terms of reference for xpansion of e …environmentclearance.nic.in › writereaddata › online ›...

148
TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18, SONIPAT, HARYANA PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD. Page 1of80 ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD. APPLICATION FOR TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” At Village-Shahpur Turk, Sector- 9 & 18, Sonipat, Haryana Developed by M/s Parsvnath Developers Ltd. Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara, Delhi-110032 Prepared By: M/s PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered wide list of accredited consultants organizations/ Rev 30/ 7 th May, 2015 at S.No-116) NN Mall, Sector-3, Rohini, New-Delhi-85 Phone: 011-47528467; 011-47021086 Fax: - 011-47528434

Upload: others

Post on 30-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 1of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

APPLICATION FOR TERMS OF REFERENCE

FOR

EXPANSION OF GROUP HOUSING “PRESTON”

At Village-Shahpur Turk, Sector- 9 & 18,

Sonipat, Haryana

Developed by M/s Parsvnath Developers Ltd.

Parsvnath Metro Tower,

Near Shahdara Metro Station,

Shahdara, Delhi-110032

Prepared By: M/s PERFACT ENVIRO SOLUTIONS PVT. LTD.

(NABET Registered wide list of accredited consultants organizations/ Rev 30/ 7th

May, 2015 at S.No-116)

NN Mall, Sector-3, Rohini, New-Delhi-85

Phone: 011-47528467; 011-47021086

Fax: - 011-47528434

Page 2: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) CONTENTS

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 2of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

TABLE OF CONTENTS ENCLOSURE 1. FORM 1 & 1A ....................................................................................................... 4

ENCLOSURE 2. CONCEPTUAL PLAN........................................................................................ 40

2.1 INTRODUCTION .............................................................................................................41 2.2 ACTIVITIES/ AMENITIES .................................................................................................41 2.3 SITE LOCATION ............................................................................................................41 2.4 TYPE OF PROJECT ........................................................................................................41

2.5 PROJECT DETAILS ........................................................................................................41 2.6 POPULATION DETAILS ...................................................................................................43 2.7 WATER MANAGEMENT ..................................................................................................43 2.8 RAIN WATER COLLECTION DETAILS.................................................................................43 2.9 POWER REQUIREMENT& BACK-UP .................................................................................43 2.10 SOLID & HAZARDOUS WASTE MANAGEMENT ..................................................................44 2.11 PARKING MANAGEMENT ................................................................................................44 2.12 GREEN AREA DEVELOPMENT ........................................................................................44

ENCLOSURE 3. CONSTRUCTION STATUS AS ON 01.01.2015 ............................................ 45

ENCLOSURE 4. PRE-FEASIBILITY REPORT ............................................................................ 47

4.1 EXECUTIVE SUMMARY OF THE PROJECT ............................................................49

4.1.1 Activities: ......................................................................................................................... 49

4.1.2 Description & Details of Project: ................................................................................... 49 4.2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION ...................50

4.2.1 Identification of the project & project proponent: ........................................................ 50

4.2.2 Brief Description of the Nature of the Project: ............................................................ 50

4.2.3 Need for the Project & its importance to the country or the region: ......................... 50

4.2.4 Demand & Supply Gap: ................................................................................................. 50

4.2.5 Export Possibilities: ........................................................................................................ 51

4.2.6 Domestic/Expert Markets: ............................................................................................. 51

4.2.7 Employment Generation (Direct & Indirect) due to the Project: ................................ 51 4.3 PROJECT DESCRIPTION .........................................................................................51

4.3.1 Type of Project including interlinked & interdependent Projects, if any: .................. 51

4.3.2 Location (with coordinates): .......................................................................................... 51

4.3.3 Selection of Site: ............................................................................................................. 55

4.3.4 Size or Magnitude of Operation: ................................................................................... 55

4.3.5 Project Description: ........................................................................................................ 55

4.3.6 Details of raw material required: ................................................................................... 56

4.3.7 Resource optimization and reuse and recycling in project resources: .................... 57

4.3.8 Management of Resources: .......................................................................................... 57

4.3.9 Waste Management: ...................................................................................................... 58

4.3.10 Layout and Plans: ........................................................................................................... 58 4.4 SITE ANALYSIS: ............................................................................................................58

4.4.1 Connectivity: .................................................................................................................... 58

4.4.2 Land form, land use and land ownership: ................................................................... 59

Page 3: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 3of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.4.3 Topographical map: ....................................................................................................... 59

4.4.4 Existing Land Use Pattern: ............................................................................................ 59

4.4.5 Existing Infrastructure: ................................................................................................... 60

4.4.6 Soil classification: ........................................................................................................... 60

4.4.7 Climate data from secondary sources: ........................................................................ 60

4.4.8 Social Infrastructure available: ...................................................................................... 61 4.5 PLANNING BRIEF: .........................................................................................................61

4.5.1 Planning concept: ........................................................................................................... 61

4.5.2 Population projection: .................................................................................................... 62

4.5.3 Land use Planning (break-up along with green belt): ................................................ 62

4.5.4 Assessment of infrastructure Demand (Physical and Social): .................................. 62

4.5.5 Industrial area: ................................................................................................................ 62

4.5.6 Amenities/facilities: ......................................................................................................... 62 4.6 PROPOSED INFRASTRUCTURE: ......................................................................................62

4.6.1 Other area: ...................................................................................................................... 62

4.6.2 Green Belt and Plantation Details: ............................................................................... 63

4.6.3 Connectivity: .................................................................................................................... 63

4.6.4 Water Management: ....................................................................................................... 63

4.6.5 Sewage system: ............................................................................................................. 65

4.6.6 SCHEMATIC DIAGRAM OF STP: ............................................................................... 66

4.6.7 Rain water harvesting: ................................................................................................... 66

4.6.8 INDUSTRIAL WASTE MANAGEMENT: ...................................................................... 67

4.6.9 SOLID WASTE MANAGEMENT: ................................................................................. 68

4.6.10 POWER REQUIREMENT: ............................................................................................ 69 4.7 REHABILITATION AND RESETTLEMENT (R&R) PLAN: ..........................................69

4.7.1 Details on Project Affected person: .............................................................................. 69 4.8 PROJECT SCHEDULE & COST ESTIMATION: ........................................................69

4.8.1 Likely date of start of construction and date of completion: ...................................... 69

4.8.2 Estimated project cost: ........................................................................................... 69 4.9 ANALYSIS OF PROPOSAL: ......................................................................................69

4.9.1 Social benefits to the local population: ........................................................................ 69

ENCLOSURE 5. DISCLOSURE OF THE CONSULTANT SHOWING NABET/QCI

ACCREDIATION STATUS ................................................................................................................. 70

ENCLOSURE 6. LICENSE & LAND PAPERS ............................................................................. 72

ENCLOSURE 7. BOARD RESOLUTION ..................................................................................... 73

ENCLOSURE 8. AUTHORIZATION FOR CONSULTANT ......................................................... 74

ENCLOSURE 9. FOREST NOC .................................................................................................... 75

ENCLOSURE 10. ZONING PLAN ................................................................................................... 76

ENCLOSURE 11. {L¢9 PLANS ......................................................................................................... 77

ENCLOSURE 12. AFFIDAVIT BY CONSULTANT FOR OWNING OF DATA ........................... 78

ENCLOSURE 13. EARLIER ENVIRONMENTAL CLEARANCE ................................................. 79

Page 4: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) CONTENTS

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 4of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 1. FORM 1 & 1A

Page 5: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 5of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

FORM 1

I. Basic Information S. No. Item Details

1. Name of the project/s Expansion of Group Housing Project “PRESTON”

2. S. No. in the schedule 8 (b)

3. Proposed capacity/ area/length/ tonnage to be handled/ command area/ lease area/ number of wells to be drilled

Total plot area – 113741.41 Sq m Area under road – 26410.47 sq m Net plot area – 87330.94 sq m Total Built-up area – 230224.675 Sq m

4. New/ Expansion/ Modernization Expansion The project has already been granted Environmental Clearance vide letter no.-21-545/2007-IA,III dated 24-12-2007

5. Existing Capacity/ Area etc. Plot area = 113741.41 sq m Built-up area= 203903.71 sq m

6. Category of Project i.e. ‘A’ or ‘B’ ‘B’

7. Does it attract the general condition? If yes, please specify.

Not Applicable

8. Does it attract the specific condition? If yes, please specify.

Not Applicable

9. Location Sec-9 & 18

Plot/ Survey/ Khasra No. -

Village Shahpur Turk

Tehsil Sonipat

District Sonipat

State Haryana

10. Nearest railway station/ airport along with distance in kms.

Nearest Railway Station-

Sonipat Railway Station- 6.3 Km W

Nearest Highway-

NH-01- Adjacent E

Nearest Airport-

Indira Gandhi International Airport- 48 Km S

11. Nearest Town, city, District Headquarters along with distance in kms.

Sonipat

Page 6: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 6of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given)

Municipal Council of Sonipat.

13. Name of the applicant M/s Parsvnath Developers Ltd.

14. Registered Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara, Delhi-110032

15. Address for correspondence: Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara, Delhi-110032

Name Shri Ashim Gandhi

Designation (Owner/Partner/CEO) Authorized signatory

Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara, Delhi-110032

Pin Code 110032

E-mail [email protected]

Telephone No. 011-43010500

Fax no. 011-43050473

16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a Toposheet.

No, alternate site has been examined. It is expansion of already existing Project.

17. Interlinked Projects No it is not an interlinked project.

18. Whether separate application of interlinked project has been submitted?

Not Applicable

19. If yes, date of submission Not Applicable

20. If no, reason Not Applicable

21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act,

1980?

(b) The Wildlife (Protection) Act, 1972?

(c) The C.R.Z. Notification, 1991?

Clarification regarding non applicability of forest laws on project site is enclosed as enclosure-9

Not Applicable Not Applicable

22. Whether there is any Government Order/ Policy relevant/ relating to the site?

Not Applicable

23. Forest land involved (hectares) No

Page 7: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 7 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

24. Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up?

(a) Name of the Court (b) Case No. (c) Orders/ directions of the

Court, if any and its relevance with the proposed project.

No Not applicable Not applicable Not applicable

II. Activity 1. Construction, operation or decommissioning of the Project involving

actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

Yes Land has been allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 for the development of group housing Colony. All deed and collaboration Agreement is enclosed in enclosure-6 Environmental Clearance has already been granted vide letter no. 21-545/2007-IA.III dated 24-12-2007 for the development of the Group Housing Colony. So there will be no change in land use.

