  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    1/15

    INFORMATION HAS BEEN REMOVED

    FROM THIS DOCUMENT FOR

    PRIVILEGED TREATMENT (18 C.F.R. § 388.112)

    June 1, 2015

    Kimberly D. Bose, Secretary

    Federal Energy Regulatory Commission

    888 First Street, N.E.Washington, DC 20426

    Re: Tennessee Gas Pipeline Company, Docket No. PF14-22-000 Northeast Energy Direct Project

    Supplemental Filing -- Compressor Station Locations

    Dear Ms. Bose:

    On September 15, 2014, Tennessee Gas Pipeline Company, L.L.C. (“Tennessee”) filed a

    request to use the Federal Energy Regulatory Commission’s (“Commission”) pre-filing proceduresfor the proposed Northeast Energy Direct Project (“Project”). By notice issued October 2, 2014, the

    Commission approved Tennessee’s request to use the pre-filing procedures for the Project. As part

    of the pre-filing process, Tennessee submitted drafts of Resource Reports 1 and 10 for the Projecton November 5, 2014, with an updated Resource Report 1 filed on December 8, 2014. On March

    13, 2015, Tennessee filed a first draft of Environmental Resource Reports 1 through 13

    (collectively, “Environmental Report”) for the Project.

    In the March 13, 2015 draft Environmental Report, Tennessee noted that it would fileupdated information with the Commission regarding the locations of the nine new compressorstations proposed for the Project. With this filing, Tennessee is now providing the following

    information regarding the specific locations for the nine proposed compressor stations:

    Proposed Compressor Station Locations

    Station

    Name

    Location

    (Town,

    County, State)

    Facilities to be

    Installed

    (anticipated)

    Estimated

    Acreage of

    Compressor

    Station Site

    Total Property

    Acreage to be

    Acquired

    (approximate)

    Property Acquisition

    Status

    Supply

    Path HeadStation

    Town of New

    Milford,Susquehanna

    County,

    Pennsylvania

    Two compressor

    units

    Compressor building

    Ancillary facilities

    10 acres 86 acres Option to Purchase

    Agreement executed 

    20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    2/15

    Federal Energy Regulatory Commission

    June 1, 2015

    Page 2

    Station

    Name

    Location

    (Town,

    County, State)

    Facilities to be

    Installed

    (anticipated)

    Estimated

    Acreage of

    Compressor

    Station Site

    Total Property

    Acreage to be

    Acquired

    (approximate)

    Property Acquisition

    Status

    Supply

    Path Mid

    Station

    Town of

    Franklin,

    Delaware

    County, New

    York*

    One compressor unit

    Compressor building

    Office building for

    Tennessee personnel

    Ancillary facilities

    10 acres 117 acres Option to Purchase

    Agreement in

    negotiation

    Supply

    Path Tail

    Station

    Town of

    Schoharie,

    Schoharie

    County, New

    York 

    One compressor unit

    Compressor building

    Ancillary facilities

    10 acres 91 acres Option to Purchase

    Agreement executed 

    Market

    Path Head 

    Station

    Town of

    Schoharie,

    Schoharie

    County, New

    York 

    Two compressor

    units

    Compressor building

    Ancillary facilities

    Metering facilities

    10 acres 64 acres** Option to Purchase

    Agreement executed 

    Market

    Path Mid

    Station 1

    Town of

     Nassau,

    Rensselear

    County, NewYork 

    Three compressor

    units

    Compressor buildings

    Ancillary facilities

    10 acres 142 acres Option to Purchase

    Agreement executed 

    Market

    Path Mid

    Station 2

    Town of

    Windsor,

    Berkshire

    County,

    Massachusetts

    Three compressor

    units

    Compressor buildings

    Ancillary facilities

    10 acres 89 acres Option to Purchase

    Agreement executed 

    Market

    Path MidStation 3

    Town of

     Northfield,Franklin

    County,

    Massachusetts

    Three compressor

    units

    Compressor buildings

    Ancillary facilities

    10 acres 242 acres Option to Purchase

    Agreement executed 

    20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    3/15

    Federal Energy Regulatory Commission

    June 1, 2015

    Page 3

    Station

    Name

    Location

    (Town,

    County, State)

    Facilities to be

    Installed

    (anticipated)

    Estimated

    Acreage of

    Compressor

    Station Site

    Total Property

    Acreage to be

    Acquired

    (approximate)

    Property Acquisition

    Status

    Market

    Path Tail

    Station

    Town of

    Dracut,

    Middlesex

    County,

    Massachusetts

    One compressor unit

    Compressor building

    Ancillary facilities

    Metering facilities

    10 acres 29 acres Option to Purchase

    Agreement executed 

    Market

    Path Mid

    Station 4

    Town of New

    Ipswich, New

    Hampshire

    Two Titan 250

    turbines; one Titan

    130 turbine

    Compressor building

    Office building forTennessee personnel

    Ancillary facilities

    10 acres 165 acres Option to Purchase

    Agreement executed 

    * The proposed Supply Path Mid Station will be located on property to be acquired in the Town of Franklin, Delaware

    County, New York. Tennessee will also be acquiring an adjacent property in the Town of Otsego, Otsego County, New

    York to serve as a buffer area. The site of the proposed Supply Path Mid Station will not be located on the property

    located in the Town of Otsego.

