Texas Eastern Transmission, LP

Critical NoticesPostings from 09/01/2019 to 09/30/2019

Page 1 of 110

Page 2: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/01/2019 09:05:00 AMNotice End Date/Time: 11/30/2019 08:38:54 AMNotice ID: 88058Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/01/2019 09:05:00 AMPrior Notice: 87859Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: 30" Unplanned Lincoln County, KY Outage - UPDATE 9

Notice Text: As previously posted, Texas Eastern (TE) has experienced an unplanned outage between Danville and Tompkinsville compressor stations and repair efforts to restore capacity are continuing. The date on which the return to full capacity will occur through the Danville Compressor Station remains unknown. However, consistent with what was posted on August 22, 2019, the restoration of partial physical capacity (Lines 10 and 25) totaling approximately as follows:

ApproximatelyBerne 1,556,000 Dth/dDanville 1,400,000 Dth/dTompkinsville 1,198,000 Dth/dBarton 1,141,000 Dth/d

These North to South capacities through these locations will be available effective immediately.

TE will provide updates as additional information is known.

Please contact your Operations Account Representative if you have any questions.

Page 2 of 110

Page 3: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/02/2019 09:00:00 AMNotice End Date/Time: 09/03/2019 09:00:00 AMNotice ID: 88083Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/01/2019 03:11:59 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/2/2019

Notice Text: For Gas Day September 2, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements Page 3 of 110

Page 4: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 4 of 110

Page 5: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/03/2019 09:00:00 AMNotice End Date/Time: 09/04/2019 09:00:00 AMNotice ID: 88095Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/02/2019 02:56:23 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/3/2019

Notice Text: For Gas Day September 3, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements Page 5 of 110

Page 6: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 6 of 110

Page 7: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/03/2019 01:23:58 PMNotice End Date/Time: 09/04/2019 09:00:00 AMNotice ID: 88113Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/03/2019 01:23:58 PMPrior Notice: 88095Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/3/2019 -- INTRADAY

Notice Text:

As a result of intraday nomination changes for Gas Day September 3, 2019, the following restriction will be in place on the Texas Eastern (TE) system for Gas Day September 3, 2019:

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

The following restrictions will remain in place on TE for Gas Day September 3, 2019:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the

Page 7 of 110

Page 8: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 8 of 110

Page 9: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/13/2019 10:00:00 PMNotice End Date/Time: 09/15/2019 09:00:00 AMNotice ID: 88153Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 09/05/2019 09:00:00 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: LINK® System Maintenance

Notice Text: Beginning Friday September 13, 2019 at 10:00PM CCT, LINK® will be unavailable for normal customer usage in order to perform system maintenance. LINK® will be restored to customers for viewing information approximately an hour later at 11:00PM CCT on Friday, September 13 (Note that any attempts to update data during the viewing period will result in a database error being displayed). LINK® will be returned to full normal operation on or before Sunday, September 15, 2019 at 9:00AM CCT. Please note that this transition will impact all Enbridge Gas Transmission business units utilizing LINK®.

To better serve customers during the upgrade, the NAESB timely nomination deadline for Sunday, September 15, 2019, will be moved to Friday September 13, 2019 at 5:00 PM CCT for on-line, proprietary file transfer and Electronic Data Interchange (EDI) transactions.

While Enbridge will continue to accept hard copy changes to nominations and PDAs throughout the maintenance period, customers are encouraged to submit electronic nominations on or before 10:00PM CCT on Friday, September 13, 2019. Forms needed for hard copy changes can be found on Informational Postings, under the Downloads section, as "Nomination Form" and "PDA Change Form". Once complete, the forms should be faxed to 713-989-3085. Alternately, customers can submit changes via e-mail to [email protected] without the forms as long as sufficient information is present to authorize and process the change successfully. Changes will be reflected in LINK® when the system returns to full normal operation.

In addition, Enbridge will continue to process confirmation reductions from interconnecting parties for all business units during each NAESB cycle. Any reductions due to pipeline restrictions, confirmations or nominations will be communicated to customers as identified and will be reflected in LINK® after the application returns to full normal operation.

During the upgrade, Informational Postings and operational data will not be refreshed.

