1 | P a g e
Quinault Indian Nation Tribal Employment Rights Office
Bidders Packet Construction Projects
• Compliance Plan & Agreement
• TERO Compliance Requirements
• Job Request Form
• TERO Classifications and Wage Rates
• Candidate Evaluation Form & Performance Evaluation Form
• Question & Answers
QIN TERO forms and information can be found on our website at:
www.quinaultindiannation.com
Click on departments then click TERO
Quinault Indian Nation Tribal Employment Rights Office
2 | P a g e
Notice The Quinault Indian Nation has a Tribal Employment Rights Ordinance (Title 97) in effect covering Indian Preference, Indian Employment, Training, Contracting and Sub-Contracting. All bidders must contact the Quinault Indian Nation Tribal Employment Rights Office to obtain all relevant information before bidding. The successful bidder must notify our TERO office in person before any work commences. Every Employer with a Construction Contract, in the sum of $10,000.00 or more, or more than one Contract in a 12-month period and the aggregate sum of those contracts is $10,000.00 or more, shall pay a one-time fee of 1.75 percent of the total amount of each Contract. Such fee shall be paid by the Employer prior to commencing work On or Near the Reservation. Any Employer that does not submit an acceptable Compliance Plan may be denied the right to commence or continue business within the boundaries of the Quinault Indian Nation Reservation as defined in Title 97. Bidders are required to contact the TERO office for information concerning TERO requirements in the following areas:
• Wage Rates • Indian Employment • Indian Sub-Contracting • Indian Training Opportunities
Please contact the TERO office should you have any questions or visit our website at www.quinaultindiannation.com for copies of Title 97 related information, forms and documents. Evelyne Kalama TERO Manager 360.276.8215 x4805
Cell: 360.324.9177
Email: [email protected]
Tara Perez TERO Compliance Officer 360.276.8215 x4806 Cell: 360.590.0566 Email: [email protected]
All TERO Ext. 4800
3 | P a g e
Tribal Employment Rights Office Quinault Indian Nation TERO
P.O Box 189 Taholah, WA 98587 Phone: 360-276-8211 Ext. 4800
TERO Manager Ext. 4805 [email protected]
TERO Compliance Officer Ext. 4806 [email protected]
TERO Admin Assistant Ext. 4807 [email protected]
COMPLIANCE PLAN & AGREEMENT
Note: All Contractors/Subcontractors must meet with the TERO office. Any covered entity not submitting a completed compliance plan will be denied the right to commence work on the Quinault Reservation. A compliance plan should be submitted at least 72 hours prior to starting project. All Contractors are required to submit a copy of the contract with the compliance plan to TERO. Failure to comply with the TERO Ordinance may result in civil penalties. Please send the completed Compliance Plan & Agreement at pages 3-8 to [email protected].
Historically, Quinault Tribal members and other Indians have suffered discrimination in employment on and near the Quinault Reservation by being excluded from the employment market and experiencing discrimination when employed by private sector employers. As a result, Indians have suffered poverty and high unemployment rates, lost opportunities to learn needed skills or to participate in job training programs, lost opportunities for permanent/full time employment, and were not paid equal wage for equal work. To eliminate discrimination and insure that tribal members and other Indians on the Quinault Reservation will have preference in employment and training opportunities, the Quinault Nation established a Tribal Employment Rights Ordinance (TERO), Title 97 of the Quinault Tribal Code.
4 | P a g e
Project Information
Project Name Project No
Location
Project Owner
Project Architect Phone:
Project Funding Agency:
Funding Agency Contact: Phone Project Start Date: Project Completion Date:
Contractor Information Check all that apply: Prime Contractor Sub Contractor Union Non-Union
Company Complete Address
Contact Person
Title
Phone: Fax: Cell:
Email:
Insurance Company:
Policy:
Scope of work performed:
Construction Schedule/Business Plan: Work Commencement Date: Work Completion Date:
Contract Amount: TERO Fee 1.75%:
This agreement shall be for the life of this specific project, This compliance plan serves as an invoice – payment must be paid prior to commencing work on the reservation.
5 | P a g e
Identification of Key Personnel A Key Employee is defined as one who is in a top supervisory position or performs a critical function such that an Employer would risk likely financial damage or loss if that task were assigned to a person unknown to the Employer. Name
Position/Classification
Licensed Yes/No
Hourly Rate
Length with Company
ALL SUPERVISORY KEY PERSONNEL LISTED ABOVE ARE REQUIRED TO ATTEND THE TERO PRE-CONSTRUCTION MEETING, WHICH WILL BE HELD PRIOR TO THE BEGINNING OF WORK ON THE PROJECT IDENTIFIED ON THIS COMPLIANCE PLAN.
Employment Rights Fee Every Employer with a construction contract in the amount of $10,000 or more, or more than one contract in a 12 month period and the aggregate sum of those contracts is $10,000 or more, shall pay a one-time fee of 1.75% of the total amount of each contract. Such fee shall be paid by the Employer prior to commencing work on the Reservation. Identification of Sub-Contractors It shall be the Prime/General Contractor’s responsibility to provide copies of this TERO Compliance Plan and Agreement form to all their subcontractors and suppliers. All Subcontractors must secure an approved TERO Compliance Plan and Agreement prior to the commencement of any portion of work activity they will be involved in. The Prime and all subcontractors are required to attend a TERO Pre-Construction meeting prior to the beginning of work.
Company Name Phone Scope of Work Estimated Start Date
6 | P a g e
Manpower Requests Provide a preliminary estimate of workers (in addition to permanent and key employees) that your company will require for completing the work on this project. List classification/skill, number needed, starting date, and pay rate. A TERO Dispatch form and follow up call to TERO at least forty-eight (48) hours prior to identified “start date” is required. Attach a copy of Personnel Manual and Company application to be used in selection process.
Skill/Qualification Start Date No Pay Rate Special Instruction
Training and Salary The Employer agrees that all local Indian employees will receive adequate training for the position for which they are hired. All native employees will be evaluated and paid in accordance with a training plan set forth between the contractor and TERO. All contractors shall compensate their Employees at a rate not less than the approved Quinault Construction wage scale specified for their trade or the prevailing wage scale per Contract requirements. If the company is signatory to a Construction trade union, the current union pay scale with fringe benefits of that trade will be paid, in cash, unless otherwise specified through any other compliance plan or Contract; provided, that it is not less than the Quinault Construction wage scale. Emergency Replacement Workers Employers operating during hours when the TERO office is closed (i.e. weekends, holidays, etc.) who are in need of workers to fill a vacancy will be authorized to place an emergency worker to fill the vacancy. This emergency placement shall be allowed for no longer than seventy-two (72) hours. The TERO will be notified of such hires immediately upon the next working day and the position will be filled by TERO worker(s) unless none are available. The TERO Office hours are between 8 AM- 4:30 PM Mon-Fri Notify TERO by email or call our cell phones listed. Termination/Layoff No TERO workers shall be terminated except for cause as provided in the contractor’s personnel policies. No TERO worker, who can perform the work required, shall be terminated through layoff or reduction in force while a non-Indian or non-local Indian employee in the same craft is still employed. If employees are laid off by crews, classifications or other categories, qualified TERO workers shall be transferred to crews or positions that will be retained.
7 | P a g e
Enforcement The TERO Manager or Compliance Officer has the right to make on-site inspections and conduct compliance investigations at all sites where employment is taking place under the provisions of this compliance plan. Employers ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites in all facilities at which the employees are assigned to work. The Employers shall specifically ensure that all supervisors are aware of and carry out the Employers obligations under the TERO ordinance. The Employer agrees to comply with all rules and regulations set forth in the TERO Ordinance. This agreement is affirmed in writing by the appropriate company officer. TERO Pre-Construction Meeting A TERO Pre-Construction meeting is required to provide each contractor and their supervisory personnel orientation on the TERO requirements and procedures. The meeting must occur prior to the project start date. The Prime/General Contractor shall be responsible for contacting TERO to schedule the meeting and for providing notification of meeting date and time to their subcontractors.
Meeting Date Location Time
TERO Personnel
8 | P a g e
TERO Understanding and Acceptance Quinault Nation Tribal Employment Rights Office
Understanding & Acceptance
On behalf of , I hereby certify that I have received and understand the Quinault Nation Tribal Employment Rights Office (TERO) requirements set forth in this TERO Compliance Plan and Agreement, and hereby agree to accept the responsibility of compliance with the described obligations and requirements.
Dated this day of , 20 .
Project: Project No.
Contractor: Sub-Contractor:
Address:
Phone: Fax:
Printed Name: Title:
Signature: Date:
TERO ATTEST
On behalf of the Quinault Nation TERO, I hereby attest to the conditions set forth in this TERO Compliance Plan and Agreement, and will enforce this agreement through the powers vested in me by the Quinault TERO Commission and the Quinault Nation Employment Rights Ordinance (TERO) Title 97.
Signature Date
TERO Compliance Officer or Representative
NOTICE TO PROCEED
The attached TERO Compliance Plan and Agreement has been received and is fully acceptable. On behalf of the Quinault Nation TERO, authorization to begin work on the above-described project is hereby granted.
Signature Date
TERO Compliance Officer or Representative
15 | P a g e
DESCRIPTION OF TERO COMPLIANCE REQUIREMENTS The Quinault Indian Nation Tribal Employment Rights Program is authorized by Title 97 of the Quinault Tribal Code. Title 97 establishes the Tribal Employment Rights Office and the requirements for compliance. 1. EMPLOYMENT REQUIREMENTS. The intent of TERO is to achieve employment and training opportunities for the local Indian workforce. Pursuant to Title 97, Indian preference will be required on all employment and training opportunities. All Permanent and Key Employees, who will be utilized on this project, must be identified in this TERO Compliance Plan by name and title, with a complete description of duties each will be performing on this project.
A. Key Employee is defined as one who is in a top supervisory position or performs a critical function such that an Employer would risk likely financial damage or loss if that task were assigned to a person unknown to the Employer. Any claims that the employee possesses a “specialized skill” in order to be designated a key employee shall require written proof, including resume of work history, certificates, licenses, etc. A complete description of duties for each “key employee” listed must be attached to this TERO Compliance Plan. TERO will review the information submitted and determine whether the employee is in fact a key employee. B. Hiring. The Employer agrees to utilize the TERO Hiring Hall to fill their manpower request, and must provide a minimum of seventy two (72) hours’ notice and a job description on the manpower needs to the TERO office. The TERO staff will attempt to accommodate the Employer in the timeliest manner, matching the specified needs with a TERO referral that meets the minimum of qualifications. TERO will certify in writing when a qualified TERO referral is not available. C. TERO Dispatching. All TERO referrals or “Dispatches” will be made from Hiring Hall listings of Local Indian Workforces. The hiring hall lists contain names of unemployed Indian workers who have indicated that they are available for work and their skill level. Once a name is taken from the Hiring Hall List, the individual’s name will be provided to the Employer. If that worker possesses the minimum threshold of qualification, then they are referred for the opportunity. All TERO referrals will report to work with a TERO Referral form in hand, unless a copy has been faxed/ mailed/hand-delivered prior to the referral’s first day of work. The Employer shall contact TERO regarding any worker who reports to the job site without a TERO Referral Form in hand. (See Attachment B). D. TERO Job Request. This form provides a space for the Employer to give a brief job summary, including company name, address, and phone number, position title/classification, start date, start time, rate of pay anticipated length of employment, tools required, who to see, etc. The TERO referral of “dispatch” shall sign the pay rate offered. All dispatch forms shall require dates and signatures of the Employer and a TERO Representative. Unsigned forms will be considered invalid. Employers should review the dispatch form and discuss it with the referral/worker his/her first day of work. Any revisions
16 | P a g e
to the work opportunity, identified on the original dispatch form, regarding position/title, duties, rate of pay, etc. must be reported to TERO prior to any revisions taking place. (See Attachment B). E. Local Indian Workforce is defined as any member of a federally recognized tribe who resides either within the exterior boundaries of the Quinault Indian Reservation or within 60 miles of the Reservation. F. Hiring Hall. The main TERO Hiring Hall is located at the Taholah Administration Building at 1214 Aalis St. Taholah, WA 98587. G. Training. All training opportunities or Training Special Provisions (TSP) requirements must be identified prior to the commencement of work activity on this project. Training opportunities shall be filed through the same process described under Section C “Hiring”, and through coordination with the TERO Employment and Training Program components to locate individual(s) who may already be in an apprenticeship program for which the opportunity will exist. H. Layoff. TERO referred workers will have priority in all work opportunities. In the event that a lay-off becomes necessary, a TERO worker with skills, and in some cases key employee, will be retained. Daily TERO monitoring and a review of weekly certified payroll reports will be made to assure that opportunities are not being eliminated by revising the duties of Key Personnel or Employees. I. Disciplinary Action. Employers must report any disciplinary action taken against a TERO referred worker in written form, providing name, date of incident(s), individual(s) involved, names of witnesses, location of incident, etc. Any disciplinary action taken against a TERO worker will be kept on record at TERO. J. Termination. Employers must discuss termination of an Indian worker with TERO prior to final action. In instances of deliberate acts of safety violation, damage to property, or act of violence, the Employer shall have the right to dismiss the employee immediately. Failure to provide TERO with a notice of impending termination for other matters may result in a violation of this agreement. K. Employer Policies. The Employer must submit a copy of its employee policies prior to the commencement of work activity for TERO review and approval. In case of any conflict or dispute between company policies and with the TERO requirements, Title 97 will govern. An Employer may be required to demonstrate that a challenged employment practice is job-related for the position in question and consistent with business necessity. L. Drug Testing. Employment must be offered prior to requiring a “pre-employment” drug test. The TERO must be notified and provided a copy of the Employer’s pre-employment drug testing policies. Documentation must be provided that all permanent and key employees have complied with the drug testing requirements prior to the commencement of their work activity on this project. It is the contractor’s responsibility to do drug testing.
17 | P a g e
2. WAGE RATES/FRINGE BENEFITS/PAYROLL REPORTS
A. Wages and Fringe Benefits. The prime contractor and their subcontractor(s) must submit a table of wages to be paid. All contractors shall compensate their employees at a rate not less than the approved Quinault Construction wage scale specified for their trade or the prevailing wage scale per contract requirements. TERO referrals must receive pay equal to the Employer’s permanent employees and waived workers performing the same duties/job descriptions. If the company is signatory to a construction trade union, the current union pay scale with fringe benefits of that trade will be paid, in cash, unless otherwise specified through any other compliance plan or contract; provided, that it is not less than the Quinault Construction wage scale. TERO referrals will receive all fringe benefits in cash, unless the worker is a union member. TERO referrals will not be required to join a union to procure or retain employment. Each worker must receive a paycheck with an explanation of workweek, payroll number, regular and over-time hours, and all deductions taken. B. Certified Payroll Reports. All contractors and subcontractors must submit a bi-weekly- certified payroll report. Certified payroll reports submitted to the contracting agency will not satisfy this requirement. Payroll reports must contain the name, address, social security number, classification/title, hourly rate, over-time rate, number of regular and over-time hours worked that pay period and deductions for each worker the employee has on the project. Failure to submit certified payroll reports on a weekly/timely basis will constitute grounds for a “violation” and possible sanctions against the Employer. C. Payroll Deductions. No payroll deductions indirectly or directly will be taken from the full wages earned, other than tax withholding and permissible deductions outlined in the United States Federal Labor and Standards Act (FLSA) and this TERO Agreement, so long as the deduction does not take the employee below federal minimum wage for the workweek. D. Pay Day Schedules. TERO workers will receive their pay on the same day as the Employer’s permanent and key employees. All employees must receive their paycheck for the previous week’s work hours no later than the close of the workday every Thursday or Friday; whichever may be the last working day of the week for the Employer. E. Distribution of Payroll. Payroll checks must not be distributed to anyone other than the worker for whom the check is made out to, unless the worker has given written permission to release their check to specifically named individual.
18 | P a g e
3. CONTRACTING AND SUBCONTRACTING.
A. The General Contractor and Subcontractor shall give preference to Quinault TERO Certified Native American Owned (NAOB), all subcontracting opportunities on this project. A list of Quinault Native American Owned Businesses is available from TERO. TERO NAOBs are subject to the same terms of this agreement and are required to submit a Compliance Plan and Agreement for TERO approval prior to the start of work activity. B. Notification of Subcontracting Opportunity. Contractors bidding on projects on or near the Quinault Reservation must provide notification to TERO providing the name of the Project, project owner, funding source, location and listing of subcontract opportunities. Once it has been determined that the project is located on or near the Quinault Reservation, contractors must provide copies of “notice of subcontracting opportunity” forms, by email, mail, or fax transmission. If you do not wish to use the attached form, provide copies of letters notifying NAOBs of the opportunity and attach U.S. Post Office certified mail receipts. Notification must be made in good faith, providing adequate information about scope of work opportunity and time-line for response. (See Attachment D – Notice of Subcontracting Opportunity). C. Response to Notice of Subcontracting Opportunity. Once the deadline for responses to the “Notification of Subcontracting Opportunity” has elapsed, the Contractor will provide TERO with a written explanation of the responses and the decision on the subcontract award. TERO will retain a copy in the project file.
4. RELIGIOUS ACCOMMODATION. Employer agrees to make reasonable accommodation to the religious beliefs of Indian workers. TERO will assist the Employer in identifying “reasonable accommodation.” 5. TERO FEE. A TERO Fee will be assessed at 1.75% of the total contract award amount for contracts totaling $10,000 or more. No fees shall be passed on to the contracting entity, including but not limited to as a change order or as part of the bid or Contract amount.
Change Orders must be reported to TERO immediately upon approval from the funding/contracting agency. Adjustments to the TERO Fee amount will be made accordingly. If the change orders are not reported that is considered a violation.
6. PROJECT MONITORING. TERO shall have the right to make on-site inspections during regular working hours in order to monitor a contractor’s compliance. TERO also has the authority to inspect and copy all relevant records of a contractor, of the contractor’s signatory unions or subcontracts, to speak with workers on the contractor’s or subcontractor’s job site and to engage in similar investigatory inspection activities. Any potential violation will be documented and processed pursuant to the procedures provided in Title 97. Continuous violation may result in sanctions against the Employer as provided in Title 97.
19 | P a g e
7. COMPLAINTS.
A. On-The-Job Incidents. TERO referrals are advised to make complaints for incidents occurring on the job through the procedures outlined in the Employer policies prior to filing a complaint with TERO. The Employer must provide notice to TERO once a complaint is filed and provide information on the action taken to resolve the matter and final disposition of the matter once it is settled. B. Discrimination. If a TERO referred worker feels they have been discriminated against because they are Indian, they may file a complaint with TERO. The complaint must be employment related. C. Complaint Investigation. TERO will investigate complaints on-site pursuant to the procedures provided in Title 97.
8. FAILURE TO COMPLETE COMPLIANCE PLAN. Failure to complete this compliance plan thoroughly and submit prior to the commencement of work on the above described project, will be construed as a refusal to comply and may result in a “Notice of Violation.” The Quinault TERO will make every effort to work cooperatively with the Employer named on this agreement. However, when willful disregard for these requirements are evident, the sanctions afforded will be utilized to the fullest extent of the law.
TERO Dispatch Form TRIBAL EMPLOYMENT RIGHTS OFFICE
Project:
Location:
DISPATCH INFORMATION & JOB SUMMARY (TO BE COMPLETED BY EMPLOYER)
Company Name:
Address:
Phone: Fax: Cell:
Classification/Title:
Hourly Pay Rate: $
Start Date: Time: AM PM Job Length
Whom to Report to: Title:
Brief Job Summary:
Tools/Equipment required:
Employer will provide the following:
Employer Signature: Date:
UNDERSTANDING AND ACCEPTANCE (TO BE COMPLETED BY DISPATCHING WORKER)
I have reviewed and understand that I am being dispatched to the above named company for the stated job classification/title, at no less than the hourly rate stated. I understand that TERO does not issue payroll for the above named company, and questions regarding pay, paydays or any discrepancy of pay related matters, I must first attempt to resolve the matter with my Employer. If issues cannot be resolved TERO will intervene upon receipt of a written complaint. I further understand that it is my responsibility to carry proper identification and proof of citizenship with me when I report to work for employer tax purposes. I also understand that it is not TERO’S responsibility to provide my proof of enrollment or any other identification required.
_____ I HEREBY ACCEPT THIS JOB DISPATCH _____ I DECLINE THIS DISPATCH
Dispatch Signature: Date:
TERO Official Date:
Would you rehire this employee? _ Yes No _ Not Sure
RATE THIS EMPLOYEE, ON A SCALE OF 1-10, ON THE FOLLOWING:
Attendance Knowledge of skills required for the job/classification for which they were referred Knowledge of proper use of tools or equipment required for this position Used time productively Ability to work cooperatively with others Attitude Other:
AUTHORIZED EMPLOYER REPRESENTATIVE
I understand that the information provided above will be taken in the strictest of confidentiality, and is to be used to assist TERO in assessing the level of skill and training needs of TERO referred workers.