1.2 Clearance of existing land, vegetation and buildings?

No Not Applicable

1.3 Creation of new land uses?

No Construction had already been started at site. Hence landuse has already been changed from vacant land to Group Housing Colony. So, no new

Page 8: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 8of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

landuse is changed to group housing colony.

1.4 Pre-construction investigations e.g. bore houses, soil testing?

Yes Pre-construction Geo-technical investigation shall be prepare. Construction at site is on hold.

1.5 Construction works? Yes Construction will be done as per Building sanction plan &Master plan of Sonipat. Construction had been started as per earlier Environmental Clearance. Current status of construction is given in enclosure – 3

1.6 Demolition works? No Not applicable.

1.7 Temporary sites used for construction works or housing of construction workers?

No Workers during construction phase generally hired from nearby areas and hence there is no need of providing housing. Only temporary shelters are provided.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Above ground, the building shall be elevated upto maximum height of 57 m Current status of construction is enclosed as enclosure – 3

1.9 Underground works including mining or tunneling?

No It is a construction project. Hence no underground works will be required except for excavation of basements.

1.10 Reclamation works? No No reclamation work will be done

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing processes?

No It is a construction project, hence no production or manufacturing processes shall be carried out.

Page 9: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 9 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

1.14 Facilities for storage of goods or materials?

Yes During Construction Phase:

Separate raw material yard will be made within the project site.

Cement will be separately stored under cover in bales.

Sand will be stacked nearby under tarpaulin cover.

Bricks and steel will be laid in open.

The raw material yard has been located within the project site.

During Operation Phase: As the project is a Group Housing colony, the raw material will be official or commercial items which will be stored in respective commercial areas & community sites only

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes During Construction phase: Solid waste generation during construction phase 23 kg/day which will be disposed off at municipal solid waste site. The sewage waste will be discharged to

septic tank followed by soak pit.

During Operation Phase: Approx. 4502 Kg/day of total solid waste shall be generated from the colony. The total waste water generated in the colony shall be 1138 KLD which will be treated in STP of 1400 KLD.

Page 10: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 10of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

1.16 Facilities for long term housing of operational workers?

No During Construction phase: The workers during construction phase generally hired from nearby areas and hence there is no need of providing long term housing. Only temporary shelters will be provided. During Operation Phase: As this is Group Housing colony, Staff will only be needed in the schools and community building. Most of the staff will be from colony itself. Other staff like servants or maintenance staff will be from the nearby areas.

1.17 New road, rail or sea traffic during construction or operation?

No No new road, rail or sea traffic is proposed. Existing transportation facilities will be used during construction or operation phase.

1.18 New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.?

No

No new road, rail, or sea traffic is proposed. The transportation measures already existing near site are as follows: Nearest Railway Station-

Sonipat Railway Station- 6.3 Km W

Nearest Highway-

NH-01- Adjacent E

State Highway-11- 3 Km SW

Nearest Airport-

Indira Gandhi International Airport- 48 Km S

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No No closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements will be made. movements will be made

1.20 New or diverted transmission lines or pipelines?

No No such closure or diversion of transmission lines is required.

Page 11: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 11 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No No impoundment, damming, culverting, realignment or other changes to the hydrology of surface water courses is required.

1.22 Stream crossings? No No stream crossing.

1.23 Abstraction or transfers of water from ground or surface waters?

No No abstraction or transfer of water from ground or surface will be done

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No There will be no change in water bodies or the land surface effective drainage or run-off.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes During Construction phase: Materials during construction phase will be transported by tractor & trolley etc. on start of construction. During Operation Phase: Car, two-wheeler, etc. will be used.

1.26 Long-term dismantling or decommissioning or restoration works?

No Not Applicable

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No Not Applicable

1.28 Influx of people to an area in either temporarily or permanently?

No During Construction phase: Temporary influx of people in the form of labors is envisaged. Approx. 150 no. of local labours are employed. During Operation Phase: As this is a Group Housing, 9570(including main unit & EWS) residents, 300 no. of staff (working for 8-12 hours) & visitors of approx. 1000 no. is envisaged.

1.29 Introduction of alien species?

No Not Applicable

1.30 Loss of native species or genetic diversity?

No Not applicable.

1.31 Any other actions? No Not Applicable

Page 12: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 12of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. No. Information/checklist confirmation

Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

Yes Plot Area – 113741.41 sq m of undeveloped land has been allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 for the development of group housing Colony.for development of Group Housing. Copy of license and land papers is enclosed as enclosure-6.

2.2 Water (expected source & competing users) unit: KLD

Yes Source & Quantity During Construction phase: Water during construction phase is being taken from tanker water supplier which supply treated water from STP of nearby area/HUDA STP. Source & Quantity During Operation Phase: The ultimate source of water will be through Municipal Supply to be arranged by HUDA to supply. Total water requirement of the project will be 1417 KLD out of which 924 KLD will be fresh water. Rest of the 493 KLD water requirement will be fulfilled by treated water. Detailed water Management & water Balance are given in Prefeasibility Report.

2.3 Minerals (MT) No Not applicable

Page 13: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 13 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Yes The major materials required for construction of the project are steel, tiles, glass, cement, agate, bricks, flooring tiles / stones, sanitary and hardware items, electrical fittings, etc.

2.5 Forests and timber (source – MT)

Yes Plywood for doors & windows shall be used which shall be procured from local market.

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes Source of Electricity – Uttar Haryana Bijli Vitran Nigam (UHBVN) Total Electrical load – 11 MVA D.G. sets for power back up- 4 X 2000 KVA& 2 X 1010 KVA

2.7 Any other natural resources (use appropriate standard units)

No Not applicable

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

Yes No storage of hazardous substances (as per MSIHC rules) will be done however, 68 litr/month used oil from DG sets and 2 kg/month E-waste will be generated from the colony. Proper management of Used oil & E-waste shall be taken. Details are given Prefeasibility Report.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No Suitable drainage and waste management measures will be adopted in both the construction and operational phase which will restrict stagnation of water or accumulation of water. This will effectively restrict the reproduction and growth of disease vectors.

Page 14: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 14of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

3.3 Affect the welfare of people e.g. by changing living conditions?

Yes During Construction phase: This project provides employment to about 150 no. of local labours during construction phase. During Operation Phase: As it is a Group Housing colony, there shall be generation of direct & indirect employment for the people of nearby area.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.

No No vulnerable group of people will be

affected by the project.

3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes.

No Not applicable

4.2 Municipal waste (domestic and or commercial wastes)

Yes During Construction phase: Solid waste during construction phase will be 23 kg/day which will be disposed off at municipal solid waste site. Excavated soil is being reused to the extent possible. Top soil will be preserved for gardening purposes. During Operation Phase: Approx. 4502 Kg/day of solid waste shall be generated from the colony during operational phase. Detailed Solid Waste Management is given in Prefeasibility Report.

Page 15: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 15 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

Yes During Construction phase: Used oil whenever generated from the DG sets shall be kept in leak proof containers in an isolated area and is being sent to approved recycler. During Operation Phase: Used oil from diesel generators will be carefully stored in HDPE drums in isolated covered facility. The used oil will be sold to vendors authorized by Central Pollution Control Board for the treatment of the same. Suitable care will be taken so that spills / leaks of used oil from storage could be avoided. E-waste shall be collected and given to approved recycler of SPCB.

4.4 Other industrial process wastes

No Not Applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge from effluent treatment

Yes About 284 Kg/day of dried sludge will be generated from STP within colony during operation phase and this sludge will be passed through filter press where it will be dewatered/ dried to form a cake and then will be used as manure in green areas. The unused sludge shall be given to farmers or nursery.

4.7 Construction or demolition wastes

Yes Construction waste will be stored to be used for flooring & Back filling in roads etc. same shall be followed for expansion.

4.8 Redundant machinery or equipment

No Not applicable

4.9 Contaminated soils or other materials.

No Not applicable

4.10 Agricultural wastes

No Not applicable

4.11 Other solid wastes

No Not applicable

Page 16: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 16of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes During Construction phase: DG sets of capacity 62.5 KVA installed acoustically enclosed with adequate stack height. During Operation Phase: The only source of emission from combustion of fuel will be DG sets of 4 x 2000 KVA & 2 X1010 KVA. Hence, to avoid the emissions, stack height of 6 m above roof level for each D.G. sets has been installed to reduce the air emissions, meeting all the norms prescribed by CPCB.

5.2 Emissions from production processes

No Not applicable

5.3 Emissions from materials handling including storage or transport

Yes Dust is being generated during construction, from the movement of transport vehicles & other construction activities. The effect is restricted to construction phase only. Water sprinklers will be used for dust suppression. Material are stored under Tarpaulin cover.

5.4 Emissions from construction activities including plant and equipment

Yes RMC will be used in the colony. Dust & emissions are likely to be generated during construction activities which is being reduced by sprinkling of water in a specific time interval & timely maintenance schedule for machinery. Also the machines are kept shut down during idle period.

Page 17: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 17 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

Yes During loading & unloading of construction material dust is generated during construction phase. Water is sprinkled and tarpaulin cover is provided over stored raw material to reduce dust emission. Mobile Toilets during construction phase are provided & waste water is being disposed off in septic tank followed by soak pits. During Operation Phase:

In-house STP shall be provided to treat wastewater. Proper ventilation will be provided in STP room.

On accumulation area, waste will be given to authorized vendor on daily basis.

5.6 Emissions from incineration of waste.

No Not applicable.

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris).

No Open burning of biomass/ other material will be prohibited.

5.8 Emissions from any other sources.

No None

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

Page 18: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 18of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

No During Construction phase: The equipment such as mixer machines, bulldozers, cranes, compactors & excavators are used which are of highest standard of reputed make and adhere to international standards. Hence an insignificant impact due to construction machinery is envisaged. During Operation Phase: Source of noise in the operational phase will be D.G. Set of capacity 4 X 2000 KVA & 2 x 1010 KVA. The D.G. Sets shall be bought acoustically enclosed room & and will be used during Power failure only. They may generate noise level maximum upto 75 dB (A).

6.2 From industrial or similar processes

No Not applicable

6.3 From construction or demolition

Yes Due to the various activities there are short-term noise impacts in the immediate vicinity of the project site. These shall be restricted to day time only. It has been estimated that during the construction period the average noise level will be 70-75 dB (A) during peak construction hours. However embankment shall be done to further prevent the noise pollution.

