    TEPI VICO CAPILLARY STRING WORKSHOP

    Sharing the experiences key success for the future !!

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    2/21

    Decreasing gas rate

    new well,

    high gas rate Well died !!

    Liquid loading issue will always occurs in gas wells, just only wait in the

    matter of time when it comes !!

    At initial stage of production, the gas will

    carry produced liquids up to surface as the gasvelocity is high enough.

    The energy available to transport theproduced liquids to surface declines due to thedepletion drive of reservoirs.

    When the gas produced are below gas

    critical rate, the liquids start toaccumulate in the wellboreincreasing hydrostatic pressure, backpressure into formation. As a result,thegas rate will significantly drops and thewell died

    Quick overview: liquids loading phenomena in gas wells

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    3/21

    2

    1 32

    IP of the well is deceasing very fast after offload due to

    water production from the reservoirs

    Very fast transition (a few days) from steady state (offload)to death

    Frequent offloads between repressurization period

    Water loading kills the well

    Objective of capillary = stabilize the rate

    1 32

    1- 2 weeks

    1- 2months

    IP of the well is downgraded because of partial water

    loading

    The well is able to produce during a long period

    Offloads are less frequent

    Water loading limits the gas rate

    Objective of capillary = enhance the gas rate

    Offloads

    TIME

    GASRATE

    2

    Targeted wells; 2 types

    Offloads

    TIME

    GAS

    RATE

    1

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    4/21

    reps. pseudo diedcategory

    need special

    operating procedure

    Below 50% Turner

    velocity line

    validated in 2011

    campaign

    50% above Turner

    velocity line

    validated in 2010

    campaign

    Turner Velocity

    Conclusion: Foaming technology can be applied in all region BUT it will

    not work if the well has reservoir pressure issue (som e black w ells)

    Test the limit of foaming technology !!

    Weak wells

    loading mode

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    5/21

    TN-X8was in

    Regular offloadcategory

    With CS

    Sustainable production for 16 months

    (No off-load was required)

    Qg: 0.8 MM

    Surfactant

    60 L/D

    Qw: 30 bwpd

    TN-H5 was in

    Regular offload category

    With CS

    Sustainable production for 12 months

    (No off-load was required)

    Some good results: Off-loaded wells, critical velocity

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    6/21

    TN-F7was in died

    category since 2010

    With CS

    Intermittent production = 7

    MMscfD more than 4 weeks

    Unique well (died, even only

    shut in for 2 hours)

    Very good response if the well has strong inflow (high DEQ) but severe problem in

    the outflow

    Qg: 5.2 MM

    ~1 month~1 month

    The special one !! good surprise of revival

    Well

    revivalLong offload

    + testLong offload

    +test

    6TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    7/21

    Negative response due to reservoir pressure issue (low deq)

    TN-ML5was in died category

    Negative response (production

    can not be sustained):

    Offload 4x

    1x intermittent well opening

    The died well: negativeresponse !!

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    8/21

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0

    1

    2

    3

    4

    5

    17-May-11 6-Jun-11 26-Jun-11 16-Jul-11 5-Aug-11 25-Aug-11 14-Sep-11

    WHFP(Bar)

    Surfact

    antInejctionrate(L/D)

    GasRate(MMSCFD)

    Production Evolution on Well TN-X8

    Gas Rate Surfactant Injection Rate Water Production oil Production WHFP

    LP

    mode

    SI for CS

    installation

    QG increase After surfactant injection

    DP downhole linked to dewatering is > DP linked to LP mode

    TN-X8: Dewatering dP downhole evaluation

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    9/21

    DEPTH REACHED (TARGET VS ACTUAL)

    Some tolerance to the setting depth

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    10/21

    Highlights from pilot phase Gain obtained 6.84 MMscfd (5 wells put on production).

    TN-F7 rePoP after offload (+4.8 MM) ; TN-F5 plugged due to drilling activity. TN-X8 still low after misunderstanding of program.

    TN-R23 is SI due to need to replace a part of DH equipment.

    Highlights from Industrial phase Gain obtained 8.41 MMscfd (7 wells put on production).

    TN-M18 rePoP : +3.7 MM TN-I9 rePoP failed : inject de-mineral then stop injection while waiting rig move out.

