Page 1: Test planning

TEST PLANNING

Presented by

Aliaa Monier

Page 2: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResources

Test schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 3: Test planning

Why to use a test plan

It guides our thinking

It serves as a mean of

communication with other

members of the project team

It helps to

manage changes

Page 4: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResources

Test schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 5: Test planning

HOW TO PLAN FOR TESTING

Page 6: Test planning

Test Planning

Project Plan Requirements Document Design Document Use-case model Supplemental specifications Client MOM Existing Systems

Review System materials

Page 7: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResources

Test schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 8: Test planning

• To identify what is being tested.• To determine the overall test effort.• Used as the basis for test coverage.

Define test items

Why to identify test items

Item 1

Item 2

Item 3

Page 9: Test planning

Verifiable: they have an observable, measurable outcome.

Items to be tested should be:

Example:

The home page needs to load fast.

Home page loading time will take maximum 10 sec once Home page link is clicked.

Page 10: Test planning

Output:- Hierarchy of features to be tested , which

can be grouped by : Use case Business case Type of test (functional, performance, etc.)

Note:- Each use case should derive at least one

test item.

Page 11: Test planning

Patrons of the library can search library catalog online to locate various resources - books, periodicals, audio and visual materials, or other items under control of the library. Patrons may reserve or renew item, provide feedback, and manage their account.

Manage Account

Search Catalog

Reserve Item

Renew Item

Provide Feedback

Online public access catalog

Page 12: Test planning

Why not to include some features in testing:• Not to be included in this release of the Software.• Low risk, has been used before and is considered

stable.• OOB component• Will be tested by the client

Features not to be tested

Page 13: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResourcesTest schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 14: Test planning

Risk assessment and establishing test priority

What is Risk?

Risk is a future uncertain event with a probability of occurrence and a potential for loss

Page 15: Test planning

why to assess risk:

• To ensure the most critical, significant, or riskiest requirements for tests are addressed as early as possible

• To ensure the test efforts are focused on the most appropriate requirements for test

• To ensure that any dependencies (sequence, data, etc.) are accounted for in the testing

Page 16: Test planning

Risk Types

Schedule Risk

Budget Risk

Operational Risks

Technical risks

Programmatic Risks

Wro

ng t

ime

esti

mat

ion

Reso

urce

s ar

e no

t tr

acke

d pr

oper

ly

Failu

re t

o id

enti

fy c

ompl

ex fu

ncti

onal

itie

s

Wro

ng b

udge

t es

tim

atio

n

Cost

ove

rrun

s

Proj

ect

scop

e ex

pans

ion

Failu

re t

o re

solv

e th

e re

spon

sibi

litie

sN

o pr

oper

sub

ject

tra

inin

g

No

com

mun

icat

ion

in t

eam

Cont

inuo

us c

hang

ing

requ

irem

ents

Diffi

cult

pro

ject

mod

ules

inte

grat

ion

Runn

ing

out

of fu

nd

Mar

ket

deve

lopm

ent

Chan

ging

cus

tom

er p

rodu

ct s

trat

egy

and

prio

rity

Page 17: Test planning

Assess RiskDetermine operational

profile

Establish test

priority

Three steps to assessing risk and establishing the test priorities

Page 18: Test planning

a - Identify and describe the risk magnitude indicators that will be used, such as:

• H - High risk:

• M - Medium risk:

• L - Low risk:

b - For each item in your test items list , define expected risks, select a risk magnitude indicator, and justify (in a brief statement) the value you selected.

Assess Risk

Page 19: Test planning

There are three perspectives that can be used for assessing risk:

• Effect - the consequence of a specified test item fails.

• Cause - an undesirable outcome caused by the failure of a test item

• Likelihood - the probability of a test item fails.

Page 20: Test planning

Effect

To assess risk by Effect, identify a condition, event, or action and try to determine its impact.

Ask the question:"What would happen if ___________?"

For example:• "What would happen if while installing the new software, the

system runs out of disk space?"

Page 21: Test planning

Description Risk Mitigation Factor

Justification

Insufficient disk space during install

Example

H Installing the software provides the user with the first impression of the product. Any undesirable outcomes, such as those listed below would degrade the user's system, the installed software, and communicate a negative impression to the user:

• software is partially installed (some files, some registry entries), which leaves the installed software in an unstable condition, or

• the installation halts leaving the system in an unstable state

Page 22: Test planning

Cause

Assessing risk by Cause is the opposite of by Effect.

Begin by stating an undesirable event or condition, and identify the set of events that could have permitted the condition to exist. Ask a question such as:

"How could ___________ happen?”

For example:• "How could an order being replicated?"

Page 23: Test planning

Example

Description Risk Mitigation Factor

Justification

Replicated orders

H Replicated orders increase the company overhead and diminish profits via the costs

associated with shipping, handling, and restocking.