6.4 From blasting or piling No No blasting or piling is required.

6.5 From construction or operational traffic

Yes Some amount of noise (70 – 75 dB (A)) will be generated from vehicular movement in the construction phase and will be generated in the operational phase. Plantation around the boundary wall shall be done to reduce noise from traffic.

6.6 From lighting or cooling systems

No Not Applicable

6.7 From any other sources No None

Page 19: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 19 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No The hazardous waste generated during operation phase will be Used oil and E-waste. Used oil generated will be stored in HDPE drums and kept in covered rooms under lock and key and will be sold to authorized vendors only. Special care will be taken to prevent leakages and spills. E-waste generated from the colony shall be given to approved recycler of SPCB.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No During operational phase STP of 1400 KLD will be installed for treating the waste water of 1138 KLD of treated water will be used in flushing, gardening, cooling & misc. purpose. Excess treated water of 590KLD shall be given to tanker water supplier.

7.3 By deposition of pollutants emitted to air into the land or into water

No None

7.4 From any other sources

No Not applicable

7.5 Is there a risk of long term buildup of pollutants in the environment from these sources?

No Not applicable

Page 20: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 20of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.

S. No. Information/Checklist confirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances

No During Construction Phase: All appropriate measures shall be taken to avoid accidents. During Operation phase: Proper disaster management & fire-fighting system will be installed at site.

8.2 From any other causes No During Construction Phase: All the labours will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms will be provided time to time to all supervisors and labours involved in construction activity.

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc.)?

No The area under study falls in Seismic zone-IV, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

S. No. Information/Checklist

confirmation Yes/No Details thereof (with approximate

quantities/rates, wherever possible) with source of information data

Page 21: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 21 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure

(roads, power supply, waste or waste water treatment, etc.)

• Housing development • Extractive industries • Supply industries • Other

No

Yes

No No No No

The project is a residential project, Infrastructure like road, power network, already exists in area STP & solid waste management system will be installed for treatment of wastewater & solid waste.

STP will be installed for the treatment of wastewater.

Not Applicable Not Applicable Not Applicable Not Applicable

9.2 Lead to after-use of the site, which could have an impact on the environment

No Not Applicable

9.3 Set a precedent for later developments

Yes It will attract people to develop organized Group Housing Colonies.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

No No impact

III. Environmental Sensitivity S. No. Areas Name/

Identity

Aerial distance

(within 15 km.)

Proposed project

location boundary

1. Areas protected under

international conventions, national

or local legislation for their

ecological, landscape, cultural or

other related value

Nil

Page 22: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 22of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

2. Areas which are important or

sensitive for ecological reasons -

Wetlands, watercourses or other

water bodies, coastal zone,

biospheres, mountains, forests

Water sources or other

water bodies

Yamuna River Yamuna Canal Rajpur Distributary Harsana distributary Main drain no. 6 Drain No. 8

8.7 Km NE

11 Km SW

1.9 Km SW

6 Km SW

4.2 Km WSW

9.2 Km S

3. Areas used by protected, important

or sensitive species of flora or

fauna for breeding, nesting,

foraging, resting, over wintering,

migration

Nil

4. Inland, coastal, marine or

underground waters

Nil

5. State, National boundaries U.P. state boundary Delhi - Haryana boundary

9.5 Km NE 12.5 Km S

6. Routes or facilities used by the

public for access to recreation or

other tourist, pilgrim areas

NH-1 State Highway-11 Railway Station Sonipat Railway Station Harsana Kalan Railway Station Airport Indira Gandhi International Airport

Adjacent E 3Km SW 6.3 Km W 7 Km SW

48 Km S

7. Defence installations Nil Nil

8. Densely populated or built-up area Sonipat 4 Km W

Page 23: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 23 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

9. Areas occupied by sensitive man-

made land uses (hospital, school,

places of worship, community

facilities)

Hospitals

1. Speech & Hearing

Hospital

2. D. N Sharma Hospital

3. Speech & hearing

Hospital

Schools

1. Sri Sathya Sai School

2. Govt. Girls School

3. IITM

Post office

1. Post Office

Place of Worship

1. Temple

2. Mosque

5.76 Km W

4.98 Km W

5.76 km W

3.2 Km N

5.79 Km W

3.89 Km N

3.7 Km E

1 Km W

4.5 Km SE

10. Areas containing important, high

quality or scarce resources

(Ground water resources, surface

resources, forestry, agriculture,

fisheries, tourism, minerals)

Nil Nil

11. Areas already subjected to

pollution or environmental

damage. (Those where existing

legal environmental standards

are exceeded)

Nil Nil

Page 24: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 24of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

12. Areas susceptible to natural

hazard which could cause the

project to present environmental

problems

(Earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

There is possibility of earthquake As the area lies in Seismic Zone -IV

Page 25: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 25 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

FORM 1A CHECK LIST OF ENVIRONMENTAL IMPACTS

(Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with

proposed environmental management plan & monitoring programme)

I. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing landuse get

significantly altered from the project that is not consistent with the surroundings? (Proposed landuse must conform to the approved Master Plan / Development Plan of the area. Change of landuse if any and the statutory approval from the competent authority be submitted). Attach Maps of

I. Site location

II. Surrounding features of the proposed site (within 500 meters)

III. The site (indicating levels &

contours) to appropriate scales. If not available attach only conceptual plans.

The proposed site is located at sec-9&18, village-Shahpur Turk, Sonipat, Haryana. Only 3-4% of structural work has been done at site after that construction work was stopped at site. Proposed site has been allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 & the environmental clearance granted vide letter no. 21-545/2007-AI.III dated 24-12-2007

for the development of the Group Housing Colony. The developments also confirms to the master plan of the area i.e., master plan of Haryana. The construction is not going at site. Site is located in village shahpur Turk at sector no. 9 &18, sonipat, Haryana The site location shown on Google Map is enclosed as ENCLOSURE-2 (Conceptual Plan). Map showing vicinity around the site is enclosed as ENCLOSURE-2 (Conceptual Plan). Contour plan is enclosed as ENCLOSURE-11. The land of project site is fairly a plain land with level varying from 216.49 m to 215.85 m Site plan is enclosed with ENCLOSURE-3 PRE-FEASIBILITY.

Page 26: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 26of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

1.2 List out all the major project requirements in terms of the Land area, Total Built up area Water consumption Power requirement Connectivity

Community facilities Parking needs etc.

Total Plot area = 113741.41 sq m 230224.67 sq m 1417 KLD 11 MW NH-1 – Adjacent E SH-11 - 3 Km SW

Community building, Nursery School, Primary School etc. Parking Requirements – 2028ECS Parking Provisions - 2045ECS

1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing landuse, and disturbance to the local ecology).

The entire project influenced area is being developed as per the provision of Master Pan of Haryana, thus no induced development is foreseen due to the proposed project. Also the proposed development is being carried out as per the defined building by-laws; hence no impact is envisaged due to proposed development. Construction phase as well as operation Phase of the project, will generate direct and indirect employment opportunities for a large section of society. The employment will have positive impact thereby increasing the quality of life.

1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc. may be given).

Yes, there is disturbance due to excavation of foundation and basements. However, care will be taken so that no erosion, subsidence & instability takes place. Soil Type: Silt loam Slope Analysis: The project area possesses fairly plain terrain. Erosion / Subsidence: Proper greening & paving of area will not cause any soil erosion problem and subsidence. Moreover Contour Plan is enclosed as enclosure-11.

Page 27: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 27 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

Seismicity: The area under study falls in Seismic zone-IV according to the Indian Standard Seismic Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure.

1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site)

The proposed project activities will not cause any alteration of natural drainage system.

1.6 What are the quantities of earthwork involved in the construction activity cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill mssssaterials from outside the site etc.)

At present excavation for towers 2, 3, 4, 5, & 6 has been completed and about 1,02,371 cum soil was excavated for towers 1, 9, 10, 11 & 12 while excavation for towers 7,8,13,14,15,16,17 & 18 not yet started.The excavated soil has properly been stacked within site under tarpaulin cover and will be reused for back filling purposes. The top soil has been preserved separately and will be used for landscaping purpose only. Hence, no adverse impacts on the land environment are envisaged. The unused soil shall be sent to landfill site only.

1.7 Give details regarding water supply, waste handling etc. during the construction period.

Water Supply: During Construction stage, about 7 KLD of water is sourced through nearby STP/HUDA STP. Waste Generation / Handling: Soil excavated will be reused for backfilling and the fertile top soil will be reused for horticulture purpose. Spillage of oil from the machinery or cement residual from concrete mixer plants will be properly being collected and reused in construction site. For construction labour, proper sanitary facilities & wash areas will be constructed such as mobile toilets and good hygienic conditions are maintained.

1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity)

No low lying and wetlands area are present in and around the project site.

Page 28: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 28of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

1.9 Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal)

The construction waste generated from the project is common in nature and does not cause any health hazard to associate and nearby population. The construction debris is kept to be used for land leveling/back filling. Waste concrete will be reused as aggregate in construction process. Mobile toilets & drinking water for construction labor are provided. The sewage and waste water generated is being disposed off to septic tank via soak pit.

2. WATER ENVIRONMENT 2.1 Give the total quantity of water

requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement.

The total quantity of water requirement shall be 1417 KLD & shall be met by HUDA Supply. Domestic : 924 KLD Flushing : 397KLD Gardening : 79 KLD DG Cooling : 10 KLD Misc. : 7 KLD Total Water Requirement : 1417 KLD Total Waste Water Discharge : 1138 KLD

2.2 What is the capacity (dependable flow or yield) of the proposed source of water?

HUDA will supply water to the colony and it is a dependable source of water.

2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality)

Huda will supply is not made or the supply made is inadequate then the water shall be arranged through tankers.

2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage)

The total treated water of 1081 KLD generated from the S.T.P out of which 493 KLD shall be used in flushing, gardening, cooling & misc. purposes within the project premises. Approx. 34.7 % of total water requirement will be met by recycled water.

Page 29: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 29 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption)

There will not be any substantial effect on water demand of this region as the development will be done as per the development plan.

