  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    1/51

    Testing Result for VMS 3G SWITCH Project

    Mac table Capability Test

    Test No. 1

    Test item Mac table Capability Test

    Testpurpose

    To test the capability of Mac table

    TestEnvironment

    DUT

    SMB-

    6000B

    1 2

    A B

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Config port1 and port2 in the same vlan10.

    3. Send 16k packets from tester port A to port 1 with source Mac changed

    ExpectedResult

    1. After step 3the switch can learn 16K source Mac

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    2. The Tester Configuration

    Page 1 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    2/51

    Testing Result for VMS 3G SWITCH Project

    3. The Result:

    Page 2 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    3/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    1. Basic function of VLAN (802.1Q tag-based)Test No. 2

    Test item Basic function of VLAN

    Testpurpose

    To test thebasic function of VLAN

    TestEnvironment

    Tester

    1 2

    A B

    DUT

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Configure the port 1 and 2 join in vlan 1-4094, send 4094 streams with different vidfrom port A and B, check the result

    3. Reload the switch after saving Configuration

    ExpectedResult

    1. In step 2, can learn about 4094 mac-address with different vid

    2. In step 3, the mac-address will be lost but the Configuration of vlan wont be lost

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    2. The 4094 mac-address with different vid

    Page 3 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    4/51

    Testing Result for VMS 3G SWITCH Project

    3. The tester configuration

    Page 4 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    5/51

    Testing Result for VMS 3G SWITCH Project

    4. In step 3, the mac-address will be lost but the Configuration of vlan wont be lost

    Tested by VMS-MobiFone: Vendor:ISTT

    Page 5 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    6/51

    Testing Result for VMS 3G SWITCH Project

    2. QinQ

    Test No. 3

    Test item QinQ

    Testpurpose

    To test the QinQ function.

    TestEnvironment

    Agilent

    DUT

    Port1

    Port26

    101/1

    101/3

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Configure QinQ on DUT with client port 1 and uplink port 26 with VLAN 100.

    3. Send stream from port 101/1 of Agilent with VLAN 10.

    4.Observe receiving stream on port 101/3 of Agilent.

    ExpectedResult 1. In step 4 stream with 2 VLAN tags should be observed.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    set vlan 10 add port 1 untag

    set vlan 100 add port 1 untag

    set vlan 100 add port 26 tag

    set vlan qinq customer port 1 enable

    set vlan qinq uplink port 26 enable

    2. The tester configuration

    Page 6 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    7/51

    Testing Result for VMS 3G SWITCH Project

    3. The result

    Page 7 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    8/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    3. Private VLAN

    Test No. 4

    Test item VLAN function

    Testpurpose

    To test the PVLAN based isolation of clients

    TestEnvironment

    192.168.1.1

    PC1

    192.168.1.2

    PC2

    192.168.1.100

    PC3

    DUT

    Port1

    Port2

    Port25

    TestProcedure 1. Build the test environment according to the figure mentioned above.2. Make sure PC1 and PC2 can ping PC3.

    3. Add Port1, Port2 and Port 25 of the DUT to VLAN 10. Configure PVLAN. Set Port1and Port2 to the isolate port and Port25 to the promiscuous port.

    set pvlan se 1 add promiscuous port 25 isolate-port 1-2

    set pvlan se 1 clear-config

    4. Make PC1 and PC2 ping each other and also ping PC3.

    ExpectedResult

    1. In Step 4, both PC1 and PC2 can Agilent, but they cannot ping each other.

    Page 8 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    9/51

    Testing Result for VMS 3G SWITCH Project

    Test Result Passed Partially Passed Failed Not Tested

    Remarks1. The configuration of DUT

    set vlan pvlan session 1 promis-port 26 isolate-port 1-2

    2. The tester configuration

    3. The result

    Page 9 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    10/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    4. Jumbo FrameTest No. 5

    Test item Jumbo Frame test

    Testpurpose

    To test the function of jambo frame

    TestEnvironment

    Tester

    1 2

    A B

    DUT

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Configure the port 1 and 2 in the same vlan, and enable the jambo frame function.

