8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
1/15
INFORMATION HAS BEEN REMOVED
FROM THIS DOCUMENT FOR
PRIVILEGED TREATMENT (18 C.F.R. § 388.112)
June 1, 2015
Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, N.E.Washington, DC 20426
Re: Tennessee Gas Pipeline Company, Docket No. PF14-22-000 Northeast Energy Direct Project
Supplemental Filing -- Compressor Station Locations
Dear Ms. Bose:
On September 15, 2014, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) filed a
request to use the Federal Energy Regulatory Commission’s (“Commission”) pre-filing proceduresfor the proposed Northeast Energy Direct Project (“Project”). By notice issued October 2, 2014, the
Commission approved Tennessee’s request to use the pre-filing procedures for the Project. As part
of the pre-filing process, Tennessee submitted drafts of Resource Reports 1 and 10 for the Projecton November 5, 2014, with an updated Resource Report 1 filed on December 8, 2014. On March
13, 2015, Tennessee filed a first draft of Environmental Resource Reports 1 through 13
(collectively, “Environmental Report”) for the Project.
In the March 13, 2015 draft Environmental Report, Tennessee noted that it would fileupdated information with the Commission regarding the locations of the nine new compressorstations proposed for the Project. With this filing, Tennessee is now providing the following
information regarding the specific locations for the nine proposed compressor stations:
Proposed Compressor Station Locations
Station
Name
Location
(Town,
County, State)
Facilities to be
Installed
(anticipated)
Estimated
Acreage of
Compressor
Station Site
Total Property
Acreage to be
Acquired
(approximate)
Property Acquisition
Status
Supply
Path HeadStation
Town of New
Milford,Susquehanna
County,
Pennsylvania
Two compressor
units
Compressor building
Ancillary facilities
10 acres 86 acres Option to Purchase
Agreement executed
20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
2/15
Federal Energy Regulatory Commission
June 1, 2015
Page 2
Station
Name
Location
(Town,
County, State)
Facilities to be
Installed
(anticipated)
Estimated
Acreage of
Compressor
Station Site
Total Property
Acreage to be
Acquired
(approximate)
Property Acquisition
Status
Supply
Path Mid
Station
Town of
Franklin,
Delaware
County, New
York*
One compressor unit
Compressor building
Office building for
Tennessee personnel
Ancillary facilities
10 acres 117 acres Option to Purchase
Agreement in
negotiation
Supply
Path Tail
Station
Town of
Schoharie,
Schoharie
County, New
York
One compressor unit
Compressor building
Ancillary facilities
10 acres 91 acres Option to Purchase
Agreement executed
Market
Path Head
Station
Town of
Schoharie,
Schoharie
County, New
York
Two compressor
units
Compressor building
Ancillary facilities
Metering facilities
10 acres 64 acres** Option to Purchase
Agreement executed
Market
Path Mid
Station 1
Town of
Nassau,
Rensselear
County, NewYork
Three compressor
units
Compressor buildings
Ancillary facilities
10 acres 142 acres Option to Purchase
Agreement executed
Market
Path Mid
Station 2
Town of
Windsor,
Berkshire
County,
Massachusetts
Three compressor
units
Compressor buildings
Ancillary facilities
10 acres 89 acres Option to Purchase
Agreement executed
Market
Path MidStation 3
Town of
Northfield,Franklin
County,
Massachusetts
Three compressor
units
Compressor buildings
Ancillary facilities
10 acres 242 acres Option to Purchase
Agreement executed
20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
3/15
Federal Energy Regulatory Commission
June 1, 2015
Page 3
Station
Name
Location
(Town,
County, State)
Facilities to be
Installed
(anticipated)
Estimated
Acreage of
Compressor
Station Site
Total Property
Acreage to be
Acquired
(approximate)
Property Acquisition
Status
Market
Path Tail
Station
Town of
Dracut,
Middlesex
County,
Massachusetts
One compressor unit
Compressor building
Ancillary facilities
Metering facilities
10 acres 29 acres Option to Purchase
Agreement executed
Market
Path Mid
Station 4
Town of New
Ipswich, New
Hampshire
Two Titan 250
turbines; one Titan
130 turbine
Compressor building
Office building forTennessee personnel
Ancillary facilities
10 acres 165 acres Option to Purchase
Agreement executed
* The proposed Supply Path Mid Station will be located on property to be acquired in the Town of Franklin, Delaware
County, New York. Tennessee will also be acquiring an adjacent property in the Town of Otsego, Otsego County, New
York to serve as a buffer area. The site of the proposed Supply Path Mid Station will not be located on the property
located in the Town of Otsego.
