Webinar Series
The ABCs of BCAs: Their Value in Asset
Management and Planning
Bill Bacon, DpIT, CET, PMPSenior Technical Project Manager, Technical Services Dept,
Housing Services Corporation
October 28, 2015
About Sustainable Housing Asset Resource
Exchange (SHARE)
http: //share.hscorp.ca
ONLINE RESOURCE HUB
Revitalization
ONLINE RESOURCE HUB
• EOA Resource Centre
• Building Capacity
• Revitalization
EVENT SERIES
Regeneration Forum
EVENT SERIES
• Webinar Series
• Innovation Events
• Regeneration Forum
Upcoming eventsSHARE Webinar
Slicing up the Cake: Making Stock Transfer Happen in Canada
November 17, 2015 | 12:30 to 1:30 p.m. EST | Cost: free
Join us for this unique opportunity to go in-depth with BC Housing’s CEO, Shayne Ramsay on the creation of a
program to facilitate the stock transfer. He will share the nuts-and-bolts of the program, including its structure, goals
and expected outcomes.
You will learn:
• The details and mechanics of the program
• Structural elements and requirements: policies, operating agreements and financial tools
• Approaches and methods for assessing and selecting non-profit providers
• Frameworks for accountability and reporting
• Financing support and resources for non-profit providers
• The role of BC Housing and non-profit providers Shayne Ramsay is CEO of
BC Housing, the provincial
agency responsible for
creating housing options for
those most in need in British
Columbia.
To register, go to the events tab on the SHARE website: http: //share.hscorp.ca
Upcoming events
Bill Bacon:
Senior Technical Project Manager
About this Webinar:
� Increasingly, housing providers across Canada are using a
Building Condition Assessment (BCA) as a trusted resource to
effectively manage aging assets and to make informed
decision-making about capital planning.
� This webinar intended to demonstrate how to move from a
reactive to a planned asset management approach using a
Building Condition Assessment (BCA).
Outline
�The BIG PICTURE - capital planning and why it
matters
�Building Condition Assessments (BCA)- what,
why and how
�Using and Interpreting the BCA
�Updating Existing BCAs
�“I need HELP”
What is involved in managing assets?
THE BIG PICTURE:
Typical stages in the lifecycle of an asset
Decision making model for capital projects
1
Evaluate needs and priorities - assess planned and unplanned capital needs, prioritize projects
2
Establish annual plan - assess project options and develop formal plan with regard to available funding, risks and capacity
3
Implement plan - execute projects or defer projects with associated monitoring, revise capital needs list accordingly
What do I need to get started?
To help establish your comprehensive capital
plan, you will need 3 key ingredients:
Building Condition
Assessment (BCA)Energy Audit (EA)
Reserve Fund Forecast (RFF)
What is a Building Condition Assessment?
• It is a technical inspection of your building and its individual
components that assesses the future maintenance needs of a
project; usually involves:
� a walk-through of the building and property
� a review of maintenance history and drawings
� discussions with key staff
• Undertaken by competent assessors and/or a qualified
technical advisor
• Can be done visually or by using computer based models (or a
combination of both)
Value of a BCA
� Essential in keeping facility managers in control of their
facilities.
� Assists in planning for major expenditures within a certain
timeline.
� Provides information required to develop a capital repair
reserve fund.
� Minimizes pre-mature asset failures, shorter useful asset lives,
higher repair and replacement costs that can impact capacity
and quality (health, life, safety).
Important is mitigating unnecessary exposure to
legal, social and other risks associated with
deteriorated facilities, statutory non-compliance
and hazardous materials.
A building condition assessment is not the same
as a technical audit. Technical audits look for
construction and design defects. They usually
involve “destructive testing” to inspect in and
behind walls and ceilings, and are much more
expensive.
What a BCA provides?
For the building and its major components, a BCA provides
reliable and objective details on:
Current condition rating
Serviceable life remaining
When repairs or replacements will
be required moving forward
An estimate of costs for the future
repairs or replacements
What a BCA provides?
� forecasts replacement needs over the extended operating period of the
building (up to 30 years) using standard useful life estimates
� estimates capital costs for replacement/repairs, identified for each
element and rolled up to help provide a cumulative annual picture of
projected costs over time
� estimates typically valid for up to 5 years from initial inspection, so it
should be updated every 3-5 years to ensure that the BCA continues to
reflect actual conditions
� by using standard templates, the base projection of the BCA can be
refreshed every 5 years, enabling the capital plan to remain a valuable and
reliable tool for managing assets over time
What a BCA doesn’t provide…
• Estimates of other costs that may need to be incurred i.e.,
�Soft costs related with design, tendering, permits etc.
�Consequential costs i.e., removal of roof top equipment to repair roof
�Cost of inflation
Caution: Estimates on near term costs will be more
accurate than longer-term forecasts and this should be
taken into account.
Requirements to conduct BCA
� Commission/ engage competent assessment firm (RFP)
� Provide assessors: – Full access to building and all building components
– Building construction drawings and specifications
– Details of any renovations/changes/alternations made to facility
– Maintenance records- especially anything that suggest repeat problems in units
– Any compliance orders by Authorities Having Jurisdiction
– All existing warranties, guarantees and service contracts
• Assessor will inspect your building. There is no need to look at every single items. Unless you are doing a more complete inspection to create benchmark data for your maintenance program, a sample will do.
If you ask your staff to do this job, be realistic
about the amount of work involved. It can take up
a lot of time. That could take away staff time from
other essential work for your organization.
What is in a BCA report?