Employer Representative: Date;
Please Return to: Quinault TERO P.O Box 189 Taholah, WA 98587 PH: (360) 276-8211 ext.4806 FX: (360) 276-4191 Date Received by TERO Representative:
TERO Official:
NOTICE OF SUBCONTRACTING OPPORTUNITY
Date:
Project Name: Location: Project Owner Project Architect: Project Funding Agency: Funding Agency Contact:
CONTRACTOR INFORMATION
Name:
Address:
Phone:
Fax:
Contract #: Email:
This form is a requirement for bids on the above-described project located on the Quinault Indian Reservation. The Quinault Tribal Employment Rights Office (TERO) referred our company to your company, and we look forward to receiving a bid. If you would take a moment and fill out the following item(s), it would assist this company in fulfilling its obligation to provide subcontracting opportunities for Quinault Nation TERO Native American Owned Businesses.
Bid opening Date is _/ _/ and this company will welcome bid until _/ / . Time: _________________ ____AM ____PM Thank you for your time and response. Please note the division (i..e. framing, drywall, trucking, site prep, etc.) that your company would be interested in bidding on:
Authorized Signature of Prime Contractor:
RESPONSE FROM TERO CERTIFIED NATIVE AMERICAN OWNED BUSINESSES
Upon notification of this opportunity, our company requested, received or were given the opportunity to review description of work to be bid on:
Yes No If yes, date received: / /_ Our company has DECLINED the opportunity to bid on the above named division/project. Our company BID and were given the opportunity to negotiate for the above division. Comments:
TERO CERTIFIED NATIVE AMERICAN OWNED BUSINESS INFORMATION
Company Name: CIB #
Owner Name/Contract: Title:
Address:
Insurance/Bonding Company: Phone: Fax: Cell/Email: CC: QIN TERO U.S. Postal Fax Hand Delivered Other
26 | P a g e
TERO CLASSIFICATIONS AND RATES Building Construction
Trade Job Classification TERO Min. TERO Mid. TERO Max. Asbestos Workers $16.43
$24.85 $32.87
Carpenter $19.16 $28.75 $38.33
Brush Cutter/Chain Saw/Grubbing $16.43 $24.65 $32.87
Cement Mason $19.63 $29.45 $39.26
Drywall Applicator $20.34 $30.51 $40.68
Drywall Taper $20.34 $30.51 $40.68
Electricians
$21.96
$32.95 $43.93 Flaggers $15.92
$23.83 $31.84
General Laborer
$15.87
$23.41 $30.95
Heavy Equipment Operator $20.50
$30.75 $41.01
Iron Worker $23.09
$34.64 $46.19
Landscaper $12.81 $14.41 $16.01
Painter $12.40 $18.60 $24.80
Pipe Layer $16.79 $25.19 $33.59
Plumber Pipe Fitter $22.48 $35.31 $44.96
Roofer $12.00 $15.61 $19.21
Traffic Control Supervisors TCS $16.94 $25.42 $33.89
Tree Trimmer $14.92 $22.39 $29.85 Tree Trimmer Ground person $11.25 $16.88 $22.50
Tree Trimmer Operator
$16.41 $24.62 $32.83
Tree Trimmer Sprayer
$15.82
$23.74 $31.65
Tree Trimmer Supervisor
$16.70 $25.05 $33.40 Truck Driver Class A $18.13
$27.20 $36.26
Truck Driver Class B $17.98
$26.97 $35.96
All construction projects conducted on or near the Quinault Indian Nation will utilize the wage list provided, unless the project is a federal project using federal dollars then Davis Bacon wages will apply. Union contracts will pay union scale wages plus fringe benefits. The wage scale is the least amount that can be paid to the TERO Clients for the positions listed. The funding source will determine the wages used. Please contact the TERO office if you have any questions. Wages will be adjusted when needed.
QIN TERO Compliance Plan Page: 27 of
Quinault Indian Nation Tribal Employment Rights Office (TERO)
PO Box 189 Taholah, WA 98587
email: [email protected]
All TERO forms, documents and information can be
Contractor Date
Tribal Employment Rights Manager Date
Tribal Employment Rights Commission Date
Quinault Indian Nation Tribal Employment Rights Office
HIRING HALL PROCEDURES I. Labor Pool In order to be considered in the Quinault Indian Nation labor pool, applicants must adhere to the following:
A. Application Process: 1. Must be 18 years of age.
2. Complete a TERO application and any other applicable supplemental forms. These
forms must be updated annually (October 1st) or if any changes occur in the data on the application or supplemental.
3. Submit any of the following (if applicable) to be placed into your file:
a. Resume b. Copy of enrollment card with enrollment number and Tribal affiliation; or if a
supporter of a Quinault family submit a completed “Verification of Supporting Quinault” form
c. Any certificate, license, degree or additional information that may apply to the type of employment you are seeking
d. A copy of your drivers or any special license (i.e. bus, truck, etc.) e. Union affiliation and status (if you are a member) f. Any other applicable information
B. Sign In Process:
1. The TERO office maintains three sign in books located as follows:
a. One in Taholah at the Admin Building directly outside the TERO office doors. b. One in Queets at the Admin Building c. One at the TANF office in Hoquiam
2. In order for the TERO office to know that you are available and looking for
employment, you need to sign in at either the Taholah, Hoquiam or Queets site on a monthly basis (or on a/ weekly basis depending on the busy season). You may do this in two ways: a. By coming in and signing the books b. By phoning or emailing a TERO staff member and requesting they sign you in
3. Be sure to let us know when you call in what type of work you are seeking. Also, if
you do not provide a way for the TERO office to reach you, you will not be considered
for employment.
II. Referral/Placement Process: A. Notification of Opening:
When the TERO staff is notified of a job opening, potential candidates will be selected from the labor pool. Names will be compiled from those who have a current application on file and who have signed or phoned in within the past month under the requested job classification. (Note: because some jobs are recurring in nature, an Employer may request a specific employee for the position so please keep your status active otherwise you will not be eligible for a referral from TERO). After this step, a list of available individuals will be prepared.
B. Pre-Screening Process:
1. The files of all individuals on the list will be reviewed to see that they meet the
minimum qualifications for the position. 2. The TERO office will then check the tribal enrollment status and create a priority listing
according to the following tier (It is up to the person applying for work to get the proper enrollment documentation to TERO): a. Federally funded Employers:
i. Local Indians ii. Indian who are not local Indians
b. Non-Federally funded Employers: i. Enrolled Quinaults ii. Supporters of Quinault families as defined in Title 97 iii. Other Indians
3. The TERO office checks previous placement history. Anyone who had previously been
referred by TERO and had been terminated with cause, had failed to show up for an interview without notice or who has a poor performance record and who has failed to provide the TERO office with an adequate reason for their action will be placed on a low priority status or on a no-rehire list for a specific period of time depending on the type of action involved. This time period will range anywhere from 1-3 months. Some reasons for a low priority status include but are not limited to: a. Being under the influence of intoxicants or chemicals while on duty b. Failure to report to work and notify the Employer without good reason c. Failure to show up for an interview without notification or good reason d. Providing TERO with false information e. Insubordination f. Deliberate or careless conduct endangering the safety of self or fellow workers g. Theft or intentional destruction of Employer property h. Excessive absenteeism and/or tardiness i. Poor work performance
4. Some Employers request that we pre-screen for specific skills at which time we will develop a pre-screening questionnaire based on the qualification criteria set forth. Also an Employer may request that all potential employees be required to submit to a drug test before employment. We will advertise within the job announcement of such special requirements.
C. Referrals:
After TERO makes a recommendation to prospective Employers based on the above pre-screening process, the first priority list will be provided to the Employer for selection or to set up interviews. The Employer then notifies the TERO office of individuals selected for employment or interviews. The TERO office then contacts the individuals and completes a referral card with one copy for the employee to take to the Employer and one copy for the TERO files. The above procedures are general procedures and may vary depending on the Employer and at the discretion of the TERO office. It is important to note that any employee that is placed with an Employer and does a good job generally is requested back by the Employer for rehire.
Quinault Indian Nation Tribal Employment Rights Office
TERO Candidate Evaluation Form
Candidate Name: Position: Interviewer Name: Interview Date:
Rating Scale (1-5): {Circle one choice only, enter NA under Comments if question not applicable} 1=Unsatisfactory, 2=Below Average, 3=Average, 4=Above Average, 5=Outstanding
Comments
Related Education/Training/Certification 1 2 3 4 5
Communication Skills 1 2 3 4 5
Technical Ability 1 2 3 4 5
Practical Application 1 2 3 4 5
Overall Understanding 1 2 3 4 5
Professional Appearance 1 2 3 4 5
Direct Answers 1 2 3 4 5
Writing Ability 1 2 3 4 5
Clarity of Ideas 1 2 3 4 5
Problem Solving 1 2 3 4 5
Accountable 1 2 3 4 5
Likes Challenges Offered 1 2 3 4 5
Working with Others 1 2 3 4 5
Team Player 1 2 3 4 5
Motivated to Work 1 2 3 4 5
Fit for Project/Position 1 2 3 4 5
Overall Rating: 1 2 3 4 5
Comments:
Reviewer Signature:
Date Signed:
Quinault Indian Nation Tribal Employment Rights Office
TERO EMPLOYEE PERFORMANCE REVIEW
Employee Name: Date Hired: Job Title: Reviewer: Date of Review: Next Review: 30 Days 90 Days 1 Year
Performance Evaluation Excellent Good Fair Poor Comments
Job Knowledge
Productivity Work Quality Technical Skills Work Consistency Enthusiasm Cooperation Attitude Initiative Work Relations Creativity Punctuality Attendance Dependability Communication Skills Leadership Ability Overall Rating
Reviewer’s Comments
By signing this form you are confirming this evaluation is true to the best of your knowledge as a representative of the business listed below and is for the sole purpose of following up on a job referral from the Quinault Indian Nation TERO Department and Title 97 compliance.
Reviewer’s Signature Business Name Date
Development Opportunities
1
Quinault Indian Nation Tribal Employment Rights Office
Tribal Employment Rights Ordinance
Questions & Answers
The following presents a listing of some of the most common inquiries made about Indian Preference and Tribal Employment Rights Offices (TEROs)
1. WHAT IS TERO?
There are two (2) main elements of TERO: A. Conceptual—TERO is a sovereignty based, self-help, and systematic approach to Indian and
economic self-reliance or self-determination. B. Programmatic—TERO is also a Tribal enforcement and compliance program that monitors
employers to ensure optimal benefits are attained from Federal and Tribal employment laws, regulations, policies and procedures.
2. WHAT IS THE PURPOSE OF TERO?
To access more employment & training opportunities for Native Americans, and to provide more business & economic opportunities for businesses owned by Native Americans.
3. WHAT IS THE LEGAL BASIS FOR TERO?
A tribe’s authority to enact and enforce an Indian employment preference is grounded in its inherent sovereign powers of self-government. This legal doctrine is the most basic principal of Indian laws and is supported by a host of Supreme Court decisions. These decisions have held that “Inherent sovereign powers derive from the principle that certain powers do not necessarily come from delegated powers granted by express acts of Congress, but are inherent powers of a limited sovereign which have never been extinguished. Tribes have a basic relationship with the federal government as sovereign powers. This is recognized in both treaties and federal statutes. The sovereignty of tribes has been limited from time to time by treaties and federal legislation; however, what has not been expressly limited remains within tribal sovereignty.” One important area in which the inherent powers of tribes clearly apply is in the right of tribes to regulate and tax all commerce activity within the jurisdictional boundaries of their reservations. A full and accurate explanation of tribal sovereignty is found in Felix S. Cohen’s Handbook of Federal Indian Law.
4. WHAT ARE THE BASIC REQUIREMENTS OF TERO?
All employers operating within tribal jurisdiction are required to provide Indian Preference in employment, training, contracting, subcontracting and all other aspects of employment. Below are six (6) major provisions found in most TERO Ordinances that employers must agree to: A. Submit an acceptable compliance plan detailing employer workforce needs and the steps to be
taken to ensure Indian Preference. B. Utilize the TERO Hiring Hall for all referrals and consider Indian applicants before interviewing
or hiring non-Indian workers.
2
C. Agree to hire no less than a specific number of Indians in each job classification and cooperate with tribal training programs to hire a certain amount of trainees.
D. Eliminate all extraneous job qualification criteria or personnel requirements, which may act as a barrier to Indian employment. TEROs are guided by EEOC guidelines for verifying legitimate Bona-Fide Occupational Qualifications (BFOQs).
E. Agree to acknowledge and respect tribal religious beliefs and cultural differences and to cooperate with the TERO to provide reasonable accommodation.
F. Tribes have found the most effective means by which they can ensure Indian Preference compliance is through the endeavors of their own TERO enforcement programs. The success of TERO programs can be directly attributed to the fact that these programs embody all of the critical elements listed above. Since TEROs are the core of an effective tribal employment rights effort, a close examination of TERO is necessary.
5. WHAT IS THE EXTENT OF TERO JURISDICTION?
To the extent of what is legally described or defined by treaty or legislation which is the exterior boundaries of the reservation, including ceded territories and lands where jurisdiction has not been extinguished.
6. IS THERE A DIFFERENCE BETWEEN TRIBAL & INDIAN PREFERENCE?
Yes, with jurisdiction on tribal projects which are funded, owned, and operated by the tribe (i.e. Tribal Enterprises), tribes can require tribal preference. This is permissible under the federal law because tribes are exempt from Title VII of the Civil Rights Act, Executive Order 11246 and most other employment rights legislation. A. Indian Preference is permissible under some federal laws i.e. Indian Staff Determination Act, Buy
Indian Act and under most federal laws. B. Executive Order 11246 Provides: “Contractors or subcontractors extending such a preference
shall not, however, discriminate among Indians on the basis of religion, sex, or tribal affiliation and the use of such a preference shall not excuse a contractor from complying with other requirements contained in this chapter.”
7. ARE TERO FEES LEGAL?
Yes, tribal authority to impose fees is equal to that of any government. Licenses, fees and, in some cases, taxation are a valuable sources for financing tribal government operations. TERO Programs have the unique characteristics of being able to generate their own operating income and contribute to the tribal general fund. A. Employers can realize substantial savings since tribal taxes pre-empt state and other local taxation
on reservation projects often to the benefit of the employer. The average TERO fee is 2.5% substantially lower than most states.
B. The TERO has the responsibility to ensure the due process of the employer under the tribal ordinance and that only qualified and screened referrals are made to the employer.
8. WILL TERO FEES INCREASE THE COST OF THE PROJECT?
No. The Quinault TERO fee is 1.75%, which is much lower than the state taxes that the contractor might otherwise pay.
3
A. The Federal Highway Administration (FHWA) allows a 1% flow through for highway contractors, which means they can pass up to 1% of their tribal tax/fee burden on to the agency. This provides another incentive to support TERO. The remaining amounts are the contractors’ responsibility and like other federal, state, county and local taxes/fees, must come out of the contractors’ pocket.
9. IS INDIAN PREFERENCE “REVERSE DISCRIMINATION?”
No, there is no such thing as reverse discrimination; simply stated, discrimination is discrimination no matter who does it to whom. Indian preference is defined as a “political preference, not a racial one” which exists because of the nation-to-nation relationship America has always enjoyed with tribes since Columbian times. TEROs do not violate any U.S. Equal Protection Laws. A. In Morton v. Mancari, the court held that “the preference as applied, granted to Indians not as a
discrete racial group, but rather as members of quasi-sovereign tribal entities.” Subsequently, the Indian preference classification is not racially, but politically based and as such does not violate Title VII or any other federal employment law.
10. ARE THERE ANY EXEMPTIONS TO TERO REQUIREMENTS?
Yes, there are several exemptions. Direct employment by federal/state governments, schools, churches and some non-profits are not covered by the TERO. Some tribes also exempt themselves from TERO coverage. It is important to note, however, that any contract or sub-contract let by any of these entities is covered by TERO.
11. WILL TERO INTERRUPT MY DAILY BUSINESS OPERATIONS?
No, since TEROs are pro-active, TERO and employer sign the compliance agreements before the commencement of work, which prevents disputes. Most TERO ordinances provide for compliance and enforcement visits to the worksites during normal business hours but not to the detriment of operations. TEROs sanctioning employers for violations may shut down operations but only in severe disputes and in accordance with the applicable law.
12. WHAT SANCTIONS DO EMPLOYERS FACE FOR VIOLATIONS OF TERO?
Violation of TERO requirements may result in severe sanctions. If tribes determine that employers willfully and intentionally breached TERO requirements they may: A. Deny such a party the right to commence or continue business on the reservation. B. Impose a civil fine on such party (at Quinault, the range is $100 to $1000 per violation per day,
depending on the size of the contract). C. Terminate or suspend such party’s operation and deny them the rights to conduct further business
on the reservation. D. Order such party to dismiss any illegally hired non-Indians, take action to ensure future compliance
and to make back payment of any lost wages be paid to aggrieved Indians. 13. ARE EMPLOYERS PROTECTED AGAINST UNFAIR TERO VIOLATION CHARGES?
Yes, the first level of protection comes from the TERO enforcement officer who handles the charge. These officers are trained to deal with facts and merits of the case before taking action. The TERO Commission provides a second level of protection by hearing grievances and again weighing the
4
facts and merits of the case before making determinations. Beyond the TERO Commission, grievants can seek relief in the tribal and federal courts.
14. CAN SANCTIONS IMPOSED BY THE TERO COMMISSION BE APPEALED?
Yes. Sanctions imposed by the TERO Commission can be appealed in tribal court. Appeals of tribal court decisions can be made to the federal court system. A. It is important to note that only one (1) appeal to a TERO Commission and tribal court has ever
been appealed to the federal court. The case ended at the Ninth Circuit Court of Appeals , which upheld the TERO Commission and the tribal court decisions.
15. HOW HAVE VARIOUS FEDERAL, STATE, AND OTHER AGENCIES VIEWED TERO
AND INDIAN PREFERENCE IN THEIR OPERATIONS? When TEROs first appeared in the late seventies there was opposition from some and indifferences from others. Over the years a great deal of progress has been made, some by direct legal action but most through pro-active, non-adversarial, synergistic effort. The results are Indian preference and TERO provision, policies and procedures figure prominently in the following:
The Civil Rights Handbook The Job Training and Partnership
Act The Small Business Administration
8(a) Program Public Law 93-638, The Indian
Education Assistance & Self Determination Act of 1974
HUD Regulations BIA Acquisitions Assistance
Agreement 84-1 EEOC/TERO Contracts
Department of Commerce Economic Development
Administration OFCCP Indian Employment
Initiative FHWA ISTEA “Indians in Highway
Construction Initiative” US DOL/BAT Notice 84-1 Indian Education Impact and
Programs under PL 81-815 (construction) and PL 91-874 (OPS/Admin)
16. DO TERO REFERRALS GET SPECIAL TREATMENT ON THE JOB? No, TERO referrals should be treated like any other qualified employee with the same performance expectations and requirements. Special treatment of preference category employees serves only to isolate them and set them up for disparate or discriminatory treatment.
AIA®
Document A201TM – 2007
General Conditions of the Contract for Construction
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
1
ADDITIONS AND DELETIONS:
The author of this document
has added information
needed for its completion.
The author may also have
revised the text of the
original AIA standard form.
An Additions and Deletions
Report that notes added
information as well as
revisions to the standard
form text is available from
the author and should be
reviewed.
This document has important
legal consequences.
Consultation with an
attorney is encouraged with
respect to its completion
or modification.
ELECTRONIC COPYING of any
portion of this AIA® Document
to another electronic file is
prohibited and constitutes a
violation of copyright laws
as set forth in the footer of
this document.
for the following PROJECT: (Name and location or address)
«QIN Road Maintenance Shop»
«1114 5th Ave.
Taholah, WA 98587»
THE OWNER: (Name, legal status and address)
«Quinault Indian Nation»« »
«1214 Aalis Drive
Taholah, WA 98587»
(Name, legal status and address)
«
TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 4 OMITTED. 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT 15 CLAIMS AND DISPUTES
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
2
INDEX (Topics and numbers in bold are section headings.)