    3. Send the frame size of 9K bytes from testers port A.

    ExpectedResult

    1. In step 3, the testers PortB can receive the frame from Port A.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks1. The configuration of DUT

    set jumbo port 1 enable

    set jumbo port 2 enable

    Page 10 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    11/51

    Testing Result for VMS 3G SWITCH Project

    2. The tester configuration

    3. The result

    Page 11 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    12/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    Support to IGMP SNOOPING Function

    Test No. 6

    Test item IGMP SNOOPING Function Test

    Test purpose To test function of IGMP SNOOPING

    Test

    Environmen

    t

    PC1

    PC2

    Multicast Group

    224.1.1.1

    MulticastServer

    DUT

    Port1

    Port2

    Port25

    Multicast Group

    224.1.1.1

    Test

    Procedure

    1. Set up the test environment according to the diagram.

    2. Configure DUT3 port 1-2 in the same vlan 10, Add DUT port 2 to the group of

    Page 12 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    13/51

    Testing Result for VMS 3G SWITCH Project

    224.1.1.1.

    3. Send multicast flow from multicast server. Check the flow receiving status of PC1, PC2.

    4. Add DUT port 1 to the group of 224.1.1.1, and check the flow receiving status of PC1,PC2.

    5. Send the leaving-group request from port PC2 and check the flow receiving status of

    PC1, PC2.

    Expected

    Result

    1. In step 3: Only ports PC2 can receive the multicast flows.

    2. In step 4: Both PC1 and PC2 can receive the multicast flows.

    3. In step 5: PC1 can receive the multicast flow, but PC2 cannot receive.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    zte(cfg)#set vlan 10 add port 1-2,25

    zte(cfg)#set port 1,2,25 pvid 10

    zte(cfg)#set vlan 10 ena

    zte(cfg)#set igmp snooping enable

    zte(cfg)#set igmp snooping add vlan 10

    zte(cfg)#set port 1 multicast-filter enable

    zte(cfg)#set port 2 multicast-filter enable

    2. The tester configuration

    Page 13 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    14/51

    Testing Result for VMS 3G SWITCH Project

    4. Only ports PC2 can receive the multicast flows.

    Page 14 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    15/51

    Testing Result for VMS 3G SWITCH Project

    5. Both PC1 and PC2 can receive the multicast flows.

    6. PC1 can receive the multicast flow, but PC2 cannot receive.

    Tested by VMS-MobiFone: Vendor:ISTT

    Capability of transmiting test (Whole Switch Port)

    Test No. 7

    Page 15 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    16/51

    Testing Result for VMS 3G SWITCH Project

    Test item Capability of transmiting test

    Test

    purpose

    Capability of transmiting test

    TestEnvironment

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Build the topology of S in switch , test the RFC2544.

    ExpectedResult

    2. After step 2 the frame lost should be zero, the Latency should below 200us. the

    throughput should be 100%, the jitter should be less than 10ms

    Test Result Passed Partially Passed Failed Not Tested

    Remarks

    RFC2544.7z

    Tested by VMS-MobiFone: Vendor:ISTT

    Page 16 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    17/51

    Testing Result for VMS 3G SWITCH Project

    5. PQ function

    Test No. 8

    Test item QoS

    Testpurpose

    To test the priority queue functioning, create several queues with different priority, lowestpriority traffic should be dropped.

    TestEnvironment

    Port1

    Port26

    101/1

    101/3

    Agilent

    DUT

    Port25101/2

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Configure like this in DUT:

    3. Port 101/1 send 3 streams :

    Stream1: 30Mbps, priority = 3

    Stream2: 30Mbps, priority = 2

    Stream3: 40Mbps, priority = 1

    4. Port 101/2 send 4 streams :

    Stream1: 300Mbps, priority = 3

    Stream2: 300Mbps, priority = 2

    Stream3: 350Mbps, priority = 1

    Stream4: 50Mbps, priority = 0

    5. Check the received streams of port 101/3, build graph on Agilent.

    ExpectedResult

    1. In step5, port 4 receives streams:

    Stream1: about 330Mbps, priority = 3

    Stream2: about 330Mbps, priority = 2

    Stream3: about 340Mbps, priority = 1

    Stream4: about 0Mbps, priority = 0

    Test Result Passed Partially Passed Failed Not Tested

    Page 17 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    18/51

    Testing Result for VMS 3G SWITCH Project

    Remarks1. The configuration of DUT

    set qos queue-schedule port 28 default

    set qos priority-mapping port 1 trust-mode user-priorityset qos priority-mapping port 27 trust-mode user-priority

    2. The tester configuration

    Page 18 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    19/51

    Testing Result for VMS 3G SWITCH Project

    3. The result

    Tested by VMS-MobiFone: Vendor:ISTT

    6. Policing Test Based 802.1p

    Test No. 9

    Test item QoS

    Testpurpose

    To test Triple play test based 802.1p, observe appripriate traffic shaping.