2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity)

The total waste water generated from the colony will be 1138 KLD which will be treated in in-house S.T.P of capacity 1400 KLD. 493 KLD of the treated water will be reused for flushing, gardening, cooling & misc. purposes. 34.7 % of treated water will be recycled for use. Excess treated water of 588 KLD shall be discharge to tanker water supplier.

2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created.

28 number of rain water harvesting pits will be provided at site. (Details of Rain Water Harvesting is given in Prefeasibility Report).

2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long-term basis? Would it aggravate the problems of flooding or water logging in any way?

After the construction of the colony; the rain water will be properly collected and will be treated & reused used to recharge the ground. No, it will not aggravate the problem of flooding or water logging in any way, rather will reduce the same.

2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any)

Ground water extraction, if required will be done with prior permission from CGWA however ground water recharging is proposed through rain water harvesting, so, there will be positive impact on ground water levels. Ground water table is at 15-20 m

2.10 What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts)

During the construction phase, runoff from the construction site shall not allowed into the roadside. It will be collected in a tank & after pre-treatment it is being reused for sprinkling, etc.

Page 30: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 30of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels)

During construction phase, Adequate measures will be taken to channelize such storm water and the same will be collected in a tank & after pre-treatment it will be reused for sprinkling etc. During operation phase Storm water will be channelized to 28 no. of rainwater harvesting pits proposed for the colony.

2.12 Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation)

Mobile toilets are proposed for labourers during construction period. The waste will be disposed off to septic tank via soak pit. Washing area will be cleaned and hygienic condition will be maintained.

2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal)

Waste water during construction phase from labours will be discharged into septic tank followed by soak pit. During operation phase 1138 KLD of waste water will be treated in the proposed S.T.P. of 1400 KLD capacity based on Extended Aeration technology. 34.7 % of treated water will be reused. Excess treated water of 588 KLD shall be given to water tanker supplier.

2.14 Give details of dual plumbing system if treated waste used is used for flushing of toilets or any other use.

Dual Plumbing line will be provided in the colony for reuse of treated water.

3. VEGETATION 3.1 Is there any threat of the project to

the biodiversity? (Give a description of the local ecosystem with its unique features, if any)

Core Zone: No vegetation exists at site except few bushes and grasses which has been cleared at the time of construction. Buffer Zone:

Shisham Champak Chhota

Gulmohar

Pilkhan Arjun Champa

Ashoka Ficus Dhayti

Madhu Roheda Harisinghar

Page 31: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 31 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project)

No vegetation exists at site except few bushes and grasses which has already been cleared at the time of construction.

3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)

There will not be any kind of impact of this project on site features. The Shelter belt for the proposed project has been planned to provide a clean, healthy and beautiful green environment for the people to live in within the proposed project site. To minimize the impact, the provision of plantation area 26199.28 Sqm area, with lawns, ornamental plants and trees shall be provided.

4. FAUNA 4.1 Is there likely to be any

displacement of fauna- both terrestrial and aquatic or creation of barriers for their movement? Provide the details.

Core Zone: The proposed site is an open land and there will be only some rats, dogs and squirrels, so in existing conditions this place is not the habitat for local fauna. There is no displacement or any other effect on the local fauna due to proposed project activities. Buffer Zone: There are No wild life sanctuaries within 10 km radius of the project site.

4.2 Any direct or indirect impacts on the avifauna of the area? Provide details.

As there is no distinct plantation at site, hence no avifauna exist at site. However, proper landscaping has been planned to provide a clean, healthy and beautiful green environment for the population. Common native variety of trees and ornamental flowering species will be planted in the green space which will attract avifauna & hence, will have direct positive impact on the local avifauna and will provide shelter to local birds.

4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna

Not applicable

Page 32: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 32of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

5. AIR ENVIRONMENT

5.1 Will the project increase atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions)

The traffic will increase due to operation of colony. Increased traffic generation of vehicles due to project will not cause significant increase in atmospheric concentration of gases and do not result in heat island formation. Tree plantation in the colony will be provided such that the impact of air pollution shall be minimized. D.G. Set of capacity 4 X 2000 KVA& 2 X 1010 KVA will be installed in the colony which will be operated during power cut only. Ventilation system will also be provided in STP room.

5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters.

During construction phase sprinkling will be done which will reduce the dust generation. No dust, odour will be generated at site. Smoke will be generated from the operation of DG sets. Proper emission standards will be maintained as per CPCB guidelines. Ventilation system will also be provided in STP room.

5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site.

The optimum parking provision is proposed within the site on surface stilt & Basement. Hence there will be no shortage of parking space for vehicles. The parking provision of colony is 2045 ECS.

5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category.

The project is well connected to NH-1 & by a service road. The main entrance will be from ROW of 45 meter and service road of 12 meter. All internal roads will be 6 m wide. It will be good enough for better movement of vehicles. It is also ensure that street lighting will be installed along the road to avoid any accident.

Page 33: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 33 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

6. AESTHETICS

5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above.

During construction, noise barriers are installed to reduce traffic noise & vibration and during operation Shelter belt developed within the colony will mitigate the traffic noise. Proper care is being taken during design that there will not be any increase in traffic noise by providing two-way traffic movement, hence no honking within the colony will be maintained. The foundation is being made very hard and paved with rubber flooring to minimize the vibration, also all other measures are being adopted during designing that there will not be any causes of vibrations during the traffic density.

5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details.

There would be slight impact of DG sets on noise levels, vibration and in ambient air quality around the project site.

1. All the DG Sets of the proposed project would be acoustically enclosed. And will be kept in acoustically treated room.

2. Stack height as per C.P.C.B. norms to reduce the impact on air quality around the project site will be provided.

3. The noise from DG sets will meet the desired standard as per C.P.C.B. guidelines. Low Sulphur fuel will be used to run these DG sets.

4. Vibration pads will be used to run these DG sets to minimize the vibration effect.

6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?

The open land does not have any scenic amenity or beauty. Construction of the Group Housing Colony will increase the beauty of the area by having proper landscaping. Yes, all considerations have been taken by the proponents.

Page 34: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 34of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details.

The proposed project is a Group Housing colony & thus there will be influx of population in the form of residents, staffs & visitors. Thus there will be some change in the demographic structure of the area.

Residents(D.U.) = 8110

EWS = 1460

STAFF = 300

Visitors = 1000

7.2 Give details of the existing social infrastructure around the proposed project.

Hospitals

1.Civil Hospital

Schools

1.Sri Sathya Sai School

Post office

1.Post Office

Place of Worship

1.Temple

2.Mosque

4.5 Km W

3.2 Km N

3.7 Km E

1 Km W

4.5 Km SE

6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account?

Construction was started at site as per Earlier EC. Which is a part of construction hence no such impact on existing structure. Hence, there is no need of any consideration.

6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered.

There are no typical urban form & urban design influencing the design criteria. No there is no anthropological or archaeological site or artifacts near the site. All significant features have been considered.

Page 35: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 35 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed?

The proposed colony will be constructed within the designated site as per the defined building by-laws of government authority. There is no sacred site or cultural heritage site within vicinity of proposed project; hence no adverse impacts are envisaged.

8. BUILDING MATERIALS

8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency

The major materials required for construction of the project are steel, cement, bricks, flooring tiles/ stones, sanitary and hardware items, electrical fittings, etc. Energy efficient building material will be used.

8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts?

Yes, transportation and handling of material will be resulting in air & noise pollution; however will be minimized by covering material by the tarpaulin and ensuring PUC certificate of vehicles and good condition silencers. Public Nuisance: Barricading will be provided on construction site and construction activity will be restricted to specific site only. A boundary wall/ fencing will be constructed around the site to avoid any public nuisance. No wastewater or waste shall be allowed to be disposed outside the site. All activity related to construction will be restricted within the project site only.

8.3 Are recycled materials used in roads and structures? State the extent of savings achieved?

The excavated earth will be stacked & will be utilized to the extent possible. The debris of construction material will be kept & will be also used in backfilling, roads etc.

Page 36: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 36of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project.

The solid waste will be disposed off as per Municipal Solid Waste (Management and Handling) Rules, 2000. Details are given in Prefeasibility Report.

9. ENERGY CONSERVATION 9.1 Give details of the power

requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption?

Power Requirement – 11 MW Source of Power: Uttar Haryana Board Vitran Nigam(UHBVN) Back-up Source: 72.8 % power back up will proposed by using D.G. Sets of 4 X 2000 KVA & 2 X 1010 KVA. During power failure D.G. Sets will start automatically. Fuel consumption for DG Sets has been calculated to be 360 lt/hr (when in operation) of Ultra Low Sulphur Diesel. As per the latest C.P.C.B. norms, D.G. Sets have to be installed in acoustic enclosure room and silencer. LED, T5 lamps, energy efficient motors and pumps shall be used to conserve the electrical energy & to minimize the consumption of non-renewable fuel.

9.2 What type of and capacity of power back-up do you plan to provide?

DG Sets: 4 X 2000 KVA & 2 x 1010 KVA Fuel: Ultra Low sulphur diesel. All shall be installed to provide 72.8% power backup during power failures.

9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation?

Plain openable glass will be used

9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project.

Building design and envelope is being optimized through selection of appropriate wall and roof construction and through adoption of solar measures.

Page 37: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 37 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building? Substantiate with details.

Yes, the layouts of buildings are designed to maximize the potential for use of solar lighting per day devices. Yes, solar lights shall be used for street lighting & common areas.

9.6. Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected?

Solar Measures shall be adopted to provide shading devices for windows and roof which would effectively reduce heating up of building envelope. Louvers and sunshades will be used around windows in order to protect from direct sunlight.

9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details.

Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions?

Are you using CFC and HCFC free chillers? Provide specifications

Suitable energy optimization will be adopted during the calculation of energy load of the proposed project. The space heating load will be minimized using solar structure and suitable buildings envelop material. Uses of incandescent lamp and halogen lamps have been avoided and energy efficient LED shall be used for all common area. The diesel generator sets shall be automatically controlled to optimize their usage based on the actual load requirements at any time. Space conditioning will be provided as per norms of National Building Code – Part 8; Building Services Section 3–Mechanical Ventilation. Lighting intensity will be done as per the National Building Code Guidelines.

Not applicable.

9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self-assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects?

No significant effect is envisaged on the surrounding environment of project. Increased traffic generation and use of diesel generators sets in the project will not cause significant increase in atmospheric concentration of gases and will not result in heat island formation.

Page 38: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 38of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components.