Acceptance of Nonconforming Work
9.6.6, 9.9.3, 12.3
Acceptance of Work
9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3
Access to Work
3.16, 6.2.1, 12.1
Accident Prevention
10
Acts and Omissions
3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5,
10.2.8, 13.4.2, 13.7, 14.1, 15.2
Addenda
1.1.1, 3.11.1
Additional Costs, Claims for
3.7.4, 3.7.5, 6.1.1, 7.3.7.5, 10.3, 15.1.4
Additional Inspections and Testing
9.4.2, 9.8.3, 12.2.1, 13.5
Additional Insured
11.1.4
Additional Time, Claims for
3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.5
Administration of the Contract
3.1.3, 4.2, 9.4, 9.5
Advertisement or Invitation to Bid
1.1.1
Aesthetic Effect
4.2.13
Allowances
3.8, 7.3.8
All-risk Insurance
11.3.1, 11.3.1.1
Applications for Payment
4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7, 9.10,
11.1.3
Approvals
2.1.1, 2.2.2, 2.4, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10,
4.2.7, 9.3.2, 13.5.1
Arbitration
8.3.1, 11.3.10, 13.1.1, 15.3.2, 15.4
ARCHITECT
4
Architect, Definition of
4.1.1
Architect, Extent of Authority
2.4.1, 3.12.7, 4.1, 4.2, 5.2, 6.3, 7.1.2, 7.3.7, 7.4, 9.2,
9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1,
13.5.1, 13.5.2, 14.2.2, 14.2.4, 15.1.3, 15.2.1
Architect, Limitations of Authority and
Responsibility
2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2,
4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4,
9.4.2, 9.5.3, 9.6.4, 15.1.3, 15.2
Architect’s Additional Services and Expenses
2.4.1, 11.3.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4
Architect’s Administration of the Contract
3.1.3, 4.2, 3.7.4, 15.2, 9.4.1, 9.5
Architect’s Approvals
2.4.1, 3.1.3, 3.5, 3.10.2, 4.2.7
Architect’s Authority to Reject Work
3.5, 4.2.6, 12.1.2, 12.2.1
Architect’s Copyright
1.1.7, 1.5
Architect’s Decisions
3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3,
7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1,
13.5.2, 15.2, 15.3
Architect’s Inspections
3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.5
Architect’s Instructions
3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.5.2
Architect’s Interpretations
4.2.11, 4.2.12
Architect’s Project Representative
4.2.10
Architect’s Relationship with Contractor
1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5,
3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18,
4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5,
9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.4.2, 13.5,
15.2
Architect’s Relationship with Subcontractors
1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3.7
Architect’s Representations
9.4.2, 9.5.1, 9.10.1
Architect’s Site Visits
3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5
Asbestos
10.3.1
Attorneys’ Fees
3.18.1, 9.10.2, 10.3.3
Award of Separate Contracts
6.1.1, 6.1.2
Award of Subcontracts and Other Contracts for
Portions of the Work
5.2
Basic Definitions
1.1
Bidding Requirements
1.1.1, 5.2.1, 11.4.1
Binding Dispute Resolution
9.7, 11.3.9, 11.3.10, 13.1.1, 15.2.5, 15.2.6.1, 15.3.1,
15.3.2, 15.4.1
Boiler and Machinery Insurance
11.3.2
Bonds, Lien
7.3.7.4, 9.10.2, 9.10.3
Bonds, Performance, and Payment
7.3.7.4, 9.6.7, 9.10.3, 11.3.9, 11.4
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
3
Building Permit
3.7.1
Capitalization
1.3
Certificate of Substantial Completion
9.8.3, 9.8.4, 9.8.5
Certificates for Payment
4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7,
9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.3
Certificates of Inspection, Testing or Approval
13.5.4
Certificates of Insurance
9.10.2, 11.1.3
Change Orders
1.1.1, 2.4.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11.1, 3.12.8, 4.2.8,
5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.6, 7.3.9, 7.3.10,
8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.3.1.2, 11.3.4, 11.3.9,
12.1.2, 15.1.3
Change Orders, Definition of
7.2.1
CHANGES IN THE WORK
2.2.1, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 7.4.1, 8.3.1,
9.3.1.1, 11.3.9
Claims, Definition of
15.1.1
CLAIMS AND DISPUTES
3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4
Claims and Timely Assertion of Claims
15.4.1
Claims for Additional Cost
3.2.4, 3.7.4, 6.1.1, 7.3.9, 10.3.2, 15.1.4
Claims for Additional Time
3.2.4, 3.7.46.1.1, 8.3.2, 10.3.2, 15.1.5
Concealed or Unknown Conditions, Claims for
3.7.4
Claims for Damages
3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1,
11.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6
Claims Subject to Arbitration
15.3.1, 15.4.1
Cleaning Up
3.15, 6.3
Commencement of the Work, Conditions Relating to
2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3,
6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.3.1, 11.3.6, 11.4.1,
15.1.4
Commencement of the Work, Definition of
8.1.2
Communications Facilitating Contract
Administration
3.9.1, 4.2.4
Completion, Conditions Relating to
3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1,
9.10, 12.2, 13.7, 14.1.2
COMPLETION, PAYMENTS AND
9
Completion, Substantial
4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3,
12.2, 13.7
Compliance with Laws
1.6.1, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4,
10.2.2, 11.1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2, 13.6,
14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3
Concealed or Unknown Conditions
3.7.4, 4.2.8, 8.3.1, 10.3
Conditions of the Contract
1.1.1, 6.1.1, 6.1.4
Consent, Written
3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.8.5, 9.9.1,
9.10.2, 9.10.3, 11.3.1, 13.2, 13.4.2, 15.4.4.2
Consolidation or Joinder
15.4.4
CONSTRUCTION BY OWNER OR BY
SEPARATE CONTRACTORS
1.1.4, 6
Construction Change Directive, Definition of
7.3.1
Construction Change Directives
1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3,
9.3.1.1
Construction Schedules, Contractor’s
3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2
Contingent Assignment of Subcontracts
5.4, 14.2.2.2
Continuing Contract Performance
15.1.3
Contract, Definition of
1.1.2
CONTRACT, TERMINATION OR
SUSPENSION OF THE
5.4.1.1, 11.3.9, 14
Contract Administration
3.1.3, 4, 9.4, 9.5
Contract Award and Execution, Conditions Relating
to
3.7.1, 3.10, 5.2, 6.1, 11.1.3, 11.3.6, 11.4.1
Contract Documents, Copies Furnished and Use of
1.5.2, 2.2.5, 5.3
Contract Documents, Definition of
1.1.1
Contract Sum
3.7.4, 3.8, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, 9.5.1.4,
9.6.7, 9.7, 10.3.2, 11.3.1, 14.2.4, 14.3.2, 15.1.4,
15.2.5
Contract Sum, Definition of
9.1
Contract Time
3.7.4, 3.7.5, 3.10.2, 5.2.3, 7.2.1.3, 7.3.1, 7.3.5, 7.4,
8.1.1, 8.2.1, 8.3.1, 9.5.1, 9.7, 10.3.2, 12.1.1, 14.3.2,
15.1.5.1, 15.2.5
Contract Time, Definition of
8.1.1
CONTRACTOR
3
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
4
Contractor, Definition of
3.1, 6.1.2
Contractor’s Construction Schedules
3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2
Contractor’s Employees
3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3,
11.1.1, 11.3.7, 14.1, 14.2.1.1,
Contractor’s Liability Insurance
11.1
Contractor’s Relationship with Separate Contractors
and Owner’s Forces
3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4
Contractor’s Relationship with Subcontractors
1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2,
11.3.1.2, 11.3.7, 11.3.8
Contractor’s Relationship with the Architect
1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5,
3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2,
6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6,
10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1
Contractor’s Representations
3.2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2
Contractor’s Responsibility for Those Performing the
Work
3.3.2, 3.18, 5.3.1, 6.1.3, 6.2, 9.5.1, 10.2.8
Contractor’s Review of Contract Documents
3.2
Contractor’s Right to Stop the Work
9.7
Contractor’s Right to Terminate the Contract
14.1, 15.1.6
Contractor’s Submittals
3.10, 3.11, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2,
9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.4.2
Contractor’s Superintendent
3.9, 10.2.6
Contractor’s Supervision and Construction
Procedures
1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4,
7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3
Contractual Liability Insurance
11.1.1.8, 11.2
Coordination and Correlation
1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1
Copies Furnished of Drawings and Specifications
1.5, 2.2.5, 3.11
Copyrights
1.5, 3.17
Correction of Work
2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2
Correlation and Intent of the Contract Documents
1.2
Cost, Definition of
7.3.7
Costs
2.4.1, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3,
7.3.3.3, 7.3.7, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6,
11.3, 12.1.2, 12.2.1, 12.2.4, 13.5, 14
Cutting and Patching
3.14, 6.2.5
Damage to Construction of Owner or Separate
Contractors
3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 11.1.1, 11.3,
12.2.4
Damage to the Work
3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4.1, 11.3.1, 12.2.4
Damages, Claims for
3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1,
11.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6
Damages for Delay
6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2
Date of Commencement of the Work, Definition of
8.1.2
Date of Substantial Completion, Definition of
8.1.3
Day, Definition of
8.1.4
Decisions of the Architect
3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 15.2, 6.3,
7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1,
13.5.2, 14.2.2, 14.2.4, 15.1, 15.2
Decisions to Withhold Certification
9.4.1, 9.5, 9.7, 14.1.1.3
Defective or Nonconforming Work, Acceptance,
Rejection and Correction of
2.3.1, 2.4.1, 3.5, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2,
9.9.3, 9.10.4, 12.2.1
Definitions
1.1, 2.1.1, 3.1.1, 3.5, 3.12.1, 3.12.2, 3.12.3, 4.1.1,
15.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1, 8.1, 9.1, 9.8.1
Delays and Extensions of Time
3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7,
10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5
Disputes
6.3, 7.3.9, 15.1, 15.2
Documents and Samples at the Site
3.11
Drawings, Definition of
1.1.5
Drawings and Specifications, Use and Ownership of
3.11
Effective Date of Insurance
8.2.2, 11.1.2
Emergencies
10.4, 14.1.1.2, 15.1.4
Employees, Contractor’s
3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2,
10.3.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1
Equipment, Labor, Materials or
1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13.1, 3.15.1,
4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3,
9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2
Execution and Progress of the Work
1.1.3, 1.2.1, 1.2.2, 2.2.3, 2.2.5, 3.1, 3.3.1, 3.4.1, 3.5,
3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.5, 8.2,
9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3.1, 15.1.3
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
5
Extensions of Time
3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4, 9.5.1, 9.7, 10.3.2,
10.4.1, 14.3, 15.1.5, 15.2.5
Failure of Payment
9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2
Faulty Work
(See Defective or Nonconforming Work)
Final Completion and Final Payment
4.2.1, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.3.1, 11.3.5,
12.3.1, 14.2.4, 14.4.3
Financial Arrangements, Owner’s
2.2.1, 13.2.2, 14.1.1.4
Fire and Extended Coverage Insurance
11.3.1.1
GENERAL PROVISIONS
1
Governing Law
13.1
Guarantees (See Warranty)
Hazardous Materials
10.2.4, 10.3
Identification of Subcontractors and Suppliers
5.2.1
Indemnification
3.17, 3.18, 9.10.2, 10.3.3, 10.3.5, 10.3.6, 11.3.1.2,
11.3.7
Information and Services Required of the Owner
2.1.2, 2.2, 3.2.2, 3.12.4, 3.12.10, 6.1.3, 6.1.4, 6.2.5,
9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2, 11.4, 13.5.1,
13.5.2, 14.1.1.4, 14.1.4, 15.1.3
Initial Decision
15.2
Initial Decision Maker, Definition of
1.1.8
Initial Decision Maker, Decisions
14.2.2, 14.2.4, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5
Initial Decision Maker, Extent of Authority
14.2.2, 14.2.4, 15.1.3, 15.2.1, 15.2.2, 15.2.3, 15.2.4,
15.2.5
Injury or Damage to Person or Property
10.2.8, 10.4.1
Inspections
3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3,
9.9.2, 9.10.1, 12.2.1, 13.5
Instructions to Bidders
1.1.1
Instructions to the Contractor
3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.5.2
Instruments of Service, Definition of
1.1.7
Insurance
3.18.1, 6.1.1, 7.3.7, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 11
Insurance, Boiler and Machinery
11.3.2
Insurance, Contractor’s Liability
11.1
Insurance, Effective Date of
8.2.2, 11.1.2
Insurance, Loss of Use
11.3.3
Insurance, Owner’s Liability
11.2
Insurance, Property
10.2.5, 11.3
Insurance, Stored Materials
9.3.2
INSURANCE AND BONDS
11
Insurance Companies, Consent to Partial Occupancy
9.9.1
Intent of the Contract Documents
1.2.1, 4.2.7, 4.2.12, 4.2.13, 7.4
Interest
13.6
Interpretation
1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1
Interpretations, Written
4.2.11, 4.2.12, 15.1.4
Judgment on Final Award
15.4.2
Labor and Materials, Equipment
1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1,
4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3,
9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2
Labor Disputes
8.3.1
Laws and Regulations
1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13.1, 4.1.1, 9.6.4, 9.9.1,
10.2.2, 11.1.1, 11.3, 13.1.1, 13.4, 13.5.1, 13.5.2,
13.6.1, 14, 15.2.8, 15.4
Liens
2.1.2, 9.3.3, 9.10.2, 9.10.4, 15.2.8
Limitations, Statutes of
12.2.5, 13.7, 15.4.1.1
Limitations of Liability
2.3.1, 3.2.2, 3.5, 3.12.10, 3.17, 3.18.1, 4.2.6, 4.2.7,
4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 10.2.5, 10.3.3,
11.1.2, 11.2, 11.3.7, 12.2.5, 13.4.2
Limitations of Time
2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.7,
5.2, 5.3.1, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3,
9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 11.1.3, 11.3.1.5,
11.3.6, 11.3.10, 12.2, 13.5, 13.7, 14, 15
Loss of Use Insurance
11.3.3
Material Suppliers
1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5
Materials, Hazardous
10.2.4, 10.3
Materials, Labor, Equipment and
1.1.3, 1.1.6, 1.5.1, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12,
3.13.1, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2,
9.3.3, 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1,
14.2.1.2
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
6
Means, Methods, Techniques, Sequences and
Procedures of Construction
3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2
Mechanic’s Lien
2.1.2, 15.2.8
Mediation
8.3.1, 10.3.5, 10.3.6, 15.2.1, 15.2.5, 15.2.6, 15.3,
15.4.1
Minor Changes in the Work
1.1.1, 3.12.8, 4.2.8, 7.1, 7.4
MISCELLANEOUS PROVISIONS
13
Modifications, Definition of
1.1.1
Modifications to the Contract
1.1.1, 1.1.2, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7,
10.3.2, 11.3.1
Mutual Responsibility
6.2
Nonconforming Work, Acceptance of
9.6.6, 9.9.3, 12.3
Nonconforming Work, Rejection and Correction of
2.3.1, 2.4.1, 3.5, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3,
9.10.4, 12.2.1
Notice
2.2.1, 2.3.1, 2.4.1, 3.2.4, 3.3.1, 3.7.2, 3.12.9, 5.2.1,
9.7, 9.10, 10.2.2, 11.1.3, 12.2.2.1, 13.3, 13.5.1,
13.5.2, 14.1, 14.2, 15.2.8, 15.4.1
Notice, Written
2.3.1, 2.4.1, 3.3.1, 3.9.2, 3.12.9, 3.12.10, 5.2.1, 9.7,
9.10, 10.2.2, 10.3, 11.1.3, 11.3.6, 12.2.2.1, 13.3, 14,
15.2.8, 15.4.1
Notice of Claims
3.7.4, 10.2.8, 15.1.2, 15.4
Notice of Testing and Inspections
13.5.1, 13.5.2
Observations, Contractor’s
3.2, 3.7.4
Occupancy
2.2.2, 9.6.6, 9.8, 11.3.1.5
Orders, Written
1.1.1, 2.3, 3.9.2, 7, 8.2.2, 11.3.9, 12.1, 12.2.2.1,
13.5.2, 14.3.1
OWNER
2
Owner, Definition of
2.1.1
Owner, Information and Services Required of the
2.1.2, 2.2, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2,
9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2, 11.3, 13.5.1,
13.5.2, 14.1.1.4, 14.1.4, 15.1.3
Owner’s Authority
1.5, 2.1.1, 2.3.1, 2.4.1, 3.4.2, 3.8.1, 3.12.10, 3.14.2,
4.1.2, 4.1.3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3,
7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.6.4,
9.9.1, 9.10.2, 10.3.2, 11.1.3, 11.3.3, 11.3.10, 12.2.2,
12.3.1, 13.2.2, 14.3, 14.4, 15.2.7
Owner’s Financial Capability
2.2.1, 13.2.2, 14.1.1.4
Owner’s Liability Insurance
11.2
Owner’s Relationship with Subcontractors
1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2
Owner’s Right to Carry Out the Work
2.4, 14.2.2
Owner’s Right to Clean Up
6.3
Owner’s Right to Perform Construction and to
Award Separate Contracts
6.1
Owner’s Right to Stop the Work
2.3
Owner’s Right to Suspend the Work
14.3
Owner’s Right to Terminate the Contract
14.2
Ownership and Use of Drawings, Specifications
and Other Instruments of Service
1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, 3.2.2, 3.11.1, 3.17,
4.2.12, 5.3.1
Partial Occupancy or Use
9.6.6, 9.9, 11.3.1.5
Patching, Cutting and
3.14, 6.2.5
Patents
3.17
Payment, Applications for
4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5, 9.6.3, 9.7, 9.8.5, 9.10.1,
14.2.3, 14.2.4, 14.4.3
Payment, Certificates for
4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1,
9.10.3, 13.7, 14.1.1.3, 14.2.4
Payment, Failure of
9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2
Payment, Final
4.2.1, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.4.1, 12.3.1,
13.7, 14.2.4, 14.4.3
Payment Bond, Performance Bond and
7.3.7.4, 9.6.7, 9.10.3, 11.4
Payments, Progress
9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3
PAYMENTS AND COMPLETION
9
Payments to Subcontractors
5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 14.2.1.2
PCB
10.3.1
Performance Bond and Payment Bond
7.3.7.4, 9.6.7, 9.10.3, 11.4
Permits, Fees, Notices and Compliance with Laws
2.2.2, 3.7, 3.13, 7.3.7.4, 10.2.2
PERSONS AND PROPERTY, PROTECTION
OF
10
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
7
Polychlorinated Biphenyl
10.3.1
Product Data, Definition of
3.12.2
Product Data and Samples, Shop Drawings
3.11, 3.12, 4.2.7
Progress and Completion
4.2.2, 8.2, 9.8, 9.9.1, 14.1.4, 15.1.3
Progress Payments
9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3
Project, Definition of
1.1.4
Project Representatives
4.2.10
Property Insurance
10.2.5, 11.3
PROTECTION OF PERSONS AND PROPERTY
10
Regulations and Laws
1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 9.9.1,
10.2.2, 11.1, 11.4, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14,
15.2.8, 15.4
Rejection of Work
3.5, 4.2.6, 12.2.1
Releases and Waivers of Liens
9.10.2
Representations
3.2.1, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.4.2, 9.5.1,
9.8.2, 9.10.1
Representatives
2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.1, 4.2.2, 4.2.10, 5.1.1,
5.1.2, 13.2.1
Responsibility for Those Performing the Work
3.3.2, 3.18, 4.2.3, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, 10
Retainage
9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3
Review of Contract Documents and Field
Conditions by Contractor
3.2, 3.12.7, 6.1.3
Review of Contractor’s Submittals by Owner and
Architect
3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2
Review of Shop Drawings, Product Data and
Samples by Contractor
3.12
Rights and Remedies
1.1.2, 2.3, 2.4, 3.5, 3.7.4, 3.15.2, 4.2.6, 5.3, 5.4, 6.1,
6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.2, 12.2.4,
13.4, 14, 15.4
Royalties, Patents and Copyrights
3.17
Rules and Notices for Arbitration
15.4.1
Safety of Persons and Property
10.2, 10.4
Safety Precautions and Programs
3.3.1, 4.2.2, 4.2.7, 5.3.1, 10.1, 10.2, 10.4
Samples, Definition of
3.12.3
Samples, Shop Drawings, Product Data and
3.11, 3.12, 4.2.7
Samples at the Site, Documents and
3.11
Schedule of Values
9.2, 9.3.1
Schedules, Construction
3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2
Separate Contracts and Contractors
1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2
Shop Drawings, Definition of
3.12.1
Shop Drawings, Product Data and Samples
3.11, 3.12, 4.2.7
Site, Use of
3.13, 6.1.1, 6.2.1
Site Inspections
3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.4.2, 9.10.1, 13.5
Site Visits, Architect’s
3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5
Special Inspections and Testing
4.2.6, 12.2.1, 13.5
Specifications, Definition of
1.1.6
Specifications
1.1.1, 1.1.6, 1.2.2, 1.5, 3.11, 3.12.10, 3.17, 4.2.14
Statute of Limitations
13.7, 15.4.1.1
Stopping the Work
2.3, 9.7, 10.3, 14.1
Stored Materials
6.2.1, 9.3.2, 10.2.1.2, 10.2.4
Subcontractor, Definition of
5.1.1
SUBCONTRACTORS
5
Subcontractors, Work by
1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2,
9.6.7
Subcontractual Relations
5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 14.1, 14.2.1
Submittals
3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3,
9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3
Submittal Schedule
3.10.2, 3.12.5, 4.2.7
Subrogation, Waivers of
6.1.1, 11.3.7
Substantial Completion
4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3,
12.2, 13.7
Substantial Completion, Definition of
9.8.1
Substitution of Subcontractors
5.2.3, 5.2.4
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
8
Substitution of Architect
4.1.3
Substitutions of Materials
3.4.2, 3.5, 7.3.8
Sub-subcontractor, Definition of
5.1.2
Subsurface Conditions
3.7.4
Successors and Assigns
13.2
Superintendent
3.9, 10.2.6
Supervision and Construction Procedures
1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4,
7.1.3, 7.3.7, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.3
Surety
5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2, 15.2.7
Surety, Consent of
9.10.2, 9.10.3
Surveys
2.2.3
Suspension by the Owner for Convenience
14.3
Suspension of the Work
5.4.2, 14.3
Suspension or Termination of the Contract
5.4.1.1, 14
Taxes
3.6, 3.8.2.1, 7.3.7.4
Termination by the Contractor
14.1, 15.1.6
Termination by the Owner for Cause
5.4.1.1, 14.2, 15.1.6
Termination by the Owner for Convenience
14.4
Termination of the Architect
4.1.3
Termination of the Contractor
14.2.2
TERMINATION OR SUSPENSION OF THE
CONTRACT
14
Tests and Inspections
3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2,
9.10.1, 10.3.2, 11.4.1.1, 12.2.1, 13.5
TIME
8
Time, Delays and Extensions of
3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7,
10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5
Time Limits
2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2,
5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3,
9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 11.1.3, 12.2, 13.5,
13.7, 14, 15.1.2, 15.4
Time Limits on Claims
3.7.4, 10.2.8, 13.7, 15.1.2
Title to Work
9.3.2, 9.3.3
Transmission of Data in Digital Form
1.6
UNCOVERING AND CORRECTION OF
WORK
12
Uncovering of Work
12.1
Unforeseen Conditions, Concealed or Unknown
3.7.4, 8.3.1, 10.3
Unit Prices
7.3.3.2, 7.3.4
Use of Documents
1.1.1, 1.5, 2.2.5, 3.12.6, 5.3
Use of Site
3.13, 6.1.1, 6.2.1
Values, Schedule of
9.2, 9.3.1
Waiver of Claims by the Architect
13.4.2
Waiver of Claims by the Contractor
9.10.5, 13.4.2, 15.1.6
Waiver of Claims by the Owner
9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.4.2, 14.2.4, 15.1.6
Waiver of Consequential Damages
14.2.4, 15.1.6
Waiver of Liens
9.10.2, 9.10.4
Waivers of Subrogation
6.1.1, 11.3.7
Warranty
3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, 9.10.4, 12.2.2, 13.7
Weather Delays
15.1.5.2
Work, Definition of
1.1.3
Written Consent
1.5.2, 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.8.5,
9.9.1, 9.10.2, 9.10.3, 11.4.1, 13.2, 13.4.2, 15.4.4.2
Written Interpretations
4.2.11, 4.2.12
Written Notice
2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3.12.10, 5.2.1, 8.2.2, 9.7,
9.10, 10.2.2, 10.3, 11.1.3, 12.2.2, 12.2.4, 13.3, 14,
15.4.1
Written Orders
1.1.1, 2.3, 3.9, 7, 8.2.2, 12.1, 12.2, 13.5.2, 14.3.1,
15.1.2
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
9
ARTICLE 1 GENERAL PROVISIONS § 1.1 BASIC DEFINITIONS § 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the
Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in
the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment
to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written
order for a minor change in the Work issued by the Owner.