    TestEnvironme

    nt

    Agilent

    DUT

    Port1

    Port26

    101/1

    101/3

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2.Configure Port 1 and Port 26 in trunk mode, and belong to VLAN 100.

    3. Port 101/3 simulated three services: HSI/IPTV/VoIP. Each flow simulated each service withCoS value 0/2/4/.

    4.Port 101/3 send three flows with bandwidth percentage :15%/25%/10%.

    5.DUT make traffic limit per service matched CoS value for the allocated bandwidth with apercentage :10%/20%/15% .

    zte(cfg)#config acl hybrid num 300

    zte(hybrid-acl-group)#rule 1 permit ip any any cos 0

    zte(hybrid-acl-group)#rule 2 permit ip any any cos 2

    Page 19 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    20/51

    Testing Result for VMS 3G SWITCH Project

    zte(hybrid-acl-group)#rule 3 permit ip any any cos 4

    zte(cfg)#set qos policer 0 par 10000

    zte(cfg)#set qos policer 0 exc dropzte(cfg)#set qos policer 2 par 20000

    zte(cfg)#set qos policer 2 exc drop

    zte(cfg)#set qos policer 4 par 15000

    zte(cfg)#set qos policer 4 exc drop

    zte(cfg)#set policy policing in acl 300 rule 1 policer 0

    zte(cfg)#set policy policing in acl 300 rule 2 policer 2

    zte(cfg)#set policy policing in acl 300 rule 3 policer 4

    zte(cfg)#set port 1 acl 300 enable

    6. Observe the received each service flow, build summary graph..

    7.Make the traffic shaping on Port 26 with bandwidth percentage 30%.

    zte(cfg)#set bandwidth geport 26 egress on rate 30000

    8 Observe the received each service flow, build summary graph..

    ExpectedResult

    1. In step 6,all the bandwidth of received flows is 40%,and only VoIP services can beforwarded without packets lost. Record the received flow bandwidth.

    2. In step 8, all the bandwidth of received flows is 30%. record the received other flowbandwidth.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    config ingress-acl hybrid number 300

    rule 1 permit ip any any cos 0

    rule 2 permit ip any any cos 2

    rule 3 permit ip any any cos 4

    exit

    set qos policer 0 mode blind cir 10000 cbs 20000 ebs 40000

    set qos policer 2 mode blind cir 20000 cbs 20000 ebs 40000

    set qos policer 4 mode blind cir 15000 cbs 20000 ebs 40000

    set qos policer 0 exceed-action red drop yellow drop

    set qos policer 2 exceed-action red drop yellow drop

    set qos policer 4 exceed-action red drop yellow drop

    zte(cfg)#set policy policing in acl 300 rule 1 policer 0

    zte(cfg)#set policy policing in acl 300 rule 2 policer 2

    zte(cfg)#set policy policing in acl 300 rule 3 policer 4

    zte(cfg)#set port 1 acl 300 enable

    Page 20 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    21/51

    Testing Result for VMS 3G SWITCH Project

    set qos traffic-shaping ge-port 27 data-rate 30 burst-size 4

    2. The tester configuration

    3. The result

    Step 6

    Page 21 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    22/51

    Testing Result for VMS 3G SWITCH Project

    Step 7 after enable the traffic-shaping on Port 27

    Tested by VMS-MobiFone: Vendor:ISTT

    Speed limit of Port

    Test No. 10

    Test item ACL

    Testpurpose

    To test the Speed limit of FE port and GE port

    TestEnvironment

    Agilent

    DUT

    Port1

    Port26

    101/1

    101/3

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Configure the speed limit 20Mbps (the granularity can reach 8kbps for Fe port) on port1 DUT, send the stream from Port 101/1 which speed is 100Mbps, and check the speedwhich receives by Port 101/3.

