tetratech, louisville cmta, louisville kiesel/meyer, louisville j-town contractors, louisville n/a...

7
w www.KYschooldesigns.org Name of School: Location: Grades Served: Completion Date: Architectural Firm: A collaborative project of AIA Kentucky, Kentucky School Boards Association, Kentucky Association of School Superintendents, Kentucky Association of School Administrators The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record. East Oldham Middle School East Oldham Campus, Crestwood, KY 6-8 August 2005 Scott-Klausing & Co., Inc. (SKC)

Upload: domien

Post on 11-May-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

w www.KYschooldesigns.org

Name of School:Location:Grades Served: Completion Date:Architectural Firm:

A collaborative project of AIA Kentucky, Kentucky School Boards Association, Kentucky Association of School Superintendents, Kentucky Association of School Administrators

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

East Oldham Middle School

East Oldham Campus, Crestwood, KY

6-8

August 2005

Scott-Klausing & Co., Inc. (SKC)

School Information

School Name:School District:School District Web Site Link:

Gross building area by floor:

Gross area per student:

Special Considerations/Descriptive Info:

High Performance Features:

KDE Rated Student Capacity:Grades Served:

Gross building area total:

Site area (acres):

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

Site amenities included in project:

The Library's direct-indirect lighting and perimeter see-through display cases provide 75 fc of light on all work surfaces.

Student Courtyards, separate bus, parent/visitor and service drives.

East Oldham Middle SchoolOldham County Schools

www.oldham.k12.ky.us600 (Phase 1)

19 Acres on the East Oldham Campus153 Square Feet

91,748 Square Feet(One Level)

6-8

Building Energy Management System, Variable Flow Pumping System, Integrated Intelligent Classroom System.

The school is designed for a future 200-student addition. The project included $1.2 million in Sitework/Utilities for the 150-acre campus to include a future Elem. and High School.

Final Construction Contract Cost (per square foot):

Bid Date:Completion Date:Construction Type:

Number of Floors:Heating Fuel Type:Heating & A/C System Type:

Construction Information

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

Final Construction Contract Cost (total amount):

Original BG-1 Date:

Roof Design/Materials:

The Stage opens to the Gym as well as the Multi-Purpose Room. The Stage doubles as a classroom with operable walls.

$11,110,080.35$121.09

01/28/0209/03/03

09/01/05Load-bearing Masonry

Shingles and Standing Seam Metal; Light Weight Trusses & Long Span Steel Joist.One, with Mechanical MezzaninesNatural Gas and Electricity

Water Source Heat Pump System with Dedicated Outside Air Ventilation Systems.

Construction Manager:

Architecture FirmName:Contact:Address:Phone:FAX:Email:Web Site Address/Link:

Project Team InfoStructural Engineer:Mechanical/Electrical Engineer:

General Contractor:

Team Information

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

Civil Engineer:

Landscape Architect:

Mechanical Mezzanine runs over the Corridors, providing easy access for routine maintenance without disturbing class.

N/A

Scott-Klausing & Co., Inc. (SKC)Francis J. (Fran) Scott, AIA, CID, Exec., V.P.205 Parker Drive, LaGrange, KY 40031

502-222-5366502-222-0021

[email protected]

TetraTech, LouisvilleCMTA, Louisville

Kiesel/Meyer, LouisvilleJ-Town Contractors, Louisville

N/A

Site Plan

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

First Floor Plan

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

The plans, designs and photographs published herein are the property of the named architect of record. Any use, other than incidental printing for further study, is prohibited without the express written consent of the architect of record.

Dell's "Intelligent Classroom" System has replaced corner TV monitor in the Computer Lab. The lab features controlled indirect lighting and natural day lighting.

Parents and visitors arrive at the right side of the Main Entry structure. The buses arrive and leave at the left side. Just inside is a secure vestibule.