§ 1.1.2 THE CONTRACT The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated
agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written
or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be
construed to create a contractual relationship of any kind (1) between the Contractor and the Owner, (2) between the
Owner and a Subcontractor or a Sub-subcontractor, (3) between any persons or entities other than the Owner and the
Contractor. The Owner shall, however, be entitled to performance and enforcement of obligations under the
Contract intended to facilitate performance of the Owner’ duties.
§ 1.1.3 THE WORK The term “Work” means the construction and services required by the Contract Documents, whether completed or
partially completed, and includes all other labor, materials, equipment and services provided or to be provided by
the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Project.
§ 1.1.4 THE PROJECT The Project is the total construction of which the Work performed under the Contract Documents may be the whole
or a part and which may include construction by the Owner and by separate contractors.
§ 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and
dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.
§ 1.1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials,
equipment, systems, standards and workmanship for the Work, and performance of related services.
§ 1.1.7 INSTRUMENTS OF SERVICE Instruments of Service are representations, in any medium of expression now known or later developed, of the
tangible and intangible creative work performed by the Architect and the Architect’s consultants under their
respective professional services agreements. Instruments of Service may include, without limitation, studies,
surveys, models, sketches, drawings, specifications, and other similar materials.
§ 1.1.8 INITIAL DECISION MAKER The Initial Decision Maker is the person identified in the Agreement to render initial decisions on Claims in
accordance with Section 15.2 and certify termination of the Agreement under Section 14.2.2.
§ 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS § 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and
completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by
one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent
consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the
indicated results.
§ 1.2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not
control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be
performed by any trade.
§ 1.2.3 Unless otherwise stated in the Contract Documents, words that have well-known technical or construction
industry meanings are used in the Contract Documents in accordance with such recognized meanings.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
10
§ 1.3 CAPITALIZATION Terms capitalized in these General Conditions include those that are (1) specifically defined, (2) the titles of
numbered articles or (3) the titles of other documents published by the American Institute of Architects.
§ 1.4 INTERPRETATION In the interest of brevity the Contract Documents frequently omit modifying words such as “all” and “any” and
articles such as “the” and “an,” but the fact that a modifier or an article is absent from one statement and appears in
another is not intended to affect the interpretation of either statement.
§ 1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE § 1.5.1 The Architect and the Architect’s consultants shall be deemed the authors and owners of their respective
Instruments of Service, including the Drawings and Specifications, and will retain all common law, statutory and
other reserved rights, including copyrights. The Contractor, Subcontractors, Sub-subcontractors, and material or
equipment suppliers shall not own or claim a copyright in the Instruments of Service. Submittal or distribution to
meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as
publication in derogation of the Architect’s or Architect’s consultants’ reserved rights.
§ 1.5.2 The Contractor, Subcontractors, Sub-subcontractors and material or equipment suppliers are authorized to use
and reproduce the Instruments of Service provided to them solely and exclusively for execution of the Work. All
copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service.
The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers may not use the
Instruments of Service on other projects or for additions to this Project outside the scope of the Work without the
specific written consent of the Owner, Architect and the Architect’s consultants.
§ 1.6 TRANSMISSION OF DATA IN DIGITAL FORM If the parties intend to transmit Instruments of Service or any other information or documentation in digital form,
they shall endeavor to establish necessary protocols governing such transmissions, unless otherwise already
provided in the Agreement or the Contract Documents.
ARTICLE 2 OWNER § 2.1 GENERAL § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the
Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have
express authority to bind the Owner with respect to all matters requiring the Owner’s approval or authorization. The
term “Owner” means the Owner or the Owner’s authorized representative.
§ 2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information
necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic’s lien rights. Such
information shall include a correct statement of the record legal title to the property on which the Project is located,
usually referred to as the site, and the Owner’s interest therein.
§ 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER § 2.2.1 Prior to commencement of the Work, the Contractor may request in writing that the Owner provide
reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the
Contract. Thereafter, the Contractor may only request such evidence if (1) the Owner fails to make payments to the
Contractor as the Contract Documents require; (2) a change in the Work materially changes the Contract Sum; or (3)
the Contractor identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due.
The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or
the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not
materially vary such financial arrangements without prior notice to the Contractor.
§ 2.2.2 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents,
including those required under Section 3.7.1, the Owner shall secure and pay for necessary approvals, easements,
assessments and charges required for construction, use or occupancy of permanent structures or for permanent
changes in existing facilities.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
11
§ 2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for
the site of the Project, and a legal description of the site. The Contractor shall be entitled to rely on the accuracy of
information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the
Work.
§ 2.2.4 The Owner shall furnish information or services required of the Owner by the Contract Documents with
reasonable promptness. The Owner shall also furnish any other information or services under the Owner’s control
and relevant to the Contractor’s performance of the Work with reasonable promptness after receiving the
Contractor’s written request for such information or services.
§ 2.2.5 Unless otherwise provided in the Contract Documents, the Owner shall furnish to the Contractor one copy of
the Contract Documents for purposes of making reproductions pursuant to Section 1.5.2.
§ 2.3 OWNER’S RIGHT TO STOP THE WORK If the Contractor fails to correct Work that is not in accordance with the requirements of the Contract Documents as
required by Section 12.2 or repeatedly fails to carry out Work in accordance with the Contract Documents, the
Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such
order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part
of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent
required by Section 6.1.3.
§ 2.4 OWNER’S RIGHT TO CARRY OUT THE WORK If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails
within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such
default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies the Owner
may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from
payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including
Owner’s expenses and compensation for the Architect’s additional services made necessary by such default, neglect
or failure. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor
shall pay the difference to the Owner.
ARTICLE 3 CONTRACTOR § 3.1 GENERAL § 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the
Contract Documents as if singular in number. The Contractor shall be lawfully licensed, if required in the
jurisdiction where the Project is located. The Contractor shall designate in writing a representative who shall have
express authority to bind the Contractor with respect to all matters under this Contract. The term “Contractor” means
the Contractor or the Contractor’s authorized representative.
§ 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.
§ 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR § 3.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become
generally familiar with local conditions under which the Work is to be performed and correlated personal
observations with requirements of the Contract Documents.
§ 3.2.2 Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the
Work, carefully study and compare the various Contract Documents relative to that portion of the Work, as well as
the information furnished by the Owner pursuant to Section 2.2.3, shall take field measurements of any existing
conditions related to that portion of the Work, and shall observe any conditions at the site affecting it. These
obligations are for the purpose of facilitating coordination and construction by the Contractor and are not for the
purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, the Contractor
shall promptly report to the Owner any errors, inconsistencies or omissions discovered by or made known to the
Contractor as a request for information in such form as the Owner may require. It is recognized that the Contractor’s
review is made in the Contractor’s capacity as a contractor and not as a licensed design professional, unless
otherwise specifically provided in the Contract Documents.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
12
§ 3.2.3 The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable
laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, but the Contractor
shall promptly report to the Owner any nonconformity discovered by or made known to the Contractor as a request
for information in such form as the Owner may require.
§ 3.2.4 If the Contractor believes that additional cost or time is involved because of clarifications or instructions the
Owner issues in response to the Contractor’s notices or requests for information pursuant to Sections 3.2.2 or 3.2.3,
the Contractor shall make Claims as provided in Article 15. If the Contractor fails to perform the obligations of
Sections 3.2.2 or 3.2.3, the Contractor shall pay such costs and damages to the Owner as would have been avoided if
the Contractor had performed such obligations. If the Contractor performs those obligations, the Contractor shall not
be liable to the Owner for damages resulting from errors, inconsistencies or omissions in the Contract Documents,
for differences between field measurements or conditions and the Contract Documents, or for nonconformities of the
Contract Documents to applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of
public authorities.
§ 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES § 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The
Contractor shall be solely responsible for, and have control over, construction means, methods, techniques,
sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract
Documents give other specific instructions concerning these matters. If the Contract Documents give specific
instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall
evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite
safety of such means, methods, techniques, sequences or procedures. If the Contractor determines that such means,
methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the
Owner and shall not proceed with that portion of the Work without further written instructions from the Owner. If
the Contractor is then instructed to proceed with the required means, methods, techniques, sequences or procedures
without acceptance of changes proposed by the Contractor, the Owner shall be solely responsible for any loss or
damage arising solely from those Owner-required means, methods, techniques, sequences or procedures.
§ 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor’s employees,
Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for, or
on behalf of, the Contractor or any of its Subcontractors.
§ 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that
such portions are in proper condition to receive subsequent Work.
§ 3.4 LABOR AND MATERIALS § 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor,
materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other
facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent
and whether or not incorporated or to be incorporated in the Work.
§ 3.4.2 Except in the case of minor changes in the Work authorized by the Owner in accordance with Sections 3.12.8
or 7.4, the Contractor may make substitutions only with the consent of the Owner, after evaluation and in
accordance with a Change Order or Construction Change Directive.
§ 3.4.3 The Contractor shall enforce strict discipline and good order among the Contractor’s employees and other
persons carrying out the Work. The Contractor shall not permit employment of unfit persons or persons not properly
skilled in tasks assigned to them.
§ 3.5 WARRANTY The Contractor warrants to the Owner that materials and equipment furnished under the Contract will be of good
quality and new unless the Contract Documents require or permit otherwise. The Contractor further warrants that the
Work will conform to the requirements of the Contract Documents and will be free from defects, except for those
inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or equipment not
conforming to these requirements may be considered defective. The Contractor’s warranty excludes remedy for
damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or insufficient
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
13
maintenance, improper operation, or normal wear and tear and normal usage. If required by the Owner, the
Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
§ 3.6 TAXES The Owner is a federally-recognized Indian tribe and is exempt from Washington State sales and business and
occupation taxes for work done on the Quinault Reservation or goods delivered to the Nation on the Quinault
Reservation. With respect to the Washington State business and occupation tax, this tax may not be included in
overhead charges to the Owner. See, Washington Administrative Code (WAC) 458-20-192.
§ 3.7 PERMITS, FEES, NOTICES AND COMPLIANCE WITH LAWS § 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building
permit as well as for other permits, fees, licenses, and inspections by government agencies necessary for proper
execution and completion of the Work that are customarily secured after execution of the Contract and legally
required at the time bids are received or negotiations concluded.
§ 3.7.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes,
rules and regulations, and lawful orders of public authorities applicable to performance of the Work.
§ 3.7.3 If the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes,
rules and regulations, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility
for such Work and shall bear the costs attributable to correction.
§ 3.7.4 Concealed or Unknown Conditions. If the Contractor encounters conditions at the site that are (1)
subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract
Documents or (2) unknown physical conditions of an unusual nature, that differ materially from those ordinarily
found to exist and generally recognized as inherent in construction activities of the character provided for in the
Contract Documents, the Contractor shall promptly provide notice to the Owner before conditions are disturbed and
in no event later than 21 days after first observance of the conditions. The Owner will promptly investigate such
conditions and, if the Owner determines that they differ materially and cause an increase or decrease in the
Contractor’s cost of, or time required for, performance of any part of the Work, will recommend an equitable
adjustment in the Contract Sum or Contract Time, or both. If the Owner determines that the conditions at the site are
not materially different from those indicated in the Contract Documents and that no change in the terms of the
Contract is justified, the Owner shall promptly notify the Contractor in writing, stating the reasons. If either party
disputes the Owner’s determination or recommendation, that party may proceed as provided in Article 15.
§ 3.7.5 If, in the course of the Work, the Contractor encounters human remains or recognizes the existence of burial
markers, archaeological sites or wetlands not indicated in the Contract Documents, the Contractor shall immediately
suspend any operations that would affect them and shall notify the Owner. Upon receipt of such notice, the Owner
shall promptly take any action necessary to obtain governmental authorization required to resume the operations.
The Contractor shall continue to suspend such operations until otherwise instructed by the Owner but shall continue
with all other operations that do not affect those remains or features. Requests for adjustments in the Contract Sum
and Contract Time arising from the existence of such remains or features may be made as provided in Article 15.
§ 3.8 ALLOWANCES § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items
covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct,
but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable
objection.
§ 3.8.2 Unless otherwise provided in the Contract Documents,
.1 Allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and
all required taxes, less applicable trade discounts;
.2 Contractor’s costs for unloading and handling at the site, labor, installation costs, overhead, profit and
other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but
not in the allowances; and
.3 Whenever costs are more than or less than allowances, the Contract Sum shall be adjusted
accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
14
between actual costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor’s costs
under Section 3.8.2.2.
§ 3.8.3 Materials and equipment under an allowance shall be selected by the Owner with reasonable promptness.
§ 3.9 SUPERINTENDENT § 3.9.1 The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance
at the Project site during performance of the Work. The superintendent shall represent the Contractor, and
communications given to the superintendent shall be as binding as if given to the Contractor.
§ 3.9.2 The Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner the
name and qualifications of a proposed superintendent. The Owner may reply within 14 days to the Contractor in
writing stating (1) whether the Owner has reasonable objection to the proposed superintendent or (2) that the Owner
requires additional time to review. Failure of the Owner to reply within the 14 day period shall constitute notice of
no reasonable objection.
§ 3.9.3 The Contractor shall not employ a proposed superintendent to whom the Owner has made reasonable and
timely objection. The Contractor shall not change the superintendent without the Owner’s consent, which shall not
unreasonably be withheld or delayed.
§ 3.10 CONTRACTOR’S CONSTRUCTION SCHEDULES § 3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner’s
information a Contractor’s construction schedule for the Work. The schedule shall not exceed time limits current
under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work
and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide
for expeditious and practicable execution of the Work.
§ 3.10.2 The Contractor shall prepare a submittal schedule, promptly after being awarded the Contract and thereafter
as necessary to maintain a current submittal schedule, and shall submit the schedule(s) for the Owner’s
approval,which shall not unreasonably be delayed or withheld. The submittal schedule shall (1) be coordinated with
the Contractor’s construction schedule, and (2) allow the Owner reasonable time to review submittals. If the
Contractor fails to submit a submittal schedule, the Contractor shall not be entitled to any increase in Contract Sum
or extension of Contract Time based on the time required for review of submittals.
§ 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to
the Owner.
§ 3.11 DOCUMENTS AND SAMPLES AT THE SITE The Contractor shall maintain at the site for the Owner one copy of the Drawings, Specifications, Addenda, Change
Orders and other Modifications, in good order and marked currently to indicate field changes and selections made
during construction, and one copy of approved Shop Drawings, Product Data, Samples and similar required
submittals. These shall be available to the Owner upon completion of the Work as a record of the Work as
constructed.
§ 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES § 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the
Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of
the Work.
§ 3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and
other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.
§ 3.12.3 Samples are physical examples that illustrate materials, equipment or workmanship and establish standards
by which the Work will be judged.
§ 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose is
to demonstrate the way by which the Contractor proposes to conform to the information given and the design
concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
15
require submittals. Review by the Owner is subject to the limitations of Section 4.2.7. Informational submittals upon
which the Owner is not expected to take responsive action may be so identified in the Contract Documents.
Submittals that are not required by the Contract Documents may be returned by the Owner without action.
§ 3.12.5 The Contractor shall review for compliance with the Contract Documents, approve and submit to the Owner
Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents in accordance
with the submittal schedule approved by the Owner or, in the absence of an approved submittal schedule, with
reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of
separate contractors.
§ 3.12.6 By submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to
the Owner that the Contractor has (1) reviewed and approved them, (2) determined and verified materials, field
measurements and field construction criteria related thereto, or will do so and (3) checked and coordinated the
information contained within such submittals with the requirements of the Work and of the Contract Documents.
§ 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal
and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been
approved by the Owner.
§ 3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of
responsibility for deviations from requirements of the Contract Documents by the Owner’s approval of Shop
Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Owner in
writing of such deviation at the time of submittal and (1) the Owner has given written approval to the specific
deviation as a minor change in the Work, or (2) a Change Order or Construction Change Directive has been issued
authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop
Drawings, Product Data, Samples or similar submittals by the Owner’s approval thereof.
§ 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data,
Samples or similar submittals, to revisions other than those requested by the Owner on previous submittals. In the
absence of such written notice, the Owner’s approval of a resubmission shall not apply to such revisions.
§ 3.12.10 The Contractor shall not be required to provide professional services that constitute the practice of
architecture or engineering unless such services are specifically required by the Contract Documents for a portion of
the Work or unless the Contractor needs to provide such services in order to carry out the Contractor’s
responsibilities for construction means, methods, techniques, sequences and procedures. The Contractor shall not be
required to provide professional services in violation of applicable law. If professional design services or
certifications by a design professional related to systems, materials or equipment are specifically required of the
Contractor by the Contract Documents, the Owner will specify all performance and design criteria that such services
must satisfy. The Contractor shall cause such services or certifications to be provided by a properly licensed design
professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, Shop
Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the
Work designed or certified by such professional, if prepared by others, shall bear such professional’s written
approval when submitted to the Owner. The Owner shall be entitled to rely upon the adequacy, accuracy and
completeness of the services, certifications and approvals performed or provided by such design professionals,
provided the Owner has specified to the Contractor all performance and design criteria that such services must
satisfy. Pursuant to this Section 3.12.10, the Owner will review, approve or take other appropriate action on
submittals only for the limited purpose of checking for conformance with information given and the design concept
expressed in the Contract Documents. The Contractor shall not be responsible for the adequacy of the performance
and design criteria specified in the Contract Documents.
§ 3.13 USE OF SITE The Contractor shall confine operations at the site to areas permitted by applicable laws, statutes, ordinances, codes,
rules and regulations, and lawful orders of public authorities and the Contract Documents and shall not unreasonably
encumber the site with materials or equipment.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
16
§ 3.14 CUTTING AND PATCHING § 3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make
its parts fit together properly. All areas requiring cutting, fitting and patching shall be restored to the condition
existing prior to the cutting, fitting and patching, unless otherwise required by the Contract Documents.
