Texas Eastern Transmission, LP Planned Service Outage Postings from 10/01/2015 to 10/31/2015 Page 1 of 34

Upload: trannhu

Post on 29-May-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Texas Eastern Transmission, LP

Planned Service OutagePostings from 10/01/2015 to 10/31/2015

Page 1 of 34

Page 2: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 10/06/2015 08:45:00 AMNotice End Date/Time: 01/07/2016 09:00:00 AMNotice ID: 52905Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 10/06/2015 08:45:00 AMPrior Notice: 52699Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: Complete Potential Run Comparison Repair Dates: VS6: October 3 - 7

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. If further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates:

72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75475MME DESOTO PIPELINE, LP - (D70475/R76475)75778LONE STAR GAS - WALLER, TX-(D72778/R76778)75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 2 of 34

Page 3: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3 - 7To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow:

72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73391 - FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC)73477 - PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R73669 - SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX75858 - KCS TX INTRASTATE GAS PIPELINE (D72858/R76858)

Customers and point operators located between Huntsville and Lebanon compressor stations should be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels. Customers delivering to meters located between Huntsville and Lebanon compressor stations should consider sourcing gas from receipt points located between Huntsville and Lebanon compressor stations to avoid potential pressure implications.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***French Lick to Seymour Line 1 - Pipeline Maintenance: October 8 -- 11TE will be conducting pipeline maintenance on Line 1 between French Lick and Seymour stations. During this maintenance TE will be required to isolate its Line 1 mainline (24 inch) between French Lick and Seymour stations.

Based on current nominations levels, TE doesn't anticipate any restrictions associated with this outage, however during this outage customers/point operators on Line 1 between Seymour and Lebanon compressor stations be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels. Customers delivering to meters located on Line 1 between Seymour and Lebanon compressor stations should consider sourcing gas from receipt points located on Line 1 between Seymour and Lebanon compressor stations to avoid potential pressure implications.

During this outage TE will have limited operational flexibility to manage imbalances on Line 1 between Seymour and Lebanon compressor stations. As a result, during this outage TE requires all delivery point operators on Line 1 between Seymour and Lebanon to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position. All receipt point operators on Line 1 between Seymour and Lebanon are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position.

Additionally, during this outage all Power Plant Operators on Line 1 between Seymour and Lebanon will be required to provide information mandated by FERC Order No. 698. Information required includes the hourly consumption profile of directly connected power generation facilities.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Vidor to Gillis Line 14 - Pipeline Maintenance: October 14 TE will be conducting a pipeline cleaning tool run on Line 14 between Vidor and Gillis stations. During this

Page 3 of 34

Page 4: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

maintenance the following meter will be unavailable for flow:

73298 - COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX

Additionally, the following meters will be required to shut in as the cleaning tool passes the meter:

71485 - GULF SOUTH PIPELINE COMPANY - GILLIS, LA72395 - SABINE GAS TRANS. - ORANGE CO., TX73147 - CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX73432 - HOUSTON P/L VIDOR73662 - AGL/GOLDEN TRIANGLE STORAGE

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

70192 - SMITH (HARVEY BROYLE) #2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

Page 4 of 34

Page 5: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

If further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #173694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: October 20 - 22 In-Line Tool Dates: October 27Potential Repair Dates: December 28 - January 10 Potential Run Comparison Repair Dates: January 21 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu

Page 5 of 34

Page 6: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: November 24In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Petronilla to Santa Fe:Cleaning Tool Dates:November 30 - December 3In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

Page 6 of 34

Page 7: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Depending on the level of nominations, the following meter may be unavailable for flow for the duration of the cleaning and in-line tools:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

Batesville to Lebanon Line 1 - Pipeline Maintenance: Deferred to 2016To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS6 (a single line system) between Batesville and Lebanon stations. As a result of these investigations, the following meters will be unavailable for flow:

70521 - DUKE ENERGY OHIO, INC.Page 7 of 34

Page 8: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

71353 - COL. GAS - EAST MIDDLETOWN, OH71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH

In addition, if further isolations are necessary the following meter will be required to shut-in:

70552 - TE TODHUNTER - TODHUNTER, OH

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

***Marietta Compressor Station Maintenance: September 9 - October 17TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Kosciusko Compressor Station: October 12 - 18 TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.Page 8 of 34

