Test Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting Wien, 10.06. 13.06.2014 BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 1 Date 12-15.01.2015

Upload: voduong

Post on 31-Jan-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Facilities in Germany

Dr. Gerd Brinkmann / Dieter Vanvor

BriVaTech Consulting

Wien, 10.06. – 13.06.2014

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 1 Date 12-15.01.2015

Page 2: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Facilities in Germany

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 2 Date 12-15.01.2015

Page 3: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Facilities and Projects in Germany

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 3 Date 12-15.01.2015

Page 4: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

HTR-MODULE with SG

HTR-MODULE with Steam Generator

Hot Gas Temperature 750°C

Cold Gas Temperature 250 °C

Core Barrel Alloy 800

Pressure Boundary 20MnMoNi55

Steam Generator

- inner shrouds Alloy 800

- tubing Alloy 800

- type helical tubing,

steam inside tubes

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 4 Date 12-15.01.2015

Page 5: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

HTR-MODULE with SR HTR-MODULE with Steam Reformer

Hot Gas Temperature for SR 950°C

Hot Gas Temperature for SG 750 °C

Cold Gas Temperature 350 °C

Core Barrel Alloy 800H

Pressure Boundary X20CrMoV121

Steam Reformer (SR)

- inner shrouds Alloy 800H/Alloy 617

- tubing Alloy 800H/Alloy 617

- type straight tube bundle for catalysator Steam Generator (SG) - inner shrouds Alloy 800H/Alloy 617

- tubing Alloy 800H/Alloy 617

- type helical tubing integrated, steam inside tubes

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 5 Date 12-15.01.2015

Page 6: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

HTR-MODULE with IHX HTR-MODULE with Helium-Helium-Heat-Exchanger

Hot Gas Temperature Primary 950°C

Cold Gas Temperature Primary 350 °C

Hot Gas Temperature Secondary 900 °C

Cold Gas Temperature Secondary 300 °C

Core Barrel Alloy 800H

Pressure Boundary X 20 CrMoV 121

Helium-Helium-Heat-Exchanger

- inner shrouds Alloy 800H/Alloy 617

- tubing Alloy 800H/Alloy 617

- type helical tubing

- max. pressure differenze Primary/Secondary under normal conditions 2 bar

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 6 Date 12-15.01.2015

Page 7: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Vessel Steel for Pressure Boundary HTR-MODULE with Steam Generator is designed based on regulations for Light Water Reactors(KTA 3201). Therefore the best known pressure vessel material 20MnMoNi55 is used for the pressure boundary.

For all other HTR-MODULE types the pressure boundary material has to withstand higher temperatures during accident conditions.

HTR-MODULE with IHX or SR

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 7 Date 12-15.01.2015

Page 8: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Vessel Steel for Pressure Boundary

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 8 Date 12-15.01.2015

Page 9: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Vessel Steel for Pressure Boundary

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 9 Date 12-15.01.2015

Page 10: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Steel for Metallic Internals

Draft safety standard KTA 3221 (parts 1 to 3) specifies the following materials for temperatures

up to 1000 °C:

Material Component

X 20 CrMoV 12 (1.4922) support pipe hot gas duct

up to 600 °C as pressure vessel material

X 5 NiCrAlTi 31 20 DE (1.4958 special), Alloy 800 DE liner for hot gas duct

up to 700 °C as pressure vessel material vee shape for hot gas duct

core barrel

support sytems inside pressure

boundary

rods

X 6 NiCrAlTi 32 21 H, Alloy 800 H liner for hot gas duct

up to 700 °C as structural component vee shape for hot gas duct

special areas for steam reformer

and intermediate heat exchanger

rods

Ni Cr 23 Co 12 Mo, Alloy 617 special areas for steam reformer

above 500 °C as pressure vessel material and intermediate heat exchanger

(e.g. nozzel and header)

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 10 Date 12-15.01.2015

Page 11: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Graphite Internals

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 11 Date 12-15.01.2015

Page 12: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components

IHX

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 12 Date 12-15.01.2015

Page 13: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 13 Date 12-15.01.2015

Page 14: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components

Hot Gas Duct (metallic version)

Material Specifications:

Liner, hot side of vee 1.4876 (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

and depressurization gap tube

Support pipe and cold side of vee 1.4571 (X6CRNIMOTI17-12-2) with specified cobalt content of maximum 300 ppm

Packed fibre insulation pads made of long fibre mats with 95% al2o3 + 5% sio2

Wrapped fibre insulation fibre-mats made of long fibre with 95% Al2O3 + 5% SiO2

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 14 Date 12-15.01.2015

Page 15: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components Hot Gas Duct (ceramic version)

Material Specifications:

Liner Graphite type ASR-1RG, carbon fibre composite (CFC)

