    Chhatrapati Shivaji International Airport is secondbusiest airport in South Asia and was ranked 48th

    busiest airport in world

    Gateway- Mumbai.

  • 8/10/2019 Terminal 2 Ppt

    4/25

    The airport handles 1/5thof the Indias Air

    Traffic.

    Constructed by joint venture of AAI(Airports

    authority of India) and GVK.

    The T2 was inaugurated in January 2014 by

    former PM Dr. Manmohan Singh . But the

    operations started on 12thFeburary,2014 for

    the international passengers.

  • 8/10/2019 Terminal 2 Ppt

    5/25

    New Gateway of India that took seven years of

    completion amidst all the constraints that included

    landside and airside limitations.

    Design: Inspired by IndiasNational bird, ThePeacock.

  • 8/10/2019 Terminal 2 Ppt

    6/25

    Indiasfirst and most advanced VerticalPassenger Terminal

    Worlds longest glass wall structure spanning up to 11,000

    square meters

    Terminal size: 40 million passengers per annum

    Total area : Spanning over Four Hundred Thousand square

    meters

    With this new structure, an additional 700 feet, we can now

    handle 100 more planes each day

  • 8/10/2019 Terminal 2 Ppt

    7/25

  • 8/10/2019 Terminal 2 Ppt

    8/25

    Speed & Ease of

    Access

    Check-in Counters

    Immigration counters

    Self Check-in Kiosks

    Fixed Link Bridges: 25 (52 Passenger Boarding

    Bridges)

    Baggage Carousels : 10 (Expandable to 14)

    Indias Largest Multi-level Car Park

  • 8/10/2019 Terminal 2 Ppt

    9/25

    Safety & Security

    More than 2,200 CCTVs

    5 Level Inline Screening Baggage System

    Security Check Positions : 104

    Branded Experience

    Retail Space : More than 21,000 square meters

    World Class Duty Free Experience

    Presence of Fashion Luxury and Lifestyle Brands

  • 8/10/2019 Terminal 2 Ppt

    10/25

    Comfort &

    Assistance

    Green Landscape

    Pranaam

    Prayer Rooms

    Close Proximity to Citys Renowned Five Star

    Hotels

    Other facilities

  • 8/10/2019 Terminal 2 Ppt

    11/25

    Space Challenge

    Growth plan

    Financial capital of the country

  • 8/10/2019 Terminal 2 Ppt

    12/25

    India's tallest Air Traffic Control Tower with aheight of 85 m (279 ft) stands in a section ofthe parking area opposite terminal 1B.

    It has six storeys commencing from 62.1 m(204 ft). From the new tower, air trafficcontrollers are able to see five miles beyondthe thresholds of both runways.

  • 8/10/2019 Terminal 2 Ppt

    13/25

  • 8/10/2019 Terminal 2 Ppt

    14/25

    Architects : SOM (PETER LEFTKOVITS)

    Developer : G.V.SANJAY REDDY

    Project Manager : UNNIKRISHNAN POTHANY

    Designer : DANNY FORSTER

  • 8/10/2019 Terminal 2 Ppt

    15/25

    Creation of a brand new terminal (T2) at Sahar

    Construction of a parallel taxiway

    Development of infrastructure on the city-side

  • 8/10/2019 Terminal 2 Ppt

    16/25

    Estimated Budget: Rs 15,300 crore

    Incured by Govt. : Rs 9,800 crore

    Incured by GVK : Rs 5,500 crore

  • 8/10/2019 Terminal 2 Ppt

    17/25

    Space Challenges

    Maximize the number of gates at the terminal so that it can

    handle more and more air traffic.

    17 acres Mega Roof

    Sound proofing

    Construction of elevated road without disturbing the traffic.

  • 8/10/2019 Terminal 2 Ppt

    18/25

    Space Challenges

    Only 1200 acres of land

    Proper Space Utilisation

    Similar Airports

    Kuala Lumpur Airport with same number of passengers

    as CSIA has an area of 30,000 acres

    Delhi Airport has 5000 acres of land

    Bangalore airport has 5500 acres

  • 8/10/2019 Terminal 2 Ppt

    19/25

    17 Acres Mega Roof

    The Airport is maximized not in area but also in length,

    190 feet above and 45,000 feet aperture space.

    30 Mega columns (135 ft. high) were constructed to take

    the load of 15,000 tonnes roof.

    Special shape was given to the column top to share theweight between two columns and thus reducing the

    number of columns and introducing a state of art design

    to the whole structure.

  • 8/10/2019 Terminal 2 Ppt

    20/25

    Sound Proofing Plane engines make a noise of 140 decibels.

    A special glass structure to reduce this noise to 40

    decibels.

    It had two layers of glass with 0.5 inch separationbetween them .

    One million square feet of this structure was neatly

    designed to provide a clear view of runway to the

    passengers.

  • 8/10/2019 Terminal 2 Ppt

    21/25

    Airport Connectivity Road traffic near the airport was an immense problem.

    There was no space for an expressway in this area.

    A new highway must be created in order to overcome the

    traffic problem. This was the only road connecting airport to the main city.

    This road was just next to residential area due to which

    construction of such an highway without disturbing the

    traffic was a difficult task.

  • 8/10/2019 Terminal 2 Ppt

    22/25

    Jaya He art exhibit

    Rajeev Sethi, one of South Asia's leading

    curators and scenographers was the man behind

    this.

    It occupies 80,000 sq ft and curves along thecontours of the terminal.

    It has the pictures depicting Mumbais unique

    culture such as the citys Yellow and Black taxi

    and the posters of iconic Bollywood stars are alsofeatured.

  • 8/10/2019 Terminal 2 Ppt

    23/25

    Our View

    Application of functionality

    Setting benchmark

    The concept of space maximization was after thenapplied to airports of Indonesia and Mali abroad

  • 8/10/2019 Terminal 2 Ppt

    24/25

    Conclusion

    It is most complex structure ever built in Indian history

    The newly constructed terminal is able to operate 100

    more planes in a day

    Doubling the capacity of the flyers to 45 millions