Page 9: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

***Athens to Berne - Pipeline Maintenance: Deferred until 2016TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss. Repl DtBlessing to Tivoli (Line 16)* ---12/09/1503/01/1603/01/16Petronilla to Santa Fe (Line 16)* ---12/10/1503/01/1603/01/16Hempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15St. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)* ---Complete11/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---10/27/1512/28/1501/21/16Providence to Yazoo City (Line 26)* ---CompleteComplete09/09/15Blessing to Angleton (Line 16)* ---CompleteComplete10/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss. Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss. Repl DtPerulack to Shermansdale (Line 27) ---TBDTBD ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Page 9 of 34

Page 10: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Atlanta to Hope (Line 1)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Clinton to Kosciusko (Line 14)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 15)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Provident to Yazoo (Line 26)Provident City to Thomaston (Line 21)Shermansdale to Grantville (Line 19)Somerset to Summerfield (Line 1)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Tompkinsville to Danville (Line 15)Tompkinsville to Danville (Line 25)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Download File: TE 2015 Maintenance Schedule Rev27.docxPage 10 of 34

Page 11: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 10/14/2015 08:05:00 AMNotice End Date/Time: 01/07/2016 09:00:00 AMNotice ID: 53066Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 10/14/2015 08:05:00 AMPrior Notice: 52905Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

***Vidor to Gillis Line 14 - Pipeline Maintenance: October 15 TE will be conducting a pipeline cleaning tool run on Line 14 between Vidor and Gillis stations. During this maintenance the following meter will be unavailable for flow:

73298 - COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX

Additionally, the following meters will be required to shut in as the cleaning tool passes the meter:

71485 - GULF SOUTH PIPELINE COMPANY - GILLIS, LA72395 - SABINE GAS TRANS. - ORANGE CO., TX73147 - CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX73432 - HOUSTON P/L VIDOR73662 - AGL/GOLDEN TRIANGLE STORAGE

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures:

Page 11 of 34

Page 12: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

70192 - SMITH (HARVEY BROYLE) #2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

If further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #173694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: October 20 - 22 In-Line Tool Dates: October 27Potential Repair Dates: December 28 - January 10 Potential Run Comparison Repair Dates: January 21 - 31

Page 12 of 34

Page 13: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

Page 13 of 34

Page 14: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: November 24In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Petronilla to Santa Fe:Cleaning Tool Dates:November 30 - December 3In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

Depending on the level of nominations, the following meter may be unavailable for flow for the duration of the cleaning and in-line tools:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: Complete

Page 14 of 34

Page 15: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

In-Line Tool Dates: CompletePotential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

Batesville to Lebanon Line 1 - Pipeline Maintenance: Deferred to 2016To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS6 (a single line system) between Batesville and Lebanon stations. As a result of these investigations, the following meters will be unavailable for flow:

70521 - DUKE ENERGY OHIO, INC.71353 - COL. GAS - EAST MIDDLETOWN, OH71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH

In addition, if further isolations are necessary the following meter will be required to shut-in:

70552 - TE TODHUNTER - TODHUNTER, OH

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 15 of 34

Page 16: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

30 Inch System and Market Area:

Marietta Compressor Station Maintenance: September 9 - October 17TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Kosciusko Compressor Station: October 12 - 18 TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Athens to Berne - Pipeline Maintenance: Deferred until 2016TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompPage 16 of 34

Page 17: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Segment Access AreaDateDateRepl DtPoss. Repl DtBlessing to Tivoli (Line 16)* ---12/09/1503/01/1603/01/16Petronilla to Santa Fe (Line 16)* ---12/10/1503/01/1603/01/16Hempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15St. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)*; ---Complete11/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---10/27/1512/28/1501/21/16Providence to Yazoo City (Line 26)* ---CompleteComplete09/09/15Blessing to Angleton (Line 16)* ---CompleteComplete10/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss. Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss. Repl DtPerulack to Shermansdale (Line 27) ---TBDTBD ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Atlanta to Hope (Line 1)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Clinton to Kosciusko (Line 14)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 15)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)

Page 17 of 34

Page 18: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Lilly to Entriken (Line 12)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Provident to Yazoo (Line 26)Provident City to Thomaston (Line 21)Shermansdale to Grantville (Line 19)Somerset to Summerfield (Line 1)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Tompkinsville to Danville (Line 15)Tompkinsville to Danville (Line 25)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Download File: TE 2015 Maintenance Schedule Rev28.docx