For commercial areas

S. No

BUILDING MATERIAL PROPOSED WITH U & R VALUES

‘R’ Values (in Sq m. Deg C/ Watts )

‘U’ Values (in Watts/ Sq m. Deg C)

1. Wall Brick & ACC Blocks wall (230 mm thick), both side thick sand cement plaster (12-18mm) with insulation.

2.28 0.44

2. Roof 200 mm RCC slab with mud phuska & clay tiles with 75 mm insulation.

2.04 0.49

9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans.

NBC 2005 Guidelines for Group Housing Project shall be followed.

9.11 If you are using glass as wall material provides details and specifications including emissive and thermal characteristics.

No, Plain openable glass will be used

9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration.

All the window and door will be airtight quality, hence we don’t foresee any air infiltration.

9.13 To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used.

Solar energy will be used inside the Group Housing Colony.

Page 39: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 39 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

10. ENVIRONMENT MANAGEMENT PLAN 10.1 The Environment Management Plan would

consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

Environment Management Plan is given in Pre-feasibility attached as ENCLOSURE-4 PRE-FEASIBILITY REPORT

Page 40: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) FORM-I & IA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 40of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 2. CONCEPTUAL PLAN

Page 41: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) CONCEPTUAL PLAN

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 41of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

CONCEPTUAL PLAN

2.1 Introduction The project Expansion of Group Housing “PRESTON” proposed at Village- Shahapur Turk, Sector-9 &18, Sonipat, Haryana developed by M/s Parsvnath Developers Ltd., Project has already been granted EC vide letter no. 21-545/2007-IA,III Dated 24-12-2007 for the plot area 113741.41 Sq m and built up area 203903.71 Sq m . It is now proposed to be increased in total built up area from 203903.71 Sq m to 230224.67 Sq m. The site is proposed for the development of Group Housing Colony which includes Dwelling Units, EWS, Primary School, Nursery school, commercial etc. Only 3-4% structural work has been done on site. At present, no construction is going on the site.

2.2 Activities/ Amenities Dwelling Unit, EWS

Primary School

Nursery School

Commercial

2.3 Site Location The project site is located at village- Shahpur Turk, Sector- 9 & 18, Sonipat, Haryana. The location of site & Site Connectivity is given in Prefeasibility Report.

2.4 Type of Project It is an Expansion of Group Housing project. The project is proposed to be developed at a plot area of 113741.41 sq m. The total built up area of the project is 230224.67 sq m. Hence, the project falls under category 8(b) of EIA notifiction, 2006.

2.5 Project Details

The Environmental Clearance has already been granted for built up area 203903.71 Sq m. the proposed expansion is for adding built up area of 26320.96 Sq m. So, the total built up area will be revised to 230224.67 Sq m.

With 18 multi-storied tower comprising towers for 2BHK, 3BHK,3.5BHK,&4BHK,EWS units, schools and commercial shops.

At present excavation for towers 2, 3, 4, 5, & 6 has been completed and about 1,02,371 cum soil was excavated for towers 1, 9, 10, 11 & 12 while excavation for towers 7,8,13,14,15,16,17, &18 not yet started.

Page 42: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) CONCEPTUAL PLAN

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 42of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

Project details are given in Table 1 Table 1: Project Details

1. Name of Project Group Housing “PRESTON”

1 Activity D.U., EWS, Primary School (2 no.), Nursery School (2 no.), commercial etc.

2 Types of project 8(b)

3 Total Plot area 113741.41 Sq m

4 Area under road 26410.47 sq m

5 Net plot area 87330.94 sq m

6 Cost of project Rs. 238.20 crores

7 Ground coverage Permissible (35%)

39809.32 sq m

8 Ground coverage achieved (24%)

20740.3 Sq m

9 FAR (permissible)(1.75) 199046.64 sq m

10 FAR (achieved)(1.74) 199038.5 Sq m

11 Total FAR 199038.5 Sq m

12 Basement area 15609.89 Sq m

14 Total Non-FAR 15576.28 Sq m

15 Total Build-up area(FAR, Non-FAR, Stilt, basement)

230224.67 Sq m

16 Green Area (30%) 26199.28 Sq m

17 No. of basement 1

18 No. of towers 21

19 No. of floors S+19

20 Height of building 57 m

21 No. of D.U. 1622

22 EWS 292

23 Population 9570

24 Resident 8110

25 EWS 1460

26 Staff 300

27 Visitors 1000

28 Total population 10870

29 Total Power Load 11 MW

30 No. of DG sets 4 X 2000 KVA & 2 X 1010 KVA

31 No. of Rainwater Harvesting pits 28

32 Parking required 2028 ECS

Page 43: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 43 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

33 Parking provision 2045 ECS

34 Water requirement 1417 KLD

35 Waste water discharge 1138 KLD

36 STP capacity 1400 KLD

37 Solid waste generated 4502 kg/day

2.6 Population Details During Construction Phase- 150 Nos. of local labour will be employed for the construction of the Group Housing Colony. During Operation Phase- The total population of the project has been estimated to be 10870 persons. The population details are given in Table 2 Table 2: Estimation of Population

Type No. Factor Population

Dwelling unit 1622 @5 8110

EWS 292 @5 1460

Staff 300

Visitors 1000

TOTAL 10870

2.7 Water Management Water Requirement:

During construction phase- Approx. 7 KLD of water will be required which will be arranged on temporary basis through the tankers.

During operation phase- Water requirement will be 1417KLD which will be met through HUDA, Haryana.

The total water management has been given in Prefeasibility Report.

2.8 Rain water collection Details Total 28 no. of rain water recharging structures will be installed.

2.9 Power Requirement& Back-up During Construction Phase- DG sets of 62.5 kVA will be used for construction works. During Operation Phase- The total power requirement of the colony is 11 MW which will be supplied by UHBVN. In case of power failure, power backup is provided through DG sets. The DG sets of 4 X 2000 KVA and 2x 1010 KVA will be installed in the basement of colony. Stack height of 6.0 m above roof level will be maintained.

Page 44: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) CONCEPTUAL PLAN

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 44of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

2.10 Solid & Hazardous Waste Management During Construction phase- Total 23 Kg/day of solid waste will be generated from labourers during construction phase. This waste will be given to approved vendor/recycler During operation phase- Total 4502 kg/day solid waste will be generated from the colony. It will be properly managed and given to approve vendor/recycler. 68 ltrs/month used oil shall be generated which will be sent to approved vendor and 2 kg/month E-waste will be generated which will also given to approved vendor. Battery waste shall be generated from inverters & UPS. It will be properly managed as per Batteries (Management and Handling) Rules 2001. Details of Solid Waste Management are given in Pre-feasibilty Report.

2.11 Parking Management As per zonning provision of 2045 ECS has been made.

2.12 Green Area Development The area of 26199.28 sq m is designated for plantation including big foliage trees, Avenue plantation & herbs & shrubs.

Page 45: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 45 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 3. Construction Status as on 01.01.2015

Page 46: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) ENCLOSURES

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 46of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

TOWERS Excavation Work

PCC Work RCC Work Reinforcement Used

Tower 2 Completed (100 %)

380 Cum. Completed

750 Cum. Completed

316 MT used Tower 3

Tower 4

Tower 5

Tower 6

Tower 7

Not yet started

Tower 8

Tower13

Tower14

Tower 15

Tower16

Tower17

Tower18

Tower 1 1,02,371 Cum.

Not Done

Not Done

Not Done

Tower 9

Tower 10

Tower 11

Tower 12

Page 47: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 47 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 4. Pre-Feasibility Report

Page 48: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 48of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

PRE-FEASIBILITY REPORT

EXPANSION OF GROUP HOUSING

“PRESTON”

At

Village- Shahpur Turk, Sector-9 & 18,

Sonipat, Haryana.

Developed by M/s Parvsnath Developers Ltd.

Parsvnath Metro Tower,

Near Shahdara Metro Station,

Shahdara, Delhi-110032

Prepared By: M/S PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered wide list of accredited consultants

organizations/ Rev 27/ 7th May, 2015 at S.No-116)

NN Mall, Sector-3, Rohini, New-Delhi-85

Phone: 011-47528467; 011-47021086

Fax: - 011-47528434

Page 49: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 49 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.1 EXECUTIVE SUMMARY OF THE PROJECT

4.1.1 Activities: The project will be an Expansion of Group Housing colony which shall include:

1. Dwelling Units, EWS. 2. Primary School 3. Nursery School 4. Commercial etc.

There is no change in proposed activities.

4.1.2 Description & Details of Project: Project details are given in Table 3. Table 3: Project Details

1. Name of Project Group Housing “ PRESTON”

1 Activity D.U., EWS, Primary School (2 no.), Nursery School (2 no.), commercial etc.

2 Types of project 8(b)

3 Total Plot area 113741.41 Sq m

4 Area under Road 26410.47 sq m

5 Net plot area 87330.94 sq m

6 Cost of project Rs. 238.20 crores

7 Ground coverage Permissible (35%)

39809.32 sq m

8 Ground coverage achieved (24%)

20740.3 Sq m

9 FAR (permissible)(1.75) 199046.64 sq m

10 FAR (achieved)(1.74) 199038.5 Sq m

11 Basement area 15609.89 Sq m

12 Total Non-FAR 15576.28 Sq m

13 Total Build-up area(FAR, Non-FAR, Stilt, basement)

230224.67 Sq m

14 Green Area (30%) 26199.28 Sq m

15 No. of basement 1

16 No. of towers 21

17 No. of floors S+19

18 Height of building 57 m

19 No. of D.U. 1622

20 EWS 292

21 Population 9570

22 Resident 8110

23 EWS 1460

24 Staff 300

25 visitors 1000

26 Total population 10870

Page 50: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 50of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

27 Total Power Load 11 MW

28 No. of DG sets 4 X 2000 KVA & 2 X 1010 KVA

29 No. of Rainwater Harvesting pits 28

30 Parking required 2028 ECS

31 Parking provision 2045 ECS

32 Water requirement 1417 KLD

33 Waste water discharge 1138 KLD

34 STP capacity 1400 KLD

35 Solid waste generated 4502 kg/day

4.2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

4.2.1 Identification of the project & project proponent: The proposed Expansion of Group Housing “PRESTON” will be located at Village- Shahpur Turk, Sector-9 & 18, Sonipat, Haryana. The land has been allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 for the development of group housing Colony. Project has already been granted Environment Clearance vide letter no. 21-545/2007-1A.III dated 24/12/2007 for the plot area 1,13,741.41 sq m and built up area 2,03,903 sq m. it is now proposed to increase total built up area from 2,03,903.71 sq m to 230224.675 sq m.