§ 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed
construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by
excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor
except with written consent of the Owner and of such separate contractor; such consent shall not be unreasonably
withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor’s
consent to cutting or otherwise altering the Work.
§ 3.15 CLEANING UP § 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or
rubbish caused by operations under the Contract. At completion of the Work, the Contractor shall remove waste
materials, rubbish, the Contractor’s tools, construction equipment, machinery and surplus materials from and about
the Project.
§ 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and Owner
shall be entitled to reimbursement from the Contractor.
§ 3.16 ACCESS TO WORK The Contractor shall provide the Owner access to the Work in preparation and progress wherever located.
§ 3.17 ROYALTIES, PATENTS AND COPYRIGHTS The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement
of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but
shall not be responsible for such defense or loss when a particular design, process or product of a particular
manufacturer or manufacturers is required by the Contract Documents, or where the copyright violations are
contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However, if the
Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a
patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Owner
and Architect.
§ 3.18 INDEMNIFICATION § 3.18.1 To the fullest extent permitted by law the Contractor shall indemnify and hold harmless the Owner, and
Owner’s agents and employees from and against claims, damages, losses and expenses, including but not limited to
attorneys’ fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss or
expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property
(other than the Work itself), but only to the extent caused by the negligent acts or omissions of the Contractor, a
Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable,
regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder.
Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which
would otherwise exist as to a party or person described in this Section 3.18.
§ 3.18.2 In claims against any person or entity indemnified under this Section 3.18 by an employee of the Contractor,
a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the
indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of damages,
compensation or benefits payable by or for the Contractor or a Subcontractor under workers’ compensation acts,
disability benefit acts or other employee benefit acts.
ARTICLE 4 ARCHITECT - OMITTED
§ 4.2 ADMINISTRATION OF THE CONTRACT § 4.2.1 The Owner’s Representative will provide administration of the Contract as described in the Contract
Documents during construction.
§ 4.2.2 The Owner ‘s representative will visit the site at intervals appropriate to the stage of construction to become
generally familiar with the progress and quality of the portion of the Work completed, and to determine in general if
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
17
the Work observed is being performed in a manner indicating that the Work, when fully completed, will be in
accordance with the Contract Documents. The Owner’s Representative will not have control over, charge of, or
responsibility for, the construction means, methods, techniques, sequences or procedures, or for the safety
precautions and programs in connection with the Work, since these are solely the Contractor’s rights and
responsibilities under the Contract Documents, except as provided in Section 3.3.1.
§ 4.2.3 The Owner’s Representative will not be responsible for the Contractor’s failure to perform the Work in
accordance with the requirements of the Contract Documents. The Owner’s Representative will not have control
over or charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents
or employees, or any other persons or entities performing portions of the Work.
§ 4.2.4 COMMUNICATIONS FACILITATING CONTRACT ADMINISTRATION Except as otherwise provided in the Contract Documents or when direct communications have been specially
authorized, the Owner and Contractor shall endeavor to communicate directly about matters arising out of or relating
to the Contract. Communications by and with Subcontractors and material suppliers shall be through the Contractor.
Communications by and with separate contractors shall be through the Owner.
§ 4.2.5 Based on the Owner’s evaluations of the Contractor’s Applications for Payment, the Owner’s Representative
will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts.
§ 4.2.6 The Owner’s Representative has authority to reject Work that does not conform to the Contract Documents.
Whenever the Owner’s Representative considers it necessary or advisable, he will have authority to require
inspection or testing of the Work in accordance with Sections 13.5.2 and 13.5.3, whether or not such Work is
fabricated, installed or completed. However, neither this authority of the Owner’s Represenative nor a decision
made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the
Owner’s Representative to the Contractor, Subcontractors, material and equipment suppliers, their agents or
employees, or other persons or entities performing portions of the Work.
§ 4.2.7 The Owner’s Representative will review and approve, or take other appropriate action upon, the Contractor’s
submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for
conformance with information given and the design concept expressed in the Contract Documents. The Owner’s
Representative’s action will be taken in accordance with the submittal schedule approved by the Owner’s
Representative or, in the absence of an approved submittal schedule, with reasonable promptness while allowing
sufficient time in the Owner’s Representative’s professional judgment to permit adequate review. Review of such
submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as
dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems,
all of which remain the responsibility of the Contractor as required by the Contract Documents. The Owner’s review
of the Contractor’s submittals shall not relieve the Contractor of the obligations under Sections 3.3, 3.5 and 3.12.
The Owner’s Representative’s review shall not constitute approval of safety precautions or, unless otherwise
specifically stated by the Owner’s Representative, of any construction means, methods, techniques, sequences or
procedures. The Owner’s Representative’s approval of a specific item shall not indicate approval of an assembly of
which the item is a component.
§ 4.2.8 The Owner’s Representative will prepare Change Orders and Construction Change Directives, and may
authorize minor changes in the Work as provided in Section 7.4. The Owner’s Representative will investigate and
make determinations and recommendations regarding concealed and unknown conditions as provided in Section
3.7.4.
§ 4.2.9 The Owner’s Representative will conduct inspections to determine the date or dates of Substantial
Completion and the date of final completion; issue Certificates of Substantial Completion pursuant to Section 9.8;
receive and forward to the Owner, for the Owner’s review and records, written warranties and related documents
required by the Contract and assembled by the Contractor pursuant to Section 9.10; and issue a final Certificate for
Payment pursuant to Section 9.10.
§ 4.2.10 Omitted.§ 4.2.11 The Owner’s Representative will interpret and decide matters concerning performance
under, and requirements of, the Contract Documents on written request of either the Owner or Contractor. The
Owner’s Representative response to such requests will be made in writing within any time limits agreed upon or
otherwise with reasonable promptness.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
18
§ 4.2.12 Interpretations and decisions of the Owner’s Representative will be consistent with the intent of, and
reasonably inferable from, the Contract Documents and will be in writing or in the form of drawings. When making
such interpretations and decisions, the Owner’s Representative will endeavor to secure faithful performance by both
Owner and Contractor, will not show partiality to either and will not be liable for results of interpretations or
decisions rendered in good faith.
§ 4.2.13 The Owner’s Representative’s decisions on matters relating to aesthetic effect will be final if consistent with
the intent expressed in the Contract Documents.
§ 4.2.14 The Owner’s Representative will review and respond to requests for information about the Contract
Documents. The Owner’s Representative’s response to such requests will be made in writing within any time limits
agreed upon or otherwise with reasonable promptness. If appropriate, the Owner’s Representative will prepare and
issue supplemental Drawings and Specifications in response to the requests for information.
ARTICLE 5 SUBCONTRACTORS § 5.1 DEFINITIONS § 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the
Work at the site. The term “Subcontractor” is referred to throughout the Contract Documents as if singular in
number and means a Subcontractor or an authorized representative of the Subcontractor. The term “Subcontractor”
does not include a separate contractor or subcontractors of a separate contractor.
§ 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to
perform a portion of the Work at the site. The term “Sub-subcontractor” is referred to throughout the Contract
Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub-
subcontractor.
§ 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK § 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as
practicable after award of the Contract, shall furnish in writing to the Owner the names of persons or entities
(including those who are to furnish materials or equipment fabricated to a special design) proposed for each
principal portion of the Work. The Owner may reply within 14 days to the Contractor in writing stating (1) whether
the Owner has reasonable objection to any such proposed person or entity or (2) that the Owner requires additional
time for review. Failure of the Owner to reply within the 14 day period shall constitute notice of no reasonable
objection.
§ 5.2.2 The Contractor shall not contract with a proposed person or entity to whom the Owner has made reasonable
and timely objection. The Contractor shall not be required to contract with anyone to whom the Contractor has made
reasonable objection.
§ 5.2.3 If the Owner has reasonable objection to a person or entity proposed by the Contractor, the Contractor shall
propose another to whom the Owner has no reasonable objection. If the proposed but rejected Subcontractor was
reasonably capable of performing the Work, the Contract Sum and Contract Time shall be increased or decreased by
the difference, if any, occasioned by such change, and an appropriate Change Order shall be issued before
commencement of the substitute Subcontractor’s Work. However, no increase in the Contract Sum or Contract Time
shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as
required.
§ 5.2.4 The Contractor shall not substitute a Subcontractor, person or entity previously selected if the Owner makes
reasonable objection to such substitution.
§ 5.3 SUBCONTRACTUAL RELATIONS By appropriate agreement, written where legally required for validity, the Contractor shall require each
Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by
terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities,
including the responsibility for safety of the Subcontractor’s Work, which the Contractor, by these Documents,
assumes toward the Owner. Each subcontract agreement shall preserve and protect the rights of the Owner under the
Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
19
will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the
subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by
the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor
to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed
Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the
Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and
conditions of the proposed subcontract agreement that may be at variance with the Contract Documents.
Subcontractors will similarly make copies of applicable portions of such documents available to their respective
proposed Sub-subcontractors.
§ 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS § 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner, provided
that
.1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to
Section 14.2 and only for those subcontract agreements that the Owner accepts by notifying the
Subcontractor and Contractor in writing; and
.2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the
Contract.
When the Owner accepts the assignment of a subcontract agreement, the Owner assumes the Contractor’s rights and
obligations under the subcontract.
§ 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontractor’s
compensation shall be equitably adjusted for increases in cost resulting from the suspension.
§ 5.4.3 Upon such assignment to the Owner under this Section 5.4, the Owner may further assign the subcontract to a
successor contractor or other entity. If the Owner assigns the subcontract to a successor contractor or other entity,
the Owner shall nevertheless remain legally responsible for all of the successor contractor’s obligations under the
subcontract.
ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS § 6.1 OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s
own forces, and to award separate contracts in connection with other portions of the Project or other construction or
operations on the site under Conditions of the Contract identical or substantially similar to these including those
portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is
involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.
§ 6.1.2 When separate contracts are awarded for different portions of the Project or other construction or operations
on the site, the term “Contractor” in the Contract Documents in each case shall mean the Contractor who executes
each separate Owner-Contractor Agreement.
§ 6.1.3 The Owner shall provide for coordination of the activities of the Owner’s own forces and of each separate
contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with
other separate contractors and the Owner in reviewing their construction schedules. The Contractor shall make any
revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction
schedules shall then constitute the schedules to be used by the Contractor, separate contractors and the Owner until
subsequently revised.
§ 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations
related to the Project with the Owner’s own forces, the Owner shall be deemed to be subject to the same obligations
and to have the same rights that apply to the Contractor under the Conditions of the Contract, including, without
excluding others, those stated in Article 3, this Article 6 and Articles 10, 11 and 12.
§ 6.2 MUTUAL RESPONSIBILITY § 6.2.1 The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and
storage of their materials and equipment and performance of their activities, and shall connect and coordinate the
Contractor’s construction and operations with theirs as required by the Contract Documents.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
20
§ 6.2.2 If part of the Contractor’s Work depends for proper execution or results upon construction or operations by
the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly
report to the Owner’s Representative apparent discrepancies or defects in such other construction that would render
it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an
acknowledgment that the Owner’s or separate contractor’s completed or partially completed construction is fit and
proper to receive the Contractor’s Work, except as to defects not then reasonably discoverable.
§ 6.2.3 The Contractor shall reimburse the Owner for costs the Owner incurs that are payable to a separate contractor
because of the Contractor’s delays, improperly timed activities or defective construction. The Owner shall be
responsible to the Contractor for costs the Contractor incurs because of a separate contractor’s delays, improperly
timed activities, damage to the Work or defective construction.
§ 6.2.4 The Contractor shall promptly remedy damage the Contractor wrongfully causes to completed or partially
completed construction or to property of the Owner or separate contractors as provided in Section 10.2.5.
§ 6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are
described for the Contractor in Section 3.14.
§ 6.3 OWNER’S RIGHT TO CLEAN UP If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their
respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish, the
Owner may clean up and the Owner will allocate the cost among those responsible.
ARTICLE 7 CHANGES IN THE WORK § 7.1 GENERAL § 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the
Contract, by Change Order, Construction Change Directive or order for a minor change in the Work, subject to the
limitations stated in this Article 7 and elsewhere in the Contract Documents.
§ 7.1.2 A Change Order shall be based upon agreement between the Owner and Contractor; a Construction Change
Directive requires agreement by the Owner and may or may not be agreed to by the Contractor.
§ 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the
Contractor shall proceed promptly, unless otherwise provided in the Change Order, Construction Change Directive
or order for a minor change in the Work.
§ 7.2 CHANGE ORDERS § 7.2.1 A Change Order is a written instrument prepared by the Owner’s Representative and signed by the Owner
and Contractor stating their agreement upon all of the following:
.1 The change in the Work;
.2 The amount of the adjustment, if any, in the Contract Sum; and
.3 The extent of the adjustment, if any, in the Contract Time.
§ 7.3 CONSTRUCTION CHANGE DIRECTIVES § 7.3.1 A Construction Change Directive is a written order prepared by the Owner’s Representative and signed by
the Owner, directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or Contract
Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes
in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the
Contract Sum and Contract Time being adjusted accordingly.
§ 7.3.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change
Order.
§ 7.3.3 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be
based on one of the following methods:
.1 Mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to
permit evaluation;
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
21
.2 Unit prices stated in the Contract Documents or subsequently agreed upon;
.3 Cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or
percentage fee; or
.4 As provided in Section 7.3.7.
§ 7.3.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally
contemplated are materially changed in a proposed Change Order or Construction Change Directive so that
application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or
Contractor, the applicable unit prices shall be equitably adjusted.
§ 7.3.5 Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in
the Work involved and advise the Owner of the Contractor’s agreement or disagreement with the method, if any,
provided in the Construction Change Directive for determining the proposed adjustment in the Contract Sum or
Contract Time.
§ 7.3.6 A Construction Change Directive signed by the Contractor indicates the Contractor’s agreement therewith,
including adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall
be effective immediately and shall be recorded as a Change Order.
§ 7.3.7 If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract Sum,
the Owner shall determine the method and the adjustment on the basis of reasonable expenditures and savings of
those performing the Work attributable to the change, including, in case of an increase in the Contract Sum, an
amount for overhead and profit as set forth in the Agreement, or if no such amount is set forth in the Agreement, a
reasonable amount. In such case, and also under Section 7.3.3.3, the Contractor shall keep and present, in such form
as the Owner may prescribe, an itemized accounting together with appropriate supporting data. Unless otherwise
provided in the Contract Documents, costs for the purposes of this Section 7.3.7 shall be limited to the following:
.1 Costs of labor, including social security, old age and unemployment insurance, fringe benefits
required by agreement or custom, and workers’ compensation insurance;
.2 Costs of materials, supplies and equipment, including cost of transportation, whether incorporated or
consumed;
.3 Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the
Contractor or others;
.4 Costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to
the Work; and
.5 Additional costs of supervision and field office personnel directly attributable to the change.
§ 7.3.8 The amount of credit to be allowed by the Contractor to the Owner for a deletion or change that results in a
net decrease in the Contract Sum shall be actual net cost as confirmed by the Owner. When both additions and
credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall
be figured on the basis of net increase, if any, with respect to that change.
§ 7.3.9 Pending final determination of the total cost of a Construction Change Directive to the Owner, the Contractor
may request payment for Work completed under the Construction Change Directive in Applications for Payment.
The Owner will make an interim determination for purposes of monthly certification for payment for those costs and
certify for payment the amount that the Owner determines, in the Owner’s professional judgment, to be reasonably
justified. The Owner’s interim determination of cost shall adjust the Contract Sum on the same basis as a Change
Order, subject to the right of either party to disagree and assert a Claim in accordance with Article 15.
§ 7.3.10 When the Owner and Contractor agree concerning the adjustments in the Contract Sum and Contract Time,
or otherwise reach agreement upon the adjustments, such agreement shall be effective immediately and the Owner
will prepare a Change Order. Change Orders may be issued for all or any part of a Construction Change Directive.
ARTICLE 8 TIME § 8.1 DEFINITIONS § 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in
the Contract Documents for Substantial Completion of the Work.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
22
§ 8.1.2 The date of commencement of the Work is the date established in the Agreement.
§ 8.1.3 The date of Substantial Completion is the date certified by the Owner in accordance with Section 9.8.
§ 8.1.4 The term “day” as used in the Contract Documents shall mean calendar day unless otherwise specifically
defined.
§ 8.2 PROGRESS AND COMPLETION § 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement
the Contractor confirms that the Contract Time is a reasonable period for performing the Work.
§ 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely
commence operations on the site or elsewhere prior to the effective date of insurance required by Article 11 to be
furnished by the Contractor and Owner. The date of commencement of the Work shall not be changed by the
effective date of such insurance.
§ 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion
within the Contract Time.
§ 8.3 DELAYS AND EXTENSIONS OF TIME § 8.3.1 If the Contractor is delayed at any time in the commencement or progress of the Work by an act or neglect of
the Owner, or of an employee of either, or of a separate contractor employed by the Owner; or by changes ordered in
the Work; or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the
Contractor’s control; or by delay authorized by the Owner pending mediation and arbitration, then the Contract
Time shall be extended by Change Order for such reasonable time as the Owner may determine.
§ 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Article 15.
§ 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either party under other provisions of
the Contract Documents.
ARTICLE 9 PAYMENTS AND COMPLETION § 9.1 CONTRACT SUM The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by
the Owner to the Contractor for performance of the Work under the Contract Documents.
§ 9.2 SCHEDULE OF VALUES Where the Contract is based on a stipulated sum or Guaranteed Maximum Price, the Contractor shall submit to the
Owner, before the first Application for Payment, a schedule of values allocating the entire Contract Sum to the
various portions of the Work and prepared in such form and supported by such data to substantiate its accuracy as
the Owner may require. This schedule, unless objected to by the Owner, shall be used as a basis for reviewing the
Contractor’s Applications for Payment.
§ 9.3 APPLICATIONS FOR PAYMENT § 9.3.1 At least ten days before the date established for each progress payment, the Contractor shall submit to the
Owner an itemized Application for Payment prepared in accordance with the schedule of values, if required under
Section 9.2, for completed portions of the Work. Such application shall be notarized, if required, and supported by
such data substantiating the Contractor’s right to payment as the Ownermay require, such as copies of requisitions
from Subcontractors and material suppliers, and shall reflect retainage if provided for in the Contract Documents.
§ 9.3.1.1 As provided in Section 7.3.9, such applications may include requests for payment on account of changes in
the Work that have been properly authorized by Construction Change Directives, or by interim determinations of the
Owner, but not yet included in Change Orders.
§ 9.3.1.2 Applications for Payment shall not include requests for payment for portions of the Work for which the
Contractor does not intend to pay a Subcontractor or material supplier, unless such Work has been performed by
others whom the Contractor intends to pay.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
23
§ 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and
equipment delivered and suitably stored at the site for subsequent incorporation in the Work. If approved in advance
by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location
agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon
compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner’s title to such
materials and equipment or otherwise protect the Owner’s interest, and shall include the costs of applicable
insurance, storage and transportation to the site for such materials and equipment stored off the site.
§ 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner
no later than the time of payment. The Contractor further warrants that upon submittal of an Application for
Payment all Work for which Certificates for Payment have been previously issued and payments received from the
Owner shall, to the best of the Contractor’s knowledge, information and belief, be free and clear of liens, claims,
security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or
entities making a claim by reason of having provided labor, materials and equipment relating to the Work.
§ 9.4 CERTIFICATES FOR PAYMENT § 9.4.1 The Owner will, within seven days after receipt of the Contractor’s Application for Payment, either issue to
the Contractor a Certificate for Payment for such amount as the Owner determines is properly due, or notify the
Contractor in writing of the Owner’s reasons for withholding certification in whole or in part as provided in Section
9.5.1.
§ 9.4.2 The issuance of a Certificate for Payment will constitute a representation by the Owner, based on the Owner’s
evaluation of the Work and the data comprising the Application for Payment, that, to the best of the Owner’s
knowledge, information and belief, the Work has progressed to the point indicated and that the quality of the Work
is in accordance with the Contract Documents. The foregoing representations are subject to an evaluation of the
Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and
inspections, to correction of minor deviations from the Contract Documents prior to completion and to specific
qualifications expressed by the Owner. The issuance of a Certificate for Payment will further constitute a
representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a
Certificate for Payment will not be a representation that the Owner has (1) made exhaustive or continuous on-site
inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques,
sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers
and other data requested by the Owner to substantiate the Contractor’s right to payment, or (4) made examination to
ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Sum.
