Wind Farm Design Considerations
•Apply for electrical interconnection.
•Conduct interconnection studies.
•Payments to transmission operator.
•Establish contiguous block of wind
leases.
•Evaluate community attitudes toward
wind farm.
•Open communication with community leaders
and government officials.
•Hold informational meetings during design, construction
and operations.
Conduct desktop level environmental and cultural resource studies early on.
Preliminary risk assessments.
Multi-year avian and bat surveys.
Sensitive habitat assessments.
Cultural resources studies.
Noise and flicker modeling.
Final risk assessments.
Use results to drive design.
•Multi-year measuring campaign (MET Towers).
•Wind Resource Evaluation and Mapping.
•Use results to inform turbine siting.
Strong Wind Resource
Low Impact
Transmission / Interconnection
Community Support /
Land Base
![Page 3: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/3.jpg)
Wind Farm Planning Process
Site Selection & Preliminary Evaluations
Land Leasing
Interconnection
Desktop Evaluations
(wind resource, environmental, cultural, etc)
Multi-year detailed studies
(wind resource, environmental, cultural, etc)
Project Design & Engineering
Permitting
Construction
Operations
Effective Communication & Periodic Project Evaluation
![Page 4: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/4.jpg)
Turbine Siting Considerations
Regulations (Federal,
State, local)
Energy Production
Strong Lease Block
Setbacks from
residences
Setbacks from Natural & Cultural Features
Minimize sound and
flicker
Landowner and
Community Input
Construction Logistics
![Page 5: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/5.jpg)
Due Diligence •Spring & Fall Migration Surveys •Eagle Surveys •Summer and Breeding Surveys •Anabat or Mist-netting Bat Surveys
A v i a n
& B a t
S t u d i e s
•Wetland Surveys •Threatened and Endangered Species Surveys •Agency Consultations •Cultural Resources Studies
O t h e r E n v i r o n m e n t a l
S t u d i e s
•Geotechnical Investigations / Foundation Design •Site Surveys •Delivery and Construction Logistics •Transmission and Interconnection Studies •Sound and Flicker Studies
E n g i n e e r i n g
S t u d i e s
•Access Roads and Turbines along field divides •Minimize impact to existing agriculture •Electrical infrastructure installed below plow depth
O t h e r C o n s i d e r a t i o n s
![Page 6: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/6.jpg)
CONSTRUCTION
![Page 7: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/7.jpg)
• Typical road is 16’ wide and has 12” of stone to
accommodate the weight of the turbine and crane
components
Road Construction
![Page 8: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/8.jpg)
• Each site has a crane pad constructed with 12” of stone to
support the 660-ton Manitowoc 18000 crane
• The pad measures 75’ x 55’
![Page 9: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/9.jpg)
• Layout for mud mat and foundation
![Page 10: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/10.jpg)
![Page 11: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/11.jpg)
• The 80M design contains 400 yards of concrete.
• Our 100M design incorporates 500 yards.
![Page 12: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/12.jpg)
![Page 13: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/13.jpg)
• Site ready for turbine components
![Page 14: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/14.jpg)
![Page 15: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/15.jpg)
![Page 16: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/16.jpg)
• Tower Base
![Page 17: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/17.jpg)
• Intensive manual labor
![Page 18: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/18.jpg)
• Communication between crew and crane
![Page 19: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/19.jpg)
• Middle tower section
![Page 20: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/20.jpg)
![Page 21: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/21.jpg)
• The rotor is assembled, and torque on the ground is completed before the unit is lifted.
![Page 22: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/22.jpg)
![Page 23: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/23.jpg)
• Two cranes are utilized until the rotor is vertical.
• Blade socks with ropes are also used to guide the other
two blades.
![Page 24: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/24.jpg)
•The crew cuts loose the assist crane
• Blade socks with ropes guide the rotor.
![Page 25: THE BASICS OF WIND FARM DESIGN & ENGINEERINGheritagewindenergy.com/.../uploads/2012/02/windfarm...Wind Farm Design Considerations •Apply for electrical interconnection. •Conduct](https://reader030.vdocuments.net/reader030/viewer/2022041005/5eaa6805c6c64676ff4bba1a/html5/thumbnails/25.jpg)
• Completed Site takes approx 1/3 acre.
• Land can be farm right to the edge of turbine site.