    ** In addition to the property (47 acres) for which an Option to Purchase Agreement has been executed for the Market

    Path Head Station, Tennessee is in negotiations to purchase an adjacent property (17 acres) to serve as a buffer area.

    Aerial maps depicting the exact locations of the proposed nine new compressor stations to

     be constructed as part of the Project are attached to this filing. These aerial maps show a one-halfmile radius around the total property boundary where the compressor stations are proposed to be

    located.

    With the specific locations of the compressor stations selected, Tennessee is continuing the

    detailed design of the compressor stations and specific facilities to be installed at each new

    compressor station location. More detailed information about these proposed compressor stations,including preliminary plot plans for each new compressor station, will be included in the next draft

    Environmental Report, which Tennessee will submit in July 2015.

    Also attached are lists of those landowners that are located within the one-half mile radius of

    each of the property boundaries where the new compressor stations are proposed to be located.Tennessee respectfully requests that the landowner lists be accorded privileged and confidential

    treatment, pursuant to Section 388.112 of the Commission’s regulations, 18 C.F.R. § 388.112(2014). Accordingly, the landowner lists have been marked “Contains Privileged Information - Do

     Not Release.” Copies of this filing, except for the privileged information, will be provided to the

    identified landowners.

    20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    4/15

    Federal Energy Regulatory Commission

    June 1, 2015

    Page 4

    In accordance with the Commission’s filing requirements, Tennessee is submitting the

    original of this filing to the Commission’s Secretary. Tennessee is also providing two complete

    copies of this filing to the Office of Energy Projects (“OEP”).

    Respectfully submitted,

    TENNESSEE GAS PIPELINE COMPANY, L.L.C.

    By: /s/ J . Curtis Moffatt

    J. Curtis Moffatt

    Deputy General Counsel and Vice PresidentGas Group Legal

    Enclosures

    cc: Mr. Rich McGuire; Mr. Michael McGehee; Mr. Eric Tomasi (Federal Energy Regulatory

    Commission)

    20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    5/15

     

    Tennessee Gas Pipeline Company, L.L.C. 

    Northeast Energy Direct Project 

    Docket No.

     PF14

    ‐22

    ‐000

     

    June 1, 2015 

    Compressor Station Locations  – Aerial Maps 

    20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    6/15

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    7/15

    !(

    !(

    !(

    !(

    !(

    !(   !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

      M e a d

     o  w   S  t

    S  t  

    D r af t T  Ln

    W   a   y  m  

    a  n  D  r   

      M a  r  i o

      n  L  n

    CR

    M   e  d   a  l   l   i   o  n   D   

    r   

    S    t    

     W e l l s Bridge

     O t e go Rd

    F l ax  I s l and  R d 

      D  o  w  n

     e  y R d

    B    i     s   s   e   

    l     l     R    d     

    C  h a m b e r  l  a i  n H  i  l  l   R  d  

      V a  n

     T a  s  s

     e  l  l R d

       H  e  n  r  y    E  d

       w  a  r  d  s    R  d

    S   t    e   w   a   r   t    

    R   d    

       O   t  e  g  o   R   d

    Fr anklin

    Moun tain  Rd

     C R  4 8

    ST357

    ST7

    §̈¦88

    TOWN OF

    OTEGO

    TOWN OF

    OTEGO

    TOWN OF

    SIDNEY

    TOWN OF

    FRANKLIN

    OTSEGO

    COUNTY

    DELAWARE

    COUNTY

    LOC.:

    CKD. BY:

    DRN. BY:

    ENG.:

    SCALE:

    DRAWN BY:

    DWG NO.