§ 9.5 DECISIONS TO WITHHOLD CERTIFICATION § 9.5.1 The Owner may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to
protect the Owner, if in the Owner’s opinion the representations to the Owner required by Section 9.4.2 cannot be
made. If the Owner is unable to certify payment in the amount of the Application, the Owner will notify the
Contractor and Owner as provided in Section 9.4.1. If the Contractor and Owner cannot agree on a revised amount,
the Owner will promptly issue a Certificate for Payment for the amount for which the Owner is able to make such
representations. The Owner may also withhold a Certificate for Payment or, because of subsequently discovered
evidence, may nullify the whole or a part of a Certificate for Payment previously issued, to such extent as may be
necessary in the Owner’s opinion to protect the Owner from loss for which the Contractor is responsible, including
loss resulting from acts and omissions described in Section 3.3.2, because of
.1 defective Work not remedied;
.2 third party claims filed or reasonable evidence indicating probable filing of such claims unless
security acceptable to the Owner is provided by the Contractor;
.3 failure of the Contractor to make payments properly to Subcontractors or for labor, materials or
equipment;
.4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum;
.5 damage to the Owner or a separate contractor;
.6 reasonable evidence that the Work will not be completed within the Contract Time, and that the
unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay;
or
.7 repeated failure to carry out the Work in accordance with the Contract Documents.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
24
§ 9.5.2 When the above reasons for withholding certification are removed, certification will be made for amounts
previously withheld.
§ 9.6 PROGRESS PAYMENTS § 9.6.1 After the Owner has issued a Certificate for Payment, the Owner shall make payment in the manner and
within the time provided in the Contract Documents, and shall so notify the Owner.
§ 9.6.2 The Contractor shall pay each Subcontractor no later than seven days after receipt of payment from the
Owner the amount to which the Subcontractor is entitled, reflecting percentages actually retained from payments to
the Contractor on account of the Subcontractor’s portion of the Work. The Contractor shall, by appropriate
agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar
manner.
§ 9.6.3 The Owner will, on request, furnish to a Subcontractor, if practicable, information regarding percentages of
completion or amounts applied for by the Contractor and action taken thereon by the Owner and Owner on account
of portions of the Work done by such Subcontractor.
§ 9.6.4 The Owner has the right to request written evidence from the Contractor that the Contractor has properly paid
Subcontractors and material and equipment suppliers amounts paid by the Owner to the Contractor for subcontracted
Work. If the Contractor fails to furnish such evidence within seven days, the Owner shall have the right to contact
Subcontractors to ascertain whether they have been properly paid.The Owner shall have no obligation to pay or to
see to the payment of money to a Subcontractor, except as may otherwise be required by law.
§ 9.6.5 Contractor payments to material and equipment suppliers shall be treated in a manner similar to that provided
in Sections 9.6.2, 9.6.3 and 9.6.4.
§ 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occupancy of the Project by the
Owner shall not constitute acceptance of Work not in accordance with the Contract Documents.
§ 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract Sum,
payments received by the Contractor for Work properly performed by Subcontractors and suppliers shall be held by
the Contractor for those Subcontractors or suppliers who performed Work or furnished materials, or both, under
contract with the Contractor for which payment was made by the Owner. Nothing contained herein shall require
money to be placed in a separate account and not commingled with money of the Contractor, shall create any
fiduciary liability or tort liability on the part of the Contractor for breach of trust or shall entitle any person or entity
to an award of punitive damages against the Contractor for breach of the requirements of this provision.
§ 9.7 FAILURE OF PAYMENT If the Owner does not issue a Certificate for Payment, through no fault of the Contractor, within seven days after
receipt of the Contractor’s Application for Payment, or if the Owner does not pay the Contractor within seven days
after the date established in the Contract Documents the amount certified by the Owner or awarded by binding
dispute resolution, then the Contractor may, upon seven additional days’ written notice to the Owner, stop the Work
until payment of the amount owing has been received. The Contract Time shall be extended appropriately and the
Contract Sum shall be increased by the amount of the Contractor’s reasonable costs of shut-down, delay and start-
up, plus interest as provided for in the Contract Documents.
§ 9.8 SUBSTANTIAL COMPLETION § 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof
is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the
Work for its intended use.
§ 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept
separately, is substantially complete, the Contractor shall prepare and submit to the Owner a comprehensive list of
items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
25
§ 9.8.3 Upon receipt of the Contractor’s list, the Owner will make an inspection to determine whether the Work or
designated portion thereof is substantially complete. If the Owner’s inspection discloses any item, whether or not
included on the Contractor’s list, which is not sufficiently complete in accordance with the Contract Documents so
that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor
shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification
by the Owner. In such case, the Contractor shall then submit a request for another inspection by the Owner to
determine Substantial Completion.
§ 9.8.4 When the Work or designated portion thereof is substantially complete, the Owner will prepare a Certificate
of Substantial Completion that shall establish the date of Substantial Completion, shall establish responsibilities of
the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix
the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties
required by the Contract Documents shall commence on the date of Substantial Completion of the Work or
designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.
§ 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written
acceptance of responsibilities assigned to them in such Certificate. Upon such acceptance and consent of surety, if
any, the Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment
shall be adjusted for Work that is incomplete or not in accordance with the requirements of the Contract Documents.
§ 9.9 PARTIAL OCCUPANCY OR USE § 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when
such portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented
to by the insurer as required under Section 11.3.1.5 and authorized by public authorities having jurisdiction over the
Project. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided
the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments,
retainage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in
writing concerning the period for correction of the Work and commencement of warranties required by the Contract
Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and
submit a list to the Architect as provided under Section 9.8.2. Consent of the Contractor to partial occupancy or use
shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agreement
between the Owner and Contractor.
§ 9.9.2 Immediately prior to such partial occupancy or use, the Owner and Contractor shall jointly inspect the area to
be occupied or portion of the Work to be used in order to determine and record the condition of the Work.
§ 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not
constitute acceptance of Work not complying with the requirements of the Contract Documents.
§ 9.10 FINAL COMPLETION AND FINAL PAYMENT § 9.10.1 Upon receipt of the Contractor’s written notice that the Work is ready for final inspection and acceptance
and upon receipt of a final Application for Payment, the Owner will promptly make such inspection and, when the
Owner finds the Work acceptable under the Contract Documents and the Contract fully performed, the Owner will
promptly issue a final Certificate for Payment stating that to the best of the Owner’s knowledge, information and
belief, and on the basis of the Owner’s on-site visits and inspections, the Work has been completed in accordance
with terms and conditions of the Contract Documents and that the entire balance found to be due the Contractor and
noted in the final Certificate is due and payable. The Owner’s final Certificate for Payment will constitute a further
representation that conditions listed in Section 9.10.2 as precedent to the Contractor’s being entitled to final payment
have been fulfilled.
§ 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits
to the Owner (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with
the Work for which the Owner or the Owner’s property might be responsible or encumbered (less amounts withheld
by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract
Documents to remain in force after final payment is currently in effect and will not be canceled or allowed to expire
until at least 30 days’ prior written notice has been given to the Owner, (3) a written statement that the Contractor
knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract
Documents, (4) consent of surety, if any, to final payment and (5), if required by the Owner, other data establishing
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
26
payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or
encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a
Subcontractor refuses to furnish a release or waiver required by the Owner, the Contractor may furnish a bond
satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments
are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in
discharging such lien, including all costs and reasonable attorneys’ fees.
§ 9.10.3 If, after Substantial Completion of the Work, final completion thereof is materially delayed through no fault
of the Contractor or by issuance of Change Orders affecting final completion, and the Owner so confirms, the
Owner shall, upon application by the Contractor and certification by the Owner, and without terminating the
Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the
remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract
Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that
portion of the Work fully completed and accepted shall be submitted by the Contractor to the Owner prior to
certification of such payment. Such payment shall be made under terms and conditions governing final payment,
except that it shall not constitute a waiver of claims.
§ 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from
.1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled;
.2 failure of the Work to comply with the requirements of the Contract Documents; or
.3 terms of special warranties required by the Contract Documents.
§ 9.10.5 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a waiver
of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time
of final Application for Payment.
ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY § 10.1 SAFETY PRECAUTIONS AND PROGRAMS The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs
in connection with the performance of the Contract.
§ 10.2 SAFETY OF PERSONS AND PROPERTY § 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to
prevent damage, injury or loss to
.1 employees on the Work and other persons who may be affected thereby;
.2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the
site, under care, custody or control of the Contractor or the Contractor’s Subcontractors or Sub-
subcontractors; and
.3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements,
roadways, structures and utilities not designated for removal, relocation or replacement in the course
of construction.
§ 10.2.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes,
rules and regulations, and lawful orders of public authorities bearing on safety of persons or property or their
protection from damage, injury or loss.
§ 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract,
reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards,
promulgating safety regulations and notifying owners and users of adjacent sites and utilities.
§ 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are
necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under
supervision of properly qualified personnel.
§ 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property
insurance required by the Contract Documents) to property referred to in Sections 10.2.1.2 and 10.2.1.3 caused in
whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed
by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
27
Sections 10.2.1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or anyone
directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, and not
attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition
to the Contractor’s obligations under Section 3.18.
§ 10.2.6 The Contractor shall designate a responsible member of the Contractor’s organization at the site whose duty
shall be the prevention of accidents. This person shall be the Contractor’s superintendent unless otherwise
designated by the Contractor in writing to the Owner
§ 10.2.7 The Contractor shall not permit any part of the construction or site to be loaded so as to cause damage or
create an unsafe condition.
§ 10.2.8 INJURY OR DAMAGE TO PERSON OR PROPERTY If either party suffers injury or damage to person or property because of an act or omission of the other party, or of
others for whose acts such party is legally responsible, written notice of such injury or damage, whether or not
insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice
shall provide sufficient detail to enable the other party to investigate the matter.
§ 10.3 HAZARDOUS MATERIALS § 10.3.1 The Contractor is responsible for compliance with any requirements included in the Contract Documents
regarding hazardous materials. If the Contractor encounters a hazardous material or substance not addressed in the
Contract Documents and if reasonable precautions will be inadequate to prevent foreseeable bodily injury or death
to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl
(PCB), encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately
stop Work in the affected area and report the condition to the Owner in writing.
§ 10.3.2 Upon receipt of the Contractor’s written notice, the Owner shall obtain the services of a licensed laboratory
to verify the presence or absence of the material or substance reported by the Contractor and, in the event such
material or substance is found to be present, to cause it to be rendered harmless. Unless otherwise required by the
Contract Documents, the Owner shall furnish in writing to the Contractor the names and qualifications of persons or
entities who are to perform tests verifying the presence or absence of such material or substance or who are to
perform the task of removal or safe containment of such material or substance. The Contractor will promptly reply
to the Owner in writing stating whether or not either has reasonable objection to the persons or entities proposed by
the Owner. If either the Contractor has an objection to a person or entity proposed by the Owner, the Owner shall
propose another to whom the Contractor has no reasonable objection. When the material or substance has been
rendered harmless, Work in the affected area shall resume upon written agreement of the Owner and Contractor. By
Change Order, the Contract Time shall be extended appropriately and the Contract Sum shall be increased in the
amount of the Contractor’s reasonable additional costs of shut-down, delay and start-up.
§ 10.3.3 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor,
Subcontractors, consultants and agents and employees of any of them from and against claims, damages, losses and
expenses, including but not limited to attorneys’ fees, arising out of or resulting from performance of the Work in
the affected area if in fact the material or substance presents the risk of bodily injury or death as described in Section
10.3.1 and has not been rendered harmless, provided that such claim, damage, loss or expense is attributable to
bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work
itself), except to the extent that such damage, loss or expense is due to the fault or negligence of the party seeking
indemnity.
§ 10.3.4 The Owner shall not be responsible under this Section 10.3 for materials or substances the Contractor brings
to the site unless such materials or substances are required by the Contract Documents. The Owner shall be
responsible for materials or substances required by the Contract Documents, except to the extent of the Contractor’s
fault or negligence in the use and handling of such materials or substances.
§ 10.3.5 The Contractor shall indemnify the Owner for the cost and expense the Owner incurs (1) for remediation of
a material or substance the Contractor brings to the site and negligently handles, or (2) where the Contractor fails to
perform its obligations under Section 10.3.1, except to the extent that the cost and expense are due to the Owner’s
fault or negligence.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
28
§ 10.3.6 If, without negligence on the part of the Contractor, the Contractor is held liable by a government agency for
the cost of remediation of a hazardous material or substance solely by reason of performing Work as required by the
Contract Documents, the Owner shall indemnify the Contractor for all cost and expense thereby incurred.
§ 10.4 EMERGENCIES In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor’s discretion, to
prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor
on account of an emergency shall be determined as provided in Article 15 and Article 7.
ARTICLE 11 INSURANCE AND BONDS § 11.1 CONTRACTOR’S LIABILITY INSURANCE § 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do
business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims
set forth below which may arise out of or result from the Contractor’s operations and completed operations under
the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by
a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of
them may be liable:
.1 Claims under workers’ compensation, disability benefit and other similar employee benefit acts that
are applicable to the Work to be performed;
.2 Claims for damages because of bodily injury, occupational sickness or disease, or death of the
Contractor’s employees;
.3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than
the Contractor’s employees;
.4 Claims for damages insured by usual personal injury liability coverage;
.5 Claims for damages, other than to the Work itself, because of injury to or destruction of tangible
property, including loss of use resulting therefrom;
.6 Claims for damages because of bodily injury, death of a person or property damage arising out of
ownership, maintenance or use of a motor vehicle;
.7 Claims for bodily injury or property damage arising out of completed operations; and
.8 Claims involving contractual liability insurance applicable to the Contractor’s obligations under
Section 3.18.
§ 11.1.2 The insurance required by Section 11.1.1 shall be written for not less than limits of liability specified in the
Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an
occurrence or claims-made basis, shall be maintained without interruption from the date of commencement of the
Work until the date of final payment and termination of any coverage required to be maintained after final payment,
and, with respect to the Contractor’s completed operations coverage, until the expiration of the period for correction
of Work or for such other period for maintenance of completed operations coverage as specified in the Contract
Documents.
§ 11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of
the Work and thereafter upon renewal or replacement of each required policy of insurance. These certificates and the
insurance policies required by this Section 11.1 shall contain a provision that coverages afforded under the policies
will not be canceled or allowed to expire until at least 30 days’ prior written notice has been given to the Owner. An
additional certificate evidencing continuation of liability coverage, including coverage for completed operations,
shall be submitted with the final Application for Payment as required by Section 9.10.2 and thereafter upon renewal
or replacement of such coverage until the expiration of the time required by Section 11.1.2. Information concerning
reduction of coverage on account of revised limits or claims paid under the General Aggregate, or both, shall be
furnished by the Contractor with reasonable promptness.
§ 11.1.4 The Contractor shall cause the commercial liability coverage required by the Contract Documents to include
(1) the Owner as additional insureds for claims caused in whole or in part by the Contractor’s negligent acts or
omissions during the Contractor’s operations; and (2) the Owner as an additional insured for claims caused in whole
or in part by the Contractor’s negligent acts or omissions during the Contractor’s completed operations.
§ 11.2 OWNER’S LIABILITY INSURANCE The Owner shall be responsible for purchasing and maintaining the Owner’s usual liability insurance.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
29
§ 11.3 PROPERTY INSURANCE § 11.3.1 Unless otherwise provided, the Owner shall purchase and maintain, in a company or companies lawfully
authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder’s
risk “all-risk” or equivalent policy form in the amount of the initial Contract Sum, plus value of subsequent Contract
Modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at
the site on a replacement cost basis without optional deductibles. Such property insurance shall be maintained,
unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who
are beneficiaries of such insurance, until final payment has been made as provided in Section 9.10 or until no person
or entity other than the Owner has an insurable interest in the property required by this Section 11.3 to be covered,
whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub-
subcontractors in the Project.
§ 11.3.1.1 Property insurance shall be on an “all-risk” or equivalent policy form and shall include, without limitation,
insurance against the perils of fire (with extended coverage) and physical loss or damage including, without
duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework,
testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any
applicable legal requirements, and shall cover reasonable compensation for and Contractor’s services and expenses
required as a result of such insured loss.
§ 11.3.1.2 If the Owner does not intend to purchase such property insurance required by the Contract and with all of
the coverages in the amount described above, the Owner shall so inform the Contractor in writing prior to
commencement of the Work. The Contractor may then effect insurance that will protect the interests of the
Contractor, Subcontractors and Sub-subcontractors in the Work, and by appropriate Change Order the cost thereof
shall be charged to the Owner. If the Contractor is damaged by the failure or neglect of the Owner to purchase or
maintain insurance as described above, without so notifying the Contractor in writing, then the Owner shall bear all
reasonable costs properly attributable thereto.
§ 11.3.1.3 If the property insurance requires deductibles, the Owner shall pay costs not covered because of such
deductibles.
§ 11.3.1.4 This property insurance shall cover portions of the Work stored off the site, and also portions of the Work
in transit.
§ 11.3.1.5 Partial occupancy or use in accordance with Section 9.9 shall not commence until the insurance company
or companies providing property insurance have consented to such partial occupancy or use by endorsement or
otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or
companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that
would cause cancellation, lapse or reduction of insurance.
§ 11.3.2 BOILER AND MACHINERY INSURANCE The Owner shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by
law, which shall specifically cover such insured objects during installation and until final acceptance by the Owner;
this insurance shall include interests of the Owner, Contractor, Subcontractors and Sub-subcontractors in the Work,
and the Owner and Contractor shall be named insureds.
§ 11.3.3 LOSS OF USE INSURANCE The Owner, at the Owner’s option, may purchase and maintain such insurance as will insure the Owner against loss
of use of the Owner’s property due to fire or other hazards, however caused. The Owner waives all rights of action
against the Contractor for loss of use of the Owner’s property, including consequential losses due to fire or other
hazards however caused.
§ 11.3.4 If the Contractor requests in writing that insurance for risks other than those described herein or other
special causes of loss be included in the property insurance policy, the Owner shall, if possible, include such
insurance, and the cost thereof shall be charged to the Contractor by appropriate Change Order.
§ 11.3.5 If during the Project construction period the Owner insures properties, real or personal or both, at or adjacent
to the site by property insurance under policies separate from those insuring the Project, or if after final payment
property insurance is to be provided on the completed Project through a policy or policies other than those insuring
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
30
the Project during the construction period, the Owner shall waive all rights in accordance with the terms of Section
11.3.7 for damages caused by fire or other causes of loss covered by this separate property insurance. All separate
policies shall provide this waiver of subrogation by endorsement or otherwise.
§ 11.3.6 Before an exposure to loss may occur, the Owner shall file with the Contractor a copy of each policy that
includes insurance coverages required by this Section 11.3. Each policy shall contain all generally applicable
conditions, definitions, exclusions and endorsements related to this Project. Each policy shall contain a provision
that the policy will not be canceled or allowed to expire, and that its limits will not be reduced, until at least 30 days’
prior written notice has been given to the Contractor.
§ 11.3.7 WAIVERS OF SUBROGATION The Owner and Contractor waive all rights against each other and any of their subcontractors, sub-subcontractors,
agents and employees, each of the otherfor damages caused by fire or other causes of loss to the extent covered by
property insurance obtained pursuant to this Section 11.3 or other property insurance applicable to the Work, except
such rights as they have to proceeds of such insurance held by the Owner as fiduciary. The policies shall provide
such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person
or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise,
did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable
interest in the property damaged.
§ 11.3.8 A loss insured under the Owner’s property insurance shall be adjusted by the Owner as fiduciary and made
payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any
applicable mortgagee clause and of Section 11.3.10. The Contractor shall pay Subcontractors their just shares of
insurance proceeds received by the Contractor, and by appropriate agreements, written where legally required for
validity, shall require Subcontractors to make payments to their Sub-subcontractors in similar manner.
§ 11.3.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss,
give bond for proper performance of the Owner’s duties. The cost of required bonds shall be charged against
proceeds received as fiduciary. The Owner shall deposit in a separate account proceeds so received, which the
Owner shall distribute in accordance with such agreement as the parties in interest may reach, or as determined in
accordance with the method of binding dispute resolution selected in the Agreement between the Owner and
Contractor. If after such loss no other special agreement is made and unless the Owner terminates the Contract for
convenience, replacement of damaged property shall be performed by the Contractor after notification of a Change
in the Work in accordance with Article 7.
§ 11.3.10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties in
interest shall object in writing within five days after occurrence of loss to the Owner’s exercise of this power; if such
objection is made, the dispute shall be resolved in the manner selected by the Owner and Contractor as the method
of binding dispute resolution in the Agreement. If the Owner and Contractor have selected arbitration as the method
of binding dispute resolution, the Owner as fiduciary shall make settlement with insurers or, in the case of a dispute
over distribution of insurance proceeds, in accordance with the directions of the arbitrators.
§ 11.4 PERFORMANCE BOND AND PAYMENT BOND § 11.4.1 The Owner shall have the right to require the Contractor to furnish bonds covering faithful performance of
the Contract and payment of obligations arising thereunder as stipulated in bidding requirements or specifically
required in the Contract Documents on the date of execution of the Contract.