4.2.2 Brief Description of the Nature of the Project: The total plot area is 113741.41 sq m out of which 20740.38 sq m shall be utilized as Ground Coverage. The revised built-up area of the project is 230224.67 sq m hence it falls under the category 8 (b) of the EIA notification, 2006 .Earlier Environmental Clearance has been granted on built up area 203903.71 sq m. Now expansion is proposed. After that built up area will be 230224.67 sq m

4.2.3 Need for the Project & its importance to the country or the region: It will increase Infrastructure of the area & will provide better life style.

It will provide healthy, green & safe premises.

It will provide a better work environment with amenities like commercial building, Primary school, Nursery school, etc.

4.2.4 Demand & Supply Gap:

4.2.4.1.1 Import vs. Indigeneous production:

As this is an Expansion of Group Housing Colony. So this is not applicable.

Page 51: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 51 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.2.5 Export Possibilities:

As this is an Expansion of Group Housing Colony. So this is not applicable.

4.2.6 Domestic/Expert Markets:

As this is an Expansion of Group Housing Colony so this is not applicable

4.2.7 Employment Generation (Direct & Indirect) due to the Project:

The Group Housing Colony will provide employment to around 150 labours during construction

phase staff, 300 Staff will be required for workers, security staff and for other miscellaneous

purposes.

4.3 PROJECT DESCRIPTION

4.3.1 Type of Project including interlinked & interdependent Projects, if

any:

This project is a construction project which comes under category 8 (b) of EIA Notification, 2006

and it is not an interlinked project.

4.3.2 Location (with coordinates):

Latitude Longitude Elevation

28°59'40.64"N 77°04'50.85"E 220 m

Page 52: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 52of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3.2.1 Map showing general location:

4.3.2.2 Map showing specific location:

Page 53: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 53 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3.2.3 Map showing project boundary: given above

4.3.2.4 Map showing project site layout: is enclosed as enclosure-II

The connectivity to the site is given in Table 4: Table 4: Connectivity to the Site

S. No. Accessibility Description Distance & Direction

1. Highway/ Road National Highway-1 State Highway-11

Adjacent E 3 Km SW

2. Railway Station Sonipat Railway Station Harsana Kalan Railway station

6.3 Km W 7 Km SW

3. Airport Indira Gandhi International Airport 48 Km S

4.3.2.5 Topographical Map of Expansion of Group Housing “PRESTON” of 10

Km radius Area:

Page 54: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 54of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3.2.6 Layout Plan

The layout plan is given below:

4.3.2.7 Site Photographs

The site photographs of the project are given below:

EWS

T-05

143

145

36100

14824

11044 10610 15390

SITE PART A

O

6000

S+14T-08

S+14

T-10

S+14T-12

T-15

S+18T-16

T-17

T-19S+14

T-20S+14

T-21

RA

MP

DN

TO

BA

SE

ME

NT

RA

MP

UP

FR

OM

BA

SE

ME

NT

SLO

PE

1: 1

0

6000

16850

6 M

W

D P

E R

I P

H E

R I A

L R

O A

D

6 M W I D E P E R I P H E R I A L R O A D

01

05

10

15

20

25

50

51

55

6. 0 M E T E R W I D E R O A D

7000

6000

60006000

39000

3460 4460

100003000

100003460

6000

6000

6000

6785

148193

44085

49710

6800

6680

7500

6000

17882

16304

16262

14811

6 M W I D E P E R I P H E R I A L R O A D

13024

13313

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20MLvl.+43.20M

Lvl.+43.20MLvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

14001

14005

24000

7770

7430

GREEN AREA

181

88

24645

23097

6. 0

M E T E R

W I D E R

O A D

83820

79580

630

70

12000

45000

6000

10000

12000

12000

480

33

6000

SCHOOL- 2PRIMARY

P1

P45

172500

330

00

P3130000

23832

313

56

PLOT AREA1.0 Acre

PLOT AREA0.2 Acre

PLOT AREA568.70 sq.m.

6000

6000

10000

8850

G+1Lvl.+8.15M

G+2Lvl.+11.25M

S1 S3

S1

S6

S8

65

69

70

61

64

G+3Lvl.+14.60M

14421

C1C3

C5

C8

6 M

W

D P

E R

I P

H E

R I A

L R

O A

D

6000

121

15

603

50

50280

103

25

6000

6010

6000

5000

3000

5000 3000

5000

3000

3000

5000

2500

5000

2500

5000

6000

224226

G+13Lvl.+43.20M Lvl.+43.20M

1566

Services

17000

Services

6930

20000

Page 55: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 55 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3.3 Selection of Site:

4.3.3.1 Details of alternate sites considered:

No alternate or interlinked site is being considered in this project

4.3.3.2 Basis for site selection and the environmental considerations:

The land has been allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 for the development of group housing Colony namely “PRESTON” at Village- Shahpur Turk, Sector-9 & 18, Sonipat, Haryana. The surrounded area is moderately developed area. Area is well connected by road network and has power supply with all necessary amenities.

4.3.4 Size or Magnitude of Operation:

The total plot area of the project is 113741.41 sq m. The total built-up area of the project is 230224.67 sq m.

4.3.5 Project Description:

4.3.5.1 A schematic diagram showing project layout with components:

Layout plan is enclosed as Enclosure-11

Page 56: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 56of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3.6 Details of raw material required:

4.3.6.1 Raw materials source and Quantity:

ADHESIVE

AGGREGATE- BRICK

AGGREGATE- OVER BURNT

AGGREGATE-STONE

AGGREGATE-STONE CHIPPING

ALUMINIUM

ASBESTOS CEMENT PRODUCTS

BITUMEN FELT FIBRE BASE

BITUMEN HOT SEALING COMPOUND

BITUMEN & COAL TAR

BRACKETS

BRICKS

BRUSHES

CEMENT

LIME

CAUSTIC SODA

WATER PROOFING COMPOUND

POLYMER

HYDROCHLORIC ACID

ARALDITE

HARDNER

FLOW CONTROL AGENT

PLASTICIZER

BHUSA

HESSIAN CLOTH

SPUN YARN

BLEACHING POWDER

CRAMP

DISTEMPER

FLY ASH

FITTINGS (FOR DOOOR & WINDOWS)

BUTT HINGES

TOWER BOLT

BRASS FITTINGS

CASEMENT STAYS

CUPBOARD LOCK

HASPS AND STAPLES

HINGES (SINGLE ACTING SPRING)

BUTT HINGES

HANDLES

Page 57: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 57 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

HASPS AND STAPLES

SCREWS

STAIN LESSSTEEL FITTING

MS PIPE

FASTNER

GLASS

MARBLE CHIPS

MARBLE SLABS

MUSLIN CLOTH

4.3.6.2 Marketing area of final products:

This is a project of Group Housing Colony, so no production will be there. Marketing will be done of constructed flats/DU.

4.3.6.3 Mode of transport of raw materials and finished products:

The raw materials during construction will be transported by trucks and trolleys. Cars, two wheelers etc. will be used during operational phase.

4.3.7 Resource optimization and reuse and recycling in project resources:

The concept of reduce, recycle and reuse will be taken into consideration at every step of this project. Excavation(only for single level basement) for Towers 2, 3, 4, 5 & 6 has been completed and about 1,02,371 cum soil was excavated for towers 1, 9, 10, 11 & 12 while excavation for towers 7,8,13,14,15,16,17 &18 not yet started. This excavated soil/ rock has been properly stacked within the site under tarpaulin cover and will be reused for backfilling purpose. The top soil will be preserved separately and will be used for landscaping purpose and the excess excavated soil will be disposed off to approve Municipal Filling Ground. The treated water from STP is being reused in horticulture, flushing and cooling purpose and same shall be followed in future. The quantification of the same is given later in Pre-Feasibility report. The municipal solid waste will be segregated and sent to Municipal land fill site. The Organic waste from colony can be used as manure for landscaping. The quantification of the same is given later in Pre-Feasibility report.

4.3.8 Management of Resources:

4.3.8.1 Water source and quantity:

The total quantity of water required in the project will be 1417 KLD out of which fresh water requirement will be 926 KLD, which will be met by HUDA.

Page 58: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 58of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.3.8.2 Energy Source and requirement:

The total power requirement will be 11 MW which will be met by UHBVN. DG sets of 4 X 2000 KVA & 2 x 1010 KVA will be installed for power back-up and kept in Basement. Proper stack height of 6 m above roof level will be provided.

4.3.9 Waste Management:

4.3.9.1 Amount of wastewater generated and STP capacity:

The amount of waste water of 1138 KLD will be generated from the colony, which will be treatment in STP of 1400 KLD capacity.

4.3.9.2 Solid waste Management:

Total 4502 kg/day solid waste will be generated from the colony. It will be properly managed and given to approve vendor/recycler. 2800 kg/day of bio-degradable waste generated will be sent to municipal solid waste site while 1702 kg/day of Recyclable waste shall be given to approved recycler. 68 ltrs/month used oil shall be generated which will be sent to approved vendor and 2 kg/month E-waste will be generated which will also given to approved vendor Battery waste shall be generated from inverters & UPS. It will be properly managed as per Batteries (Management and Handling) Rules 2001. Details of Solid Waste Management are given in Prefeasibility Report.

4.3.10 Layout and Plans: The All Plans are attached in Enclosure-11

The topographical Map is attached as Enclosure-11

4.4 Site Analysis:

4.4.1 Connectivity:

Site Location: Village-Shahapur Turk, Sector-9 &18, Sonipat, Haryana

Nearest railway station: Sonipat Railway Station-6.3 Km, W

Nearest airport: Indira Gandhi International Airport-48 Km, S

Nearest National Highway: NH-01- Adjacent E

Page 59: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 59 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.4.2 Land form, land use and land ownership:

The proposed Expansion of Group Housing “PRESTON” will be located Village- Shahapur Turk,

Sector-9&18, Sonipat, Haryana. Land has been allotted by DTCP vide license no. 1205 of 2006

dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath

Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s

Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015

for the development of group housing Colony. Construction had already been started at site.

Hence, landuse has been already been changed from vacant land to group housing. So, no

change in landuse.