** In addition to the property (47 acres) for which an Option to Purchase Agreement has been executed for the Market
Path Head Station, Tennessee is in negotiations to purchase an adjacent property (17 acres) to serve as a buffer area.
Aerial maps depicting the exact locations of the proposed nine new compressor stations to
be constructed as part of the Project are attached to this filing. These aerial maps show a one-halfmile radius around the total property boundary where the compressor stations are proposed to be
located.
With the specific locations of the compressor stations selected, Tennessee is continuing the
detailed design of the compressor stations and specific facilities to be installed at each new
compressor station location. More detailed information about these proposed compressor stations,including preliminary plot plans for each new compressor station, will be included in the next draft
Environmental Report, which Tennessee will submit in July 2015.
Also attached are lists of those landowners that are located within the one-half mile radius of
each of the property boundaries where the new compressor stations are proposed to be located.Tennessee respectfully requests that the landowner lists be accorded privileged and confidential
treatment, pursuant to Section 388.112 of the Commission’s regulations, 18 C.F.R. § 388.112(2014). Accordingly, the landowner lists have been marked “Contains Privileged Information - Do
Not Release.” Copies of this filing, except for the privileged information, will be provided to the
identified landowners.
20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
4/15
Federal Energy Regulatory Commission
June 1, 2015
Page 4
In accordance with the Commission’s filing requirements, Tennessee is submitting the
original of this filing to the Commission’s Secretary. Tennessee is also providing two complete
copies of this filing to the Office of Energy Projects (“OEP”).
Respectfully submitted,
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
By: /s/ J . Curtis Moffatt
J. Curtis Moffatt
Deputy General Counsel and Vice PresidentGas Group Legal
Enclosures
cc: Mr. Rich McGuire; Mr. Michael McGehee; Mr. Eric Tomasi (Federal Energy Regulatory
Commission)
20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
5/15
Tennessee Gas Pipeline Company, L.L.C.
Northeast Energy Direct Project
Docket No.
PF14
‐22
‐000
June 1, 2015
Compressor Station Locations – Aerial Maps
20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
6/15
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
7/15
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
M e a d
o w S t
S t
D r af t T Ln
W a y m
a n D r
M a r i o
n L n
CR
M e d a l l i o n D
r
S t
W e l l s Bridge
O t e go Rd
F l ax I s l and R d
D o w n
e y R d
B i s s e
l l R d
C h a m b e r l a i n H i l l R d
V a n
T a s s
e l l R d
H e n r y E d
w a r d s R d
S t e w a r t
R d
O t e g o R d
Fr anklin
Moun tain Rd
C R 4 8
ST357
ST7
§̈¦88
TOWN OF
OTEGO
TOWN OF
OTEGO
TOWN OF
SIDNEY
TOWN OF
FRANKLIN
OTSEGO
COUNTY
DELAWARE
COUNTY
LOC.:
CKD. BY:
DRN. BY:
ENG.:
SCALE:
DRAWN BY:
DWG NO.