Enbridge values your business and appreciates your understanding during this effort. If you have any questions or concerns, please contact your Marketing or Capacity Services Account Manager. For any questions during the upgrade, please contact our after hours support number at 713-627-5058.

Page 9 of 110

Page 10: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/13/2019 10:00:00 PMNotice End Date/Time: 09/15/2019 09:00:00 AMNotice ID: 88175Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 09/12/2019 09:00:00 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: LINK® System Maintenance

Notice Text: Beginning Friday September 13, 2019 at 10:00PM CCT, LINK® will be unavailable for normal customer usage in order to perform system maintenance. LINK® will be restored to customers for viewing information approximately an hour later at 11:00PM CCT on Friday, September 13 (Note that any attempts to update data during the viewing period will result in a database error being displayed). LINK® will be returned to full normal operation on or before Sunday, September 15, 2019 at 9:00AM CCT. Please note that this transition will impact all Enbridge Gas Transmission business units utilizing LINK®.

To better serve customers during the upgrade, the NAESB timely nomination deadline for Sunday, September 15, 2019, will be moved to Friday September 13, 2019 at 5:00 PM CCT for on-line, proprietary file transfer and Electronic Data Interchange (EDI) transactions.

While Enbridge will continue to accept hard copy changes to nominations and PDAs throughout the maintenance period, customers are encouraged to submit electronic nominations on or before 10:00PM CCT on Friday, September 13, 2019. Forms needed for hard copy changes can be found on Informational Postings, under the Downloads section, as "Nomination Form" and "PDA Change Form". Once complete, the forms should be faxed to 713-989-3085. Alternately, customers can submit changes via e-mail to [email protected] without the forms as long as sufficient information is present to authorize and process the change successfully. Changes will be reflected in LINK® when the system returns to full normal operation.

In addition, Enbridge will continue to process confirmation reductions from interconnecting parties for all business units during each NAESB cycle. Any reductions due to pipeline restrictions, confirmations or nominations will be communicated to customers as identified and will be reflected in LINK® after the application returns to full normal operation.

During the upgrade, Informational Postings and operational data will not be refreshed.

Enbridge values your business and appreciates your understanding during this effort. If you have any questions or concerns, please contact your Marketing or Capacity Services Account Manager. For any questions during the upgrade, please contact our after hours support number at 713-627-5058.

Page 10 of 110

Page 11: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/03/2019 03:42:20 PMNotice End Date/Time: 09/04/2019 09:00:00 AMNotice ID: 88180Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/03/2019 03:42:20 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Somerset to Summerfield 36" Line 65 ILI Tool Run -- UPDATE

Notice Text:

The previously posted Somerset to Summerfield 36" Line 65 tool run originally scheduled for September 4 has been canceled and is now rescheduled for September 25. All restrictions associated with this outage for Gas Day September 4, 2019 have been lifted.

***Somerset to Summerfield 36" Line 65Caliper & ILI Tool Runs: September 25Potential Repair Beginning On: TBDPotential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 36" Line 65, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 350,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, the following meter may experience lower than normal pressure or be unavailable for low:

70062 - NAT GAS & OIL - SOMERSET, OH

Additionally, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Please contact your Operations Account Representative should you have any questions.Page 11 of 110

Page 12: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/04/2019 09:00:00 AMNotice End Date/Time: 09/05/2019 09:00:00 AMNotice ID: 88181Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/03/2019 03:52:57 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/4/2019

Notice Text:

For Gas Day September 4, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 12 of 110

Page 13: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 13 of 110

Page 14: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/05/2019 09:00:00 AMNotice End Date/Time: 09/06/2019 09:00:00 AMNotice ID: 88203Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/04/2019 03:26:59 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/5/2019

Notice Text:

For Gas Day September 5, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 14 of 110

Page 15: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 15 of 110

Page 16: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/06/2019 09:00:00 AMNotice End Date/Time: 09/07/2019 09:00:00 AMNotice ID: 88218Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/05/2019 03:03:47 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/6/2019

Notice Text:

For Gas Day September 6, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 16 of 110

Page 17: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 17 of 110

Page 18: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/07/2019 09:00:00 AMNotice End Date/Time: 09/08/2019 09:00:00 AMNotice ID: 88253Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/06/2019 02:45:14 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/7/2019

Notice Text: For Gas Day September 7, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, for rate schedules FT-1MX Page 18 of 110