Possible causes include: Transaction that writes order to the

database replicated due to user intervention, user enters order twice - no confirmation of entry

Transaction that writes order to the database replicated due to non-user intervention (recovery process from lost Internet connection, restore of database)

Page 24: Test planning

Likelihood

Assessing risk by Likelihood is to determine the probability that a test item will fail.

The probability is usually based on an external factors such as:• Failure rate(s)• Rate of change• Complexity• Origination / Originator

Example:"Historically we've found many defects in the components used to implement

use cases 1, 10, and 12, and our customers requested many changes in use case 14 and 19."

Page 25: Test planning

Example

Description Risk Mitigation Factor

Justification

High failure discovery rates / defect densities in use cases 1, 10, 12.Change Requests in use cases 14 and 19.

H

H

Due to the previous high failure discovery rates and defect density use cases 1, 10, and 12 are considered high risk.

A high number of changes to these use cases increases the probability of injecting defects into the code.

Page 26: Test planning

a - Identify and describe the operational profile magnitude indicators that will be used, such as:

• H - Quite frequently used:

• M - Frequently used:

• L - Infrequently used:

b- For each item in you test items list, select an operational profile magnitude indicator and state your justification for the indicator value.

Determine Operational

Profile

Page 27: Test planning

Examples:• Ordering items from the on-line catalog• Customers inquiring about their order on-line after order is placed• Item selection dialog

Description Operational Profile Factor Justification

Ordering items from the catalog

This is the most common use case executed by users.

H

Page 28: Test planning

a- Identify and describe the test priority magnitude indicators that will be used, such as:

• H - Must be tested.

• M - Should be tested, will test only after all H items are tested

• L - Might be tested, but not until all H and M items have been tested

b- For each item in you test items list, select a test priority indicator and a state your justification.

Establish Test

Priority

Page 29: Test planning

Consider the following :• the risk magnitude indicator value you identified earlier• the operational profile magnitude value you identified earlier• contractual obligations (will the target-of-test be acceptable if a use case or

component is not delivered?)

Strategies for establishing a test priority include:• Use the highest assessed factor • Identify one assessed factor as being the most significant and use that factor's

value as the priority.• Use a combination of assessed factors to identify the priority.• Using a weighting schema where individual factors are weighed, and their values

and priority calculated based upon the weight.

Page 30: Test planning

Examples:• Ordering items from the on-line catalog• Customers inquiring about their order on-line after order is placed• Item Selection Dialog

Priority when the highest assessed value is used to determine priority:

Item Risk Operational Profile

Contract Priority

Ordering items from catalog

H H H

Customer Inquiries

L L L

Item Selection Dialog

L H L

H

L

H

Page 31: Test planning

• Delivery of a third party product.

• New version of interfacing software

• Ability to use and understand a new package/tool, etc.

• Extremely complex functions

• Modifications to components with a past history of failure

• Poorly documented modules or change requests

• misunderstanding of the original requirements.Example for common risks

Page 32: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResourcesTest schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 33: Test planning

Test Strategy

• Define Types of Testing which will be used and their objectives

• Define which testing techniques will be used

• Define Entrance Criteria

• Define suspension criteria and resumption requirements

• Define Exit Criteria

• Define Testing Stages

Page 34: Test planning

Define Types of Testing which will be used and their objectives

Integration Testing

Acceptance testing

System testing

Regression Testing

Functional Testing

Security testing

Performance testing

Page 35: Test planning

Define Testing StagesClearly state the stage in which the test will be executed.

Application Stages

Individual Components are implemented

Individual Components are Integrated

All System Components are integrated

System will be delivered to the Client

Functional Testing

System testing

Integration Testing

Regression Testing

Performance testing

Security testing

Acceptance testing

Test

ing

type

s

Y Y

Y

Y Y

Y

Y

Y

Y

How to decide which testing types will be used

Page 36: Test planning

Define which testing techniques will be used

For each testing types :

For each test item:

• specify how the test will be implemented

• who will execute it

• Which method(s) will be used to evaluate the results

Page 37: Test planning

Define which testing techniques will be used

For each testing types :Functional testing

For each test item: Registeration Form

• Specify how the test will be implemented :

• Who will execute it :

There will be a set of test cases, each representing the actions taken by the actor when the test item is executed.

A minimum of two test cases will be created for each test item; one test case to reflect the positive condition and one to reflect the negative (unacceptable) condition.

QE / Automated Tool (For security/ performance testing : Tool / SME) , (For Acceptancr : QE / Client)

Page 38: Test planning

• Which method(s) will be used to evaluate the results

Test case execution : Function was executed successfully and as desired

Window Existence, or Object Data verification methods:(UI / Data)Windows /data were displayed during test execution.

