the 2nd generation dc all-electric subsea production ... · pdf file2 the 2nd generation dc...

24
The 2nd Generation DC All-Electric Subsea Production Control System Jan van den Akker – Cameron JOURNEES ANNUELLES DES HYDROCARBURES 2011 Atelier 5 : Equipements Innovants SUBSEA

Upload: vodiep

Post on 09-Mar-2018

223 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

The 2nd Generation DC All-ElectricSubsea Production Control System

Jan van den Akker – Cameron

JOURNEES ANNUELLES DES HYDROCARBURES 2011Atelier 5 : Equipements Innovants SUBSEA

Page 2: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

2

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• QualificationApproach/Status

• Summary

2

Page 3: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

All Electric Subsea SystemEnabler Technology for:

• Subsea Production Systems, which have:

Environmental demand for Zero discharge

High availability requirements

Extreme offset and/or water depth

• Subsea Processing, which needs:

Ultra fast control (slugs)

Continuous valve actuation (separator tank level)

Integrated Control

3

1st. electric tree being runon K5F Field, May 2008

Model of gate valve w/ electric actuator

3

Page 4: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

All Electric “DC Technology” - Milestones

19991999

DCDCProgramProgramStartStart

20042004

SuccessfulSuccessfulPilot TrialPilot Trial((BPBPMagnus)Magnus)

20042004

SuccessfulSuccessfulPilot TrialPilot Trial((BPBPMagnus)Magnus)

20082008

SuccessfulSuccessfulStart World‘sStart World‘s11stst

All ElectricAll ElectricProductionProductionSystemSystem((Total K5F)Total K5F)

20082008

SuccessfulSuccessfulStart World‘sStart World‘s11stst

All ElectricAll ElectricProductionProductionSystemSystem((Total K5F)Total K5F)

20112011

QualifiedQualifiedESCCSVESCCSVavailable,available,awaiting fieldawaiting fieldtrailtrail

2011+2011+

22ndnd gen DC fullygen DC fullyqualifiedqualified

All ElectricAll ElectricTechnologyTechnologywidely acceptedwidely acceptedwithin industrywithin industryas a trueas a truealternative foralternative fortraditional E/Htraditional E/HMuxMux SystemsSystems

4

Page 5: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Power Transmission, Communication

Subsea Control Module

Surface Control System

Electric Actuation

Page 6: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

6

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• QualificationApproach/Status

• Summary

6

Page 7: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Phase 1 Scope (installed):

• 2-off Mudline Style X-Mas Trees

• Production Control System

• Installation & Workover Control system

Phase 2 Scope (on order):

• 1-off Mudline Style X-Mas Trees

Page 8: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

System – OverviewMC

S

RigPower

RigPower

PRCM ‘A’

PRCM ‘B’

Anod

e

Anod

e

eSCM ‘A’

eSCM ‘B’

Act 1A B

On K5F,9 Tree Functions, plus8 Sensors

Umbilical

SeawaterReturn

Act 2A B

SensorA B

SeawaterReturn

EPCU ‘B’

EPCU ‘A’

Cath

ode

Cath

ode

AnodeUmbilical

AnodeUmbilical

8

Page 9: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Status• System in production since September 2008

• Per September 2011, 2 recorded unplannedsystem/well shutdowns which were a directresult of the DC System.

On 06 Jan. 2009, there was a system shutdowncaused by a topside component

On 24 Dec. 2010, there was a shutdown of tree#1 caused by a subsea component (failureinvestigation ongoing)

• Well 1 back in production using spareequipment, Subsea Distribution componentsunder review

• System under constant performance review inorder to learn for 2nd generation and futureapplications

99

Page 10: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Transfer ofField Data

DC System MCS

Reference Data

Condition Monitoring

PDA: Process Data Analysis

10

Page 11: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

11

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• QualificationApproach/Status

• Summary

11

Page 12: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Lessons Learnt• The Subsea fail-safe Electric Actuators have

performed to full satisfaction, the well was NEVER inan unsafe state.

• To original concept of CoP in combination with coaxcable, does not represent state of the art technology

• Special designed electronics haven proven to berobust, but are high cost compared with commerciallyavailable components

• Separate assemblies for each channel is not required,similar approach as with traditional systems isacceptable (separate channels but in one retrievableunit)

• Selection of electric distribution components requirereview

1212

Page 13: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

13

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• QualificationApproach/Status

• Summary

13

Page 14: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

State of the art comms• Increase data transfer rate

Usage of optical fibers between topsideand router module

Usage of DSL between router moduleand ESCMs

• Long step-out distances (> 100 km)

• Using field proven technologies

• Flexible field layouts

• Open communication architecture

• Allow for plug & Play

1414

Page 15: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Open Communication Architecture

• Based on Industrial Ethernet (TCP/IP)

• Managed, Scalable and Expandable• Heavy Industry Proven Technology

• Communication Distribution Unit included• Conversion of FO Signal to Copper (Ethernet/DSL)• Distribution of Power• Several Sensor Interfaces (e.g. SIIS Level I / II / III and IWIS)• Network access for 3rd party devices

15

Media Type Fiber Optic Ethernet Copper Ethernet DSL

Speed 100 MBit/s 100 MBit/s 192 kBit/s

Distance 160+ km Up to 100 m Up to 36 km

15

Page 16: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

16

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• QualificationApproach/Status

• Summary

16

Page 17: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Concept

17

FO 160 km+

DSL 16 km+

EPU /MCS

EPCDU

ESCM

DC Tree

32Functions

A B

17

Page 18: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Layout ESCM• Standard footprint, and locking

device

• All components are inside pressurecompensated oil filled housing

• Controls up to 32 functions

• Front access for power & commsinput, and 3rd party sensors (MPFM)

• Integrated SEM “A” and SEM “B”

• Simultaneous multiple actuations

• Complete modular concept usingpre-tested modules and wiringharness

1818

Page 19: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Layout EPCDU• Standard footprint and locking

device

• All components are insidepressure compensated oil filledhousing

• Converts FO signal into copperDSL, using field proven system

• Can control upto 5 ESCMs

• Top, Front and Bottommounted E-connectors

• Synergies with E/H-Muxequipment: 50% of componentsare field proven.

1919

Page 20: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

20

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• Qualification Approach/Status

• Summary

20

Page 21: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Qualification Status

• Single Board Q1 level testingongoing, various componentscomplete

• Q2 testing of various assy’scommenced, a few sub-assy’scomplete

• Assembly level testing scheduledfor Q4/2011

2121

Page 22: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

22

The 2nd Generation DC All-ElectricSubsea Production Control System

Agenda

• Introduction

• Performance 1st Generation

• Lessons Learnt

• Inclusion state of the art Communication

• Concept 2nd Generation

• QualificationApproach/Status

• Summary

22

Page 23: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Summary• 3+ yrs of successful production with the 1st generation

electric tree provided valuable feedback as a basis for the2nd generation development

• Significantly increased condition monitoring capabilities area valuable asset in comparison with traditional systems

• In order to further enhance functionality, field proven highbandwidth communication technologies have beenintroduced

• 2nd generation electric systems are now cost competitivewith E/H-Mux

• Technology qualification process runs at full steam.Component qualification is expected to be complete byQ4/2011

2323

Page 24: The 2nd Generation DC All-Electric Subsea Production ... · PDF file2 The 2nd Generation DC All-Electric Subsea Production Control System Agenda • Introduction • Performance1st

Contact

Jan van den AkkerProduct Manager ControlsCameron GmbHCelle, [email protected]

+49 5141 806 955+49 172 545 6932

Thank You

2424