Page 19: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless

Page 19 of 110

Page 20: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 20 of 110

Page 21: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/08/2019 09:00:00 AMNotice End Date/Time: 09/09/2019 09:00:00 AMNotice ID: 88294Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/07/2019 03:15:43 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/8/2019

Notice Text: For Gas Day September 8, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate Page 21 of 110

Page 22: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 22 of 110

Page 23: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/07/2019 03:24:11 PMNotice End Date/Time: 09/14/2019 09:00:00 AMNotice ID: 88295Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/07/2019 03:24:11 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Eagle to Chester Junction 20" Line 1-A: August 17 - September 13 Detailed Investigations -- COMPLETE

Notice Text: Texas Eastern has completed the previously posted detailed investigations on its Eagle to Chester Junction 20" Line 1-A and the line has returned to full capacity. All restrictions associated with this outage have been lifted.

Please contact your Operations Account Representative if you have any questions.

Page 23 of 110

Page 24: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/07/2019 04:39:17 PMNotice End Date/Time: 09/09/2019 09:00:00 AMNotice ID: 88296Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/07/2019 04:39:17 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Uniontown to Delmont Compressor Stations Line 39 Detailed Investigations -- COMPLETE

Notice Text: Texas Eastern has completed the previously posted detailed investigations on its Line 39 between Uniontown to Delmont compressor stations. All restrictions associated with these detailed investigations have been lifted.

Please contact your Operations Account Representative if you have any questions.

Page 24 of 110

Page 25: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/09/2019 09:00:00 AMNotice End Date/Time: 09/10/2019 09:00:00 AMNotice ID: 88304Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/08/2019 02:54:44 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/9/2019

Notice Text: For Gas Day September 9, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 25 of 110

Page 26: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 26 of 110

Page 27: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/09/2019 10:05:59 AMNotice End Date/Time: 10/01/2019 09:00:00 AMNotice ID: 88327Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/09/2019 10:05:59 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Linden to EOL 12" Line 1 -D Outage -- UPDATE

Notice Text:

Texas Eastern has completed the previously posted Linden to EOL 12" Line 1 -D pipeline outage. Effective immediately, all restrictions associated with this outage have been lifted.

Please contact your Operations Account Representative if you have any questions.

Page 27 of 110

Page 28: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/09/2019 03:00:00 PMNotice End Date/Time: 12/08/2019 03:00:00 PMNotice ID: 88328Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/09/2019 03:00:00 PMPrior Notice: 88058Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: 30" Unplanned Lincoln County, KY Outage - UPDATE 10

Notice Text: As previously posted, Texas Eastern (TE) has experienced an unplanned outage between Danville and Tompkinsville compressor stations and repair efforts to restore capacity are continuing.

Both line 10 & 25, which were taken out of service as a precautionary safety measure following the incident, have been returned to service as of September 1, 2019. Both lines were returned to service after all regulatory requirements had been met and it was determined it was safe to do so.

TE is working diligently to comply with the requirements identified the corrective action order (CAO) issued by PHMSA on August 8, 2019 in regards to Line 15. At this time work plans are proceeding in compliance with the CAO, and TE currently anticipates that work to allow Line 15 to return to full service will continue until at least the second quarter of 2020. Current work includes reviewing inspection data, evaluating construction records, performing field investigations, scheduling additional exterior inspections and in-line inspection tool runs and appropriately remediate any necessary repairs. Line 15 will only be returned to service after all physical work has been completed, the line has undergone a rigorous inspection process to determine it is safe to do so, and TE has received all required regulatory approvals.

TE is evaluating scenarios that would allow specific segments of Line 15 to return to service prior to the second quarter of 2020, but at this time that information is unknown. TE must first receive regulatory approval prior to placing any segment of Line 15 back into service. As more is determined, TE will post updates to the EBB.

There are various factors that could potentially change the projected full return to service date for Line 15, such as but not limited to: weather conditions, regulatory approvals and any unforeseen existing pipeline conditions that could lengthen the work schedule.

Capacity through Danville is currently at 1,400,000 Dth/d until additional segments of Line 15 are returned to service. If further revisions to available capacity though Danville are determined to be necessary, that information would be posted to the EBB as soon as it is known by TE.

