testing institutions for on-site treatment systems in … · small wastewater treatment systems up...

20
Testing institutions for on-site treatment systems in the EU Dr.rer.nat. Martina Defrain PIA Germany Workshop on On-site Domestic Wastewater Domestic Wastewater Treatment in Asia 1

Upload: lelien

Post on 04-Aug-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Testing institutions for on-site treatment systems in the EU

Dr.rer.nat. Martina DefrainPIA Germany

Workshop on On-site Domestic WastewaterDomestic Wastewater

Treatment in Asia

1

New Approach in Europe

break down of technical barriers

f t f d ithi th E U ifree movement of goods within the European Union

harmonised requirements for productsharmonised requirements for products placed on the European market

Testing institutions for on-site treatment systems in the EU, Tokyo November 2013 2Dr.rer.nat. Marina Defrain

European Economic AreaEuropean Economic AreaFounded: 1994Members: 30 states

3Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

Small Wastewater Treatment Systems up to 50 PEAerated sludge reactor

Fixed film reactor

Small Wastewater Treatment Systems up to 50 PE

Moving bed reactor

SBR

Trickling filter

Membrane bioreactor

C t t d tl d

Concrete

Steel Constructed wetland

Filtration systems

Construction products

PE HDPE GRP

Construction Products RegulationPurpose of CPR

Construction Products Regulation

harmonising elements which previously led to barriersharmonised technical specifications 420 h i d t d d f t ti d tca. 420 harmonised standards for construction products

agreed system of attestation of conformity (AOC) +verification of constancy for each product familyverification of constancy for each product family system 3 for SWTS

framework for Notified Bodies mandatory CE marking of products

as a passport for the internal market

Requirements on application Member States

5Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

CPR – Notifying Authorities Member States have to designate a Notifying Authority

CPR – Notifying Authorities

Notified Bodies authorised to carry out third-party tasks in the process of assessment and verification ofprocess of assessment and verification ofconstancy of performance for the purposesof the CPR

Notifying Authority responsible for setting up and carrying out thenecessary procedures for the assessment andnotification of the Notified Bodiesnotification of the Notified Bodies

responsible for the monitoring of NotifiedBodies, including their compliance with the

i i f h CPRprovisions of the CPR setting up NBs in NANDO

ec europa eu/enterprise/newapproach/nando/ec.europa.eu/enterprise/newapproach/nando/

6Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

CPR Notified BodiesCPR - Notified BodiesNational Accreditation Bodies undertake accreditation + monitoring of notified bodies Germany y National Accreditation Body DAKKS

Application h ld b d t th ti l N tif i A th it should be made to the national Notifying Authority Germany DIBT G I tit t f DIBT German Institute for Construction Technology

7Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

CPR - Notified BodiesCPR - Notified Bodies

RequirementsRequirements No involvement in the design, manufacturing, construction,

marketing, installation, use, maintenance of the products which the NB assesses

activities of subsidiaries or subcontractors do not affect the secrecy objectivity and impartiality of its assessment and/orsecrecy, objectivity and impartiality of its assessment and/or verification activities.

technical knowledge, appropriate experience technical knowledge, appropriate experience professional secrecy except in relation to the administrative authorities

of the Member State Participation in the Group of Notified Bodies

8Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

CPR – Technical SpecificationsCPR – Technical Specifications

Harmonized Standards hENEuropean Technical approvals ETA

Specifications should include testing, calculation and other means

in relation to the essential characteristics

Declaration and CE- markingmandatory where there is a hEN

9Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

CPR CEN/CENELECCPR - CEN/CENELEC

CENCEN European Committee for Standardisation

CENELEC European Committee for ElectrotechnicalSt d di tiStandardisation

recognised organisations by the European Commission forthe adoption of harmonised standards

10Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

Notified Bodies - NBs

• over 440 NBs from 25 countries across the E E i AEuropean Economic Area

• Listed on Commission`s “NANDO” websiteListed on Commission s NANDO website

• organised in the Group of Notified Bodiesg

GNB CPD

11Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

Group of Notified Bodies GNB

President

Group of Notified Bodies GNB

Advisory Group23 Sector Groups

21 product SG`s 2 horizontal SG`s

SG12 pipes, tanks and related engineering products

SG12 WG2 Small wastewater treatment systemsSG12 WG2 Small wastewater treatment systemsfounded 2008 EN 12566-3/EN 12566

12Dr.rer.nat. Marina DefrainTesting institutions for on-site treatment systems in the EU, Tokyo November 2013

EN 12566 S ll t t t t tEN 12566 Small wastewater treatment systems up to 50 PT

Standard UseEN 12566-1+A1 : 2003 Prefabricated septic tanks

CEN/TR 12566-2 : 2004 Soil infiltration systems

EN 12566-3+A1 : 2009 Packaged and/or site assembled domestic wastewater prEN12566-3+A2 : 2013 treatment plants

EN 12566-4 : 2007 Septic tanks assembled in situ from prefabricated kits

CEN/TR 12566 5 : 2004 P t t d ffl t filt ti tCEN/TR 12566-5 : 2004 Pre-treated effluent filtration systems

EN 12566-6 : 2013 Prefabricated treatment units for septic tank effluent

prEN 12566-7 : 2013 Prefabricated tertiary treatment unitsprEN 12566-7 : 2013 Prefabricated tertiary treatment units

13Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

Arrangement of parts of EN 12566

EN 12566: part 1, 2, 3, 4, 5, 6, 7B

A B1 or 4 2

C

B

CD/E

5

A1 or 4 B

5C

7 E

D A InfluentB Pre-treated

wastewaterD/ED/E6

wastewaterC Infiltration into

the groundD + E Effluent

3A

D/E

E7D

14Dr.rer.nat. Marina Defrain

D + E Effluent

Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

EN 12566-3: Tasks of Notified Bodies566 3 as s o ot ed od es

prEN 12566-3+A2 : 2013

Requirements for ITT Models to be tested

Overall dimensions, volume inlets, tl t d ti houtlets and connections,

accessibilityeach

Watertightness each

Structural behaviour biggest

Treatment efficiency smallest (38 weeks)

Durability one representative

Reaction to fire one representative

Release of dangerous substances one representative

15Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

EN 12566EN 12566 –Notified Bodies in Europein Europe

27 NB‘s

21 EN 12566 121 EN 12566-1

26 EN 12566-3

8 EN 12566-4

1 EN 12566-6

O t b 2013

16Dr.rer.nat. Marina Defrain

October 2013

Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

CPR - Notified BodiesCPR - Notified Bodies

Europe wide bodies

do not represent their country of notification

may work for ymanufacturer from any country

work equivalently according to common rules/guidance

17Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013

SG12 WG2 - small wastewater treatment plants

objectives

p

Notified Bodies for EN 12566objectives

• discussion about problems arisingin practicein practice

• same interpretation of the standard • same testing procedures• clarification of the standardclarification of the standard

working on Position Papers

• cooperation with the CEN (TC165 WG41)

• contact to other NB`s

foto: CENTA 2010

SG12 WG2• confidence in the work of all NB`s

confidence in the product

SG12 WG2meetings 1-2/year14 NBs of 10 EU countries active

Testing institutions for on-site treatment plants in EUTokyo, November 2013

18Dr.rer.nat. Marina Defrain

EU CommissionCPR

technical specification notifying authorityaccreditation bodyaccreditation body

ETA hEN NB

CEN GNBCEN GNB

TC165 „waste water engineering“ SG12 „pipe, tanks, related products“secretary: Kropf/Germany chairman: Pappler/Austria

EN 12566

secretary: Kropf/Germany chairman: Pappler/Austria

WG41 „SWTS“ WG2 „SWTS“secretary: Chandellier/France chairwoman: Defrain/Germanysecretary: Chandellier/France chairwoman: Defrain/Germany

Defrain/WG2 liason Vignoles/WG41

guidance papers + position papers support for NBs

Thank you for your attention!

Dr rer nat Martina DefrainDr.rer.nat. Martina [email protected]