4.4.3 Topographical map:

The Topographical map is attached as Enclosure-11

4.4.4 Existing Land Use Pattern:

4.4.4.1 Eco-sensitive areas with distance from project location:

Water sources or other water bodies

Yamuna Canal

Yamuna River

Rajpur Distributary

Harsana Distributary

Main drain no.6

Drain no.8

8.7 Km NE

11 Km SW

1.9 Km SW

6 Km SW

4.2 Km WSW

9.2 Km S

Page 60: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 60of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.4.5 Existing Infrastructure: Hospitals

1. Speech & Hearing Hospital

2. D. N Sharma Hospital

3. Speech & hearing Hospital

Schools

1. Sri Sathya Sai School

2. Govt. Girls School

3. IITM

Post office

1. Post Office

Place of Worship

1. Temple

2. Mosque

5.76 Km W

4.98 Km W

5.76 km W

3.2 Km N

5.79 Km W

3.89 Km N

3.7 Km E

1 Km W

4.5 Km SE

4.4.6 Soil classification: Soil quality of the area is Silt Loam. Colour of the soil is Dark-brown.

4.4.7 Climate data from secondary sources:

Climatologically data from (1969-1980)

MEAN EXTREMES

MONTH DRY BULB

WET BULB

DAILY MAX

DAILY MEAN

HIGHEST IN THE MONTH

LOWEST IN THE MONTH HIGHEST

DATE AND YEAR LOWEST

DATE AND YEAR

0C 0C 0C 0C 0C 0C 0C 0C

JAN 10.2 19.3 7.8 12.8 21.5 5 25.5 1.1 28 29 1969 0 11 1971

Page 61: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 61 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

FEB 13.0 22.1 10.2 14.9 24 7.6 29.4 2.3 33 28 1980 0.7 21 1974

MAR 19.0 28.4 14.3 17.6 30.3 12.2 36.2 6.4 39 29 1973 3.7 01 1972

APR 26.6 35.5 18.2 20.4 36.9 18.8 41.9 12.4 44.8 28 1979 9.2 02 1965

MAY 31.0 38.5 20.9 22.5 40.5 23.7 45.8 17.8 49 10 1966 17 01 1977

JUNE 31.5 37.4 24.4 25.2 39.7 26.9 44.7 21.4 46.3 10 1979 20.4 27 1974

JULY 29.3 32.5 25.9 26.6 35.2 26.2 40.5 22.8 44 02 1974 21.3 23 1970

AUG 28.2 31.0 25.6 26.6 33.3 25 36.9 22.1 40.1 04 1972 15.5 11 1978

SEP 27.4 31.6 23.5 24.8 34.2 22.8 36.9 19.6 41.2 16 1974 13.9 24 1972

OCT 24.2 31.0 18.9 20.8 33.7 17.4 36.7 12.9 38 03 1974 9.8 31 1974

NOV 17.3 25.8 13.1 16.8 29 10.3 32.8 5.5 38.4 06 1974 2.6 28 1969

DEC 11.3 20.5 8.6 13.6 23.2 5.6 27.9 2.1 32.5 06 1978 -0.4 05 1966

ANNUAL TOTAL OR MEAN 22.4 29.5 17.6 20.2 31.8 16.8 46.1 0.8 49 -0.4

NUMBER OF YEARS

14 14

14 14 15 14 15 15 15 15

4.4.8 Social Infrastructure available: Already provided in sec. no. 4.4.5 of pre-feasibility report.

4.5 Planning Brief:

4.5.1 Planning concept: The proposed Expansion of Group Housing “PRESTON” will be located at Village- Shahapur Turk, Sector-9&18, Sonipat, Haryana. Land has been allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 for the development of group housing Colony. Environmental Clearance has been granted vide letter no. 21-545/2007-IA,III dated24-12-2007 for the plot area 113741.41 Sq m and

Page 62: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 62of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

built up area 203903.71 Sq m. Now, the proposed total plot area is 113741.41 sq m out of which 20740.3 sq m shall be utilized as Ground Coverage. The revised built-up area of the project is 230224.67 sq m hence it falls under the category 8 (b) of the EIA notification, 2006.Only 3-4 % of structural work has been done at site after that construction work was stopped at site. Given in Enclosure-3.

4.5.2 Population projection: The total population of the Group housing “PRESTON” has been estimated to be 10870, out of which the supporting Residents will be 9570 & staff will be 300, visitors will be 1000.

4.5.3 Land use Planning (break-up along with green belt):

Land use Area (sq m) Percentage (%)

Ground Coverage 20740.3 18.23

Green Area 26199.28 30

Surface parking area 24100 27

Road Area/unpaved area 16291.35 19

Area under road 26410.47 5.77

4.5.4 Assessment of infrastructure Demand (Physical and Social): As the physical infrastructure already exists in the area there is no need for development of new infrastructure. The Group Housing colony project will result in the increase in the social infrastructure as the population related to Group Housing in form of supporting staff, working staff & visitors will increase

4.5.5 Industrial area: This is the Expansion of Group Housing Colony so there will not be any production in the project area.

4.5.6 Amenities/facilities: There will be Commercial building, Schools etc.

4.6 Proposed Infrastructure:

4.6.1 Other area: The proposed project will have Dwelling Units, EWS, Primary school, Nursery school, commercial.

Page 63: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 63 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.6.2 Green Belt and Plantation Details:

Green belt planning will be done with ecological perspectives for the project taking into consideration and availability of space and other aspects. This will help in increasing the aesthetic effect of the environment.

Since tree trunks are devoid of foliage, scrub should form there to give coverage to the trunks. The trees maintain the regional ecological balance and conform to soil and hydrological conditions. Indigenous species would be preferred.

Green belt/greenery has been developed along most of the periphery of the project area as well as along roads. Area under plantation/greenery is 26199.28 sq m with trees and plants. The trees planted are of adequate height. Any trees that do not survive are replaced. The plantation/greenery programme will be completed, simultaneously along with the project.

4.6.2.1 Species to be planted:

Botanical Name Common Name

Azadirachta indica Neem

Alstonia (scholaris) Indian devil tree

Delonix regia Gulmohar

Bauhinia pupurea Kachnar

Plumeria alba White Champa

Saraca indica Ashoka Tree

Cassia fistula golden shower tree

4.6.3 Connectivity:

Site location and connectivity

Site Location: Village-Shahapur Turk, Sector-9&18, Sonipat, Haryana

Nearest railway station: Sonipat Railway Station-6.3 Km W

Nearest airport: Indira Gandhi International Airport-48 Km S

Nearest National Highway: NH-01 – Adjacent E

4.6.4 Water Management:

4.6.4.1 Source & Supply of Water:

Total quantity of wastewater generation will be 1138 KLD. The generated sewage will be treated in in-house Sewage Treatment Plant capacity 1400 KLD. The treated water 493 KLD shall be utilized for flushing, gardening, DG cooling & miscellaneous purposes.

Page 64: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 64of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.6.4.2 Water balance

WATER CALCULATION

Population Factor in LPCD

Water requirement in KLD

DOMESTIC in KLD

FLUSHING in KLD

WASTE WATER in KLD

Domestic

Residents 8110 135 1095

EWS 1460 135 197

Staff 300 45 14

Visitor 1000 15 15

Total 1321 924 397

waste water discharge

739 397 1136

Gardening 79 Nil

DG Cooling 10 Nil

Misc. 7 2

Total 10870 1417 1138

Total Water Requirement 1417 KLD

Fresh Water 924 KLD

Treated Water 493 KLD

Domestic Use 924KLD

Flushing Water 397 KLD

Gardening 79 KLD

Waste Water 739 KLD

Waste Water 397 KLD

Waste Water NIL

Total waste water 1138 KLD

STP Capacity 1400 KLD

Treated Water 1081 KLD

Recycled Water 493 KLD

Misc. 7 KLD

Waste Water 2 KLD

To Tankers 588 KLD

DG Cooling 10 KLD

Waste Water NIL

Page 65: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 65 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.6.5 Sewage system: Total quantity of wastewater generation will be 1138 KLD. The generated sewage will be treated in in-house Sewage Treatment Plant capacity 1400 KLD. The treated water1081 KLD out of which 493 KLD shall be utilized for flushing, gardening, cooling & miscellaneous purposes.

The Sewage Treatment Plant of 1400 KLD offered has some distinct advantages over conventional activated sludge processes. The scheme is proven, under a variety of operating conditions, and is highly flexible in operation.

SCHEME OF SEWAGE TREATMENT PLANT: The sewage treatment plant (BASED ON EXTENDED AERATION TECHNOLOGY – 1400 m3/day) shall be installed to treat the raw sewage having the following characteristics:

The characteristics of Raw sewage and the characteristics required for the treated water will be as given in Table 5 and 6 respectively.

Table 5: RAW SEWAGE CHARACTERISTICS

The Sewage Treatment Plant (STP) can give treated water, which can be reused for Flushing, Gardening, DG Cooling & Miscellaneous purposes.

Table 6: TREATED SEWAGE CHARACTERISTICS pH - 6.5-8.5

BOD mg / l <10

COD mg / l <60

TSS mg / l <10

Oil & Grease mg / l <10

THE PROCESS FOR SEWAGE TREATMENT PLANT IS AS FOLLOWS:

The sewage is first passed through a Bar Screen Chamber where any extraneous / floating matter gets trapped. The sewage is then collected in a Equalizations tank where the variations in flow and characteristics are dampened, which otherwise can lead to operational problems and moreover it allows a constant flow rate downstream. The equalized sewage is then pumped to the Aeration tank where the agitators will agitate the sewage. From Aeration tank the water will flow to secondary setting Tank where in the sludge will get settled. The sludge from the secondary setting tank will go to sludge holding tank and then

Flow M3 / day 1138 KLD

pH - 6.5 – 8.5

BOD mg / l 350 – 400

COD mg / l 600 – 800

TSS mg / l 250 – 300

Oil & Grease mg / l Upto 50

Page 66: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 66of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

will be sent to filter press after passing through screw pump. The sludge will became cakes which will be used as manure in the green areas. The treated water from secondary settling tank will go to water tank which will then pass through filter feed pump and UV treatment system. Multi Grade filters made of FRP will Further treat the water . The treated water from MGF will go to Activated carbon filter. The treated water from ACF will go to softener plant to be used for cooli8ng purposed and treated water tank to be used of flushing & horticulture purposes.