TE will provide updates regarding Line 15 return to service as additional information is known.

Page 28 of 110

Page 29: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/10/2019 09:00:00 AMNotice End Date/Time: 09/11/2019 09:00:00 AMNotice ID: 88356Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/09/2019 03:40:43 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/10/2019

Notice Text:

For Gas Day September 10, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

Page 29 of 110

Page 30: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements and secondary out of path nominations within entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery on north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators

Page 30 of 110

Page 31: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 31 of 110

Page 32: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/11/2019 09:00:00 AMNotice End Date/Time: 09/12/2019 03:27:50 PMNotice ID: 88383Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/10/2019 03:27:50 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/11/2019

Notice Text:

For Gas Day September 11, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

Page 32 of 110

Page 33: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes Page 33 of 110

Page 34: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 34 of 110

Page 35: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/11/2019 09:31:51 AMNotice End Date/Time: 09/12/2019 09:00:00 AMNotice ID: 88401Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/11/2019 09:31:51 AMPrior Notice: 88383Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/11/2019 -- INTRADAY

Notice Text:

As a result of intraday nomination changes for Gas Day September 11, 2019, the following restriction will be in place on the Texas Eastern (TE) system for Gas Day September 11, 2019:

TE has scheduled and sealed nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

The following restrictions will remain in place on TE for Gas Day September 11, 2019:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 35 of 110

Page 36: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

Page 36 of 110

Page 37: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 37 of 110

Page 38: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/12/2019 09:00:00 AMNotice End Date/Time: 09/13/2019 09:00:00 AMNotice ID: 88422Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/11/2019 03:30:53 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/12/2019

Notice Text:

For Gas Day September 12, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 38 of 110

Page 39: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review Page 39 of 110

Page 40: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 40 of 110

Page 41: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/13/2019 09:00:00 AMNotice End Date/Time: 09/14/2019 09:00:00 AMNotice ID: 88453Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/12/2019 03:15:41 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/13/2019

Notice Text:

For Gas Day September 13, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

*TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 41 of 110

Page 42: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review Page 42 of 110

Page 43: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 43 of 110

Page 44: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/14/2019 09:00:00 AMNotice End Date/Time: 09/15/2019 09:00:00 AMNotice ID: 88469Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/13/2019 03:05:36 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/14/2019

Notice Text:

For Gas Day September 14, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 44 of 110

Page 45: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 45 of 110

Page 46: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 46 of 110

Page 47: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/15/2019 09:00:00 AMNotice End Date/Time: 09/16/2019 09:00:00 AMNotice ID: 88492Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/13/2019 06:48:24 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/15/2019

Notice Text:

For Gas Day September 15, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 47 of 110

Page 48: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 48 of 110

Page 49: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 49 of 110

Page 50: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/14/2019 11:20:00 AMNotice End Date/Time: 12/13/2019 11:20:00 AMNotice ID: 88534Notice Stat Desc: InitiateNotice Type: OtherPost Date/Time: 09/14/2019 11:20:00 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: LINK® System Maintenance - Restored

Notice Text: On Saturday September 14, 2019 at 11:20 AM CCT, Enbridge completed LINK® maintenance and the system was returned to full normal operation for all business units.

Because the NAESB timely nomination deadline for Sunday, September 15, 2019, was moved to Friday, September 13, 2019, nominations received for that gas day after the Friday deadline through faxed documents or entered into LINK® will be considered late. The first timely deadline on the restored system will be for Monday, September 16, 2019 at the standard NAESB deadline of 1:00 PM CCT on Sunday, September 15, 2019.

Enbridge values your business and appreciated your understanding during our upgrade effort. If you have any questions or concerns during the remainder of the weekend, please contact our after-hours support number at 713-627-5058. On Monday, September 16, 2019, please contact your Marketing or Capacity Services Account Manager, or LINK-HELP at 1-800-827-5465.

Page 50 of 110

Page 51: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/16/2019 09:00:00 AMNotice End Date/Time: 09/17/2019 09:00:00 AMNotice ID: 88558Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/15/2019 03:57:20 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/16/2019

Notice Text:

For Gas Day September 16, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 51 of 110

Page 52: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

As previously posted, Linden to EOL 42" Line 38: September 10 - September 16

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting a pipeline outage on 42" Line 38 between Linden to EOL compressor station.

During this outage, the following meter will be unavailable for flow:

73722 - CONED-MANHATTAN DELIVERY

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 52 of 110

Page 53: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 53 of 110

Page 54: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/17/2019 09:00:00 AMNotice End Date/Time: 09/18/2019 09:00:00 AMNotice ID: 88586Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/16/2019 03:55:59 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/17/2019

Notice Text:

For Gas Day September 17, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 54 of 110

Page 55: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with

Page 55 of 110

Page 56: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 56 of 110

Page 57: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/18/2019 09:00:00 AMNotice End Date/Time: 09/19/2019 09:00:00 AMNotice ID: 88614Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/17/2019 04:00:55 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/18/2019

Notice Text:

For Gas Day September 18, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 57 of 110

Page 58: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 58 of 110

Page 59: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 59 of 110

Page 60: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/17/2019 04:52:04 PMNotice End Date/Time: 10/01/2019 09:00:00 AMNotice ID: 88621Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/17/2019 04:52:04 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Five Points Compressor Station Outage -- UPDATE

Notice Text:

The previously posted Five Points Compressor Station outage originally scheduled for September 24 - September 30 has been rescheduled for September 19 - September 23. During this outage, capacity for nominations sourced in WLA, ELA, M1-30", M2-30" and M3 for delivery south of Sarahsville compressor station and/or the Lebanon Lateral listed below will be reduced as follows:

ApproximatelySarahsville391,000 Dth/dFive Points377,000 Dth/dLebanon377,000 Dth/d

Based on historical nominations, TE anticipates restrictions for interruptible, secondary services and primary firm services

Please contact your Operations Account Representative if you have any questions.

Page 60 of 110

Page 61: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/18/2019 09:00:00 AMNotice End Date/Time: 09/19/2019 09:00:00 AMNotice ID: 88622Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/17/2019 07:27:48 PMPrior Notice: 88614Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/18/2019 -- INTRADAY

Notice Text:

As a result of intraday nomination changes for Gas Day September 18, 2019, the following restriction will be in place on the Texas Eastern (TE) system for Gas Day September 18, 2019:

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

The following restrictions will remain in place on TE for Gas Day September 18, 2019:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

Page 61 of 110

Page 62: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review Page 62 of 110

Page 63: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 63 of 110

Page 64: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/19/2019 09:00:00 AMNotice End Date/Time: 09/20/2019 09:00:00 AMNotice ID: 88645Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/18/2019 04:05:53 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/19/2019

Notice Text:

For Gas Day September 19, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has scheduled and sealed nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 64 of 110

Page 65: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with

Page 65 of 110

Page 66: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 66 of 110

Page 67: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/20/2019 09:00:00 AMNotice End Date/Time: 09/21/2019 09:00:00 AMNotice ID: 88675Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/19/2019 03:45:34 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/20/2019

Notice Text: For Gas Day September 20, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 67 of 110

Page 68: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible, secondary out of path, secondary in path nominations not to a primary delivery point and secondary in path nominations to a primary delivery point sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than

Page 68 of 110

Page 69: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 69 of 110

Page 70: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/20/2019 09:00:00 AMNotice End Date/Time: 11/01/2019 09:00:00 AMNotice ID: 88678Notice Stat Desc: InitiateNotice Type: Operational Flow OrderPost Date/Time: 09/20/2019 07:46:19 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: M2-30 and M3 Operational Flow Order

Notice Text: In order to maintain the operational integrity of the system, TE is issuing an Operational Flow Order (OFO) pursuant to Section 4.3 of the General Terms and Conditions of TE's FERC Gas Tariff effective 9:00AM CCT September 20, 2019 to all parties, with the exception of those governed by a FERC gas tariff, in Texas Eastern's Market Area Zones M2-30 and M3.

This OFO does not affect the ability of TE to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.

During the effectiveness of this OFO, all parties must be balanced such that actual deliveries of gas out of the system must be equal to or greater than scheduled deliveries out of the system. The penalty shall apply to each dekatherm of actual delivery quantities that are less than scheduled quantities minus 2,000 Dth or 98% of scheduled delivery quantities.

During the effectiveness of this OFO, all parties must be balanced such that actual receipts of gas into the system must be equal to or less than scheduled receipts into the system. The penalty shall apply to each dekatherm of actual receipt quantities that exceeds scheduled quantities plus 2,000 Dth or 102% of scheduled receipt quantities.

The penalty will be equal to three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for the geographical region, as defined in Section 8.5(a) of the General Terms and Conditions of TE's FERC Gas Tariff for the day on which such violation occurred. In addition, TE will not permit retroactive nominations to avoid an OFO penalty.

TE may be required to issue an hourly OFO pursuant to General Terms and Conditions Section 4.3(H) to impose further restrictions in order to maintain the operational integrity of the system.

This OFO will remain in effect until further notice.

Please contact your Operations Account Representative should you have any questions.

Page 70 of 110

Page 71: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/20/2019 09:38:51 AMNotice End Date/Time: 09/27/2019 09:00:00 AMNotice ID: 88680Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/20/2019 09:38:51 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Waynesburg Planned Outage -- COMPLETE

Notice Text: Texas Eastern has completed the previously posted outage at its Waynesburg Compressor Station and the compressor station has returned to full capacity.

Please contact your Operations Account Representative if you have any questions.

Page 71 of 110

Page 72: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/21/2019 09:00:00 AMNotice End Date/Time: 09/22/2019 09:00:00 AMNotice ID: 88709Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/20/2019 03:08:22 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/21/2019

Notice Text: For Gas Day September 21, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 72 of 110

Page 73: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible, secondary out of path, secondary in path nominations not to a primary delivery point and secondary in path nominations to a primary delivery point sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA

Page 73 of 110

Page 74: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 74 of 110

Page 75: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/22/2019 09:00:00 AMNotice End Date/Time: 09/23/2019 09:00:00 AMNotice ID: 88739Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/21/2019 03:38:11 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/22/2019

Notice Text: For Gas Day September 22, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 75 of 110

Page 76: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible, secondary out of path, secondary in path nominations not to a primary delivery point and secondary in path nominations to a primary delivery point sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA

Page 76 of 110

Page 77: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 77 of 110

Page 78: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/23/2019 09:00:00 AMNotice End Date/Time: 09/24/2019 09:00:00 AMNotice ID: 88763Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/22/2019 03:49:06 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/23/2019

Notice Text: For Gas Day September 23, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 78 of 110

Page 79: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible, secondary out of path, secondary in path nominations not to a primary delivery point and secondary in path nominations to a primary delivery point sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA

Page 79 of 110

Page 80: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 80 of 110

Page 81: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/24/2019 09:00:00 AMNotice End Date/Time: 09/25/2019 09:00:00 AMNotice ID: 88790Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/23/2019 03:24:11 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/24/2019

Notice Text:

For Gas Day September 24, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 81 of 110

Page 82: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance

Page 82 of 110

Page 83: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 83 of 110

Page 84: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/25/2019 09:00:00 AMNotice End Date/Time: 09/26/2019 09:00:00 AMNotice ID: 88863Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/24/2019 03:14:23 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/25/2019

Notice Text:

For Gas Day September 25, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 84 of 110

Page 85: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

Page 85 of 110

Page 86: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 86 of 110

Page 87: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/25/2019 09:00:00 AMNotice End Date/Time: 09/26/2019 09:00:00 AMNotice ID: 88876Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/24/2019 07:19:05 PMPrior Notice: 88863Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/25/2019 -- INTRADAY

Notice Text:

As a result of intraday nomination changes for Gas Day September 25, 2019, the following restriction will be in place on the Texas Eastern (TE) system for Gas Day September 25, 2019:

TE has scheduled and sealed nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

In addition, the following restrictions will remain in place on TE for Gas Day September 25, 2019:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of

Page 87 of 110

Page 88: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Page 88 of 110

Page 89: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 89 of 110

Page 90: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/25/2019 01:37:01 PMNotice End Date/Time: 09/26/2019 09:00:00 AMNotice ID: 88878Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 09/25/2019 01:37:01 PMPrior Notice: 88876Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/25/2019 -- INTRADAY #2

Notice Text:

As a result of intraday nomination changes for Gas Day September 25, 2019, the following restriction will be in place on the Texas Eastern (TE) system for Gas Day September 25, 2019:

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

In addition, the following restrictions will remain in place on TE for Gas Day September 25, 2019:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

Page 90 of 110

Page 91: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a portion of secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

Page 91 of 110

Page 92: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 92 of 110

Page 93: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/26/2019 09:00:00 AMNotice End Date/Time: 09/27/2019 09:00:00 AMNotice ID: 88902Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/25/2019 03:30:28 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/26/2019

Notice Text:

For Gas Day September 26, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 93 of 110

Page 94: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area. No increases in nominations delivering to locations between Bedford and Lambertville on TE's 36 inch line which have receipts sourced outside this delivery area will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview. No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) up to Longview will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

Page 94 of 110

Page 95: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 95 of 110

Page 96: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/27/2019 09:00:00 AMNotice End Date/Time: 09/28/2019 09:00:00 AMNotice ID: 88934Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/26/2019 03:35:55 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/27/2019

Notice Text:

For Gas Day September 27, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 96 of 110

Page 97: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 97 of 110

Page 98: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Please contact your Operations Account Representative should you have any questions.

Page 98 of 110

Page 99: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/28/2019 09:00:00 AMNotice End Date/Time: 09/29/2019 09:00:00 AMNotice ID: 88956Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/27/2019 03:02:12 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/28/2019

Notice Text:

For Gas Day September 28, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 99 of 110

Page 100: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and a secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 100 of 110

Page 101: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Please contact your Operations Account Representative should you have any questions.

Page 101 of 110

Page 102: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/29/2019 09:00:00 AMNotice End Date/Time: 09/30/2019 09:00:00 AMNotice ID: 88999Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/28/2019 03:16:12 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/29/2019

Notice Text: For Gas Day September 29, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate Page 102 of 110

Page 103: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 103 of 110

Page 104: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Please contact your Operations Account Representative should you have any questions.

Page 104 of 110

Page 105: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 09/30/2019 09:00:00 AMNotice End Date/Time: 10/01/2019 09:00:00 AMNotice ID: 89010Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/29/2019 03:06:00 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 9/30/2019

Notice Text: For Gas Day September 30, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate Page 105 of 110

Page 106: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 106 of 110

Page 107: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

Please contact your Operations Account Representative should you have any questions.

Page 107 of 110

Page 108: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 10/01/2019 09:00:00 AMNotice End Date/Time: 10/02/2019 09:00:00 AMNotice ID: 89060Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 09/30/2019 03:23:40 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 10/1/2019

Notice Text:

For Gas Day October 1, 2019, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either in the M1-24", M2-24", M1-30" north of Barton Compressor Station (Barton), M2-30" or in M3 for delivery south of Barton. No increases for receipt nominations sourced either in the M1-24", M2-24", M1-30" north of Barton, M2-30" or in M3 for delivery south of Barton will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted TABS, interruptible and a portion of secondary out of path nominations that exceed entitlements sourced from points east of Lambertville for delivery to points west of Lambertville. No increases for receipt nominations sourced from points east of Lambertville for delivery to points west of Lambertville will be accepted.

Due to planned outage, TE has restricted interruptible, secondary out of path, secondary in path and primary firm nominations sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral

Page 108 of 110

Page 109: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path nominations that exceed entitlements, secondary out of path nominations within entitlement and secondary within path nominations not to a primary delivery point in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

As previously posted, due to the unplanned outage on line 41-A in the Cameron System, the following meters will be unavailable for flow:

72135 - MARATHON - VER(S) 369-A, LA73646 - ARENA OFFSHORE, LP -EC 32873696 - GOMEX VR 282

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M1-30, M2-24 and M2-30 and will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones STX, ETX and ELA and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-30/M3 Operational Flow Order effective September 20, 2019 will remain in effect until further notice.

Additionally, TE requires all delivery point operators in Market Area Zone M1-30 to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Market Area Zone M1-30 are required to keep actual daily receipts into the system equal to or less than

Page 109 of 110

Page 110: Texas Eastern Transmission, LP - Spectra Energy...73646 - ARENA OFFSHORE, LP -EC 328 73696 - GOMEX VR 282 TE has Force Balanced a portion of short TABS pools in Access Area zones ETX,

scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1-24" and M2-24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX, ETX, WLA and ELA and Market Area Zones M1- 24" and M2-24" are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.