test

2
SAP Note Header Data Symptom When you post a goods receipt or make a service entry, no availability control action (for example, a warning message or error message) is triggered even if the tolerance limits are exceeded. Other Terms Budget, MB01, ML81. Reason and Prerequisites System design The process recommended by SAP determines the availability control to be carried out on the basis of the purchase order commitment at the time of creating a purchase order. The posting of a goods receipt for a purchase order should not be impaired by error messages from availability control. In addition, in certain scenarios with automatic background processes, it is impossible for technical reasons to use availability control to block goods receipts because the available budget cannot be checked until actual data has been transferred to the update. The assigned value is recorded in any case. Solution If possible, use the commitment values from the purchase order to check the budget. Check the usage of non-valuated goods receipts or do not allow any account assignment change for the goods receipt posting. However, if you wish to have an availability check carried out for goods receipts, you can achieve this for Transactions MIGO, MB01, and ML81 via the user exit described in Note 696362 as of Release 4.6C. Validity This document is not restricted to a software component or software component version References This document refers to: SAP Notes This document is referenced by: 46209 - No availability control for goods receipts Version 3 Validity: 01-14-2004 - active Language English Released On 01-15-2004 05:42:55 Release Status Released for Customer Component CO-OM-OPA-C Budgeting Priority Recommendations / Additional Info Category Consulting 1424698 Budget overrun despite active availability control 922114 ALE: Availability control checks goods receipts 910472 Exit: Availability control for valuated goods receipt using MIGO_xx 696362 Exit: Availability control for valuated goods receipts 696361 Exit: Availability control for valuated goods receipts 397799 INFORMATION: CO - OM - OPA (Order & Project Accounting) 124917 No budget check during purchase order for PReq

Upload: love2dream

Post on 08-Sep-2015

215 views

Category:

Documents


3 download

DESCRIPTION

test

TRANSCRIPT

  • SAP Note

    Header Data

    Symptom

    When you post a goods receipt or make a service entry, no availability control action (for example, a warning message or error message) is triggered even if the tolerance limits are exceeded.

    Other Terms

    Budget, MB01, ML81.

    Reason and Prerequisites

    System design The process recommended by SAP determines the availability control to be carried out on the basis of the purchase order commitment at the time of creating a purchase order. The posting of a goods receipt for a purchase order should not be impaired by error messages from availability control. In addition, in certain scenarios with automatic background processes, it is impossible for technical reasons to use availability control to block goods receipts because the available budget cannot be checked until actual data has been transferred to the update. The assigned value is recorded in any case.

    Solution

    If possible, use the commitment values from the purchase order to check the budget. Check the usage of non-valuated goods receipts or do not allow any account assignment change for the goods receipt posting. However, if you wish to have an availability check carried out for goods receipts, you can achieve this for Transactions MIGO, MB01, and ML81 via the user exit described in Note 696362 as of Release 4.6C.

    Validity

    This document is not restricted to a software component or software component version

    References

    This document refers to:

    SAP Notes

    This document is referenced by:

    46209 - No availability control for goods receipts

    Version 3 Validity: 01-14-2004 - active Language English

    Released On 01-15-2004 05:42:55 Release Status Released for Customer Component CO-OM-OPA-C Budgeting Priority Recommendations / Additional Info Category Consulting

    1424698 Budget overrun despite active availability control 922114 ALE: Availability control checks goods receipts 910472 Exit: Availability control for valuated goods receipt using MIGO_xx 696362 Exit: Availability control for valuated goods receipts 696361 Exit: Availability control for valuated goods receipts 397799 INFORMATION: CO-OM-OPA (Order & Project Accounting) 124917 No budget check during purchase order for PReq

  • SAP Notes (8)

    124917 No budget check during purchase order for PReq 397799 INFORMATION: CO-OM-OPA (Order & Project Accounting) 696361 Exit: Availability control for valuated goods receipts 696362 Exit: Availability control for valuated goods receipts 1424698 Budget overrun despite active availability control 922114 ALE: Availability control checks goods receipts 910472 Exit: Availability control for valuated goods receipt using MIGO_xx 574187 Budget overrun in spite of error message