About UsDetail About Our Company
ʻʻOur experience gives us confidence
We combine both core technical know-how and global administrative know-
how arising from big and important projects in refinery, energy and industry
sectors.
1
Gizil Enerji
Who we areThe Core of Our Know-How
Diesel Hydro
Treating
Reformer Project
(Tüpraş)• 2003-2007
• 360 million$
budget
Truck Loading
Station and
OxygenateTanks
and Transfer
Sys.Project
(Tüpraş)• 2007-2009
• 20 million$
budget
Gasoline
Specifications
Improvement
Project (Tüpraş)• 2007-2009
• 80 million$ budget
Resid Upgrading
Project (RUP)
(Tüpraş)• 2009-2013
• App. 3 billion $
budget
• The biggest
project in Turkey
at one time
• Portfolio and Partner Management (2007-2009)
• Marketing and Communications (2007-2009)
• Continous Improvement (2009-2010)
• Strategy and Business Development (2010-2014)
INDUSTRIAL ENGINNERING AND MECHANICAL ENGINEERING DISCIPLINES
CORE TECHNICAL
KNOW-HOW
GLOBAL ADMINISTRATIVE
KNOW-HOW
+
Management Consultancy@Siemens (2007-2014)
MSc. MECHANICAL ENGINEERING AND ELECTRICAL ENGINEERING DISCIPLINES Gizil Enerji
What we want to doOur Goal: Sustainable Partnership
MissionWe provide innovative and cost effective products/ services
for the projects demanding technological and specialized
know-how in our focus sectors like refineries,
petrochemical plants and power plants.
VisionBe the most
preferred solution partner
in our operation fields till 2020
Core ValuesEthicsGo forward without
abandoning the principles of
business ethics and honest
work. We abide by the laws
and ethics and work with our
customers depending on the
principle of 'win-win' to make
our success sustainable.
EntrepreneurshipEntrepreneurship as a
way of doing business
and make prospective
research to uncover new
opportunities. Our goal is
to create new
opportunities by leading
the sector.
EnthusiasmThe source of our success is
desire and enthusiasm. We
always strive for our
customers and for our
society with the principle of
that success is just the
beginning of each new move.
InnovationThe key for adding value to
our customers and our
community. We closely
follow up innovations in our
industry and we create
added value through
continuous improvement
efforts.
What is our ambition?
What do we do to achieve
our ambition?
How do we act?
Gizil Enerji
How we can doOur way of doing business
*) mostly via our partnerships
Gizil Enerji
GENERAL MANAGER
Finance andAccounting
Marketing and
Communication
Sales and Offer
Business Excellence Human Resource
Strategy and Business Development
Project and EngineeringServices
Mechanical Piping Electrical
Process* Civil*
Instrumentation
PortfolioOur Portfolio Offerings
ʻʻProducts and Services in Global Standards
We have a wide range of product portfolio via our business partnerships
worldwide. In addition to this, all relevant approaches (e.g. Engineering,
Project Management) we use are originated from recognized global
methodologies.
2
Gizil Enerji
TURNKEY PROJECT (EPC)BASIC AND DETAILED
ENGINEERINGPRODUCT SUPPLY
ELECTRICALPIPINGMECHANICALCIVIL AND STEEL PROCESS
• Piping and Instrument
Diagrams
• Review of P& ID -
Jointly with Client
• Pump specifications
• Tank specifications
• …
• Preliminary projects of
the equipment
• Steel projects
• …
• Technical specifications
• Mechanical datasheets
• Mechanical equipment
list
• Metallurgy flow
diagrams
• List of spares
• Material requisitions
• Tender packages for the
main equipment
• …
• Isometrical drawings
• Pipe stress analysis
• Prepare material lists
• Support design and
selection
• …
• Technical specifications
• Electrical load list
• One lines and protection
and metering diagrams
• Area classification
drawings
• Major cable routings
• Equipment data sheets
• Equipment layouts for
substation
• List and quantity of bulk
materials
• Lighting projects
• Grounding projects
• Preliminary system model
• …
INSTRUMENTATION
• Instrument datasheets
• Control valve sizing
• Relief valve sizing
• I-O list
• Cable list
• Main instrument cable
routing
• …
What we can doEngineering Services in Global Standards
Gizil Enerji
We can do in this wayA well-structured Project Manegement approach
Dispatching
Project
Management
Infrastructure
Project Definition Project Planning Procurement
Action Planning
for Improvement
Customer
Satisfaction
and Feedback
ClosureCustomer
AcceptenceComissioning
Insta
llatio
n
Project Controlling and Monitoring
Project Controlling and Monitoring
TURNKEY PROJECT (EPC)BASIC AND DETAILED
ENGINEERINGPRODUCT SUPPLY
Gizil Enerji
ProductsOur Products in Detail
ʻʻWe offer what you need with our partners
We possess a large network of both local and international vendors of
which we are representative or distributor. Our aim is to provide safe,
reliable and cost effective products which you need.
