TGC-electronics commissioning before beam collision
Y. Sugaya Osaka-U
アトラス総会2004 12/23河口湖
![Page 2: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/2.jpg)
2004/12/23 2004アトラス総会 2
Electronics commissioning concept►TOF has been calculated, cable delay has been measured.
● Fine variable delay tuning (sub-nano step). ►Synchronization at early stage
● Easier tuning and reliable operation● Coarse variable delay tuning (12.5 nsec step)● Checking on test bench is effective
►One or a few parameters for Level 1 buffer depth and Beam crossing clock phase turning
L1B
BC clockBC clock
High-ptboard
Sector Logic
Star switch
Slave board
Patch panel
ASD
MuCTPI
Synchronous40 MHz beam crossing clockL1BL1B
![Page 3: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/3.jpg)
2004/12/23 2004アトラス総会 3
SchedulePeriod progra
mitems
during 2005Mass production of electronics
Bench test Crucial check of circuit performance
From Feb. 2005commissioning of a 1/12 slice
test pulse and cosmic-ray
Fine delay including chamber response
After installation, Nov. 2005: M12006: M2, M3
test pulse Coarse delay for synchronous circuits.Level 1 buffer depth
Chambers are ready Cosmic ray Overall check of up to nowTrigger for other detector
2007Single beam operation
beam halobeam gas
Overall check of up to now Bunch crossing clock phaseTrigger for other detector
![Page 4: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/4.jpg)
2004/12/23 2004アトラス総会 4
Inspection of circuits using test bench
►Slice test using completed circuit (at KEK?)
►Validation of trigger performance►Hardware simulation software is ready
● hit pattern <-> trigger signalHigh-ptboard
Sector Logic
Star switch
Slave board
Patch panel
ASD BCID
SoftwareSoftware
![Page 5: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/5.jpg)
2004/12/23 2004アトラス総会 5
Trigger signal from TGC►limited angle, only from vertex
Low pt
High pt
Low pt
High pt
M1M2
M3
Z (mm)
R (
mm
)
From Update of From Update of Technical Design Technical Design Report , 09 June Report , 09 June 20002000
![Page 6: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/6.jpg)
2004/12/23 2004アトラス総会 6
On detector
1/12 slice test using test pulse and cosmic ray
►Assembling of 1/12 of TGC at building 180►Objective
● Final check of chamber and elec. before installation● Fine delay value confirmation
►Remarks● Angle of cosmic ray is limited for triggering● Trigger board with FPGA
High-ptboard
Star switch
Slave board
Patch panel
ASD
Trigger board
![Page 7: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/7.jpg)
2004/12/23 2004アトラス総会 7
TOF
Test pulse run►Pulse to ASD via Patch panel through variable
delay►Objectives
● Confirmation of Coarse delay value● Level 1 buffer depth turning
►Remarks● Simulate signal from particle
►Time of Flight►Cable length correction
High-ptboard
Sector Logic
Star switch
Slave board
Patch panel
ASD
MuCTPI
Synchronous
Test Pulse
L1BL1B
![Page 8: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/8.jpg)
2004/12/23 2004アトラス総会 8
~ 5 million cosmic muons~ 5 million cosmic muons enter the cavern enter the cavern in 15 minutesin 15 minutes
upper hit
lower hit
Event
Cosmic ray run►Objectives
● Confirmation of delay values
● Chamber response to real particle
● Supply trigger for other detectors
►Remarks● Mainly vertical flux● TOF correction by delay
should be reversed at upper side
ATLAS Overview WeekATLAS Overview Week Saturday 02 October 2004Saturday 02 October 2004Pre-collision overviewPre-collision overview R McPherson Univ. of Victoria Univ. of Victoria
![Page 9: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/9.jpg)
2004/12/23 2004アトラス総会 9
Total rate 105 kHz E > 10 GeV 16 kHzE > 100 GeV 1 kHzE > 1 TeV 10 Hz
L=1034
Muons at cavern entranceMuons at cavern entrance
E (GeV)
Single beam run►Beam halo muon►Scattering of beam by r
esidual gas►Objectives
● Beam crossing clock phase tuning
● Overall check ● Provide trigger for other d
etectors ►Remarks
● Halo, only inner, TOF corr. reversed at upstream
● Gas, low pt. ATLAS Overview WeekATLAS Overview Week Saturday 02 October 2004Saturday 02 October 2004Pre-collision overviewPre-collision overview R McPherson Univ. of Victoria Univ. of Victoria
![Page 10: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/10.jpg)
2004/12/23 2004アトラス総会 10
Summary of Programs►Run type, turning parameters
Rate timingL1B depth turning
BC clock phase turning
Trigger for other detectors
From when
1/12 slice test
goodfine
delayNo No No
assembling of 1/12
Test pulse goodCoarse delay
yes No yescabling and low
vol.
Cosmic rayvertical mainly
yesyes
TOF corr.No
yesTOF corr.
HV on
Beam haloinner
mainly yes
yesTOF corr.
yesTOF corr.
yesTOF corr.
Single-beam
Beam gasyes
low ptyes yes yes yes
Single-beam
![Page 11: TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖](https://reader036.vdocuments.net/reader036/viewer/2022082821/5697bff51a28abf838cbd8d7/html5/thumbnails/11.jpg)
2004/12/23 2004アトラス総会 11
Summary
►Trigger performance check at bench test with hardware simulation software
►Timing parameter confirmation and tuning at commissioning stage, step by step ► Test pulse► Cosmic ray► Single beam; beam-halo and beam-gas
►Detector performance test by cosmic and single beam run► Cosmic ray► Single beam; beam-halo and beam-gas