Turkish Petroleum International Company & Middle East Technical University TPIC TPIC An overview on Drilling and Geothermal Energy Projects in Turkey Tevfik Kaya [email protected] TPIC TPIC Geothermal Projects “we are helping our geothermal asset to come to surface…” METU Middle East Technical University, Turkey GRC Annual Meeting International Luncheon Reno, NV, USA, Monday, October 1, 2012 Noon:121:30 PM

Upload: others

Post on 19-Jun-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

Turkish Petroleum International Company & Middle East Technical University

TPICTPIC

An overview on Drilling and Geothermal Energy Projects in Turkey

Tevfik

Kaya

[email protected]

TPICTPICGeothermal

Projects “we are helping  our  geothermal  asset to come to surface…”

METUMiddle East Technical 

University, Turkey 

GRC Annual Meeting  International

Luncheon Reno, NV, USA, Monday,

October  1, 2012 Noon:12‐1:30 PM

Page 2: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Domestic 

Production 

Dependency 

on Foreign  

Crude Oil  2.5 M ton/year 93%Natural Gas  0.73 B M3/year 97%

gas fields

Oil fields

Turkey’s oil production;

•peaked in 1991 at 85 thousand

bbl/day •bottoming out in 2006 at 44 thousand bbl/d. •Now: 53‐55 

thousand bbl/d in 2011.

t.kaya 2012

Geothermal Energy; an overview on Drilling and Projects in Turkey

Primary energy consumption of Turkey is

covered %62 oil and gas.

Oil & Gas Overviwed

of Turkey 2011

Energy Dependency on Foreign Source for Turkey

GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 3: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

.

Turkey 

has a unique geographic position 

at 

the 

crossroads 

between 

Europe 

and 

Asia. 

It 

is 

located 

on 

an 

active 

tectonic, 

orogenetic

belt, 

the 

Alpine  ‐

Himalaya 

Orogen, 

with 

young 

faults 

and 

active

volcanism.

Geothermal exploration in Turkey 

started in the early 1960s. The first 

geothermal well

for power generation

was drilled in 1968 on high enthalpy 

fields for potential power production. 

The well has a depth of 540 meters and 

a temperature of 198°C.

Geothermal

in Turkey since 1960

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 4: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Direct use application for heating ‐

38%•

Thermal  usage (spa) ‐

52%•

Power generation ‐

10%

Geothermal fields in Turkey  

December  2011

Power 

Generation

114.3 MWe

Residences 

Heating

88,000~ 805

MwtResidence 

equivalence

Greenhouse 

Heating

2,585,000         

( ~506

MWt)m2

Thermal 

Facilities,spa

325(~550 MWt)

Pc

CO2

mitigated160,000 Tons

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 5: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012

Geothermal Fields name for Power Generation in Turkey  

(September 2011)

Name of Fields  Temp.(°C

) Name of Fields  Temp.°C) 

Manisa‐Alaşehir‐

Köseali  287 Kütahya‐Simav 162

Manisa Alaşehir X 265 Aydın‐Umurlu 155Manisa‐Salihli‐

Caferbey  249 İzmir‐

Seferihisar 153

Denizli‐Kızıldere  242 Denizli‐

Bölmekaya 147

Aydın‐Germencik‐

Ömerbeyli  239 Aydın‐

Hıdırbeyli  146

Manisa‐Alaşehir‐

Kurudere  214 İzmir‐Dikili‐

Hanımınçiftliği  145

Manisa‐Alaşehir‐

X 194 Aydın‐

Sultanhisar 145

Aydın‐Yılmazköy  192 Aydın‐Bozyurt  140

Aydın‐Pamukören  188 Denizli‐Karataş 137Manisa‐Alaşehir‐

Kavaklıdere 188 İzmir‐Balçova 136

Manisa‐Salihli‐

Göbekli 182 İzmir‐Dikili‐

Kaynarca 130

Kütahya‐Şaphane 181 Aydın‐Nazilli‐

Güzelköy  127

Çanakkale‐Tuzla 174 Aydın‐Atça 124

Aydın‐Salavatlı 171 Manisa‐Salihli‐

Kurşunlu 117

Denizli‐

Tekkehamam  168Denizli‐

Sarayköy‐

Gerali114

•300 geothermal resource areas known •1500 hot and

mineralized natural springs

International Geothermal Energy Showcase

, May 23, 2012,

Washington DC 

Page 6: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Temperature distrubution of geothermal resources view field &wells

Geothermal Resources Map of Turkey

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012

1963‐2012;  Number of  geothermal wells drilled: 850‐900

(ref: i.akkus MTA)

GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 7: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Installed  Capacity of Power Plants in Turkey,  2011 September 

2011 

Installed 

Capacity 

MWe

Installed 

Capacity 

Ratio 

Generation 

Ratio

Natural Gas  16,221 32% 44‐47%Hydro  17,092 32% 24%Lignite  8,173 17% 17%Imported Coal  3,281 7% 10%Fuel  1,475 3% 1%Wind  1,358

/

1,729

3% 2%

Geothermal  114 0.20% 0.30%Other  4,034 5.80% 2.40%Total  51,004 

53,106 

100% 100%

Year  Electricity  Demand/ 

Consumption (kwh) 

Consumption 

kW/capita

2002 129  Billion 1.4852010  210 Billion  2.8712011 229,3

Bilion 3.1002023 450 Billion 5.500 9% increase from 2010 to 2011

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 8: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Geothermal installed capacity has been increasing rapidly over the years, accounting for 

50% of the total installed capacity by Sept 2012 (TPIC projection)

geothermal 

energy is 

separately 

regulated by Act 

#5686 (Jun 3rd,

2007).

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012

Name of PP Place Installed Capacity 

(MWe)Technology 

ProviderKızıldere Denizli‐Sarayköy 15 AnsaldoDora‐1 Aydın‐Salavatlı 8 OrmatBereket Denizli‐Sarayköy 7 OrmatGermencik Aydın‐Germencik 47 MitsubishiTuzla  Çanakkale

Tuzla 8 OrmatDora‐2 Aydın‐Salavatlı 12 OrmatIrem Aydın‐Germencik 20 Ormat

Under constructionSinem Aydın‐Germencik 24 OrmatDeniz Aydın‐Germencik 24 OrmatPamukoren Aydın‐Pamokoren 45 Atlas CopcoGumuskoy Aydın‐Germencik 7 TASDora 3U1 Aydın‐Salavatlı 15 OrmatAlasehir Manisa‐Alasehir 24 OrmatDora 3U2 Aydın‐Salavatlı 20 OrmatKızıldere‐2 Denizli Sarayköy 75 Fuji‐TAS

GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

7

8

Approx. 212 MWe under construction

Page 9: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

History of Geothermal Power Plants (May 2012)

TPICTPICGeothermal

Projects GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Installed 

Capacity 

MWTechnology  Provider Project Financing 1984 2003 2006 2007 2008 2009 2010 2011 2012 2013

7‐15. Steam Flash Ansaldo   Government / Zorlu   Kizildere  Zorlu  Kizildere 1

75 Steam + 

triple flash Fuji + TAS Bank Consorsium Zorlu  Kızıldere II

7.5 ORC Ormat  Yapı

Kredi  Mege  Dora 1 ‐

05

7.3 ORC Ormat  TKB Bereket BJE ‐

05

7.5 ORC Ormat  Pozitif  Enda Tuzla ‐

01

47.5 Steam Flash  Mitsubishi  WestLB

Consortium 

inc. Local banks  Gurmat  Germencik 

06

12 ORC Ormat Pozitif  Mege  Dora 2 ‐

03

18.5 ORC Ormat Vakıf   Maren  Irem ‐

11

45 ORC Atlas 

Copco Not  yet specificied  Celikler 06 Pamukore

24 ORC Ormat Vakıf  From start ‐

Owner Maren Sinem 

24 ORC Ormat Vakıf  Commissioning  ‐

month Maren Deniz 

6.6/7 ORC TAS BM/? Under development BM Gumuskoy 

18.5 ORC Ormat TKB Mege  Dora 3  U1 

23.6 ORC Ormat Is Bank Turkerler Alasehir 

20 ORC Ormat  TKB Mege  Dora  3 U2 

Page 10: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

Geothermal Site Developmentbased on the case of 20 MWe‐60 MWe in Turkey

(t.kaya 2012)

Site Scouting and 

geological/geophysical studies  6‐10 months

Exploratory drilling including  

gradient drilling 12‐15 months

Drilling and long term test15‐28  months

Power plant construction  

(mostly parallel to drilling) 18‐24  months

Total development period of a  

proven field 36‐54

months

Total development period  for 

non proven fields 48‐60 

months

View of the Geothermal Power Project Development 

in Turkey

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012TPICTPICGeothermal

Projects GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 11: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Feed –in Tariff  and Legal Framework for Geothermal Energy in Turkey: 

•FIT was introduced in 2005 as a unique tariff btw 5 – 5,5 € cents, applicable for defined renewable 

energy sources 

(18.05.2005, Law No.5346, entitled “RES Law for the)•Implementation Regulation of FIT was not adopted at that time. •In Turkey, geothermal energy is separately regulated by the Act numbered 5686 (Jun 3rd,

2007).•New RES Law was adopted in Dec 2010 •It proposes below mentioned FIT at differentiated rates (7,3 10,5 –

13,3 $ cents) for different 

renewable energy sources. •Implementation Reg. is adopted & Domestic Manufacturing incentive introduced. 