Page 18 of 34

Page 19: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 10/14/2015 02:50:00 PMNotice End Date/Time: 01/07/2016 09:00:00 AMNotice ID: 53081Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 10/14/2015 02:50:00 PMPrior Notice: 53066Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

***Vidor to Gillis Line 14 - Pipeline Maintenance: October 15 TE will be conducting a pipeline cleaning tool run on Line 14 between Vidor and Gillis stations. During this maintenance the following meter will be unavailable for flow:

73298 - COTTONWOOD ENERGY COMPANY, LP - NEWTON CO., TX

Additionally, the following meters will be required to shut in as the cleaning tool passes the meter:

71485 - GULF SOUTH PIPELINE COMPANY - GILLIS, LA72395 - SABINE GAS TRANS. - ORANGE CO., TX72604 - GULF STATES UTILITIES - BEAUREGARD PSH., LA73147 - CENTANA INTRASTATE PIPELINE CO. - ORANGE CO., TX73432 - HOUSTON P/L VIDOR73662 - AGL/GOLDEN TRIANGLE STORAGE

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Castor to EOL Line 11 - Pipeline Maintenance: October 14 - 15 TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA75078 - KOCH GATEWAY - CASTOR, LA-(D70078/R76078)

Additionally, the follow following meters may experience lower than normal pressures: Page 19 of 34

Page 20: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

70192 - SMITH (HARVEY BROYLE) #2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72307 - JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA72808 - COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73523 - ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN 173672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75688 - GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7

Based on current nomination levels TE doesn't anticipate any restrictions at this time.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Dates: October 15 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

If further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #173694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

?***Blessing to Angleton Line 16 - Detailed Investigations: October 19 - 24 Cleaning Tool: October 19Detailed Investigations: October 20 - 24

Page 20 of 34

Page 21: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting a cleaning tool run on Line 16 (a single line system) between Blessing and Angleton stations as well as further detailed investigations in VS8.

During the cleaning tool run the following meter will be required to shut in as the cleaning tool passes:

73694 - SWEENY PLANT-CONOCO PIPELINE

During the detailed investigations, the following meters will be unavailable for flow:

73283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX 73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #1

Based on current nomination levels, TE does not anticipate any restrictions during this outage, however if restrictions are necessary, restrictions to interruptible and potentially secondary services may be required for receipts sourced between Little Rock and Blessing for delivery east of Blessing.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: October 20 - 22 In-Line Tool Dates: October 27Potential Repair Dates: December 28 - January 10 Potential Run Comparison Repair Dates: January 21 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: October 29 - November 4

Page 21 of 34

Page 22: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: November 24In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Petronilla to Santa Fe:Cleaning Tool Dates:November 30 - December 3In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO

Page 22 of 34

Page 23: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

Depending on the level of nominations, the following meter may be unavailable for flow for the duration of the cleaning and in-line tools:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

Batesville to Lebanon Line 1 - Pipeline Maintenance: Deferred to 2016To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS6 (a single line system) between Batesville and Lebanon stations. As a result of these investigations, the following meters will be unavailable

Page 23 of 34

Page 24: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

for flow:

70521 - DUKE ENERGY OHIO, INC.71353 - COL. GAS - EAST MIDDLETOWN, OH71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH

In addition, if further isolations are necessary the following meter will be required to shut-in:

70552 - TE TODHUNTER - TODHUNTER, OH

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

Marietta Compressor Station Maintenance: September 9 - October 17TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line.

Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services.

Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 26 - October 21TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow:

73808 - DTI - CRAYNE LL, RT 188, GREENE CO., PA.

Kosciusko Compressor Station: October 12 - 18 TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible.

Page 24 of 34

Page 25: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Athens to Berne - Pipeline Maintenance: Deferred until 2016TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss. Repl DtBlessing to Tivoli (Line 16)* ---12/09/1503/01/1603/01/16Petronilla to Santa Fe (Line 16)* ---12/10/1503/01/1603/01/16Hempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15St. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)*; ---Complete11/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---10/27/1512/28/1501/21/16Providence to Yazoo City (Line 26)* ---CompleteComplete09/09/15Blessing to Angleton (Line 16)* ---CompleteComplete10/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss. Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Holbrook to Uniontown (Line 10) ---20162016 ---

CaliperILIPossible Run CompSegment M3 AreaDateDateRepl DtPoss. Repl DtPerulack to Shermansdale (Line 27) ---TBDTBD ---

Page 25 of 34

Page 26: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Atlanta to Hope (Line 1)Blessing to Angleton (Line 16)Blessing to Tivoli (Line 16)Carthage to Longview (Line 13)Clinton to Kosciusko (Line 14)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Delmont to Armagh (Line 27-1)Delmont to Armagh (Line 27-2)Donaldson to N. Little Rock (Line 1)Donaldson to N. Little Rock (Line 1-AUX-1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)French Lick to Seymour (Line 1)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Kosciusko to Egypt (Line 15)Longview to Atlanta (Line 1)Longview to Atlanta (Line 1N)Lilly to Entriken (Line 12)Norris City to Oakland City (Line 1)Oakland City to French Lick (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Provident to Yazoo (Line 26)Provident City to Thomaston (Line 21)Shermansdale to Grantville (Line 19)Somerset to Summerfield (Line 1)Thomaston to Provident City (Line 21)Tivoli to Petronilla (Line 16)Tompkinsville to Danville (Line 15)Tompkinsville to Danville (Line 25)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)West Monroe to Providence (Line 26)Wheelersburg to Athens (Line 10)Wheelersburg to Athens (Line 15)

Page 26 of 34

Page 28: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 10/27/2015 04:12:00 PMNotice End Date/Time: 01/07/2016 09:00:00 AMNotice ID: 53303Notice Stat Desc: SupersedeNotice Type: MaintenancePost Date/Time: 10/27/2015 04:12:00 PMPrior Notice: 53081Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised

Notice Text: The text below is included in the attached Word document located at the bottom of this posting.

Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date.

Access Area Longview to Kosciusko:

***Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: CompleteILI In-Line Tool Dates: CompletePotential Repair Dates: CompletePotential Run Comparison Dates: October 15 - November 7

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations.

If further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73481 - ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73626 - DAVIS SOUTHERN/BINTLIFF #173694 - SWEENY PLANT-CONOCO PIPELINE75558 - TRES PALACIOS GAS STORAGE - INJ/DEL

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Page 28 of 34

Page 29: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

Donaldson to North Little Rock Line 1 - Pipeline Maintenance: Cleaning Tool Dates: CompleteIn-Line Tool Dates: October 27Potential Repair Dates: December 28 - January 10 Potential Run Comparison Repair Dates: January 21 - 31

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line cleaning and inspection tool runs on Line 1 between Donaldson and North Little Rock stations. Based on current nominations and flow levels no restrictions are anticipated during the cleaning tool runs, however if nominations and/or flow levels change, the following meter may be required to shut-in during the cleaning tool run:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

Additionally, during the in-line inspection tool run, the following meter will be unavailable for flow:

73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR

If further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: November 6 & 7TE will be conducting a pipeline cleaning tool run on Line 16 between its Angleton and Mont. Belvieu stations. During this maintenance the following meters will be unavailable for flow:

73590 - NRG - CEDAR BAYOU75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, the following meters will be required to shut in as the cleaning tool passes the meter:

70129 - LOUIS DREYFUS 72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

***Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: CompleteGauge Tool Date: CompleteIn-Line Tool Date: CompletePotential Repair Dates: November 20 - December 11

Page 29 of 34

Page 30: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION75300 - TEJAS GAS/CLEAR LK. STOR75301 - CALPINE BAYER PWR. PLANT ACCT. PT.

Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules belowIn-Line Tool Dates: See specific schedules belowPotential Repair Dates: See specific schedules belowPotential Run Comparison Repair Dates: See specific schedules below

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows:

Blessing to Tivoli:Cleaning Tool Dates: November 24In-Line Tool Dates: December 9Potential Repair Dates: March 2016Potential Run Comparison Repair Dates: March 2016

The following meters may be unavailable for flow:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX73719 - T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Petronilla to Santa Fe:Cleaning Tool Dates:November 30 - December 3In-Line Tool Dates: December 10Potential Repair Dates: March 2016Potential Run Comparison: March 2016

The following meters will be unavailable for flow during the cleaning and in-line tool runs:72603 - CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO

Page 30 of 34

Page 31: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

73310 - SOUTH SHORE P/L (NE&T), NUECES CO., TX 73617 - ONYX PIPELINE/NUECES BAY73618 - ONYX PIPELINE/BARNEY DAVIS

Depending on the level of nominations, the following meter may be unavailable for flow for the duration of the cleaning and in-line tools:73113 - ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX

The following meters will be required to flow for the duration of the cleaning and in-line tool runs:73258 - MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO73223 - DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX

As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Atlanta to Hope Line 1 - Pipeline Maintenance: Cleaning Tool Dates: CompleteIn-Line Tool Dates: CompletePotential Repair Dates: November 30 - December 13Potential Run Comparison Repair Dates: December 20 - January 6, 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Line 1 between Atlanta and Hope stations. During the cleaning and in-line inspection tool run, the following meter will be unavailable for flow while the tool passes the meter:

72871 - NORAM - BODCAW, AR

Additionally, if further detailed investigations are required, the meter listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates.

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

24" System Longview to Berne:

Batesville to Lebanon Line 1 - Pipeline Maintenance: Deferred to 2016To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS6 (a single line system) between Batesville and Lebanon stations. As a result of these investigations, the following meters will be unavailable

Page 31 of 34

Page 32: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

for flow:

70521 - DUKE ENERGY OHIO, INC.71353 - COL. GAS - EAST MIDDLETOWN, OH71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH

In addition, if further isolations are necessary the following meter will be required to shut-in:

70552 - TE TODHUNTER - TODHUNTER, OH

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline MaintenanceCleaning Tool Dates: Deferred to 2016In-Line Tool Date: Deferred to 2016Potential Repair Dates: Deferred to 2016

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73623 - DUKE ENERGY VERMILLION II, LLC

During this outage, TE will coordinate system receipts and deliveries with point operators to minimize operational impacts.

30 Inch System and Market Area:

Athens to Berne - Pipeline Maintenance: Deferred until 2016TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow:

73297 - DUKE ENERGY WASHINGTON II, LLC

Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow:

73423 - PIEDMONT NATURAL GAS - RUTHERFORD

Texas Eastern DOT Pipeline Integrity Project

TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a

Page 32 of 34

Page 33: Texas Eastern Transmission, LP - Spectra Energy · Texas Eastern Transmission, LP ... receipt/delivery areas on the Texas Eastern Transmission ... WALTER OIL & GAS-KASMAN GATHERING

result of the in-line inspection.

CaliperILIPossible Run CompSegment Access AreaDateDateRepl DtPoss. Repl DtBlessing to Tivoli (Line 16)* ---12/09/1503/01/1603/01/16Petronilla to Santa Fe (Line 16)* ---12/10/1503/01/1603/01/16Hempstead to Huntsville (Line 11)* ---Complete10/03/1510/03/15St. Francisville to Union Church (Line 18) ---201620162016Union Church to Clinton (Line 14) ---CompleteNovemberNovemberAtlanta to Hope (Line 1)*; ---Complete11/30/1512/20/15Donaldson to North Little Rock (Line 1)* ---10/27/1512/28/1501/21/16Providence to Yazoo City (Line 26)* ---CompleteComplete09/09/15Blessing to Angleton (Line 16)* ---CompleteComplete10/15/15Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/15 ---

CaliperILIPossible Run CompSegment M1/M2 AreaDateDateRepl DtPoss. Repl DtNorris City to Oakland City (Line 72)* ---20162016 ---Holbrook to Uniontown (Line 10) ---20162016 ---

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Atlanta to Hope (Line 1)Blessing to Angleton (Line 16)Clinton to Kosciusko (Line 14)Delmont to Lilly (Line 12)Delmont to Lilly (Line 19)Delmont to Lilly (Line 27)Donaldson to N. Little Rock (Line 1)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Entriken to Perulack (Line 19)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Grantville to Bernville (Line 28)Holbrook to Uniontown (Line 9)Holbrook to Uniontown (Line 10)Hope to Donaldson (Line 1)Perulack to Grantville (Line 19)Perulack to Leidy (Line 24)Perulack to Shermansdale (Line 24 Aux-1)Perulack to Shermansdale (Line 27)Provident to Yazoo (Line 26)Provident City to Thomaston (Line 21)Shermansdale to Grantville (Line 19)Somerset to Summerfield (Line 1)Union Church to Clinton (Line 14)Union Church to Clinton (Line 18)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 39)

Page 33 of 34