/OJ • J/UI) I/ ~/JU : 1 1 '] I I lflOJ [C/C Ct SEEL COLUM~11
1 J_ (c'~ ( B ') A ~-~/ '-__j/
MAIN FRAME CROSS SECTIOI\ ALONG GRID~4
GIJTEF R0cJ FlllG SHEETS
lflSJUTrnl
Fl-.liE IEIU II C
SS R.Ut WIH ~ rv "'----{~·
= = F~
CIASS WH
R~.c. cnm [As P"r er.ii nehil]
- - - - - -:----- t o/lt f Ill 111 I ~I I 1~- ~---------&± .- 1t M fE ~ • • ill "" nt= '-= .- Ml I I I I I I I I
K 0 ILASHJf,i;
i------GL/iZll,~
I I !I I IOOnm. RC SLAB
r+++i 1---. - F ,XR FINIS1
' ----r-'"' ~AJ_JN~ I ~ I H
1 ·:LISS PAIFL
: I : I! WI I~
!l'\_~0; = = F>j
------ ---;;:-
-----+-----~ -::;;~"--"' : /r = =
'~ Dr TAil-1 - - - - - - t- - - ----,-- -11=~::::::::::::::::~=
: I ""'==""'"=--<'
I '
I I I '
I "c 0 J "4 I' ~/ j_,.J U . / l_ lr
I
'
I l S70J t 570D l 57Jl1 I ' I r10J !CIC 1.:t )lclL COLUMrfl ' ~ ' ~
I I I i /-------.,, /-----.., /~ /~
1,E) (,s C~J ~~J
~- CCCkllf; Sll::r
R(C. O[!W & clAO [As Pei Cr.ii DrlJil]
Rc,c cnm [~c P·Jr Cr.ii Dcl1il]
MAIN FRAME CROSS SlE CTION ALONG GRID - 5
a g Ii]
J;A~Lll.KJ R2: I ~DU.LU. Mi~tJ!Mlitn llli.WlNt.;- :sJ· n1ro~ ~,~ ANJ.t sY Jill11~ n\.MJN~ !J~l.M JJ [+-' !l.~~~-~. llYJ.]
t;.A~LHH
b-J.-[i[)l5
b-J.-0[)l6
b-J.-O[)l?
R2: ~.DU.LU. iU!~1dililllitfJ llli.WlNt.;- ).~· n1ro~ ~j~ ANll JJ' Jill11~ nutJN~ [J~l.M 11 (+-' ~;J.~~U.I!. ll....-J .] I q
R2: Q-ENILIL AJW .. ~TrlrllJ[WJ rnlAll'OW- ~C1J:F ~IlAN illll l!lllJI ~Jtlilll'JG J'L.\N AT Tl~ IIThJJ lIHVI!lL
R2: c.EJ'UL11 AJ!RANfrlrll:[&'J []J!Al!IOJtJ. -1.U.rn OOlUfH rnJ3S-j~cmnrn1
H~ C.El'ULIL AJ!R~Trll'll:K&'J []1.Alj\'[}J[). -!LJ.[N IJIJl..\ME UIJ3S-j~cmnrn1
b-1.-0IJlB R<: I c.nn M AJ!RANm.Kli[tfl rnlA'llOltJ. -mm .llLE ~i1~noN1i1
hli.-0[)l9 R2 I CI~N1:t!l AJ!RAN°~[NJ [lli_'lf[}lt} :~rm mt~VAT:mf.l 1NIT ]~i\'IU!l]
l}J..-010 I R[)l I cD'ln .!l AJIRMOI'll:IT[f] aHA'!'iCNC :s~Jrl! CJ.s11illilN.!:n:mNT1NIT nrnm:::J OA-DL I RO I ~ml.IL IJ!llMlill!llITT c111rnrnc 'S1A~ C!SI IJ!RolN!;rn!liT ill[ ]E!Af~]
GENERAL NOTES: ~ 11. AU. lll l Mll:N:J l lJN~ ~.H.": llN morn !'< Al.II. 11.11:vr:u, AHE llN 1\111:". [ll,N.U]
2. ONLY 1\TIITnTIEN []]MENSIONS Sll!A[L III: FOLLOWED ANJIJ JIJlUWINGS SHALL
'-'OT llllE SCAUD ?iJR OB1rATINTING A_'fV DTIN'EKSIONS
::'. AlPPROVA~ ON THESE ~ •. A IDP.AWI:i'GS TV EE GIVE.'! AS PER 1r~E PURCWASE ORDER.
4. nl!E "AlllllIL4T]()N AND l!:llllEC'll']()N TOUEIL4NCES SllAU !llE FOLWVfE D
AS PEIR S:lCrlO'I JV-9 (JF MEMA-19~6
" nl!E \JAXHW.\! ,ERMISS!llllE [iEYIATION OF C'OLIJMN ALIGNl£ENT SclALL Bl!: RES~lll!CUID ro 11/ollD
tlCLI II ED Bu\~
CINIECTIOll PLATE
H rn ~;mrn::TH scu; ~/ BRACKET --
rnx ;~11 ~IJ
SS PAILJl,G WITH CliS~ rAIR
0 ~ ~
~ 'D 0
illt·'·nF::JIER P~\TE [Ty~] / _P_LJ~"fH____ 1111111 II I " L~(•)1.000M. -~ ---r i ,,, · 1 ~
Internal road ~J Bl& Ull ' -L.-~o]ooM.--- --------
--+--- R.C.C CGLU•llJ
[As r•er ri1il l:itn I]
DlE TAIL-A
[SSllED FOJR A.P P ROVA.L SC:IH OJ,
Jrl U~UH IL; :OCl-lLJLJLl I HI~ f'~UJlC J\I I Hl MU:O cHIC U' I ~~ANl'~ER. RETU RI~ THESE DIJCJ MEIHS . MARJ-< ED WITH YO UR CDl.o1M EIHS
WITH lfJ TWD WFCK~ FRCW -HF ARil'JF M Flfl D\I m nATF
Al'd c WlrJ CES MADE AFTER APPROVAL OF THESE DPA'Nll'JCS cll\Y CELJ\'Y
11-l fA~C:ICAI LJJ·J AIJU UlLIVlK'i f'~U~l:O:O.
Tl-ESE 0=(.l\Wll'IGS A,RE r~CT FDR C!JrlSTRUCTJIJ 'I
D .l\PPF:D'JED llD CHl\J,ICES. FRCCEED WIT-1 FABRI CATJ:::ll'J.
2. D .l\F'PRDVED AS r10TEC FABRICATJJrl fMY' "RC,CEED OIJ THE BASIS OF CCI Re F·~Tl;JrJ:~ l~DICA-rn
J, LJ rJOT APP RCVEJ , Re-SUBMIT FO F APPROVAL, ~ ::----c:;ooo :~R
RC:'JIEWED BY ~
R2. I lR:l"vliiirf'"'11
Rt. I lR: l" Viliirf'"i1
TI'.:ev
Pl'ojel:':l~
cn_~~nt:
Archibeq:;C,;
Cuu ~ulLtiaL
0l'<1.wL1ig Til,~_,:
l~Al~F
SIGrJATUR E JATE
P'""" l" .:nr'h't l" d <PrllTl!ll'll<"'ir+ .T::>lp't">llll<:."il"hi I "R:?ihy 'T'h rnllll>i~ I flR, ll."'i ?<lli1 fr,
P'rf'" l" .. 1nr-h-t l" d tPrllTl!ll'lll"irt .T~iJb't">lllli-:."ll"hi I °R:?i h y 'T'h nTinl>i~ I :!'::\ r'l4 ?ifll1 :"!>
IDtEscF[Jl}UIJOJ N<1_m-e C:'ll'O'Cb2r:fL
JE=tE,7:TI:S::TI:OI-....:rS
qlTALT TY IF:VAUJATHPN LAIRORATORY
cUM Tl(AJNING CENT[ifl, AI' iflWJ' -~u. n ~ L~4, _\ll[JIJC
I'TC INITJUSTRIAl AREA , VIIL:icGE~l\AVI l\lrMIBAI
SFICES IBOlllllD Mini~try af Cl!}=m1En::e Ellfilr:ll IndlU:Dslb-les,
Govt oi [tr_d:iici
TEE NOVARCJH A1J<tf' hH-<Fofr~ & 1Rngl11Ff'll"~
TT c\cll'~ CUT~f;;R DRVll\T.OP\ITF:N'r [Nff~lA~fVIB LlM!nED
GENERAL .ARRANGEMENT DRAWING [IWN PlW(B CBOllS-SllCJION81
DC1J-te-
D Everest Industries Limited ES:BS Illivh:b1m,Ge-n<f'3i:3:,A-32,~ITohan Co -o]p~tfativl!" Indluisii:riiail_ E3:i:l:dl!",
Mmllhur.a Rin.arl,~e-w illlelhl-11~1'.Lld.- [l &l!Hli]
]d,; -B-'8l1-1:ll-4:ll'J3195:ll-5~ . lF1ll:x.; +91L-[JL-4-056ifi.370
W:o,b3iiJl:E" ; ~ .... ,....w.:iovereOi1ti:md.~o=
m
0
w
LL
('.;
I [trn_w:m by: I Jfa:fp:O"aik®..31h ISc[ll]e: l : 175 I :Jsd:e: 12- 04.20 ~5 I I IR<evii ~ iion~
R2 Pn:ij<r:d: N::i; I :J:n-m1ring N o;
EoIBS/Il'B-OHog :0'.. 01. 0! GA.-':•il o
o,ecilrc"1 Thy 3~1:y Thom.~B
[~ !!! llgn lby: Vik:i.sh
NO TE:-JL . AillL ril§:h_lb3 tr1E5l:r:trVE"<rll. 1J'fuisi dltrR11o:<irrB; c onb1in~ proJFirie-ft-a::-y linf-::itr:::n-a--:.iu:m \'!j(hiich is.i
prD1e<Cte{]] by CD]lJFl~:t~t. He pa.rt D! LllllE a~-aw:D:ng rnai y Tue r<B[!l"-Odu<Ced, ltF&llJJs] at,:;d illl l':11ncp11t'"n· lfl111eung_., , 11r -.1 ·0: 111s:;1111iitt"'~~ in .riny Ff1>Yrn1 wJ11a tc;,J~v..,n· 11r:t.hrin~. t J11"' pninT ~T'-t.h=m '~llii-11c;i~rrnit nif FVFRE~T ]NIDH~1f'Rrn~ ~lMTllll'Fllll
11 12 SHEEr SIZE-c.2
FIRST FLOOR [T.O.C]
Internal road
Lvl (+)5.000M.