4.6.6 SCHEMATIC DIAGRAM OF STP:

4.6.7 Rain water harvesting:

The main source of ground water recharging in the study area is rainwater, which infiltrates into the ground through various lithological units present in the study area. 28 number of rainwater harvesting pits have been installed. The runoff from the rooftop and storm water shall go to the recharge pits.

Scheme for Ground water Recharging The rainwater will be diverted from the rooftop using rain water pipes to the surface/underground drainage network. The rainwater is diverted into the de-silting tank to remove inorganic impurities and the outflow of the de-silting tank is taken into the recharge well.

Page 67: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 67 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

De-silting Tank The de-silting are used to remove silt and other floating impurities from rainwater. De-silting tank is like an ordinary container having provision for the inflow, outflow, and overflow. Apart from removing silt it holds the excess amount of water till it is soaked up by the recharging structure. The bottom of tank will have unpaved surface (layers of coarse sand) to allow standing water to percolate into soil. The rainwater collected in these de-silting chambers shall be utilized for horticulture.

Recharge well The recharge well consists of percolation pits with in the middle of the pits. UPVC pipe of 160 mm dia. perforated will be lowered in the middle of the boreholes and the pit will be filled with gravel and pebbles in three layers of 400 mm each consisting of boulders, gravel and coarse sand. The mouth of the UPVC pipe shall be protected to avoid silt getting into it. The depth of the bore will depend on the soil condition/water strata. The schematic diagram is enclosed. It should be therefore concluded that there is no significant impact on surface water quality & hydrology of the area. The proposed rainwater-harvesting scheme will stabilize the groundwater table in the area.

Rain Water Harvesting Calculation: Soil Quality: Silt Loam Infiltration rate: 20.3 mm/hr Porosity: 35 % Annual Rainfall: 723 mm Peak Hourly Rainfall: 45 mm/hr Ground Water Level: 15-20 m No. of Rain Water Collecting Pits for the colony: 28.

Table B: The rainwater calculation for common & other areas

4.6.8 INDUSTRIAL WASTE MANAGEMENT: As this is a Construction Project so this is not applicable

S. No.

Description of Area

Area Considered

(Sq. m) Runoff

coefficient

Intensity of rainfall (mm/hr) Peak hourly 45

mm/hr

Total volume of water available for

rain water harvesting (in cu

m)

1. Roof top area 20740.308 0.9 11 205

4. Road, pavements

& Open areas 16291.35 0.65 11 117

5. Green/Unpaved

areas 26199.28 0.2 11 58

GRAND TOTAL 380 cu m

Page 68: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) PRE-FEASIBILITY REPORT

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 68of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.6.9 SOLID WASTE MANAGEMENT:

For 10870 persons around 4502 kg/day of municipal solid waste will be generated for proposed site.

The Municipal waste categories and disposal method detail is shown is given in Table 7:

Table 7: Municipal Waste Management

HAZARDOUS WASTE MANAGEMENT: Hazardous waste is a waste with properties that make it dangerous or potentially harmful to human health or the environment. The universe of hazardous wastes is large and diverse. Hazardous wastes can be liquids, solids, contained gases, or sludge. They can be the by-products of manufacturing processes or simply discarded commercial products, like cleaning fluids or pesticides. All hazardous wastes are required to be treated and disposed off in the prescribed manner. The main objective is to promote safe management and use of hazardous substances including hazardous chemicals and hazardous wastes, in order to avoid damage to health and environment. Table 8: Hazardous & E-Waste Management

Battery waste will be generated from inverters & UPS, which shall be treated as per the Batteries (Management & Handling) Rules 2001

Type of Waste Colours of Bins

Category Disposal Method Total Waste (Kg/ day)

Organics Green Bio Degradable The waste will be sent to Municipal Solid Waste site

2800

Recyclable Items Blue Recyclable Recycler 1702

Total 4502 kg/ day

Type of Waste

Colours of Bins

Category Disposal Method Total Waste

Used Oil Black With

Label Hazardous

Waste Used oil shall be given Approve vendor 68 lit/month

E-waste Black With

Label

Hazardous Waste

E-Waste (Management & Handling) Rules, 2011 2 Kg/month

Page 69: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 69 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

4.6.10 POWER REQUIREMENT: 4.6.10.1 SOURCE:

The total electric load of the colony is 11 MW which will be sourced through UHBVN.

4.6.10.2 BACK-UP:

In case of power failure, power backup will be provided through DG sets 4 X 2000 KVA & 2 X 1010 KVA with stack height at 6m above from roof level.

4.7 REHABILITATION AND RESETTLEMENT (R&R) PLAN:

4.7.1 Details on Project Affected person: The vacant land is allotted by DTCP vide license no. 1205 of 2006 dated 06.10.2006 for 13.5 acre land to M/s Dreamweaver Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. & license no. 1206 of 2006 dated 06.10.2006 for 14.606 acres land to M/s Evergreen Realtors Pvt. Ltd. C/o M/s Parsvnath Developers Ltd. which is valid upto 05.10.2015 for the development of group housing Colony. As the land is devoid of any habitation and it does not have anybody staying there at present so the development of this project will not cause or need rehabilitation of the people.

4.8 PROJECT SCHEDULE & COST ESTIMATION:

4.8.1 Likely date of start of construction and date of completion: Construction has been started after getting Environmental Clearance and other relevant approvals. 3-4% of structural work has been done at site after that construction work has been stopped at the site. Project will complete in 2020

4.8.2 Estimated project cost: The total estimated cost of the project will be Rs. 238.20 crores. .

4.9 ANALYSIS OF PROPOSAL:

4.9.1 Social benefits to the local population:

Exemption from duties on all imports for project development

Well connected with network of public transport, local railways and cabs

Pollution free environment with proper drainage and sewage system

Easy access to airport and local Railway Station

Full authority to provide services such as water, electricity, security, restaurants and recreational facilities within the zone on purely commercial basis

Abundant supply of technically skilled manpower

Abundant supply of semi-skilled labour across all industry sectors

Page 70: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) ENCLOSURES

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 70of80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 5. DISCLOSURE OF THE CONSULTANT SHOWING NABET/QCI ACCREDIATION STATUS

Page 71: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 71 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

Details of the Accreditation of Perfact Enviro Solutions is available on the official website of NABET under the heading: List of Accredited EIA

Consultant Organizations with accredited sectors

http://nabet.qci.org.in/Environment/pop.asp?file=documents/Annexure7.pdf

Page 72: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) ENCLOSURES

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 72of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 6. LICENSE & LAND PAPERS

Page 73: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 74: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 75: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 76: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 77: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 78: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 79: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 73 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 7. BOARD RESOLUTION

Page 80: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 81: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) ENCLOSURES

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 74of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 8. AUTHORIZATION FOR CONSULTANT

Page 82: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 83: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 75 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 9. FOREST NOC

Page 84: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 85: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 86: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 87: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 88: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 89: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 90: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 91: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 92: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 93: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 94: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 95: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 96: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 97: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 98: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 99: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 100: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 101: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 102: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 103: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 104: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 105: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 106: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 107: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 108: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 109: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 110: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 111: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 112: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 113: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 114: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 115: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 116: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 117: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 118: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 119: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 120: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 121: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 122: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 123: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 124: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 125: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 126: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 127: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 128: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 129: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 130: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 131: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 132: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 133: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 134: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 135: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) ENCLOSURES

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 76of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 10. ZONING PLAN

Page 136: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 137: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 77 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 11. SITE PLAN

Page 138: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

EWS

T-05

143

145

36100

14824

11044 10610 15390

SITE PART A

O

6000

S+14T-08

S+14

T-10

S+14T-12

T-15

S+18T-16

T-17

T-19S+14

T-20S+14

T-21

RA

MP

DN

TO

BA

SE

ME

NT

RA

MP

UP

FR

OM

BA

SE

ME

NT

SLO

PE

1: 1

0

6000

16850

6 M

W

D

P E

R I

P H

E R

I A

L

R O

A D

6 M W I D E P E R I P H E R I A L R O A D

01

05

10

15

20

25

50

51

55

6. 0 M E T E R W I D E R O A D

7000

6000

60006000

39000

3460 4460

100003000

100003460

6000

6000

6000

6785

148193

44085

49710

6800

6680

7500

6000

17882

16304

16262

14811

6 M W I D E P E R I P H E R I A L R O A D

13024

13313

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20MLvl.+43.20M

Lvl.+43.20MLvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

Lvl.+43.20M

14001

14005

24000

7770

7430

GREEN AREA

18188

24645

23097

6. 0

M E T E R

W I D E R

O A D

79580

63070

12000

45000

6000

10000

12000

12000

48033

6000

SCHOOL- 2PRIMARY

P1

P45

172500

33000

P3130000

23832

31356

PLOT AREA1.0 Acre

PLOT AREA0.2 Acre

PLOT AREA568.70 sq.m.

6000

6000

10000

8850

G+1Lvl.+8.15M

G+2Lvl.+11.25M

S1 S3

S1

S6

S8

65

69

70

61

64

G+3Lvl.+14.60M

14421

C1C3

C5

C8

6 M

W

D

P E

R I

P H

E R

I A

L

R O

A D

6000

12115

60350

50280

10325

6000

6010

6000

5000

3000

5000 3000

5000

3000

3000

5000

2500

5000

2500

5000

6000

224226

G+13Lvl.+43.20M Lvl.+43.20M

6965

Services

17000

Services

6930

20000SITE PLAN

Page 139: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

8(b) ENCLOSURES

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 78of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 12. AFFIDAVIT BY CONSULTANT FOR OWNING OF DATA

Page 140: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 141: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 142: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,

TERMS OF REFERENCE FOR EXPANSION OF GROUP HOUSING “PRESTON” AT SEC-9 &18,

SONIPAT, HARYANA

PROJECT PROPONENT: PARSVNATH DEVELOPERS LTD.

Page 79 of 80

ENVIRONMENT CONSULTANT: PERFACT ENVIRO SOLUTIONS PVT. LTD.

ENCLOSURE 13. EARLIER ENVIRONMENTAL CLEARANCE

Page 143: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 144: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 145: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 146: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 147: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,
Page 148: TERMS OF REFERENCE FOR XPANSION OF E …environmentclearance.nic.in › writereaddata › Online › TOR › 0_0...Address Parsvnath Metro Tower, Near Shahdara Metro Station, Shahdara,