3
Gizil Enerji
Pipe HangersExclusive representative of N.C.D. Group in TR
N.C.D.
Group
Registered
supplier of
Technip, Foster
Wheeler, Ansaldo,
Danieli,
Snamprogetti
Manufacture
custom designed
special pipe
supports
More than 50 years
of experience in
power and
petrochemical
plants
References in
Turkey (Yeni
Elektrik Gebze
Power Plant,
Tupras Izmir
Refinery)
ʻʻ Safe and reliable
hangers with the
lowest possible cost
Gizil Enerji
Pipe HangersExclusive representative of N.C.D. Group in TR
Constant
Hangers
They are used when the large vertical
pipeline displacement doesn't allow the use
of variable load Spring Hangers (S.H.). In
fact, S.H. would charge the pipeline with
“additional load” due to high deviation
between operating and erection load, so
causing the possible damaging of the
pipework system. Each C.H. is calibrated to
show a constant load throughout its whole
working range, balancing the weight of the
pipeline
Hydraulic
Shock and
Sway
Suppressors
They are used to prevent damages due to
earthquake, flow pulsation, pipe rupture or
safety valve blow-off. By the use of the
Hydraulic Shock and Sway Suppressor the
occurring pipe movements are minimized.
Unlike a simple viscous damper, the Shock
and Sway Suppressor will not restrain
normal thermal movement and vibration
resulting in a piston velocity lower than the
locking velocity.
Variable
Spring
Hangers
They are used where vertical movements of
the piping are not allowed to be restricted by
rigid hangers. The Variable Spring Hanger
consists of a pre-compressed spring coil in
a cylindrical casing, with a load-and travel
indicator. Variable Spring Hangers are
designed to enable an adjustment of the
distance between Variable Spring Hanger
and pipe or equipment connection.
Accessories(Pipe Clamp, Saddle,
Turnbuckle, Clevis,
Eye Nut, etc)
They are used as connection between pipe
and hanger and between hanger and
construction. Rigid supports are consisting
of accessories only. The design of the
accessories which are connected directly
with the piping or which are subjected to
temperature influences due to medium
pipe/convection-temperature is based upon
the hot yield strength. Compared with the
medium temperature the design
temperatures can be reduced.
Maintanence and Refurbishment
Installation and After Sales Support
Design and Manufacturing
Gizil Enerji
Pipe HangersExclusive representative of N.C.D. Group in TR
India
Saudi
Arabia
Belgium
France
Czech Rep.
China
Singapore
Russia
United States of America
Brazil
Italy
Spain
United Arab Emirates
Poland
Turkey
Iran
Switzerland
Pakistan
Algeria
ThailandMalaysia
Indonesia
Tunusia
Nigeria
Greece
Kuwait
Egypt
Iraq
Turkmenistan
ʻʻ500+ references
in refinery and
power plants in
30+ countries
ʻʻYeni Enerji and Tüpraş preffered N.C.D. Group
productsGizil Enerji
SectorsOur Focus Sectors
ʻʻWe do what we have already known
We are aware of what kinds of trends our customers are dealing with and
what kinds of challenges they are tackling with in their daily lives. So, we
know very well how to support them.
4
Gizil Enerji
Petro-
chemical
IndustryEPCRefinery Power
PlantsOil & Gas
Energy products and solutions – in 6 DivisionsEngineering, Products and Solutions in various sectors
Whom we focus onCustomer centricity in dedicated markets
Gizil Enerji
ReferencesOur Selected Works
ʻʻActions speak louder than voice
Our philosophy is what you do is more important than what you say. So,
let’s talk to our customers.