External road
SECOND FLOOR [T.O.C]Lvl (+)9.000M.
THIRD FLOOR [T.O.C]Lvl (+)13.000M.
TERRACE FLOORLvl (+)17.000M.
Lvl (±)0.000M.
PLINTH/GROUND FLOOR [T.O.C]Lvl (+)1.000M.
Lvl (+)0.750M.
FIRST FLOOR [T.O.C]
Internal road
Lvl (+)5.000M.
External road
SECOND FLOOR [T.O.C]Lvl (+)9.000M.
THIRD FLOOR [T.O.C]Lvl (+)13.000M.
TERRACE FLOORLvl (+)17.000M.
Lvl (±)0.000M.
PLINTH/GROUND FLOOR [T.O.C]Lvl (+)1.000M.
Lvl (+)0.750M.
MUMTY LEVEL [T.O.S]Lvl (+)17.750M.
TOP OF MUMTY [B.O.S]Lvl (+)19.950M.
FIRST FLOOR [T.O.C]
Internal road
Lvl (+)5.000M.
External road
SECOND FLOOR [T.O.C]Lvl (+)9.000M.
THIRD FLOOR [T.O.C]Lvl (+)13.000M.
TERRACE FLOORLvl (+)17.000M.
Lvl (±)0.000M.
PLINTH/GROUND FLOOR [T.O.C]Lvl (+)1.000M.
Lvl (+)0.750M.
MUMTY LEVEL [T.O.S]Lvl (+)17.750M.
TOP OF MUMTY [B.O.S]Lvl (+)19.950M.
FIRST FLOOR [T.O.C]
Internal road
Lvl (+)5.000M.
External road
SECOND FLOOR [T.O.C]Lvl (+)9.000M.
THIRD FLOOR [T.O.C]Lvl (+)13.000M.
TERRACE FLOORLvl (+)17.000M.
Lvl (±)0.000M.
PLINTH/GROUND FLOOR [T.O.C]Lvl (+)1.000M.
Lvl (+)0.750M.
Lvl (+)19.000M.TOP OF LIFT ROOM [T.O.C]
Lvl (+)19.000M.TOP OF LIFT ROOM [T.O.C]
DOOR
1
5
11
21
913
17
22
25
31
41
2933
37
45 43
46
49
55
65
5357
61
6967
70
73
79
89
7781
85
9391
1
5
17
13
9
21
25
29
33
37
41
45
49
53
57
61
65
69
73
77
81
85
89
93
FIRST FLOOR [T.O.C]Lvl (+)5.000M.
Lvl (-)2.500M.BASEMENT FLOOR [T.O.C]
SECOND FLOOR [T.O.C]Lvl (+)9.000M.
THIRD FLOOR [T.O.C]Lvl (+)13.000M.
PLINTH/GROUND FLOOR [T.O.C]Lvl (+)1.000M.
FIRST FLOOR [T.O.C]Lvl (+)5.000M.
Lvl (-)2.500M.BASEMENT FLOOR [T.O.C]
SECOND FLOOR [T.O.C]Lvl (+)9.000M.
THIRD FLOOR [T.O.C]Lvl (+)13.000M.
PLINTH/GROUND FLOOR [T.O.C]Lvl (+)1.000M.
21
41
65
89
9
29
53
77
93
BASEMENT FLOOR [T.O.C]