� Introduction (general descriptions, purpose, scope of investigation)
� Terms of Reference (Authorizations, investigation procedures,
limitations)
� Observations/ Condition Analysis (roof, exterior windows,
interiors, landscaping, mechanical systems, electrical systems)
� Financial Analysis (Reserve fund study projections)
� Conclusions and Recommendations
� Appendices� Capital Replacement Study Table
� Capital Replacement- 20 year schedule
What’s not in the report?
� A report on every item in your building. Capital
items that are meant to last the life of the building,
such as foundations, won’t be covered unless the
assessor spots a structural problem- or you point
one out.
� A discussion of routine repairs and maintenance.
Your report won’t talk about these things except to
suggest preventive maintenance to make capital
items last longer.
Don’t expect:
Your report should also suggest ways you can save money, such as:
• preventive maintenance practices – ways of looking after capital items to
make them last longer
• less expensive replacement items that could work just as well as the
original items
• where higher-quality replacements can save you money in the long run
• When it is cheaper to replace a capital item than keep on repairing it,
even if the item is still working.
A good report should give you an opinion on your building’s
general condition and note any problem areas that may need
in-depth testing. It should also tell you about any building
code changes that will mean upgrading when you change a
capital item, rather than just staying with the same quality as
before.
Using and interpreting the BCA
�Look for priority issues i.e., Life Safety,
Structural Integrity etc.
� Develop action plans to address issues based on
their priority
SAMPLE PRIORITY RATINGS
PRIORITY A Life, Safety
PRIORITY B Structural Integrity
PRIORITY C Legislative Requirements
PRIORITY D Building Functionality
PRIORITY E Cost Effective Upgrades
Using and interpreting the BCA
SAMPLE CONDITION RATINGS
GOOD Like new condition, no work or maintenance required
FAIR Working condition with some maintenance or minimum work required
POOR Replacement or major report work required
CRITICAL No longer working or failure is imminent
� Look for critical or poor conditions that require
attention:
� Prioritize, and develop action plans to address
required repairs or replacements
� Consider synergies where practical
Using and interpreting the BCA
� Look at Repair and Replacement Schedule (costs and
timelines)
� Develop a plan (Reserve Fund Forecast) to ensure monies
required for the forecasted repairs and replacements is
available when needed
Example- Ontario
• Ottawa Community Housing Corporation conducted a BCA of
its portfolio in 2008 and identified $211 million in capital
repairs that were overdue and a further $121 million in
repairs that would be required over the next five years. The
BCA estimated that if OCHC invested about $66.5 million each
year for five years, the repair backlog for the entire portfolio
would be reduced.
Building on the original BCA, OCH is developing an integrated
program that will provide updated data on capital requirements,
along with financial planning and project implementation
planning. The enhanced system, known as the Integrated BCA
will be the foundation for OCH capital decision-making.
Example- Ontario
The United Counties of Leeds and Grenville (United Counties) conducted 2 case
studies.
1) affordable housing strategy in 2004.
2) building condition assessment study in 2005.
Studies revealed:
– changing demographics in their communities: the population was aging &
required barrier-free and/or accessible housing
– increase in the number of smaller households, particularly single-person
households.
– social housing stock was also aging and operating costs were increasing,
particularly utilities and maintenance.
– capital cost projections noted in the BCA study were high.
The United Counties calculated it would cost $1 million per year for the
next 30 years to keep their social housing in good repair
What if you have a BCA from 10 years ago?
Step 1: Find your BCA….REMOVE THE DUST…its still usable but!
Step 2: Validate or update your existing BCA
– Revise the timing of replacements based on new lifespan
information. Perhaps you expected to replace a number of
carpets, say, in the past 3 years, but you replaced fewer (or
more); or maybe that roof is going to last longer than you
expected.
– Revise the cost replacements based on new cost
information. The cost of materials change and so does tech.
Sometimes building code changes mean a standard
replacement that’s different from what you expected.
What if you have a BCA from 10 years ago?
Step 2: Validate or update your existing BCA
– Additional things to the list of capital items if necessary.
There may be a capital item that you didn’t expect would
need replacing like an elevator or wiring systems.
Bill Bacon Adeel Qasim Kerrie Michelutti Alan Bodimeade
If you want to know more about updating your
existing BCA, contact HSC Tech Services team:
EOA? No Way! Not
Without a BCA!”
Often times housing providers get a BCA completed
just because they’re “supposed to”. The BCA can be
a very powerful tool for more than assessing your
building needs.
Why BCAs are important for EOA Planning
• Updating or creating BCA’s is usually a first step
undertaken in looking at options at EOA.
• If a building has considerable capital needs a BCA can
help you decide if it is worth to continue to pour huge
amounts of money into it or is it time to renovate,
redevelop or sell?
“Dude, you’d be whacked to try to progress on EOA
without BCA info!” (Street Rap Cooperative)
Tools:
Building Condition Assessment
• BCA Updates
• Asset Planner
Designated Substance
Survey
Energy Use and Savings
Study
Accessibility Study
HSC Technical Services Can Help with Your
Capital Projects To-Do List
Ontario & across Canada
Procurement Management
Full Project Management
Services
Multi-Year Project
Management
Preventive Maintenance
Planning
Building Inspection
Reports
Data Verification
for Asset Planner
Thank you
Contact information:
Bill Bacon, DplT, CET, PMP
Senior Technical Project Manager
Telephone: 705-618-0512
E-mail: [email protected]
Adeel Qasim, PMP
Senior Project & Program Manager
Telephone: 416-594-9325 ext. 248
E-mail: [email protected]
Alan Bodimeade
Senior Technical Project Manager
Telephone: 416-594-9325 ext. 227