§ 11.4.2 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment
of obligations arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall
authorize a copy to be furnished.
ARTICLE 12 UNCOVERING AND CORRECTION OF WORK § 12.1 UNCOVERING OF WORK § 12.1.1 If a portion of the Work is covered contrary to the Owner’s request or to requirements specifically expressed
in the Contract Documents, it must, if requested in writing by the Owner, be uncovered for the Owner’s examination
and be replaced at the Contractor’s expense without change in the Contract Time.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
31
§ 12.1.2 If a portion of the Work has been covered that the Owner has not specifically requested to examine prior to
its being covered, the Owner may request to see such Work and it shall be uncovered by the Contractor. If such
Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate
Change Order, be at the Owner’s expense. If such Work is not in accordance with the Contract Documents, such
costs and the cost of correction shall be at the Contractor’s expense unless the condition was caused by the Owner or
a separate contractor in which event the Owner shall be responsible for payment of such costs.
§ 12.2 CORRECTION OF WORK § 12.2.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION The Contractor shall promptly correct Work rejected by the Owner or failing to conform to the requirements of the
Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated,
installed or completed.
§ 12.2.2 AFTER SUBSTANTIAL COMPLETION § 12.2.2.1 In addition to the Contractor’s obligations under Section 3.5, if, within one year after the date of
Substantial Completion of the Work or designated portion thereof or after the date for commencement of warranties
established under Section 9.9.1, or by terms of an applicable special warranty required by the Contract Documents,
any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor
shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously
given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after
discovery of the condition. During the one-year period for correction of Work, if the Owner fails to notify the
Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to require
correction by the Contractor and to make a claim for breach of warranty. If the Contractor fails to correct
nonconforming Work within a reasonable time during that period after receipt of notice from the Owner or
Architect, the Owner may correct it in accordance with Section 2.4.
§ 12.2.2.2 The one-year period for correction of Work shall be extended with respect to portions of Work first
performed after Substantial Completion by the period of time between Substantial Completion and the actual
completion of that portion of the Work.
§ 12.2.2.3 The one-year period for correction of Work shall not be extended by corrective Work performed by the
Contractor pursuant to this Section 12.2.
§ 12.2.3 The Contractor shall remove from the site portions of the Work that are not in accordance with the
requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner.
§ 12.2.4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or
partially completed, of the Owner or separate contractors caused by the Contractor’s correction or removal of Work
that is not in accordance with the requirements of the Contract Documents.
§ 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to
other obligations the Contractor has under the Contract Documents. Establishment of the one-year period for
correction of Work as described in Section 12.2.2 relates only to the specific obligation of the Contractor to correct
the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents
may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the
Contractor’s liability with respect to the Contractor’s obligations other than specifically to correct the Work.
§ 12.3 ACCEPTANCE OF NONCONFORMING WORK If the Owner prefers to accept Work that is not in accordance with the requirements of the Contract Documents, the
Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as
appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made.
ARTICLE 13 MISCELLANEOUS PROVISIONS § 13.1 GOVERNING LAW The Contract shall be governed by the laws of the Quinault Indian Nation.
§ 13.2 SUCCESSORS AND ASSIGNS § 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal
representatives to covenants, agreements and obligations contained in the Contract Documents. Except as provided
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
32
in Section 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the
other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain
legally responsible for all obligations under the Contract.
§ 13.2.2 The Owner may, without consent of the Contractor, assign the Contract to a lender providing construction
financing for the Project, if the lender assumes the Owner’s rights and obligations under the Contract Documents.
The Contractor shall execute all consents reasonably required to facilitate such assignment.
§ 13.3 WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual, to a member of the
firm or entity, or to an officer of the corporation for which it was intended; or if delivered at, or sent by registered or
certified mail or by courier service providing proof of delivery to, the last business address known to the party
giving notice.
§ 13.4 RIGHTS AND REMEDIES § 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder
shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available
by law.
§ 13.4.2 No action or failure to act by the Owner or Contractor shall constitute a waiver of a right or duty afforded
them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach
there under, except as may be specifically agreed in writing.
§ 13.5 TESTS AND INSPECTIONS § 13.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Contract
Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public
authorities. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and
approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public
authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the Architect
timely notice of when and where tests and inspections are to be made so that the Architect may be present for such
procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until
after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or
applicable laws or regulations prohibit the Owner from delegating their cost to the Contractor.
§ 13.5.2 If theOwner or public authorities having jurisdiction determine that portions of the Work require additional
testing, inspection or approval not included under Section 13.5.1, the Owner will instruct the Contractor to make
arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the
Contractor shall give timely notice to the Owner of when and where tests and inspections are to be made so that the
Owner may be present for such procedures. Such costs, except as provided in Section 13.5.3, shall be at the Owner’s
expense.
§ 13.5.3 If such procedures for testing, inspection or approval under Sections 13.5.1 and 13.5.2 reveal failure of the
portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary
by such failure including those of repeated procedures and compensation for the Owner’s services and expenses
shall be at the Contractor’s expense.
§ 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract
Documents, be secured by the Contractor and promptly delivered to the Owner.
§ 13.5.5 If the Owner is to observe tests, inspections or approvals required by the Contract Documents, the Owner
will do so promptly and, where practicable, at the normal place of testing.
§ 13.5.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid
unreasonable delay in the Work.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
33
§ 13.6 INTEREST Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at such rate
as the parties may agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at
the place where the Project is located.
§ 13.7 TIME LIMITS ON CLAIMS The Owner and Contractor shall commence all claims and causes of action, whether in contract, tort, breach of
warranty or otherwise, against the other arising out of or related to the Contract in accordance with the requirements
of the final dispute resolution method selected in the Agreement within the time period specified by applicable law,
but in any case not more than 10 years after the date of Substantial Completion of the Work. The Owner and
Contractor waive all claims and causes of action not commenced in accordance with this Section 13.7.
ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT § 14.1 TERMINATION BY THE CONTRACTOR § 14.1.1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 consecutive days
through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any
other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, for
any of the following reasons:
.1 Issuance of an order of a court or other public authority having jurisdiction that requires all Work to
be stopped;
.2 An act of government, such as a declaration of national emergency that requires all Work to be
stopped;
.3 Because the Owner has not issued a Certificate for Payment and has not notified the Contractor of the
reason for withholding certification as provided in Section 9.4.1, or because the Owner has not made
payment on a Certificate for Payment within the time stated in the Contract Documents; or
.4 The Owner has failed to furnish to the Contractor promptly, upon the Contractor’s request, reasonable
evidence as required by Section 2.2.1.
§ 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor or a Subcontractor,
Sub-subcontractor or their agents or employees or any other persons or entities performing portions of the Work
under direct or indirect contract with the Contractor, repeated suspensions, delays or interruptions of the entire Work
by the Owner as described in Section 14.3 constitute in the aggregate more than 100 percent of the total number of
days scheduled for completion, or 120 days in any 365-day period, whichever is less.
§ 14.1.3 If one of the reasons described in Section 14.1.1 or 14.1.2 exists, the Contractor may, upon seven days’
written notice to the Owner, terminate the Contract and recover from the Owner payment for Work executed,
including reasonable overhead and profit, costs incurred by reason of such termination, and damages.
§ 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contractor or a
Subcontractor or their agents or employees or any other persons performing portions of the Work under contract
with the Contractor because the Owner has repeatedly failed to fulfill the Owner’s obligations under the Contract
Documents with respect to matters important to the progress of the Work, the Contractor may, upon seven additional
days’ written notice to the Owner, terminate the Contract and recover from the Owner as provided in Section 14.1.3.
§ 14.2 TERMINATION BY THE OWNER FOR CAUSE § 14.2.1 The Owner may terminate the Contract if the Contractor
.1 repeatedly refuses or fails to supply enough properly skilled workers or proper materials;
.2 fails to make payment to Subcontractors for materials or labor in accordance with the respective
agreements between the Contractor and the Subcontractors;
.3 repeatedly disregards applicable laws, statutes, ordinances, codes, rules and regulations, or lawful
orders of a public authority; or
.4 otherwise is guilty of substantial breach of a provision of the Contract Documents.
§ 14.2.2 When any of the above reasons exist, the Owner, upon certification by the Initial Decision Maker that
sufficient cause exists to justify such action, may without prejudice to any other rights or remedies of the Owner and
after giving the Contractor and the Contractor’s surety, if any, seven days’ written notice, terminate employment of
the Contractor and may, subject to any prior rights of the surety:
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
34
.1 Exclude the Contractor from the site and take possession of all materials, equipment, tools, and
construction equipment and machinery thereon owned by the Contractor;
.2 Accept assignment of subcontracts pursuant to Section 5.4; and
.3 Finish the Work by whatever reasonable method the Owner may deem expedient. Upon written
request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs
incurred by the Owner in finishing the Work.
§ 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2.1, the Contractor shall
not be entitled to receive further payment until the Work is finished.
§ 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Workand other damages incurred
by the Owner and not expressly waived, such excess shall be paid to the Contractor. If such costs and damages
exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The amount to be paid to the
Contractor or Owner, as the case may be, shall be certified by the Initial Decision Maker, upon application, and this
obligation for payment shall survive termination of the Contract.
§ 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE § 14.3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work in
whole or in part for such period of time as the Owner may determine.
§ 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and time caused by
suspension, delay or interruption as described in Section 14.3.1. Adjustment of the Contract Sum shall include
profit. No adjustment shall be made to the extent
.1 that performance is, was or would have been so suspended, delayed or interrupted by another cause
for which the Contractor is responsible; or
.2 that an equitable adjustment is made or denied under another provision of the Contract.
§ 14.4 TERMINATION BY THE OWNER FOR CONVENIENCE § 14.4.1 The Owner may, at any time, terminate the Contract for the Owner’s convenience and without cause.
§ 14.4.2 Upon receipt of written notice from the Owner of such termination for the Owner’s convenience, the
Contractor shall
.1 cease operations as directed by the Owner in the notice;
.2 take actions necessary, or that the Owner may direct, for the protection and preservation of the Work;
and
.3 except for Work directed to be performed prior to the effective date of termination stated in the
notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts
and purchase orders.
§ 14.4.3 In case of such termination for the Owner’s convenience, the Contractor shall be entitled to receive payment
for Work executed, and costs incurred by reason of such termination, along with reasonable overhead and profit on
the Work not executed.
ARTICLE 15 CLAIMS AND DISPUTES § 15.1 CLAIMS § 15.1.1 DEFINITION A Claim is a demand or assertion by one of the parties seeking, as a matter of right, payment of money, or other
relief with respect to the terms of the Contract. The term “Claim” also includes other disputes and matters in
question between the Owner and Contractor arising out of or relating to the Contract. The responsibility to
substantiate Claims shall rest with the party making the Claim.
§ 15.1.2 NOTICE OF CLAIMS Claims by either the Owner or Contractor must be initiated by written notice to the other party and to the Initial
Decision Maker. Claims by either party must be initiated within 21 days after occurrence of the event giving rise to
such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is
later.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
35
§ 15.1.3 CONTINUING CONTRACT PERFORMANCE Pending final resolution of a Claim, except as otherwise agreed in writing or as provided in Section 9.7 and Article
14, the Contractor shall proceed diligently with performance of the Contract and the Owner shall continue to make
payments in accordance with the Contract Documents. The Owner will prepare Change Orders and issue Certificates
for Payment in accordance with the decisions of the Initial Decision Maker.
§ 15.1.4 CLAIMS FOR ADDITIONAL COST If the Contractor wishes to make a Claim for an increase in the Contract Sum, written notice as provided herein shall
be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency
endangering life or property arising under Section 10.4.
§ 15.1.5 CLAIMS FOR ADDITIONAL TIME § 15.1.5.1 If the Contractor wishes to make a Claim for an increase in the Contract Time, written notice as provided
herein shall be given. The Contractor’s Claim shall include an estimate of cost and of probable effect of delay on
progress of the Work. In the case of a continuing delay, only one Claim is necessary.
§ 15.1.5.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be
documented by data substantiating that weather conditions were abnormal for the period of time, could not have
been reasonably anticipated and had an adverse effect on the scheduled construction.
§ 15.1.6 CLAIMS FOR CONSEQUENTIAL DAMAGES The Contractor and Owner waive Claims against each other for consequential damages arising out of or relating to
this Contract. This mutual waiver includes
.1 damages incurred by the Owner for rental expenses, for losses of use, income, profit, financing,
business and reputation, and for loss of management or employee productivity or of the services of
such persons; and
.2 damages incurred by the Contractor for principal office expenses including the compensation of
personnel stationed there, for losses of financing, business and reputation, and for loss of profit
except anticipated profit arising directly from the Work.
This mutual waiver is applicable, without limitation, to all consequential damages due to either party’s termination
in accordance with Article 14. Nothing contained in this Section 15.1.6 shall be deemed to preclude an award of
liquidated damages, when applicable, in accordance with the requirements of the Contract Documents.
§ 15.2 INITIAL DECISION § 15.2.1 Claims, excluding those arising under Sections 10.3, 10.4, 11.3.9, and 11.3.10, shall be referred to the Initial
Decision Maker for initial decision. The Owner’s Representative will serve as the Initial Decision Maker, unless
otherwise indicated in the Agreement. Except for those Claims excluded by this Section 15.2.1, an initial decision
shall be required as a condition precedent to mediation of any Claim arising prior to the date final payment is due,
unless 30 days have passed after the Claim has been referred to the Initial Decision Maker with no decision having
been rendered. Unless the Initial Decision Maker and all affected parties agree, the Initial Decision Maker will not
decide disputes between the Contractor and persons or entities other than the Owner.
§ 15.2.2 The Initial Decision Maker will review Claims and within ten days of the receipt of a Claim take one or
more of the following actions: (1) request additional supporting data from the claimant or a response with supporting
data from the other party, (2) reject the Claim in whole or in part, (3) approve the Claim, (4) suggest a compromise,
or (5) advise the parties that the Initial Decision Maker is unable to resolve the Claim if the Initial Decision Maker
lacks sufficient information to evaluate the merits of the Claim or if the Initial Decision Maker concludes that, in the
Initial Decision Maker’s sole discretion, it would be inappropriate for the Initial Decision Maker to resolve the
Claim.
§ 15.2.3 In evaluating Claims, the Initial Decision Maker may, but shall not be obligated to, consult with or seek
information from either party or from persons with special knowledge or expertise who may assist the Initial
Decision Maker in rendering a decision. The Initial Decision Maker may request the Owner to authorize retention of
such persons at the Owner’s expense.
§ 15.2.4 If the Initial Decision Maker requests a party to provide a response to a Claim or to furnish additional
supporting data, such party shall respond, within ten days after receipt of such request, and shall either (1) provide a
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
36
response on the requested supporting data, (2) advise the Initial Decision Maker when the response or supporting
data will be furnished or (3) advise the Initial Decision Maker that no supporting data will be furnished. Upon
receipt of the response or supporting data, if any, the Initial Decision Maker will either reject or approve the Claim
in whole or in part.
§ 15.2.5 The Initial Decision Maker will render an initial decision approving or rejecting the Claim, or indicating that
the Initial Decision Maker is unable to resolve the Claim. This initial decision shall (1) be in writing; (2) state the
reasons therefor; and (3) notify the parties of any change in the Contract Sum or Contract Time or both. The initial
decision shall be final and binding on the parties but subject to mediation and, if the parties fail to resolve their
dispute through mediation, to binding dispute resolution.
§ 15.2.6 Either party may file for mediation of an initial decision at any time, subject to the terms of Section 15.2.6.1.
§ 15.2.6.1 Either party may, within 30 days from the date of an initial decision, demand in writing that the other party
file for mediation within 60 days of the initial decision. If such a demand is made and the party receiving the
demand fails to file for mediation within the time required, then both parties waive their rights to mediate or pursue
binding dispute resolution proceedings with respect to the initial decision.
§ 15.2.7 In the event of a Claim against the Contractor, the Owner may, but is not obligated to, notify the surety, if
any, of the nature and amount of the Claim. If the Claim relates to a possibility of a Contractor’s default, the Owner
may, but is not obligated to, notify the surety and request the surety’s assistance in resolving the controversy.
§ 15.2.8 If a Claim relates to or is the subject of a mechanic’s lien, the party asserting such Claim may proceed in
accordance with applicable law to comply with the lien notice or filing deadlines.
§ 15.3 MEDIATION § 15.3.1 Claims, disputes, or other matters in controversy arising out of or related to the Contract except those
waived as provided for in Sections 9.10.4, 9.10.5, and 15.1.6 shall be subject to mediation as a condition precedent
to binding dispute resolution.
§ 15.3.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree
otherwise, shall be administered by the American Arbitration Association in accordance with its Construction
Industry Mediation Procedures in effect on the date of the Agreement. A request for mediation shall be made in
writing, delivered to the other party to the Contract, and filed with the person or entity administering the mediation.
The request may be made concurrently with the filing of binding dispute resolution proceedings but, in such event,
mediation shall proceed in advance of binding dispute resolution proceedings, which shall be stayed pending
mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the
parties or court order. If an arbitration is stayed pursuant to this Section 15.3.2, the parties may nonetheless proceed
to the selection of the arbitrator(s) and agree upon a schedule for later proceedings.
§ 15.3.3 The parties shall share the mediator’s fee and any filing fees equally. The mediation shall be held in the
place where the Project is located, unless another location is mutually agreed upon. Agreements reached in
mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.
§ 15.4 ARBITRATION § 15.4.1 If the parties have selected arbitration as the method for binding dispute resolution in the Agreement, any
Claim subject to, but not resolved by, mediation shall be subject to arbitration which, unless the parties mutually
agree otherwise, shall be administered by the American Arbitration Association in accordance with its Construction
Industry Arbitration Rules in effect on the date of the Agreement. A demand for arbitration shall be made in writing,
delivered to the other party to the Contract, and filed with the person or entity administering the arbitration. The
party filing a notice of demand for arbitration must assert in the demand all Claims then known to that party on
which arbitration is permitted to be demanded.
§ 15.4.1.1 A demand for arbitration shall be made no earlier than concurrently with the filing of a request for
mediation, but in no event shall it be made after the date when the institution of legal or equitable proceedings based
on the Claim would be barred by the applicable statute of limitations. For statute of limitations purposes, receipt of a
written demand for arbitration by the person or entity administering the arbitration shall constitute the institution of
legal or equitable proceedings based on the Claim.
AIA Document A201™ – 2007. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The
American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International
Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal
penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:31:51 on
03/07/2012 under Order No.1452679630_1 which expires on 02/06/2013, and is not for resale.
User Notes: (1651207275)
37
§ 15.4.2 The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in
accordance with applicable law in any court having jurisdiction thereof.
§ 15.4.3 The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity
duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court
having jurisdiction thereof.
§ 15.4.4 CONSOLIDATION OR JOINDER § 15.4.4.1 Either party, at its sole discretion, may consolidate an arbitration conducted under this Agreement with any
other arbitration to which it is a party provided that (1) the arbitration agreement governing the other arbitration
permits consolidation, (2) the arbitrations to be consolidated substantially involve common questions of law or fact,
and (3) the arbitrations employ materially similar procedural rules and methods for selecting arbitrator(s).
§ 15.4.4.2 Either party, at its sole discretion, may include by joinder persons or entities substantially involved in a
common question of law or fact whose presence is required if complete relief is to be accorded in arbitration,
provided that the party sought to be joined consents in writing to such joinder. Consent to arbitration involving an
additional person or entity shall not constitute consent to arbitration of any claim, dispute or other matter in question
not described in the written consent.
§ 15.4.4.3 The Owner and Contractor grant to any person or entity made a party to an arbitration conducted under
this Section 15.4, whether by joinder or consolidation, the same rights of joinder and consolidation as the Owner and
Contractor under this Agreement.
AIA®
Document A105TM – 2007
Standard Form of Agreement Between Owner and Contractor for
a Residential or Small Commercial Project
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
1
ADDITIONS AND DELETIONS:
The author of this document
has added information
needed for its completion.
The author may also have
revised the text of the
original AIA standard form.
An Additions and Deletions
Report that notes added
information as well as
revisions to the standard
form text is available from
the author and should be
reviewed.
This document has important
legal consequences.
Consultation with an
attorney is encouraged with
respect to its completion
or modification.
State or local law may
impose requirements on
contracts for home
improvements. If this
document will be used for
Work on the Owner’s
residence, the Owner should
consult local authorities
or an attorney to verify
requirements applicable to
this Agreement.
ELECTRONIC COPYING of any
portion of this AIA® Document
to another electronic file is
prohibited and constitutes a
violation of copyright laws
as set forth in the footer of
this document.
AGREEMENT made as of the « » day of « » in the year « »
(In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
«Quinault Indian Nation »
«1214 A-alis Drive »
« Taholah, WA 98587 »
and the Contractor:
(Name, legal status, address and other information)
« »« »
»
« »
« »
for the following Project:
(Name, location and detailed description)
Install insulation with new roof/siding package of existing pole building, re-frame
opening to accept new doors and install three new overhead doors to match existing
doors.