    REV.:

    TENNESSEE GAS PIPELINE COMPANY, L.L.CNORTHEAST ENERGY DIRECT PROJECT

     

    W.O.:HMM HMM 05/22/2015

    HMM GRAPHIC SCALE ---

    DELAWARE & OTSEGO COUNTIES, NEW YORK

    SUPPLY PATH MID STATION

    REV. DATE:

    PAGE: 2 OF 9

    0 2,0001,000FT

    06/01/2015

    !( RESIDENTIAL

    !(

    OTHER STRUCTUREPROPOSED NED PIPELINE

    EXISTING TGP PIPELINE

    HALF MILE BUFFER

    PROPOSED COMPRESSOR STAPROPERTY BOUNDARY

    MUNICIPALITY BOUNDARY

    COUNTY BOUNDARY

    STATE BOUNDARY

    ³

    3

    Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics , CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid , IGN, IGP, swisstopo, and the GIS User Community Imagery Year: 2013

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    8/15

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    9/15

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    10/15

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    11/15

    !(

    !(

    !(!(!(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    O l d  R o u t e 9 

        S     t

    F     r     a      

    r      y   R       

    d            

          H      i g  

             h

           S      a

        i

         n             t

          H        i    l

    l      R        d

    P  i  e r  c  e  R  d  

    P   e  r  u  

    R   d   

                                                                                      H                                                            u                                                            m                                                          e                                                            s                                                                                   R                                                                              d

          E       W      i    n

        d    s    o    r

           R    d

    B  e a u  m  a n  R  d  

      N  o   b  o

     d  y  s  R

     d

    N o b o d y s  R d 

    E  W  i n d s o r  R d 

    ST9

    TOWN OF

    HINSDALE

    TOWN OF

    PERU

    TOWN OF

    WINDSOR

    BERKSHIRE

    COUNTY

    LOC.:

    CKD. BY:

    DRN. BY:

    ENG.:

    SCALE:

    DRAWN BY:

    DWG NO.

    REV.:

    TENNESSEE GAS PIPELINE COMPANY, L.L.CNORTHEAST ENERGY DIRECT PROJECT

     

    W.O.:HMM HMM 05/22/2015

    HMM GRAPHIC SCALE ---

    BERKSHIRE COUNTY, MASSACHUSETTS

    MARKET PATH MID STATION 2

    REV. DATE:

    PAGE: 6 OF 9

    0 2,0001,000FT

    06/01/2015

    !( RESIDENTIAL

    !(

    OTHER STRUCTUREPROPOSED NED PIPELINE

    EXISTING TGP PIPELINE

    HALF MILE BUFFER

    PROPOSED COMPRESSOR STAPROPERTY BOUNDARY

    MUNICIPALITY BOUNDARY

    COUNTY BOUNDARY

    STATE BOUNDARY

    ³

    3

    Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics , CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid , IGN, IGP, swisstopo, and the GIS User Community Imagery Year: 2012

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    12/15

    !(

    !(

    !(  !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

       F   l  a  g  g

       R   d

     P r a t t

     H o l l o w Rd

    M a  p l e  S t 

    O   l   d   

    W   e  n  d   e  l   l    R   

    d   

    S Mo u n t a i n R d 

    S      

    t      

    O            l            d            W             e         n         d            e         l            l             R            

    d            

    G    r    e   a   t     

    S    w   a   m    p   

    R     d     

    C   o  l   l   e  r   

    C   e  m  

    e  t   a  r    y    R   d   

    N e w  P l a i n  R d 

         L    y      m    a    n     R     d

     White

     A  l e  x a

      n d e  r

      H  i  l  l   R

     d

         G              u

                         l      f

     R        d

    O  r  a  n   g  e 

    R  d   

    TOWN OF

    NORTHFIELD

    TOWN OFWARWICK

    FRANKLIN

    COUNTY

    LOC.:

    CKD. BY:

    DRN. BY:

    ENG.:

    SCALE:

    DRAWN BY:

    DWG NO.

    REV.:

    TENNESSEE GAS PIPELINE COMPANY, L.L.CNORTHEAST ENERGY DIRECT PROJECT

     

    W.O.:HMM HMM 05/22/2015

    HMM GRAPHIC SCALE ---

    FRANKLIN COUNTY, MASSACHUSETTS

    MARKET PATH MID STATION 3

    REV. DATE:

    PAGE: 7 OF 9

    0 2,0001,000FT

    06/01/2015

    !( RESIDENTIAL

    !(

    OTHER STRUCTUREPROPOSED NED PIPELINE

    EXISTING TGP PIPELINE

    HALF MILE BUFFER

    PROPOSED COMPRESSOR STAPROPERTY BOUNDARY

    MUNICIPALITY BOUNDARY

    COUNTY BOUNDARY

    STATE BOUNDARY

    ³

    3

    Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics , CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid , IGN, IGP, swisstopo, and the GIS User Community Imagery Year: 2011

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    13/15

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    14/15

  • 8/21/2019 Tennessee Gas Pipeline Company, Northeast Energy Direct Project, Compressor Station Locations

    15/15

    Document Content(s)

    NED_CSLocations_Update_FERC(June 1, 2015).DOCX........................1-4

    NED_COMPRESSOR_STATION_MAPS_rev3_06-01-2015....PDF....................5-14

    20150601-5363 FERC PDF (Unofficial) 6/1/2015 4:08:41 PM