    3. Disable the speed limit on port 1 , check the result.

    4. Configure the speed limit 20Mbps on port 26, send the stream from Port 101/1 whichspeed is 100Mbps, check the speed which receive by Port 101/3.

    5. Disable the speed limit on port 26, check the result.

    Page 22 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    23/51

    Testing Result for VMS 3G SWITCH Project

    ExpectedResult

    1. In step 2 , can receive the speed is 20Mbps in Port 101/3.

    2. In step 3 , can receive the speed is 100Mbps in Port 101/3.

    3. In step 4 , can receive the speed is 20Mbps in Port 101/3.4. In step 5 , can receive the speed is 100Mbps in Port 101/3.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks1. The configuration of DUT

    set qos traffic-limit fe-port 1 data-rate 20000

    set qos traffic-limit fe-port 1 disable

    set qos traffic-shaping ge-port 27 data-rate 20 burst-size 4

    set qos traffic-shaping ge-port 27 disable

    2. The tester configuration

    3. The result

    Step 2

    Step 3

    Step 4

    Step 5

    Page 23 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    24/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    7. Console management.

    Test No. 11

    Test item Console management

    Testpurpose

    To test the function of management using Console

    TestEnvironment

    PC DUT

    1

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Connect PC to console port of DUT.

    3.Manage DUT use console.

    ExpectedResult

    1.Step 3DUT can be managed use console.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks Manage DUT use console.

    Tested by VMS-MobiFone: Vendor:ISTT

    Telnet/SSH management

    Test No. 12

    Test item Telnet management.

    Testpurpose

    To test the function of management using Telnet.

    Page 24 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    25/51

    Testing Result for VMS 3G SWITCH Project

    TestEnvironment PC DUT

    Port1

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Configure port 1 as a access port which belongs to vlan 100 on DUT and establish interfacevlan 100 with ip address 100.0.0.1/24.

    3.Configure pcs ip address 100.0.0.2/24.

    4.Manage DUT using telnet and SSH.

    ExpectedResult

    1.Step 4DUT can be managed using telnet and SSH.

    Test ResultPassed Partially Passed Failed Not Tested

    Remarks 1.configuration of DUT

    zte(cfg)#set vlan 100 add port 1

    zte(cfg)#set port 1 pvid 100

    zte(cfg)#config router

    zte(cfg)#set ipport 0 ipaddress 100.0.0.1 255.255.255.0

    zte(cfg-router)#set ipport 0 vlan 100

    zte(cfg-router)#set ipport 0 enable

    2.result

    Tested by VMS-MobiFone: Vendor:ISTT

    8. WEB Network Management

    Test No. 13

    Test item Web network management

    Testpurpose

    Web network management test

    Page 25 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    26/51

    Testing Result for VMS 3G SWITCH Project

    TestEnvironment

    PC DUT

    1

    100.0.0.2/24

    100.0.0.1/24

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Config port 1 as a access port which belongs to vlan 100 on DUT and establish interfacevlan 100 with ip address 100.0.0.1/24.

    3.Config pcs ip address 100.0.0.2/24.

    4. Create userloginpass and adminpass. Enable web and configure listen-port.

    5. Run Microsoft Internet Explore to login and manage.

    ExpectedResult

    1. The DUT support web network management

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1.configuration of DUT

    set ipport 0 ipaddress 100.0.0.1 255.255.255.0

    set ipport 0 vlan 100

    set ipport 0 enable

    set web enable

    set web listen-port 80

    2.result

    Tested by VMS-MobiFone: Vendor:ISTT

    9. SNMP

    Test No. 14

    Page 26 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    27/51

    Testing Result for VMS 3G SWITCH Project

    Test item SNMPv2 test

    Test

    purpose

    To test the function of SNMPv2

    TestEnvironment PC DUT

    Port1

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Configure port 1 as a access port which belongs to vlan 100 on DUT and establish interfacevlan 100 with ip address 192.168.1.1/24.

    3.Configure snmp community on DUT.

    4.Configure pcs ip address 192.168.1.2/24 and mib browser.5.Setting version is snmpv2 in mib browser. Check the value of sysObjectID.

    6. Configure trap host and enable link up/down trap generation.

    7. Set up trap host on PC, generate trap event and observe.

    ExpectedResult

    1. In step 5 the sysObjectID value should be obtained.

    2. In step 7 the trap should be raised.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks Configuration of DUT

    zte(cfg)#set vlan 100 add port 1

    zte(cfg)#set port 1 pvid 100

    zte(cfg)#config router

    zte(cfg)#set ipport 0 ipaddress 192.168.1.1 255.255.255.0

    zte(cfg-router)#set ipport 0 vlan 100

    zte(cfg-router)#set ipport 0 enable

    create community public public

    create view zteView include 1.3.6.1

    set community public view zteView

    set host 192.168.1.2 inform v2c public

    set host 192.168.1.2 trap v2c public

    set trap linkup enable

    set trap linkdown enable

    Check result on DUT

    Page 27 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    28/51

    Testing Result for VMS 3G SWITCH Project

    Page 28 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    29/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    10. MAC filterTest No. 15

    Test item MAC filter Test

    Testpurpose

    To test the MAC filter

    TestEnvironment

    DUT

    SMB-

    6000B

    1 2

    A B

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Config a mac-address which address is 0000.0000.1111 on port1

    3. Send a stream from port A which SMAC is 0000.0000.1111

    ExpectedResult

    1. After step 3The port B cant receive the stream.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    set mac filter source 00.00.00.00.11.11 vlan 100

    2. The tester configuration

    Page 29 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    30/51

    Testing Result for VMS 3G SWITCH Project

    3. The result

    Tested by VMS-MobiFone: Vendor:ISTT

    Page 30 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    31/51

    Testing Result for VMS 3G SWITCH Project

    MAC Limit

    Test No. 16

    Test item MAC Limit test

    Testpurpose

    MAC Limit test

    TestEnvironment

    DUT

    SMB-

    6000B

    1 2

    A B

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Config port 1 can learn 100 mac-address

    3. Send a stream which source mac-address changed4. Check the result on port 1

    ExpectedResult

    1. After step 4only can learn 100 mac-address on port 1

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    set mac limit port 1 limit-num 100

    2. The tester configuration

    Page 31 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    32/51

    Testing Result for VMS 3G SWITCH Project

    3. The result

    Page 32 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    33/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    Static-Mac test

    Test No. 17

    Test item Static-Mac test

    Testpurpose

    Static-Mac test

    TestEnvironment

    DUT

    SMB-

    6000B

    1 2

    A B

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Add an static mac-address on port 2

    Send a stream which DMAC address is 00.00.00.00.11.11

    3. Check the result on port B

    ExpectedResult

    1. After step 4port B can receive the stream

    Page 33 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    34/51

    Testing Result for VMS 3G SWITCH Project

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    set mac add static 00.00.00.00.11.11 port 1 vlan 100

    2. The tester configuration

    3. The result

    Page 34 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    35/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    11. 802.1X Authentication

    Test No. 18

    Test Item 802.1X authentication

    TestPurpose

    Verify the correctness of the Radius authentication for the 802.1X users.

    TestEnvironment

    Radi us

    Server

    PCDUT

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Implement the relevant configuration of the DOT1X Server and the Radius Client on the

    DUT.

    3. Configure a user and the relevant configurations on the Radius Server.4. Log in from PC as the DOT1X Client with the user name and the password configured on

    the Radius Server and then view the login result.

    5. Log in from PC as the DOT1X Client with the user name and the password not configured

    on the Radius Server.

    ExpectedResult

    1. The login is successful in Step 4.

    2. The login is failed in Step 5.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1.configuration of DUT

    zte(cfg)#set port 2 security enable

    zte(cfg)#config nas

    zte(cfg-nas)#aaa port 2 dot1x enable

    zte(cfg-nas)#aaa port 2 keepalive enable

    zte(cfg-nas)#aaa port 2 accounting enable

    zte(zte)#config nas

    zte(cfg-nas)#radius isp zte enable

    zte(cfg-nas)#radius isp zte defaultisp enable

    zte(cfg-nas)#radius isp zte sharedsecret isam

    Page 35 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    36/51

    Testing Result for VMS 3G SWITCH Project

    zte(cfg-nas)#radius isp zte client 100.1.1.1

    zte(cfg-nas)#radius isp zte add accounting 100.1.1.100 1812

    zte(cfg-nas)#radius isp zte add authentication 100.1.1.100 1813

    2. result

    Set an ip address on PC: 100.1.1.2/24

    Enable dot.1X function on PC adapter:

    Page 36 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    37/51

    Testing Result for VMS 3G SWITCH Project

    Create an user (username: zte, password:123456) in radius server :

    Page 37 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    38/51

    Testing Result for VMS 3G SWITCH Project

    When PC connects to DUT, afer a while, there is a message to input username and password to authenticate:

    Radius server can receive the authentication packets:

    Page 38 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    39/51

    Testing Result for VMS 3G SWITCH Project

    So we can see : when pc authenticate successfully, PC can ping DUT successfully.

    Tested by VMS-MobiFone: Vendor:ISTT

    Page 39 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    40/51

    Testing Result for VMS 3G SWITCH Project

    12. Group management (ZTP).

    Test No. 19

    Test item Group management

    Testpurpose

    To test the function of group management

    TestEnvironment

    DUT 1

    DUT 2 DUT 3

    PC

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Enable the function of ztp on DUT1DUT2 and DUT3. Configure DUT1 to commanderswitch.

    3.DUT2 and DUT3 as the candidates. Configure all candidates to the members of the DUT1.

    4.Manage DUT use console, check the state of group and debice list.

    5. Manage DUT1 use console, telnet DUT2 for manage and configure. Telnet DUT3 formanage and configure. Check the configure result.

    ExpectedResult

    1. Step 4DUT2 and DUT3 change to the members of DUT1.

    2. Step 5: DUT2 and DUT3 can be manage by DUT1. The configure result is right.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1.Configuration of DUT

    2928E-02(cfg)#config group

    2928E-02(cfg-group)#set ztp enable

    2928E-02(cfg-group)#set ztp vlan 1

    2928E-02(cfg-group)#ztp start

    2.Result

    Tested by VMS-MobiFone: Vendor:ISTT

    Page 40 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    41/51

    Testing Result for VMS 3G SWITCH Project

    Port Mirrioring

    Test No. 20

    Test item Mirror test

    Testpurpose

    To test the function of ingress and egress mirror

    TestEnvironment

    Tester

    DUT

    A

    1

    B

    C

    2

    3

    TestProcedure

    1.Build the test environment according to the figure mentioned above.

    2.Config port 1/2 as access port which belongs to vlan 100.

    3.Config port 3 as access port which belongs to vlan 200.

    4.Send one 10Mbps unicast stream which DMAC=0000.0000.0001 SMAC=0000.0000.0002from port A in the Tester and another 10Mbps unicast stream which DMAC=0000.0000.0002SMAC=0000.0000.0001 from prot B.

    5.Config port 3 as monitor session 1 destination, port 1 as monitor session 1 source directionrx .Capture the traffic in tester port C

    6.Config port 2 as monitor session 1 source direction tx.

    7.Capture the traffic in port C.

    ExpectedResult

    1. Step 4: Port C cannot receive the packets.

    2. Step 5: Port C can capture packets only with SMAC=0000.0000.0002DMAC=0000.0000.0001.The traffic load is 10Mbps.

    3. Step 7: Port C can capture packets only with SMAC=0000.0000.0002DMAC=0000.0000.0001.The traffic load is 20Mbps.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1. The configuration of DUT

    set mirror session 1 add source-port 1 ingress

    set mirror session 1 add dest-port 3 ingress

    2. The tester configuration

    Page 41 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    42/51

    Testing Result for VMS 3G SWITCH Project

    Page 42 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    43/51

    Testing Result for VMS 3G SWITCH Project

    3. The result

    Page 43 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    44/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    13. STP test

    Test No. 21

    Test item STP test

    Test

    purpose

    To test the function of STP, time of protection switching and time of restoration

    TestEnvironment

    Port25

    Port1

    Port26

    Port2

    Agilent

    101/1

    101/3 DUT3

    DUT2

    DUT1

    Port5

    Port4

    Port24

    RootBridge

    Port3

    Test

    Procedure

    1. Build the test environment according to the figure mentioned above.

    2. Running STP on every switch, configure exact parameters on every switch to makeDUT3 to become Root Bridge.

    zte(cfg)#set stp enable

    zte(cfg)#set stp forceversion stp

    3. Observe if DUTs can prevent the ring automatically.

    4. Break down the link between DUT1 and DUT3,observe if DUTs can rebuild the topologyautomatically, measure the time of service unavailability.

    5. Change STP parameters of every switch, observe if DUTs can rebuild the topologyautomatically, measure the time of rebuilding.

    Page 44 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    45/51

    Testing Result for VMS 3G SWITCH Project

    ExpectedResult

    1. Step 3, DUT can support STP, and complete spanning tree calculation automaticallywhen a ring exists.

    2. Step 4,DUT can rebuild the topology automatically when link failed.

    3. Step 5,DUT can choose new root bridge or new root port, block link when parameterschanged.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1.configuration of DUT

    zte(cfg)#set stp enable

    zte(cfg)#set stp forceversion stp

    3. Result

    Switch-1

    Switch2

    Tested by VMS-MobiFone: Vendor:ISTT

    RSTP test

    Test No. 22

    Test item RSTP test

    Testpurpose

    To test the function of RSTP, time of protection switching and time of restoration

    Page 45 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    46/51

    Testing Result for VMS 3G SWITCH Project

    TestEnvironment

    Port25

    Port1

    Port26

    Port2

    Agilent

    101/1

    101/3 DUT3

    DUT2

    DUT1

    Port5

    Port4

    Port24

    RootBridge

    Port3

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Run RSTP on every switch, configure exact parameters on every switch to make DUT3to become Root Bridge.

    3. Observe if DUTs can prevent the ring automatically.

    4. Break down the link between DUT1 and DUT3,observe if DUTs can rebuild the topologyautomatically, measure the time of service unavailability.

    5. Change RSTP parameters of every switch, observe if DUTs can rebuild the topologyautomatically, measure the time of rebuilding.

    ExpectedResult

    1. Step 3, DUT can support RSTP, and complete spanning tree calculation automaticallywhen a ring exists.

    2. Step 4,DUT can rebuild the topology automatically when link failed.

    3. Step 5,DUT can choose new root bridge or new root port, block link when parameterschanged.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1.configuration of DUTzte(cfg)#set stp enable

    zte(cfg)#set stp forceversion rstp

    3. result

    switch-1

    Page 46 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    47/51

    Testing Result for VMS 3G SWITCH Project

    switch-2

    Tested by VMS-MobiFone: Vendor:ISTT

    GVRP test

    Test No. 23

    Test item GVRP test

    Testpurpose

    To test the function of GVRP

    TestEnvironment

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Create vlan from 1 to 100 in one device.

    3. Enable the GVRP on both devices

    4. Check the vlan configuration on the other device.

    ExpectedResult

    1. Step 4, DUT can support GVRP, and there are also vlan from 1 to 100 in the other device.

    Test Result Passed Partially Passed Failed Not Tested

    Remarks 1.configuration of DUT

    set garp enable

    set gvrp enable

    set gvrp port 1 enable

    set gvrp port 2 enable

    2. result

    Page 47 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    48/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT

    14. LACP test

    Test No. 24

    Test item LACP test

    Testpurpose

    To test the function of LACP

    TestEnvironment

    Page 48 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    49/51

    Testing Result for VMS 3G SWITCH Project

    TestProcedure

    1. Build the test environment according to the figure mentioned above.

    2. Configure two ports join in the same aggregator

    3. Check the status of the aggregator4. Send the Smac with different from port A, check the statistic in each port.

    ExpectedResult

    1. In step 3, all the state is right.

    2. In step 4,the stream had average in each port

    Test Result Passed Partially Passed Failed Not Tested

    Remarks1. The configuration of DUT

    set lacp enable

    set lacp aggregator 3 add port 1,2

    set vlan 100 add port 28 tag

    set vlan 100 add trunk 3 tag

    2. The configuration of tester

    Page 49 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    50/51

    Testing Result for VMS 3G SWITCH Project

    3. The result

    Page 50 / 51

  • 7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final

    51/51

    Testing Result for VMS 3G SWITCH Project

    Tested by VMS-MobiFone: Vendor:ISTT