« 1114 5th. Ave. »
« Taholah WA, 98587 »
The Owner and Contractor agree as follows.
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
2
TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION DATE 3 CONTRACT SUM 4 PAYMENT 5 INSURANCE 6 GENERAL PROVISIONS 7 OWNER 8 CONTRACTOR 10 CHANGES IN THE WORK 11 TIME 12 PAYMENTS AND COMPLETION 13 PROTECTION OF PERSONS AND PROPERTY 14 CORRECTION OF WORK 15 MISCELLANEOUS PROVISIONS 16 TERMINATION OF THE CONTRACT 17 OTHER TERMS AND CONDITIONS
ARTICLE 1 THE CONTRACT DOCUMENTS § 1.1 The Contractor shall complete the Work described in the Contract Documents for the Project. The Contract
Documents consist of
.1 this Agreement signed by the Owner and Contractor;
.2 the designs and specifications prepared by the Engineer, dated « » , and enumerated as follows:
Designs:
Number Title Date
Specifications:
Section Title Pages
Exhibit A Roof / Siding / Kynar Paint 6
.3 addenda prepared by the Engineer as follows:
Number Date Pages
.4 written orders for changes in the Work issued after execution of this Agreement; and
.5 other documents, if any, identified as follows:
«General and Supplemental Conditions , TERO Compliance Plan »
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
3
ARTICLE 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION The number of calendar days available to the Contractor to substantially complete the Work is the Contract Time.
The date of commencement of the Work shall be the date of this Agreement unless otherwise indicated below. The
Contractor shall substantially complete the Work, no later than « » ( « » ) calendar days from the date of
commencement, subject to adjustment as provided in Article 10 and Article 11.
(Insert the date of commencement, if it differs from the date of this Agreement.)
« »
ARTICLE 3 CONTRACT SUM § 3.1 Subject to additions and deductions in accordance with Article 10, the Contract Sum is:
« » ($ « » )
§ 3.2 For purposes of payment, the Contract Sum includes the following itemized payment schedule related to
portions of the Work:
(Itemize the Contract Sum among the major portions of the Work.)
§ 3.5 The Contract Sum is based upon the following alternates, if any, which are described in the Contract
Documents and hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the
Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other
alternates showing the amount for each and the date when that amount expires.)
«.»
§ 3.6 The Contract Sum shall include all items and services necessary for the proper execution and completion of the
Work.
ARTICLE 4 PAYMENT § 4.1 Based on Contractor’s Applications for Payment certified by the Owner’s Representative, the Owner shall pay
the Contractor, in accordance with Article 12, as follows:
(Insert below timing for payments and provisions for withholding retainage, if any.)
« Payment shall be made after project has been certified complete by Owner’s Representative. Owner shall retain
10% of final payment until Owner can verify L&I and employment security requirements have been met by the
Contractor. »
« 0 » % «0 »
ARTICLE 5 INSURANCE § 5.1 The Contractor shall provide Contractor’s general liability and other insurance as follows:
(Insert specific insurance requirements and limits.)
Type of insurance Limit of liability ($0.00) Liability
Umbrella Liability
$1,000,000.00
$2,000,000.00
§ 5.2 The Owner shall provide property insurance to cover the value of the Owner’s property, including any Work
provided under this Agreement. The Contractor is entitled to receive an increase in the Contract Sum equal to the
insurance proceeds related to a loss for damage to the Work covered by the Owner’s property insurance.
§ 5.3 The Contractor shall obtain an endorsement to its general liability insurance policy to cover the Contractor’s
obligations under Section 8.12.
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
4
§ 5.4 Each party shall provide certificates of insurance showing their respective coverages prior to commencement of
the Work.
§ 5.5 Unless specifically precluded by the Owner’s property insurance policy, the Owner and Contractor waive all
rights against (1) each other and any of their subcontractors, suppliers, agents and employees, each of the other; and
(2) the Architect, Architect’s consultants and any of their agents and employees, for damages caused by fire or other
causes of loss to the extent covered by property insurance or other insurance applicable to the Work.
ARTICLE 6 GENERAL PROVISIONS § 6.1 THE CONTRACT The Contract represents the entire and integrated agreement between the parties and supersedes prior negotiations,
representations or agreements, either written or oral. The Contract may be amended or modified only by a written
modification in accordance with Article 10.
§ 6.2 THE WORK The term “Work” means the construction and services required by the Contract Documents, and includes all other
labor, materials, equipment and services provided, or to be provided, by the Contractor to fulfill the Contractor’s
obligations.
§ 6.3 INTENT The intent of the Contract Documents is to include all items necessary for the proper execution and completion of
the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as
binding as if required by all.
§ 6.4 OWNERSHIP AND USE OF ENGINEER’S DESIGNS, SPECIFICATIONS AND OTHER DOCUMENTS Documents prepared by the Engineer are instruments of the Engineer’s service for use solely with respect to this
Project. The Engineer shall retain all common law, statutory and other reserved rights, including the copyright. The
Contractor, subcontractors, sub-subcontractors, and material or equipment suppliers are authorized to use and
reproduce the instruments of service solely and exclusively for execution of the Work. The instruments of service
may not be used for other Projects or for additions to this Project outside the scope of the Work without the specific
written consent of the Owner.
ARTICLE 7 OWNER § 7.1 INFORMATION AND SERVICES REQUIRED OF THE OWNER § 7.1.1 If requested by the Contractor, the Owner shall furnish all necessary surveys and a legal description of the
site.
§ 7.1.2 Except for permits and fees that are the responsibility of the Contractor under the Contract Documents, the
Owner shall obtain and pay for other necessary approvals, easements, assessments and charges.
§ 7.2 OWNER’S RIGHT TO STOP THE WORK If the Contractor fails to correct Work which is not in accordance with the Contract Documents, the Owner may
direct the Contractor in writing to stop the Work until the correction is made.
§ 7.3 OWNER’S RIGHT TO CARRY OUT THE WORK If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails
within a seven day period after receipt of written notice from the Owner to commence and continue correction of
such default or neglect with diligence and promptness, the Owner may, without prejudice to other remedies, correct
such deficiencies. In such case, the Contract Sum shall be adjusted to deduct the cost of correction from payments
due the Contractor.
§ 7.4 OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 7.4.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s
own forces, and to award separate contracts in connection with other portions of the Project.
§ 7.4.2 The Contractor shall coordinate and cooperate with the Owner’s own forces and separate contractors
employed by the Owner.
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
5
§ 7.4.3 Costs caused by delays or by improperly timed activities or defective construction shall be borne by the party
responsible therefor.
ARTICLE 8 CONTRACTOR § 8.1 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR § 8.1.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become
familiar with local conditions under which the Work is to be performed and correlated personal observations with
requirements of the Contract Documents.
§ 8.1.2 The Contractor shall carefully study and compare the Contract Documents with each other and with
information furnished by the Owner. Before commencing activities, the Contractor shall (1) take field measurements
and verify field conditions; (2) carefully compare this and other information known to the Contractor with the
Contract Documents; and (3) promptly report errors, inconsistencies or omissions discovered to the Owner’s
Representative.
§ 8.2 CONTRACTOR’S CONSTRUCTION SCHEDULE The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner’s and Owner’s
Representative information a Contractor’s construction schedule for the Work.
§ 8.3 SUPERVISION AND CONSTRUCTION PROCEDURES § 8.3.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention, and with
coordination by the Engineer or Engineer’s representative, when appropriate. The Contractor shall be solely
responsible for and have control over construction means, methods, techniques, sequences and procedures, and for
coordinating all portions of the Work.
§ 8.3.2 The Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner the
names of subcontractors or suppliers for each portion of the Work. The Contractor shall not contract with any
subcontractor or supplier to whom the Owner have made a timely and reasonable objection.
§ 8.4 LABOR AND MATERIALS § 8.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor,
materials, equipment, tools, utilities, transportation, and other facilities and services necessary for proper execution
and completion of the Work.
§ 8.4.2 The Contractor shall enforce strict discipline and good order among the Contractor’s employees and other
persons carrying out the Contract Work. The Contractor shall not permit employment of unfit persons or persons not
skilled in tasks assigned to them.
§ 8.5 WARRANTY The Contractor warrants to the Owner that: (1) materials and equipment furnished under the Contract will be new
and of good quality unless otherwise required or permitted by the Contract Documents; (2) the Work will be free
from defects not inherent in the quality required or permitted; and (3) the Work will conform to the requirements of
the Contract Documents, including all engineer designs and specification.
§ 8.6 TAXES The Contractor shall pay sales, consumer, use and similar taxes that are legally required when the Contract is
executed. The Owner is a federally-recognized Indian tribe and is exempt from Washington State sales and business
and occupation taxes for work done on the Quinault Reservation or goods delivered to the Nation on the Quinault
Reservation. With respect to the Washington State business and occupation tax, this tax may not be included in
overhead charges to the Owner. See, Washington Administrative Code (WAC) 458-20-192.
§ 8.7 PERMITS, FEES AND NOTICES § 8.7.1 The Contractor shall obtain and pay for the required permits, licenses and inspections necessary for proper
execution and completion of the Work.
§ 8.7.2 The Contractor shall comply with and give notices required by agencies having jurisdiction over the Work. If
the Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and
regulations, or lawful orders of public authorities, the Contractor shall assume full responsibility for such Work and
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
6
shall bear the attributable costs. The Contractor shall promptly notify the Owner’s Representative in writing of any
known inconsistencies in the Contract Documents with such governmental laws, rules and regulations.
§ 8.9 USE OF SITE The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits, the Contract
Documents and the Owner.
§ 8.11 CLEANING UP The Contractor shall keep the premises and surrounding area free from accumulation of debris and trash related to
the Work. At the completion of the Work, the Contractor shall remove its tools, construction equipment, machinery
and surplus material from the Reservation; and shall properly dispose of waste materials.
§ 8.12 INDEMNIFICATION To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Owner, Owner’s
consultants and agents and employees of any of them from and against claims, damages, losses and expenses,
including but not limited to attorneys’ fees, arising out of or resulting from performance of the Work, provided that
such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or
destruction of tangible property (other than the Work itself), but only to the extent caused by the negligent acts or
omissions of the Contractor, a subcontractor, anyone directly or indirectly employed by them or anyone for whose
acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party
indemnified hereunder.
ARTICLE 9 ADMINISTRATION OF CONTACT § 9.1 The Owner’s Representative will provide administration of the Contract as described in the Contract
Documents. The Owner’s Representative will have authority to act on behalf of the Owner only to the extent
provided in the Contract Documents.
§ 9.2 The Owner’s Representative will visit the site at intervals appropriate to the stage of construction to become
generally familiar with the progress and quality of the Work.
§ 9.3 The Owner will not have control over or charge of, and will not be responsible for, construction means,
methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work,
since these are solely the Contractor’s responsibility. The Owner’s Representative will not be responsible for the
Contractor’s failure to carry out the Work in accordance with the Contract Documents.
§ 9.4 Based on the Owner’s Representaitve observations and evaluations of the Contractor’s Applications for
Payment, the Owner’s Representative will review and certify the amounts due the Contractor.
§ 9.5 The Owner’s Representative has authority to reject Work that does not conform to the Contract Documents.
§ 9.6 The Owner’s Representative will promptly review and approve or take appropriate action upon Contractor’s
submittals, but only for the limited purpose of checking for conformance with information given and the design
concept expressed in the Contract Documents.
§ 9.7 The Owner’s Representative will promptly interpret and decide matters concerning performance under, and
requirements of, the Contract Documents on written request from either the Owner or Contractor.
§ 9.8 Interpretations and decisions of the Owner’s Representative will be consistent with the intent of and reasonably
inferable from the Contract Documents and will be in writing or in the form of designs or specification. When
making such interpretations and decisions, the Owner’s Representative will endeavor to secure faithful performance
by both Owner and Contractor, will not show partiality to either and will not be liable for results of interpretations or
decisions rendered in good faith.
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
7
§ 9.9 The Owner’s Representative duties, responsibilities and limits of authority as described in the Contract
Documents shall not be changed without written consent of the Owner and Contractor. Consent shall not be
unreasonably withheld.
ARTICLE 10 CHANGES IN THE WORK § 10.1 The Owner, without invalidating the Contract, may order changes in the Work within the general scope of the
Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusted
accordingly in writing. If the Owner and Contractor can not agree to a change in the Contract Sum, the Owner shall
pay the Contractor its actual cost plus reasonable overhead and profit.
§ 10.2 The Owner’s Representative will have authority to order minor changes in the Work not involving changes in
the Contract Sum or the Contract Time and not inconsistent with the intent of the Contract Documents. Such orders
shall be in writing and shall be binding on the Owner and Contractor. The Contractor shall carry out such orders
promptly.
§ 10.3 If concealed or unknown physical conditions are encountered at the site that differ materially from those
indicated in the Contract Documents or from those conditions ordinarily found to exist, the Contract Sum and
Contract Time shall be subject to equitable adjustment.
ARTICLE 11 TIME § 11.1 Time limits stated in the Contract Documents are of the essence of the Contract.
§ 11.2 If the Contractor is delayed at any time in progress of the Work by changes ordered in the Work, or by labor
disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the Contractor’s control,
the Contract Time shall be subject to equitable adjustment.
ARTICLE 12 PAYMENTS AND COMPLETION § 12.1 CONTRACT SUM The Contract Sum stated in the Agreement, including authorized adjustments, is the total amount payable by the
Owner to the Contractor for performance of the Work under the Contract Documents.
§ 12.2 INVOICES FOR PAYMENT § 12.2.1 The Contractor shall submit to the Owner’s Representative an itemized Invoices for Payment for Work
completed in accordance with the values stated in the Agreement. Such Invoices shall be supported by data
substantiating the Contractor’s right to payment as the Owner or Owner’s Representative may reasonably require.
Payments shall be made on account of materials and equipment delivered and work completed to specifications.
§ 12.2.2 The Contractor warrants that title to all Work covered by an Invoice for Payment will pass to the Owner no
later than the time of payment. The Contractor further warrants that upon submittal of an Invoice for Payment, all
Work for which Certificates for Payment have been previously issued and payments received from the Owner shall,
to the best of the Contractor’s knowledge, information and belief, be free and clear of liens, claims, security interests
or other encumbrances adverse to the Owner’s interests.
§ 12.3 CERTIFICATES FOR PAYMENT The Owner’s Representative will, within seven days after receipt of the Contractor’s Invoice for Payment, either
issue to the Owner a Certificate for Payment, with a copy to the Contractor, for such amount as the Owner’s
Representative determines is properly due, or notify the Contractor and Owner in writing of the Owner’s
Representative reasons for withholding certification in whole or in part.
§ 12.4 PROGRESS PAYMENTS § 12.4.1 After the Owner’s Representative has issued a Certificate for Payment, the Owner shall make payment in
the manner provided in the Contract Documents.
§ 12.4.2 The Contractor shall promptly pay each subcontractor and supplier, upon receipt of payment from the
Owner, an amount determined in accordance with the terms of the applicable subcontracts and purchase orders.
§ 12.4.3 The Owner shall not have responsibility for payments to a subcontractor or supplier.
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
8
§ 12.6 FINAL COMPLETION AND FINAL PAYMENT § 12.6.1 Upon receipt of a final Invoice for Payment, the Owner’s Representative will inspect the Work. When the
Owner’s Representative finds the Work acceptable and the Contract fully performed, the Owner’s Representative
will promptly issue a final Certificate for Payment.
§ 12.6.2 Final payment shall not become due until the Contractor submits to the Owner’s Representative releases and
waivers of liens, and data establishing payment or satisfaction of obligations, such as receipts, claims, security
interests or encumbrances arising out of the Contract.
§ 12.6.3 Acceptance of final payment by the Contractor, a subcontractor or material supplier shall constitute a waiver
of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time
of final Invoice for Payment.
ARTICLE 13 PROTECTION OF PERSONS AND PROPERTY The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs,
including all those required by law in connection with performance of the Contract. The Contractor shall take
reasonable precautions to prevent damage, injury or loss to employees on the Work, the Work and materials and
equipment to be incorporated therein, and other property at the site or adjacent thereto. The Contractor shall
promptly remedy damage and loss to property caused in whole or in part by the Contractor, or by anyone for whose
acts the Contractor may be liable.
ARTICLE 14 CORRECTION OF WORK § 14.1 The Contractor shall promptly correct Work rejected by the Owner’s Representative as failing to conform to
the requirements of the Contract Documents. The Contractor shall bear the cost of correcting such rejected Work,
including the costs of uncovering, replacement and additional testing.
§ 14.2 In addition to the Contractor’s other obligations including warranties under the Contract, the Contractor shall,
for a period of one year after Substantial Completion, correct work not conforming to the requirements of the
Contract Documents.
§ 14.3 If the Contractor fails to correct nonconforming Work within a reasonable time, the Owner may correct it in
accordance with Section 7.3.
ARTICLE 15 MISCELLANEOUS PROVISIONS § 15.1 ASSIGNMENT OF CONTRACT Neither party to the Contract shall assign the Contract as a whole without written consent of the other.
§ 15.2 TESTS AND INSPECTIONS § 15.2.1 At the appropriate times, the Contractor shall arrange and bear cost of tests, inspections and approvals of
portions of the Work required by the Contract Documents or by laws, statutes, ordinances, codes, rules and
regulations, or lawful orders of public authorities.
§ 15.2.2 If the Owner’s Representative requires additional testing, the Contractor shall perform those tests.
§ 15.2.3 The Owner shall bear cost of tests, inspections or approvals that do not become requirements until after the
Contract is executed.
§ 15.3 GOVERNING LAW The Contract shall be governed by the law of the Quinault Indian Nation.
ARTICLE 16 TERMINATION OF THE CONTRACT § 16.1 TERMINATION BY THE CONTRACTOR If the Owner’s Representative fails to certify payment as provided in Section 12.3 for a period of 30 days through no
fault of the Contractor, or if the Owner fails to make payment as provided in Section 12.4.1 for a period of 30 days,
the Contractor may, upon seven additional days’ written notice to the Owner, terminate the Contract and recover
from the Owner payment for Work executed including reasonable overhead and profit, and costs incurred by reason
of such termination.
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
9
§ 16.2 TERMINATION BY THE OWNER FOR CAUSE § 16.2.1 The Owner may terminate the Contract if the Contractor
.1 repeatedly refuses or fails to supply enough properly skilled workers or proper materials;
.2 fails to make payment to subcontractors for materials or labor in accordance with the respective
agreements between the Contractor and the subcontractors;
.3 persistently disregards laws, ordinances, or rules, regulations or orders of a public authority having
jurisdiction; or
.4 is otherwise guilty of substantial breach of a provision of the Contract Documents.
§ 16.2.2 When any of the above reasons exist, the Owner may without prejudice to any other rights or remedies of
the Owner and after giving the Contractor and the Contractor’s surety, if any, seven days’ written notice, terminate
employment of the Contractor and may
.1 take possession of the site and of all materials thereon owned by the Contractor, and
.2 finish the Work by whatever reasonable method the Owner may deem expedient.
§ 16.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 16.2.1, the Contractor shall
not be entitled to receive further payment until the Work is finished.
§ 16.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, such excess shall be paid to
the Contractor. If such costs exceed the unpaid balance, the Contractor shall pay the difference to the Owner. This
obligation for payment shall survive termination of the Contract.
§ 16.3 TERMINATION BY THE OWNER FOR CONVENIENCE The Owner may, at any time, terminate the Contract for the Owner’s convenience and without cause. The Contractor
shall be entitled to receive payment for Work executed, and costs incurred by reason of such termination, along with
reasonable overhead and profit on the Work not executed.
ARTICLE 17 TERO Compliance (Insert any other terms or conditions below.)
The Quinault Indian Nation’s TERO Code applies to this Agreement. Every employer with a contract in the sum of
$10,000 or more, or more than one contract in a 12- month period and the aggregate sum of those contracts is
$10,000 or more, shall pay a one-time fee of 1.75% of the total amount of each contract. Such fee shall be paid by
the employer prior to commencing work on the Quinault Reservation. »
This Agreement entered into as of the day and year first written above.
(If required by law, insert cancellation period, disclosures or other warning statements above the signatures.)
« »
OWNER (Signature)
CONTRACTOR (Signature)
« »« »
« »
« »« »
« »
(Printed name, title and address) (Printed name, title and address)
AIA Document A105™ – 2007 (formerly A105™ – 1993 and A205™ – 1993). Copyright © 1993 and 2007 by The American Institute of Architects. All
rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
maximum extent possible under the law. This draft was produced by AIA software at 09:44:40 on 09/03/2013 under Order No.7242818697_1 which
expires on 08/28/2014, and is not for resale.
User Notes: (1634951530)
10
QIN Contract Officer: ______________________________
QIN Division Director: ______________________________
QIN Office of Attorney
General: ______________________________________
QIN Grants and Contracts: ___________________________
QIN QBC Executive: _______________________________