REV.:
TENNESSEE GAS PIPELINE COMPANY, L.L.CNORTHEAST ENERGY DIRECT PROJECT
W.O.:HMM HMM 05/22/2015
HMM GRAPHIC SCALE ---
DELAWARE & OTSEGO COUNTIES, NEW YORK
SUPPLY PATH MID STATION
REV. DATE:
PAGE: 2 OF 9
0 2,0001,000FT
06/01/2015
!( RESIDENTIAL
!(
OTHER STRUCTUREPROPOSED NED PIPELINE
EXISTING TGP PIPELINE
HALF MILE BUFFER
PROPOSED COMPRESSOR STAPROPERTY BOUNDARY
MUNICIPALITY BOUNDARY
COUNTY BOUNDARY
STATE BOUNDARY
³
3
Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics , CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid , IGN, IGP, swisstopo, and the GIS User Community Imagery Year: 2013
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
8/15
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
9/15
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
10/15
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
11/15
!(
!(
!(!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
O l d R o u t e 9
S t
F r a
r y R
d
H i g
h
S a
i
n t
H i l
l R d
P i e r c e R d
P e r u
R d
H u m e s R d
E W i n
d s o r
R d
B e a u m a n R d
N o b o
d y s R
d
N o b o d y s R d
E W i n d s o r R d
ST9
TOWN OF
HINSDALE
TOWN OF
PERU
TOWN OF
WINDSOR
BERKSHIRE
COUNTY
LOC.:
CKD. BY:
DRN. BY:
ENG.:
SCALE:
DRAWN BY:
DWG NO.
REV.:
TENNESSEE GAS PIPELINE COMPANY, L.L.CNORTHEAST ENERGY DIRECT PROJECT
W.O.:HMM HMM 05/22/2015
HMM GRAPHIC SCALE ---
BERKSHIRE COUNTY, MASSACHUSETTS
MARKET PATH MID STATION 2
REV. DATE:
PAGE: 6 OF 9
0 2,0001,000FT
06/01/2015
!( RESIDENTIAL
!(
OTHER STRUCTUREPROPOSED NED PIPELINE
EXISTING TGP PIPELINE
HALF MILE BUFFER
PROPOSED COMPRESSOR STAPROPERTY BOUNDARY
MUNICIPALITY BOUNDARY
COUNTY BOUNDARY
STATE BOUNDARY
³
3
Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics , CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid , IGN, IGP, swisstopo, and the GIS User Community Imagery Year: 2012
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
12/15
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
F l a g g
R d
P r a t t
H o l l o w Rd
M a p l e S t
O l d
W e n d e l l R
d
S Mo u n t a i n R d
S
t
O l d W e n d e l l R
d
G r e a t
S w a m p
R d
C o l l e r
C e m
e t a r y R d
N e w P l a i n R d
L y m a n R d
White
A l e x a
n d e r
H i l l R
d
G u
l f
R d
O r a n g e
R d
TOWN OF
NORTHFIELD
TOWN OFWARWICK
FRANKLIN
COUNTY
LOC.:
CKD. BY:
DRN. BY:
ENG.:
SCALE:
DRAWN BY:
DWG NO.
REV.:
TENNESSEE GAS PIPELINE COMPANY, L.L.CNORTHEAST ENERGY DIRECT PROJECT
W.O.:HMM HMM 05/22/2015
HMM GRAPHIC SCALE ---
FRANKLIN COUNTY, MASSACHUSETTS
MARKET PATH MID STATION 3
REV. DATE:
PAGE: 7 OF 9
0 2,0001,000FT
06/01/2015
!( RESIDENTIAL
!(
OTHER STRUCTUREPROPOSED NED PIPELINE
EXISTING TGP PIPELINE
HALF MILE BUFFER
PROPOSED COMPRESSOR STAPROPERTY BOUNDARY
MUNICIPALITY BOUNDARY
COUNTY BOUNDARY
STATE BOUNDARY
³
3
Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics , CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid , IGN, IGP, swisstopo, and the GIS User Community Imagery Year: 2011
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
13/15
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
14/15
-
8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations
15/15
Document Content(s)
NED_CSLocations_Update_FERC(June 1, 2015).DOCX........................1-4
NED_COMPRESSOR_STATION_MAPS_rev3_06-01-2015....PDF....................5-14
20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM