Testing Result for VMS 3G SWITCH Project
Mac table Capability Test
Test No. 1
Test item Mac table Capability Test
Testpurpose
To test the capability of Mac table
TestEnvironment
DUT
SMB-
6000B
1 2
A B
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Config port1 and port2 in the same vlan10.
3. Send 16k packets from tester port A to port 1 with source Mac changed
ExpectedResult
1. After step 3the switch can learn 16K source Mac
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
2. The Tester Configuration
Page 1 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
2/51
Testing Result for VMS 3G SWITCH Project
3. The Result:
Page 2 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
3/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
1. Basic function of VLAN (802.1Q tag-based)Test No. 2
Test item Basic function of VLAN
Testpurpose
To test thebasic function of VLAN
TestEnvironment
Tester
1 2
A B
DUT
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Configure the port 1 and 2 join in vlan 1-4094, send 4094 streams with different vidfrom port A and B, check the result
3. Reload the switch after saving Configuration
ExpectedResult
1. In step 2, can learn about 4094 mac-address with different vid
2. In step 3, the mac-address will be lost but the Configuration of vlan wont be lost
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
2. The 4094 mac-address with different vid
Page 3 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
4/51
Testing Result for VMS 3G SWITCH Project
3. The tester configuration
Page 4 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
5/51
Testing Result for VMS 3G SWITCH Project
4. In step 3, the mac-address will be lost but the Configuration of vlan wont be lost
Tested by VMS-MobiFone: Vendor:ISTT
Page 5 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
6/51
Testing Result for VMS 3G SWITCH Project
2. QinQ
Test No. 3
Test item QinQ
Testpurpose
To test the QinQ function.
TestEnvironment
Agilent
DUT
Port1
Port26
101/1
101/3
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Configure QinQ on DUT with client port 1 and uplink port 26 with VLAN 100.
3. Send stream from port 101/1 of Agilent with VLAN 10.
4.Observe receiving stream on port 101/3 of Agilent.
ExpectedResult 1. In step 4 stream with 2 VLAN tags should be observed.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
set vlan 10 add port 1 untag
set vlan 100 add port 1 untag
set vlan 100 add port 26 tag
set vlan qinq customer port 1 enable
set vlan qinq uplink port 26 enable
2. The tester configuration
Page 6 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
7/51
Testing Result for VMS 3G SWITCH Project
3. The result
Page 7 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
8/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
3. Private VLAN
Test No. 4
Test item VLAN function
Testpurpose
To test the PVLAN based isolation of clients
TestEnvironment
192.168.1.1
PC1
192.168.1.2
PC2
192.168.1.100
PC3
DUT
Port1
Port2
Port25
TestProcedure 1. Build the test environment according to the figure mentioned above.2. Make sure PC1 and PC2 can ping PC3.
3. Add Port1, Port2 and Port 25 of the DUT to VLAN 10. Configure PVLAN. Set Port1and Port2 to the isolate port and Port25 to the promiscuous port.
set pvlan se 1 add promiscuous port 25 isolate-port 1-2
set pvlan se 1 clear-config
4. Make PC1 and PC2 ping each other and also ping PC3.
ExpectedResult
1. In Step 4, both PC1 and PC2 can Agilent, but they cannot ping each other.
Page 8 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
9/51
Testing Result for VMS 3G SWITCH Project
Test Result Passed Partially Passed Failed Not Tested
Remarks1. The configuration of DUT
set vlan pvlan session 1 promis-port 26 isolate-port 1-2
2. The tester configuration
3. The result
Page 9 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
10/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
4. Jumbo FrameTest No. 5
Test item Jumbo Frame test
Testpurpose
To test the function of jambo frame
TestEnvironment
Tester
1 2
A B
DUT
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Configure the port 1 and 2 in the same vlan, and enable the jambo frame function.
3. Send the frame size of 9K bytes from testers port A.
ExpectedResult
1. In step 3, the testers PortB can receive the frame from Port A.
Test Result Passed Partially Passed Failed Not Tested
Remarks1. The configuration of DUT
set jumbo port 1 enable
set jumbo port 2 enable
Page 10 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
11/51
Testing Result for VMS 3G SWITCH Project
2. The tester configuration
3. The result
Page 11 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
12/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
Support to IGMP SNOOPING Function
Test No. 6
Test item IGMP SNOOPING Function Test
Test purpose To test function of IGMP SNOOPING
Test
Environmen
t
PC1
PC2
Multicast Group
224.1.1.1
MulticastServer
DUT
Port1
Port2
Port25
Multicast Group
224.1.1.1
Test
Procedure
1. Set up the test environment according to the diagram.
2. Configure DUT3 port 1-2 in the same vlan 10, Add DUT port 2 to the group of
Page 12 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
13/51
Testing Result for VMS 3G SWITCH Project
224.1.1.1.
3. Send multicast flow from multicast server. Check the flow receiving status of PC1, PC2.
4. Add DUT port 1 to the group of 224.1.1.1, and check the flow receiving status of PC1,PC2.
5. Send the leaving-group request from port PC2 and check the flow receiving status of
PC1, PC2.
Expected
Result
1. In step 3: Only ports PC2 can receive the multicast flows.
2. In step 4: Both PC1 and PC2 can receive the multicast flows.
3. In step 5: PC1 can receive the multicast flow, but PC2 cannot receive.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
zte(cfg)#set vlan 10 add port 1-2,25
zte(cfg)#set port 1,2,25 pvid 10
zte(cfg)#set vlan 10 ena
zte(cfg)#set igmp snooping enable
zte(cfg)#set igmp snooping add vlan 10
zte(cfg)#set port 1 multicast-filter enable
zte(cfg)#set port 2 multicast-filter enable
2. The tester configuration
Page 13 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
14/51
Testing Result for VMS 3G SWITCH Project
4. Only ports PC2 can receive the multicast flows.
Page 14 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
15/51
Testing Result for VMS 3G SWITCH Project
5. Both PC1 and PC2 can receive the multicast flows.
6. PC1 can receive the multicast flow, but PC2 cannot receive.
Tested by VMS-MobiFone: Vendor:ISTT
Capability of transmiting test (Whole Switch Port)
Test No. 7
Page 15 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
16/51
Testing Result for VMS 3G SWITCH Project
Test item Capability of transmiting test
Test
purpose
Capability of transmiting test
TestEnvironment
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Build the topology of S in switch , test the RFC2544.
ExpectedResult
2. After step 2 the frame lost should be zero, the Latency should below 200us. the
throughput should be 100%, the jitter should be less than 10ms
Test Result Passed Partially Passed Failed Not Tested
Remarks
RFC2544.7z
Tested by VMS-MobiFone: Vendor:ISTT
Page 16 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
17/51
Testing Result for VMS 3G SWITCH Project
5. PQ function
Test No. 8
Test item QoS
Testpurpose
To test the priority queue functioning, create several queues with different priority, lowestpriority traffic should be dropped.
TestEnvironment
Port1
Port26
101/1
101/3
Agilent
DUT
Port25101/2
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Configure like this in DUT:
3. Port 101/1 send 3 streams :
Stream1: 30Mbps, priority = 3
Stream2: 30Mbps, priority = 2
Stream3: 40Mbps, priority = 1
4. Port 101/2 send 4 streams :
Stream1: 300Mbps, priority = 3
Stream2: 300Mbps, priority = 2
Stream3: 350Mbps, priority = 1
Stream4: 50Mbps, priority = 0
5. Check the received streams of port 101/3, build graph on Agilent.
ExpectedResult
1. In step5, port 4 receives streams:
Stream1: about 330Mbps, priority = 3
Stream2: about 330Mbps, priority = 2
Stream3: about 340Mbps, priority = 1
Stream4: about 0Mbps, priority = 0
Test Result Passed Partially Passed Failed Not Tested
Page 17 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
18/51
Testing Result for VMS 3G SWITCH Project
Remarks1. The configuration of DUT
set qos queue-schedule port 28 default
set qos priority-mapping port 1 trust-mode user-priorityset qos priority-mapping port 27 trust-mode user-priority
2. The tester configuration
Page 18 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
19/51
Testing Result for VMS 3G SWITCH Project
3. The result
Tested by VMS-MobiFone: Vendor:ISTT
6. Policing Test Based 802.1p
Test No. 9
Test item QoS
Testpurpose
To test Triple play test based 802.1p, observe appripriate traffic shaping.
TestEnvironme
nt
Agilent
DUT
Port1
Port26
101/1
101/3
TestProcedure
1. Build the test environment according to the figure mentioned above.
2.Configure Port 1 and Port 26 in trunk mode, and belong to VLAN 100.
3. Port 101/3 simulated three services: HSI/IPTV/VoIP. Each flow simulated each service withCoS value 0/2/4/.
4.Port 101/3 send three flows with bandwidth percentage :15%/25%/10%.
5.DUT make traffic limit per service matched CoS value for the allocated bandwidth with apercentage :10%/20%/15% .
zte(cfg)#config acl hybrid num 300
zte(hybrid-acl-group)#rule 1 permit ip any any cos 0
zte(hybrid-acl-group)#rule 2 permit ip any any cos 2
Page 19 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
20/51
Testing Result for VMS 3G SWITCH Project
zte(hybrid-acl-group)#rule 3 permit ip any any cos 4
zte(cfg)#set qos policer 0 par 10000
zte(cfg)#set qos policer 0 exc dropzte(cfg)#set qos policer 2 par 20000
zte(cfg)#set qos policer 2 exc drop
zte(cfg)#set qos policer 4 par 15000
zte(cfg)#set qos policer 4 exc drop
zte(cfg)#set policy policing in acl 300 rule 1 policer 0
zte(cfg)#set policy policing in acl 300 rule 2 policer 2
zte(cfg)#set policy policing in acl 300 rule 3 policer 4
zte(cfg)#set port 1 acl 300 enable
6. Observe the received each service flow, build summary graph..
7.Make the traffic shaping on Port 26 with bandwidth percentage 30%.
zte(cfg)#set bandwidth geport 26 egress on rate 30000
8 Observe the received each service flow, build summary graph..
ExpectedResult
1. In step 6,all the bandwidth of received flows is 40%,and only VoIP services can beforwarded without packets lost. Record the received flow bandwidth.
2. In step 8, all the bandwidth of received flows is 30%. record the received other flowbandwidth.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
config ingress-acl hybrid number 300
rule 1 permit ip any any cos 0
rule 2 permit ip any any cos 2
rule 3 permit ip any any cos 4
exit
set qos policer 0 mode blind cir 10000 cbs 20000 ebs 40000
set qos policer 2 mode blind cir 20000 cbs 20000 ebs 40000
set qos policer 4 mode blind cir 15000 cbs 20000 ebs 40000
set qos policer 0 exceed-action red drop yellow drop
set qos policer 2 exceed-action red drop yellow drop
set qos policer 4 exceed-action red drop yellow drop
zte(cfg)#set policy policing in acl 300 rule 1 policer 0
zte(cfg)#set policy policing in acl 300 rule 2 policer 2
zte(cfg)#set policy policing in acl 300 rule 3 policer 4
zte(cfg)#set port 1 acl 300 enable
Page 20 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
21/51
Testing Result for VMS 3G SWITCH Project
set qos traffic-shaping ge-port 27 data-rate 30 burst-size 4
2. The tester configuration
3. The result
Step 6
Page 21 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
22/51
Testing Result for VMS 3G SWITCH Project
Step 7 after enable the traffic-shaping on Port 27
Tested by VMS-MobiFone: Vendor:ISTT
Speed limit of Port
Test No. 10
Test item ACL
Testpurpose
To test the Speed limit of FE port and GE port
TestEnvironment
Agilent
DUT
Port1
Port26
101/1
101/3
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Configure the speed limit 20Mbps (the granularity can reach 8kbps for Fe port) on port1 DUT, send the stream from Port 101/1 which speed is 100Mbps, and check the speedwhich receives by Port 101/3.
3. Disable the speed limit on port 1 , check the result.
4. Configure the speed limit 20Mbps on port 26, send the stream from Port 101/1 whichspeed is 100Mbps, check the speed which receive by Port 101/3.
5. Disable the speed limit on port 26, check the result.
Page 22 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
23/51
Testing Result for VMS 3G SWITCH Project
ExpectedResult
1. In step 2 , can receive the speed is 20Mbps in Port 101/3.
2. In step 3 , can receive the speed is 100Mbps in Port 101/3.
3. In step 4 , can receive the speed is 20Mbps in Port 101/3.4. In step 5 , can receive the speed is 100Mbps in Port 101/3.
Test Result Passed Partially Passed Failed Not Tested
Remarks1. The configuration of DUT
set qos traffic-limit fe-port 1 data-rate 20000
set qos traffic-limit fe-port 1 disable
set qos traffic-shaping ge-port 27 data-rate 20 burst-size 4
set qos traffic-shaping ge-port 27 disable
2. The tester configuration
3. The result
Step 2
Step 3
Step 4
Step 5
Page 23 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
24/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
7. Console management.
Test No. 11
Test item Console management
Testpurpose
To test the function of management using Console
TestEnvironment
PC DUT
1
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Connect PC to console port of DUT.
3.Manage DUT use console.
ExpectedResult
1.Step 3DUT can be managed use console.
Test Result Passed Partially Passed Failed Not Tested
Remarks Manage DUT use console.
Tested by VMS-MobiFone: Vendor:ISTT
Telnet/SSH management
Test No. 12
Test item Telnet management.
Testpurpose
To test the function of management using Telnet.
Page 24 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
25/51
Testing Result for VMS 3G SWITCH Project
TestEnvironment PC DUT
Port1
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Configure port 1 as a access port which belongs to vlan 100 on DUT and establish interfacevlan 100 with ip address 100.0.0.1/24.
3.Configure pcs ip address 100.0.0.2/24.
4.Manage DUT using telnet and SSH.
ExpectedResult
1.Step 4DUT can be managed using telnet and SSH.
Test ResultPassed Partially Passed Failed Not Tested
Remarks 1.configuration of DUT
zte(cfg)#set vlan 100 add port 1
zte(cfg)#set port 1 pvid 100
zte(cfg)#config router
zte(cfg)#set ipport 0 ipaddress 100.0.0.1 255.255.255.0
zte(cfg-router)#set ipport 0 vlan 100
zte(cfg-router)#set ipport 0 enable
2.result
Tested by VMS-MobiFone: Vendor:ISTT
8. WEB Network Management
Test No. 13
Test item Web network management
Testpurpose
Web network management test
Page 25 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
26/51
Testing Result for VMS 3G SWITCH Project
TestEnvironment
PC DUT
1
100.0.0.2/24
100.0.0.1/24
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Config port 1 as a access port which belongs to vlan 100 on DUT and establish interfacevlan 100 with ip address 100.0.0.1/24.
3.Config pcs ip address 100.0.0.2/24.
4. Create userloginpass and adminpass. Enable web and configure listen-port.
5. Run Microsoft Internet Explore to login and manage.
ExpectedResult
1. The DUT support web network management
Test Result Passed Partially Passed Failed Not Tested
Remarks 1.configuration of DUT
set ipport 0 ipaddress 100.0.0.1 255.255.255.0
set ipport 0 vlan 100
set ipport 0 enable
set web enable
set web listen-port 80
2.result
Tested by VMS-MobiFone: Vendor:ISTT
9. SNMP
Test No. 14
Page 26 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
27/51
Testing Result for VMS 3G SWITCH Project
Test item SNMPv2 test
Test
purpose
To test the function of SNMPv2
TestEnvironment PC DUT
Port1
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Configure port 1 as a access port which belongs to vlan 100 on DUT and establish interfacevlan 100 with ip address 192.168.1.1/24.
3.Configure snmp community on DUT.
4.Configure pcs ip address 192.168.1.2/24 and mib browser.5.Setting version is snmpv2 in mib browser. Check the value of sysObjectID.
6. Configure trap host and enable link up/down trap generation.
7. Set up trap host on PC, generate trap event and observe.
ExpectedResult
1. In step 5 the sysObjectID value should be obtained.
2. In step 7 the trap should be raised.
Test Result Passed Partially Passed Failed Not Tested
Remarks Configuration of DUT
zte(cfg)#set vlan 100 add port 1
zte(cfg)#set port 1 pvid 100
zte(cfg)#config router
zte(cfg)#set ipport 0 ipaddress 192.168.1.1 255.255.255.0
zte(cfg-router)#set ipport 0 vlan 100
zte(cfg-router)#set ipport 0 enable
create community public public
create view zteView include 1.3.6.1
set community public view zteView
set host 192.168.1.2 inform v2c public
set host 192.168.1.2 trap v2c public
set trap linkup enable
set trap linkdown enable
Check result on DUT
Page 27 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
28/51
Testing Result for VMS 3G SWITCH Project
Page 28 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
29/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
10. MAC filterTest No. 15
Test item MAC filter Test
Testpurpose
To test the MAC filter
TestEnvironment
DUT
SMB-
6000B
1 2
A B
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Config a mac-address which address is 0000.0000.1111 on port1
3. Send a stream from port A which SMAC is 0000.0000.1111
ExpectedResult
1. After step 3The port B cant receive the stream.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
set mac filter source 00.00.00.00.11.11 vlan 100
2. The tester configuration
Page 29 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
30/51
Testing Result for VMS 3G SWITCH Project
3. The result
Tested by VMS-MobiFone: Vendor:ISTT
Page 30 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
31/51
Testing Result for VMS 3G SWITCH Project
MAC Limit
Test No. 16
Test item MAC Limit test
Testpurpose
MAC Limit test
TestEnvironment
DUT
SMB-
6000B
1 2
A B
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Config port 1 can learn 100 mac-address
3. Send a stream which source mac-address changed4. Check the result on port 1
ExpectedResult
1. After step 4only can learn 100 mac-address on port 1
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
set mac limit port 1 limit-num 100
2. The tester configuration
Page 31 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
32/51
Testing Result for VMS 3G SWITCH Project
3. The result
Page 32 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
33/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
Static-Mac test
Test No. 17
Test item Static-Mac test
Testpurpose
Static-Mac test
TestEnvironment
DUT
SMB-
6000B
1 2
A B
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Add an static mac-address on port 2
Send a stream which DMAC address is 00.00.00.00.11.11
3. Check the result on port B
ExpectedResult
1. After step 4port B can receive the stream
Page 33 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
34/51
Testing Result for VMS 3G SWITCH Project
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
set mac add static 00.00.00.00.11.11 port 1 vlan 100
2. The tester configuration
3. The result
Page 34 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
35/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
11. 802.1X Authentication
Test No. 18
Test Item 802.1X authentication
TestPurpose
Verify the correctness of the Radius authentication for the 802.1X users.
TestEnvironment
Radi us
Server
PCDUT
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Implement the relevant configuration of the DOT1X Server and the Radius Client on the
DUT.
3. Configure a user and the relevant configurations on the Radius Server.4. Log in from PC as the DOT1X Client with the user name and the password configured on
the Radius Server and then view the login result.
5. Log in from PC as the DOT1X Client with the user name and the password not configured
on the Radius Server.
ExpectedResult
1. The login is successful in Step 4.
2. The login is failed in Step 5.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1.configuration of DUT
zte(cfg)#set port 2 security enable
zte(cfg)#config nas
zte(cfg-nas)#aaa port 2 dot1x enable
zte(cfg-nas)#aaa port 2 keepalive enable
zte(cfg-nas)#aaa port 2 accounting enable
zte(zte)#config nas
zte(cfg-nas)#radius isp zte enable
zte(cfg-nas)#radius isp zte defaultisp enable
zte(cfg-nas)#radius isp zte sharedsecret isam
Page 35 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
36/51
Testing Result for VMS 3G SWITCH Project
zte(cfg-nas)#radius isp zte client 100.1.1.1
zte(cfg-nas)#radius isp zte add accounting 100.1.1.100 1812
zte(cfg-nas)#radius isp zte add authentication 100.1.1.100 1813
2. result
Set an ip address on PC: 100.1.1.2/24
Enable dot.1X function on PC adapter:
Page 36 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
37/51
Testing Result for VMS 3G SWITCH Project
Create an user (username: zte, password:123456) in radius server :
Page 37 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
38/51
Testing Result for VMS 3G SWITCH Project
When PC connects to DUT, afer a while, there is a message to input username and password to authenticate:
Radius server can receive the authentication packets:
Page 38 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
39/51
Testing Result for VMS 3G SWITCH Project
So we can see : when pc authenticate successfully, PC can ping DUT successfully.
Tested by VMS-MobiFone: Vendor:ISTT
Page 39 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
40/51
Testing Result for VMS 3G SWITCH Project
12. Group management (ZTP).
Test No. 19
Test item Group management
Testpurpose
To test the function of group management
TestEnvironment
DUT 1
DUT 2 DUT 3
PC
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Enable the function of ztp on DUT1DUT2 and DUT3. Configure DUT1 to commanderswitch.
3.DUT2 and DUT3 as the candidates. Configure all candidates to the members of the DUT1.
4.Manage DUT use console, check the state of group and debice list.
5. Manage DUT1 use console, telnet DUT2 for manage and configure. Telnet DUT3 formanage and configure. Check the configure result.
ExpectedResult
1. Step 4DUT2 and DUT3 change to the members of DUT1.
2. Step 5: DUT2 and DUT3 can be manage by DUT1. The configure result is right.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1.Configuration of DUT
2928E-02(cfg)#config group
2928E-02(cfg-group)#set ztp enable
2928E-02(cfg-group)#set ztp vlan 1
2928E-02(cfg-group)#ztp start
2.Result
Tested by VMS-MobiFone: Vendor:ISTT
Page 40 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
41/51
Testing Result for VMS 3G SWITCH Project
Port Mirrioring
Test No. 20
Test item Mirror test
Testpurpose
To test the function of ingress and egress mirror
TestEnvironment
Tester
DUT
A
1
B
C
2
3
TestProcedure
1.Build the test environment according to the figure mentioned above.
2.Config port 1/2 as access port which belongs to vlan 100.
3.Config port 3 as access port which belongs to vlan 200.
4.Send one 10Mbps unicast stream which DMAC=0000.0000.0001 SMAC=0000.0000.0002from port A in the Tester and another 10Mbps unicast stream which DMAC=0000.0000.0002SMAC=0000.0000.0001 from prot B.
5.Config port 3 as monitor session 1 destination, port 1 as monitor session 1 source directionrx .Capture the traffic in tester port C
6.Config port 2 as monitor session 1 source direction tx.
7.Capture the traffic in port C.
ExpectedResult
1. Step 4: Port C cannot receive the packets.
2. Step 5: Port C can capture packets only with SMAC=0000.0000.0002DMAC=0000.0000.0001.The traffic load is 10Mbps.
3. Step 7: Port C can capture packets only with SMAC=0000.0000.0002DMAC=0000.0000.0001.The traffic load is 20Mbps.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1. The configuration of DUT
set mirror session 1 add source-port 1 ingress
set mirror session 1 add dest-port 3 ingress
2. The tester configuration
Page 41 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
42/51
Testing Result for VMS 3G SWITCH Project
Page 42 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
43/51
Testing Result for VMS 3G SWITCH Project
3. The result
Page 43 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
44/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
13. STP test
Test No. 21
Test item STP test
Test
purpose
To test the function of STP, time of protection switching and time of restoration
TestEnvironment
Port25
Port1
Port26
Port2
Agilent
101/1
101/3 DUT3
DUT2
DUT1
Port5
Port4
Port24
RootBridge
Port3
Test
Procedure
1. Build the test environment according to the figure mentioned above.
2. Running STP on every switch, configure exact parameters on every switch to makeDUT3 to become Root Bridge.
zte(cfg)#set stp enable
zte(cfg)#set stp forceversion stp
3. Observe if DUTs can prevent the ring automatically.
4. Break down the link between DUT1 and DUT3,observe if DUTs can rebuild the topologyautomatically, measure the time of service unavailability.
5. Change STP parameters of every switch, observe if DUTs can rebuild the topologyautomatically, measure the time of rebuilding.
Page 44 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
45/51
Testing Result for VMS 3G SWITCH Project
ExpectedResult
1. Step 3, DUT can support STP, and complete spanning tree calculation automaticallywhen a ring exists.
2. Step 4,DUT can rebuild the topology automatically when link failed.
3. Step 5,DUT can choose new root bridge or new root port, block link when parameterschanged.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1.configuration of DUT
zte(cfg)#set stp enable
zte(cfg)#set stp forceversion stp
3. Result
Switch-1
Switch2
Tested by VMS-MobiFone: Vendor:ISTT
RSTP test
Test No. 22
Test item RSTP test
Testpurpose
To test the function of RSTP, time of protection switching and time of restoration
Page 45 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
46/51
Testing Result for VMS 3G SWITCH Project
TestEnvironment
Port25
Port1
Port26
Port2
Agilent
101/1
101/3 DUT3
DUT2
DUT1
Port5
Port4
Port24
RootBridge
Port3
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Run RSTP on every switch, configure exact parameters on every switch to make DUT3to become Root Bridge.
3. Observe if DUTs can prevent the ring automatically.
4. Break down the link between DUT1 and DUT3,observe if DUTs can rebuild the topologyautomatically, measure the time of service unavailability.
5. Change RSTP parameters of every switch, observe if DUTs can rebuild the topologyautomatically, measure the time of rebuilding.
ExpectedResult
1. Step 3, DUT can support RSTP, and complete spanning tree calculation automaticallywhen a ring exists.
2. Step 4,DUT can rebuild the topology automatically when link failed.
3. Step 5,DUT can choose new root bridge or new root port, block link when parameterschanged.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1.configuration of DUTzte(cfg)#set stp enable
zte(cfg)#set stp forceversion rstp
3. result
switch-1
Page 46 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
47/51
Testing Result for VMS 3G SWITCH Project
switch-2
Tested by VMS-MobiFone: Vendor:ISTT
GVRP test
Test No. 23
Test item GVRP test
Testpurpose
To test the function of GVRP
TestEnvironment
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Create vlan from 1 to 100 in one device.
3. Enable the GVRP on both devices
4. Check the vlan configuration on the other device.
ExpectedResult
1. Step 4, DUT can support GVRP, and there are also vlan from 1 to 100 in the other device.
Test Result Passed Partially Passed Failed Not Tested
Remarks 1.configuration of DUT
set garp enable
set gvrp enable
set gvrp port 1 enable
set gvrp port 2 enable
2. result
Page 47 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
48/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT
14. LACP test
Test No. 24
Test item LACP test
Testpurpose
To test the function of LACP
TestEnvironment
Page 48 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
49/51
Testing Result for VMS 3G SWITCH Project
TestProcedure
1. Build the test environment according to the figure mentioned above.
2. Configure two ports join in the same aggregator
3. Check the status of the aggregator4. Send the Smac with different from port A, check the statistic in each port.
ExpectedResult
1. In step 3, all the state is right.
2. In step 4,the stream had average in each port
Test Result Passed Partially Passed Failed Not Tested
Remarks1. The configuration of DUT
set lacp enable
set lacp aggregator 3 add port 1,2
set vlan 100 add port 28 tag
set vlan 100 add trunk 3 tag
2. The configuration of tester
Page 49 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
50/51
Testing Result for VMS 3G SWITCH Project
3. The result
Page 50 / 51
-
7/31/2019 Testing Report for VMS 3G SW Project 2011-3-11 Final
51/51
Testing Result for VMS 3G SWITCH Project
Tested by VMS-MobiFone: Vendor:ISTT