the arena (a project of bahria town)
TRANSCRIPT
THE ARENAA PROJECT OF BAHRIA
TOWNPresented ByM. Omar Tariq
Badar Sultan QureshiShujaat Khan
INTRODUCTION• Inaugurated in April 2012.• Based on the vision of the founder of Bahria Town. • Pakistan’s first Gold Class Digital 3-D Cinema. • One of its unique kind of cinema of international
standards with “Gold Class” category. • Favorite hangout for the film buffs of twin cities and of
Bahria Town as well.
INTRODUCTION• Unique blend of the latest high-tech
equipment combined with serene luxury.• Arena has the seating capacity of 252 heads
at a time and has an addition of 2 V.I.P Boxes consisting of 6 Lay-z-Boy recliners each.
• It is not just a movie theater but a back to back entertainment facility of fun & games for the entire family.
ARENA FEATURES• Seating Capacity 264• 2 VIP Box Offices with electronic sofa
recliners• Concession Area• BARCO Digital 3D Projector• 4-Way QSC Sound System• Restaurants• Shopping Arcade
SPONSORS
GENERAL INFORMATIONOwner• Malik RiazBoard of Directors• Bena Riaz• Ali RiazArchitects Of Arena• Ali Ishaq- Also the Head of Bahria PMO• Architects INC
GENERAL INFORMATIONConstruction Company• Bahria Construction CompanyCovered Area• Approximately 12 Canals• Started June 2010• Fish date June 2012• Budget approved: Rs. 20 crores
LAYOUT DESIGN
TECHNOLOGY
• World’s brightest BARCO projector. • A state of the art 7.1 channel 4-way QSC
digital audio systems. • Equipped with latest 3D technology.
BENCH MARK• The bench mark of arena was Cine-Gold that
is located in Mall of Lahore that was the first cinema project by Bahria town.
ORGANIZATION STRUCTURE
General Manager
Human Resource
Marketing Media Projec
tionAccou
ntsTheatr
e
PROJECT MANAGEMENT OFFICE• Bahria has established its own PMO to handle and
coordinate all the projects in all over Pakistan including establishment of new societies, malls, theme parks, individual projects and exporting technical expertise.
• Ali Ishaq was the head of PMO, project manager, and the architect of Arena.
• PM selected before making the project charter• PM had legitimate authority to determine, manage
and change the budget, resources and staff.
WHO SIGNED OFF THE PROJECT?
• MR. Sajid Ilays. (General Manager )• MR. Commodore Ilays. (V.P Bahria Town)• MR. Ali Riaz Malik (CEO Bahria Town)• MR. Malik Riaz (Owner of bahria town)
• Decide whether the project is a success or not. • What elements need to be added. • Responsible for signoff of the project.
STAKEHOLDERS OF ARENA• Malik Riaz (The owner of Bahria town)• Bahria Construction Company• Sajid Ilays (General manager of Arena)• Ali Ishaq (Architect and project manager of
Arena)• Bahria Community.
STAKEHOLDER ANALYSISPower/Interest:• Mr. Sajid Ilyas• Bahria Town CommunityPower/Influence• Mr. Malik Riaz• Mr. Ali Ishaq• Bina Riaz• Ali Riaz
TRIPLE CONSTRAINTS
Performing Arts
Theatre
Rs. 20 Crores
2 year
s
SCOPE STATEMENTObjectives• Provide the Bahria community a place of
entertainment through reviving performing arts.
But• Later on, with the consent of the BODs
and the stakeholders, it was decided that the building will be converted into the state-of-the-art 3D cinema.
SCOPE STATEMENT• The reasons that were considered to scope
creep were:• Community Demand• Time to break-even• Revenue generation• Differentiation
WORK BREAKDOWN STRUCTURE
The Building
Exterior
Masonry Work
Finishing
Interior
Electrical
Plumbing
Decorations
Foundation
Excavation
Steel Erection
DELIVERABLES• Site clearance• Excavation• Sand cushion• Laying PCC• Fixing reinforcement for foundation• Fixing form work• Laying concrete in foundation• Foundation up to plinth beam• Fixing reinforcement for Plinth• Form work for plinth• laying concrete in plinth• fixing reinforcement for column• Fixing formwork for column
DELIVERABLES• Concreting for column • Tie beam • Brickwork • Fixing of doors • Column reinforcement • Concreting for column • Tie beam • Brick work • Fixing doors • Reinforcement for folded plate slab• Form work for folded plate slab inside• Concreting for folded plate slab
DELIVERABLES• Column reinforcement • concreting for column • Brick work up • Column reinforcement• Beam at roof• shuttering & reinforcement for slab• RCC Slab• Brick work up to roof level• Acoustic paneling• HVAC ducting• Electric wiring and fixing lights• False ceiling in arena
DELIVERABLES• F&S in arena• Fixing the screen• Fixing the seats• Fixing the Projectors• Laying carpets in arena• Final finishing works• Handing over to client
QUALITY CHECKS• Bahria town has its own QC department.• Government certification and
licensing(Censor Board).• Distribution rights.
CORRECTIVE OR PREVENTIVE ACTIONS• The project manager of Arena focused on taking
preventive actions so that there is less problems to solve.• He took preventive action in terms of:• Material (steel, cement, bricks, labor)• Equipment Acquisition• Electricity
GOVERNMENT INFLUENCE• Government of Pakistan has a proper check and balance
on Arena from checking their license to tax payment to film censor certification.
• Chaudhry Nisar, the interior minister, member of Pakistan Muslim League Nawaz has a personal issues with Mr. Malik Riaz , so he on and off creates problems for Bahria town projects from time to time.
PROBLEMS FACED BY ARENALess revenue• as they can play only one movie at time.
Seating arrangement• designed as a theater with one hall and 250
seats which was later turned into a cinema, makes the first row very uncomfortable as the screen is just on the head.
Single screen • creates problem in adjusting the movie
timings.
FUTURE PLANS• Extension of hall• Up-gradation of equipment
CONCLUSION- SUCCESS• Cinema is the one of the medium of
entertainment in the world.• Arena is one of the best cinemas that are
providing healthy entertainment.• Arena is not only providing cinema facilities but
also deals with exclusive corporate event.• Mobilink, Telenor, and Ufone are the major
corporate clients of Arena.• This all shows that if the project is done in
a proper manner it can lead to a great success just like “ARENA”