    TN-I1 is waiting rig move-out for an intervention (gas found in control line)

    TN-P23 SI for pressure Build up

    TN-Lx41 rePoP : +0.5MM

    TN-H12 diedafter switch to MP. SIBU

    TN-Dx20 to be rePoP this week.

    Result of current FAL project (per W1 Dec 12) No. Well Site Phase Date Gas Rate Surf. Inj.Rate (L/D) WHFP (bar) WHFT(deg C)1 TN-T6 SPU

    Pilot

    2-Dec 0.54 MMSCFD 20 14.5 36

    2 TN-X8 SPU 2-Dec 0.38 MMSCFD 60 11 33

    3 TN-H5 SPU 2-Dec 0.82 MMSCFD 60 12 35

    4 TN-H3 SPU 2-Dec 0.35 MMSCFD 30 12 33

    5 TN-F5 SPU 2-Dec 0.00 MMSCFD 5 0 0

    6 TN-F7 SPU 2-Dec 4.76 MMSCFD 150 23 57

    7 TN-R23 SPU 2-Dec 0.00 MMSCFD 0 60 0

    8 TN-K11 NPU

    Industria

    l

    2-Dec 0.40 MMSCFD 126 9 36.6

    9 TN-P14 NPU 2-Dec 1.79 MMSCFD 50 12 41.7

    10 TN-P23 NPU 2-Dec 0.00 MMSCFD 15 11 30

    11 TN-H12 SPU 2-Dec 0.00 MMSCFD 15 10.5 3112 TN-I9 NPU 2-Dec 0.00 MMSCFD 5 9.4 0

    13 TN-Kx23 NPU 2-Dec 0.25 MMSCFD 40 7.9 35

    14 TN-TMx30 SPU 2-Dec 1.20 MMSCFD 80 13 46

    15 TN-Dx20 SPU 2-Dec 0.00 MMSCFD 100 107 0

    16 TN-M18 NPU 2-Dec 3.69 MMSCFD 60 10 50

    17 TN-I1 NPU 2-Dec 0.00 MMSCFD 0 10 0

    18 TN-F11 SPU 2-Dec 0.55 MMSCFD 100 26 57

    19 TN-Lx41 NPU 2-Dec 0.52 MMSCFD 40 12 33

    TOTAL (12) ells flowing 15.25 MMSCFD 956 L/D

    1.27 MMSCFD/ Well flowingin Network Total

    SPU 8.60 MMSCFD 500 L/D 620 L/DNPU 6.65 MMSCFD 316 L/D 336 L/D

    Pilot Phase 6.84 MMSCFD 325 L/D

    Indus. Phase 8.41 MMSCFD 631 L/D

    TEPIVICO Capillary String Workshop

    7 wells are still shut in due to DHSV packing leaking, work over, plug due to rig activity and

    pressure build up

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    11/21

    DESIGN FEATURES

    To keep down-hole safety valve installation

    To reach target injection depth (3000 ~ 5000 m)

    To avoid gas through inside capillary string

    To be able to inject 150 L/D whilst maintaining DHSV

    open

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    12/21

    INSTALLATION PROCEDURE

    12

    WIRELINE PREPARATION:

    RIH Dummy CS Hanger

    RIH Memory P/T Survey

    CAPILLARY STRING:

    RIH Capillary String with Bottom Injection

    valve to target depth

    Cut Capillary String at surface

    WIRELINE/BRAIDED LINE:

    Connect CS with Hanger

    Deploy CS with Hanger using Braided line

    Function test the CS Installation

    DOWNHOLE EQUIPMENT SCHEMATIC

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    13/21

    Pressure up Control lineSTART OPEN DHSV AT 2000 PSICRACK TOP INJECTION VALVE AT

    3200 PSI

    CRACK BOTTOM INJECTION

    VALVE AT 4000 PSI

    2.81 DHSV Inside CS

    Hanger. Opening

    pressure 2000 psi

    Top Injection Valveinside CS Hanger.