Database reflection testing : Database will be examined before the test and again after the test to verify that the changes executed during the test are accurately reflected in the data.

Page 39: Test planning

Define Entrance Criteria

• Components are developed and unit tested

• Test environment is ready

• Testing tools are available

• Testing Resources are available

• All bugs are fixed (regression testing)

Page 40: Test planning

Define suspension and resumption requirements

Example:

If the number or type of defects reaches a point where the follow on testing has no value, it makes no sense to continue the test; you are just wasting resources.

Testing after a truly fatal error will generate conditions that may be identified as defects but are in fact ghost errors caused by the earlier defects that were ignored.

Page 41: Test planning

Why to define Exit Criteria? To identify acceptable product quality To identify when the test effort has been successfully implemented

A clear statement of exit criteria should include the following items: What is being tested (the specific test item) How is the measurement being made What criteria is being used to evaluate the measurement

Define Exit Criteria

Page 42: Test planning

Example All planned test cases have been executed

All identified defects have been addressed to an agreed upon resolution

All planned test cases have been re-executed and all known defects have been addressed as agreed upon, and no new defects have been discovered

Page 43: Test planning

IDENTIFY THE RESOURCES NECESSARY TO TESTING

Human resources (skills, knowledge, availability , training)

Test environment (Hardware and software requirements)

Tools

Data

Page 44: Test planning

• Manage and plan the testing• Design the tests and data• Implement the tests and data• (test cases creation and test data• preparation)• Execute testing and evaluate the results• Manage and maintain the test

systems(Support team)

Identify human resources who can

do the following

Page 45: Test planning

  Team Leader -

Development

Project Manager

Development Team

Testing team

Client

User Acceptance test

   

System/Integration

testing

       

Unit testing      

System Design Reviews

       

Test Cases Creation

       

Test Cases Review

     

Screen prototype reviews

       

Regression testing

       

Define RESPONSIBILITIES Who is in charge?

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Page 46: Test planning

Identify non-human resource needs (Test environment)

Two different physical environments are recommended

Implementation Environment

ExecutionEnvironment

Page 47: Test planning

• The application-under-test.• The client O/S.• The server O/S.

• Internet Browser • Bugs Tracking system• Test case repository tool• Database management tool• Microsoft office , Outlook

Software Needed

Minimum software needed:

Additional software needed:

Page 48: Test planning

Data can be used as: Input (creating or supporting a test condition) Output (to be compared to an expected result).

• What software tools will be used, • by whom, • and what information or benefit will be gained by the use of each tool.

Tools

Data

Page 49: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResourcesTest schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 50: Test planning

TEST DELIVERABLES• Test plan document. • Test cases. • Test Data• Traceability matrix• Build status report• Release notes

• Test design specifications.

• Output of testing tools. (Performance-security - automation - Reports)

Page 51: Test planning

CREATING SCHEDULE

Why to create a test schedule:

Creating a schedule includes:

• Estimate test effort• Generate test schedule

To identify and communicate test effort, schedule, and milestones

Page 52: Test planning

Software testing estimation methods: Percentage of development effort. Experience Based. Work Breakdown Structure. Delphi technique Three-point estimation

Estimate testing effort

Why to estimate

To avoid the exceeding timescales and overshooting budgets

Page 53: Test planning

Reading / analyzing and reviewing Requirements.

Test design (Test cases creation , test data preparation....)

Test implementation ( Recording test cases) Test Execution Re-testing(Issues) Regression testing Integration testing User acceptance testing Performance / security testing Compatibility testing(Across different

browsers , OS..) Language testing

Estimates should include estimates for:

Page 54: Test planning

Generate test scheduleA test project schedule can be built from the work

estimates and resource assignments.

It is always best to tie all test dates directly to their related development activity dates.

Page 55: Test planning

GENERATE TEST PLAN

To organize and communicate to others the test-planning information.

Prior to generating the test plan, a review of all the existing project information should be done to ensure the test plan contains the most current and accurate information.

The test plan should be distributed to at least the following:• all test roles• developer representative• Project Leader• client representative

Page 56: Test planning

APPROVAL

Who can approve the process as complete and allow the project to proceed to the next level

Page 57: Test planning

Agenda

Why to use a test plan How to plan for testing

Inputs for test planTest itemsRisk AssessmentTest strategyResourcesTest schedulingTest deliverablesGenerate test plan

Types of test Plan

Page 58: Test planning

Types of test Plan

Project Information

Software Information

Create details test

plan

Create Master test

plan

Master test plan

Details test plan

Page 59: Test planning

Master test plan

Unit test plan

Acceptance test

plan

Integration test

planSystem

test plan

Page 60: Test planning
Page 61: Test planning

Referenceshttp://www.computing.dcu.ie/~davids/courses/CA267/ieee829mtp.pdfhttp://www.upedu.org/process/gdlines/md_tstpl.htm