Radial and axial ceramic spacers Al2O3 ceramic, under pressure from all sides

Packed fibre insulation pads made of long fibre mats with 95% Al2O3 + 5% SiO2

Wrapped fibre insulation fibre-mats made of long fibre with 95% Al2O3 + 5% SiO2

Support pipe 1.4571 (X6CrNiMoTi17-12-2) with specified cobalt content

of maximum 300 ppm

CFC-Tube Graphite-Tube

Fibre Insulation

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 15 Date 12-15.01.2015

Page 16: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components Isolation Valves (secondary side)

Design Features of RCS Isolation Valves In the course of the above-mentioned development project the following main design data and operating data were established for the secondary-side hot gas valves. Most of these specifications can be applied unchanged to new projects:

Operating pressure 41.9 bar

Hot gas temperature 900 ±18°C

Body design temperature (pressure boundary) 400°C

Helium mass flow 47.3 kg / s

Temperature transient (startup and shutdown) ± 2 K / min

Total closing time 5 s

Max. p across seat 42 bar

Max. p during opening and closing 3.5 bar (max: backpressure to be overcome)

Leakage rate from both seats 1 mbarl / s (cf. Section 3.5)

Design lifetime 140,000 h

Prototype dimensions:

Pressure-retaining pipe Dia. 1,120 mm, t = 30 mm

Free flow cross section Dia. 700 mm

Total length 2,400 mm

Isolation Valve (secondary side)

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 16 Date 12-15.01.2015

Page 17: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components

Isolation Valves (secondary side)

Direction of

movement on

closure

Double seal

system

Valve

seat

Valve

seat

Direction of

movement on

closure

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 17 Date 12-15.01.2015

Page 18: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Materials for Components

Draft safety standard KTA 3221 (parts 1 to 3) specifies the following materials for

temperatures up to 1000 °C:

X 20 CrMoV 12 (1.4922) Support plate and support structure

up to 600°C tubes for SG, SR and IHX

pressure tube for secondary hot and

cold gas duct

X 5 NiCrAlTi 31 20 DE (1.4958 special), Alloy 800 DE tubes for SG, SR and IHX

up to 700°C liner, sealing structure, support system

X8 NiCrAlTi 32 21 H, Alloy 800 H tubes for SG, SR and IHX

up to 700°C liner, sealing structure, support system

Ni Cr 23 Co 12 Mo, Alloy 617 special areas of SR, IHX (nozzle and

above 500°C header) and special components

inside secondary separation valves

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 18 Date 12-15.01.2015

Page 19: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Facility KVK

KVK Testing hall with operational and testing components

Thermal power 10 MW

(in one and two cycle test loop)

Helium Temperature 950 °C/900°C

Operating Pressure 40 bar/40 bar

Helium Flow 3 kg/s / 2,9 kg/s

Helium Velocity 60 m/s / 60 m/s

Temperature Transients ± 200 K/min

(only in primary loop)

Pressure Transient - 5 bar/s

(only in primary loop)

Operation time:

> 900 °C ~ 7.000 h

> 700 °C ~ 12.000 h

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 19 Date 12-15.01.2015

Page 20: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

KVK Hot Gas Duct

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 20 Date 12-15.01.2015

Page 21: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK Hot Gas Duct (metallic version)

pictures from manufacturing

Horizontal test tube

outer diameter 1220 mm

wall thickness 30 mm

flow diameter 700 mm

90° elbow test tube

outer diameter 1320 mm

wall thickness 50 mm

flow diameter 700 mm

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 21 Date 12-15.01.2015

Page 22: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

Hot Gas Duct (ceramic design)

pictures from manufacturing

Horizontal test tube

outer diameter 1020 mm

wall thickness 20 mm

flow diameter 700 mm Core Connection

System test tube

flow diameter 700 mm

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 22 Date 12-15.01.2015

Page 23: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

IHX (U-Tube-Type), demension for 170 MW but

tubing only for 10 MW

Picture during assembling

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 23 Date 12-15.01.2015

Page 24: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

Picture during assembling

in back: IHX-Helical-Type

in front: SG for KVK

IHX (Helical-Tube-Type), dimension for 170 MW

but tubing only for 10 MW

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 24 Date 12-15.01.2015

Page 25: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

IHX (Helical-Tube-Type), dimension for 170 MW

but tubing only for 10 MW

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 25 Date 12-15.01.2015

Page 26: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

Picture during assembling

in back: IHX-Helical-Type

in front: SG for KVK

10 MW decay heat cooler for KVK (steam

generator)

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 26 Date 12-15.01.2015

Page 27: Test Facilities in Germany - International Atomic Energy ... · PDF fileTest Facilities in Germany Dr. Gerd Brinkmann / Dieter Vanvor BriVaTech Consulting ... (X10NiCrAlTi32-21 / X10NiCrAlTi32-20)

Test Components inside KVK

Isolation Valves (secondary

side)

axial valve type,

BriVaTech Consulting, Hemhofen, GERMANY ALL RIGHTS RESERVED Page 27 Date 12-15.01.2015