Power Plant Type FIT Domestic ManufacturingAdditional Local 

Content 

($cebt/kWh)

Max FIT 

($cent/kWh)

Hydro Power Plant 7.3 Turbine 1.3 9.6Generator and Power Electronics 1.0

Wind Power Plant 7.3

Blade 0.8

11.0Generator and Power Electronics 1.0Tower 0.6Rotor and Nacel

(all mechanic) 1.3

Geothermal Power Plant 10.5Steam or Gas Turbine 1.3

13.2Generator and Power Electronics 0.7Steam Injector or Vacuum Pump 0.7

Biomass 13.3 Equipments 18.9

Solar 13.3 Fotovoltaik

Equipments 20.0Concentrated olar

Power Equipments 22.5

t.kaya 2012

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 12: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Geothermal Projects in Aegean Region TPIC Services

F200 in Salihli

celikler

aytemizsoyak

bm

güriş zorlu

sanko

kayen

akca

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012

transmark

burc

enel

delta maspo

rarik

maren ors

hateks

endademirören

enerji‐adolmabahce

+ > 12 

companies

erna

Ümran boru

GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 13: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Geothermal Well Drillings

by TPIC (2008‐

May 2012

105.000 meter )

According to TPIC drilling experiences in Menderes and Alaşehir

graben

mostly metamorphic, shiest, 

limestone, sand stone and marble formation,Average penetration day for 2000‐2500 meter is 45‐50 days for production wells, for the 2800‐

3000meter exploration well’s average  penetration days is more than 65 days

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 14: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Turkey’s current geothermal drilling operations are being executed under drilling service contract 

structures which are predominantly “unit time rate”

(similar to New Zealand, Kenya and 

Indonesian). TPIC can also operate under a turn‐key agreement. “meter‐rate”

and “turn‐key”

geothermal drilling operations are typical of  Iceland. Meter‐rate and turn‐key is used for direct use utilization projects drilling in Turkey.

Rig Cost in Turkey

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 15: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012

Drilling Rigs in Geothermal Power Projects  in Turkey           

(May 2012)

tkaya 2012

#  Rig  Place  Capacity           

(w/ 4 1/2" DP) Company

1 F‐320/5  Denizli 6210 m/2000 HP TPIC2 F 200/11  Aydın 4000 m/1350 HP TPIC3 F200/10 Manisa 4000 m/1350 HP TPIC4 IRI 100/1 Aydın 425 HP/W.OWER TPIC5 MR8000 Manisa 4300 m/1080 HP MAPEK6 MR8000 Aydın 4300 m/1080 HP MAREN7 IDECO H44 Aydın  3000 m / 750 HP POLMAK

8 F. Cooper LTO‐

750 Aydın 2500m/750 HP AME

9 Wilson 75 Aydın 2500m/900 HP AME10 NAT 80 B Aydın 3500 m/1000 HP AME11 F200  Aydın 4000 m/1350 HP AME12 BD125 Denizli 1600 HP DEĞİRMENCİ13 Gefco 185 K Konya 2000m/600 HP GM Müh14 MR6000  İzmir 2000 m/540 HP MTA

15 Not Specified Manisa 2000m/600 HP Merty

16 Not Specified Manisa 2000m/600 HP Gül Sondaj

Turkey Rig Count in Geothermal Projects

GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 16: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

TPICTPICGeothermal

Projects

Geothermal Energy; an overview on Drilling and Projects in Turkey

t.kaya 2012

Why Finance and 

Invest in 

Geothermal in 

Turkey

As a result of Turkey’s economic growth over the last eight years Turkey has become one of the 

fastest growing energy markets in the world. The energy market is also rapidly gaining a 

competitive structure. The Turkish Electricity Transmission Company estimates that Turkey’s 

demand for electricity will increase at an annual rate of six percent between 2009 and 2023.

Total geothermal potential of Turkey is estimated around 30,000 MW. In geothermal, Turkey 

has a proven 4,000 MW of resources over 20°C of which 600 to 1000 MW are high temperature 

fields able to produce electricity. 

GRC

2012 ‐GEA Annual Meeting  International

Luncheon Reno, NV, USA,

Page 17: Tevfik Kaya tkaya@tpic.com - Geothermal Resources Council · Manisa‐Alaşehir‐ Köseali 287. Kütahya‐Simav: 162. Manisa Alaşehir X: 265. Aydın‐Umurlu: 155. Manisa‐Salihli‐

.

TPICTPICGeothermal

Projects

Thank you…

We love the geothermal because geothermal is beautiful…

Pamukkale/Turkey