    Crack pressure 3200

    psi

    Bottom Injection

    Valve

    3/8 CS

    Max 4800 lbs

    TEPI CAPILLARY STRING COMPLETION

    INDUSTRIALIZATION PHASE

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    14/21

    CHALLENGES

    Down-hole equipment reliability

    To simplify installation process

    Running use CS Unit & deploy still

    utilizes Braided line

    Reduce crane dependency

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    15/21151515

    Surfactant Injection Surface Facility

    Overview and Design Basis

    Well Location

    - Scattered Location Around Tunu Area

    - Instrument Gas is The Main Motive/Control Fluid

    - Limited Electrical Power (in some area is not available at all)

    Design Basis

    - Injection Pressure : 159332 Barg

    - Injection Flowrate : 10150 LPD

    - Positive Displacement Pump (Pneumatic Driven) Selection Based on API-675

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    16/21

    1616

    Surfactant Injection Surface Facility

    Injection Package - Simplified Block Diagram

    Safety Equipment

    (Surfactant Injection

    Isolation Valve)

    Safety Equipment

    (Pressure Protection)Safety Equipment

    (Instrument Gas Supply

    Isolation Valve)

    Pump, Regulator

    and Filter

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    17/21

    17

    Surface facilities package

    Surface facilities package will be

    removable. Once the capillarywell is finished, the package will be

    used for the other well

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    18/21

    1818

    Surfactant Injection Surface Facility

    Challenges

    Modification on Existing Infrastructure/Facilities

    - Various Type of Structure and Configuration

    - Portable Injection Facilities (Structure/Platform, Tank and Injection Package)

    Surfactant Liquid Compatibility

    - Corrosion Issues

    - Instrument Seal vs Surfactant Liquid Compatibility

    - Surfactant as Safety Valves (DHSV) Motive Fluid

    Engineering and Design Condition

    - Required Injection Pressure and Flowrate (Sensitive to Wells Characteristic)

    - Instrument Gas Issues (Low Pressure, Condensation)

    Alternative Solution : Gas Amplifier ?, Local Gas Scrubber ?, Electric Driven Pump (by

    Solar Panel + Battery)?

    TEPIVICO Capillary String Workshop

    D l f f b h

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    19/21

    Development of surfactant test bench

    Sign of chemical

    degradation

    If chemical

    degrade, end of

    story !!

    Onsite

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    20/21

    FOAMING & EMULSION ISSUE

    20

    NMP3 SC

    M M M

    FLOTATOR

    M

    TO FOSTTO DISPOSAL

    TUBE

    DEFOAMER

    INJECTION LINE

    SAMPLING POINT

    REVERSE

    DEMULSIFIER

    INJECTION

    SURFACTANT

    INJECTION

    7.9 7.8 8.2 8.3 8.7 7.9 7.1 7.3 7.8 7.2 8.6 8.1 7.8 7.9 9.3 9.1

    32.9

    19.6 17.29.1 9.0

    0 0 0 0 0 0

    80 80

    50

    100

    40

    240

    260

    1 40 1 40

    230

    3 80 3 80

    330

    230

    9910

    10433

    10219

    8965

    9259

    96459426

    8939

    5318

    6334

    7013

    8029

    4162

    3386

    2972

    3243 3190 31442922

    6782

    0

    2000

    4000

    6000

    8000

    10000

    12000

    -50

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    20-Sep-12

    21-Sep-12

    22-Sep-12

    23-Sep-12

    24-Sep-12

    25-Sep-12

    26-Sep-12

    27-Sep-12

    28-Sep-12

    29-Sep-12

    30-Sep-12

    1-Oct-12

    2-Oct-12

    3-Oct-12

    4-Oct-12

    5-Oct-12

    6-Oct-12

    7-Oct-12

    8-Oct-12

    9-Oct-12

    10-Oct-12

    ProducedWater(bbl/d)

    Water Oil Content (ppm)

    SurfactantInjec tion (L/d)

    Defoamer Injection (L/d)

    Produced Water (bbl/d)

    TEPIVICO Capillary String Workshop

  • 7/23/2019 TEPI - VICO Capillary String Workshop

    21/21

    Conclusions & Way forward

    The Capillary String project is profitable. The additional gas production is obtained and

    can sustain/prolong the life of liquids loaded wells.

    Foaming & emulsions issue shall be solved asap to maintain project delivery.

    Continue learning process to get comprehensive understanding about capillary foaming

    technology.

    21TEPI VICO Capillary String Workshop