5
Gizil Enerji
ReferencesTank Construction Project in Karbala Refinery
Challenge
Solution
• Project Planning
• Contract Management
• Project Controlling
• Site Management Activities
• QA/ QC Activities
• HSE Activities
• Project Procurement Activities
• Project Reporting
• Technical Drawings
• All Engineering Activities
• Other All Relevant Works
• The aim of the project is to provide all engineering, procurement and
construction management (EPCM) services for Construction of 42
Storage Tank Project Karbala Refinery, Iraq.
Short project information:
Customer: Arca Metal
Location: Karbala, Iraq
Start: July, 2015
Finish: Ongoing
Gizil Enerji
ReferencesTupras Izmir Demin Water Tanks and Transfer Lines
Challenge
Solution
• Basic and Detailed Engineering
• Prepare data sheets
• Develop material requisition forms
• Procurement of all electrical and instrumentation equipment
• Installation supervision
• Test and commissioning
• All relevant technical drawings
• Other all relevant works
• The aim of the project is engineering, material supply and test/
commissioning activities of electrical and automation scope of the
project.
Short project information:
Customer: Ada Endüstri
Location: Izmir, Turkey
Start: October, 2015
Finish: Ongoing
Gizil Enerji
ReferencesTupras Petrocoke Storage Conveyor Line Project
Challenge
Solution
• Procurement of all electrical and instrumentation equipment
• Design and assembly of exproof electrical panel
• Prepare data sheets
• Material requisition forms
• Cable routings and projects
• Electrical panel one line diagram
• Cable lists
• Cable section calculations
• All relevant technical drawings
• Other all relevant works
• The aim of the project is making of the petrocoke storage conveyor line
which will transport petrocoke as the output of Resid Upgrading Project
(RUP).
Short project information:
Customer: Intra Danismanlik
Location: Kocaeli, Turkey
Start: August, 2014
Finish: May, 2015
Gizil Enerji
ReferencesTupras Petrocoke Storage Dast Control System
Challenge
Solution
• Procurement of all electrical and instrumentation equipment
• Design and assembly of exproof electrical panels
• Prepare data sheets
• Material requisition forms
• Electrical panel one line diagram
• Cable lists
• Cable section calculations
• All relevant technical drawings
• Other all relevant works
• The aim of the project is designing and assembly of exproof electrical
panels in dast control system of petrocoke storage in Resid Upgrading
Project (RUP).
Short project information:
Customer: Enveks
Location: Ankara, Turkey
Start: July, 2014
Finish: March, 2015
Gizil Enerji
ReferencesTupras Izmir Refinery Resid Upgrading Storage Tanks
Challenge
Solution
• Generate electrical one-line diagram
• Preparation of electrical grounding project
• Prepare data sheets of MCC panels
• Calculations of cable sections
• Develop cable list
• Lighting projects
• Instrument data sheets
• Instrument list
• Logic diagrams
• Procurement supervision
• The aim of the project is making of the storage tanks which will feed fuel
oil to the Resid Upgrading Project (RUP).
Short project information:
Customer: Dema Makine
Location: Izmir, Turkey
Start: 2014
Finish: 2014
Gizil Enerji
ReferencesTupras Izmir RUP Charge Tanks
Challenge
Solution
• Relevant special pipe hangers are manufactured and delivered to the
customer site on time. One of the competitive advantages is best price
philosophy. This is the first order intake of NCD Group products in
Tupras Refinery as a result of being a part of listed vendor list.
• Special pipe support delivery for RUP Charge Tanks in Tupras Izmir
Refinery
Short project information:
Customer: Tüpraş
Location: İzmir
Start: December, 2014
Finish: February, 2015
Gizil Enerji
ReferencesTurkmenbashi Refinery LPG Treatment Project
Challenge
Solution
• Develop project pilot plan
• Prepare civil and steel projects
• Pressure vessels and heat exchangers calculations
• Isometrical drawings
• Stress analysis
• Generate electrical and instrumentation projects
• Develop material requisition forms
• Coordinate procurement activities
• Commissioning supervision
• Other all relevant works
• The aim of the Project is treatment of LPG gas which is output of coker
unit from H2S. Basic engineering is owned by Axens as LPG Treatment
Basic Engineering package.
Short project information:
Customer: Lotus Enerji
Location: Turkmenbashi, Turkmenistan
Start: 2014
Finish: Ongoing
Gizil Enerji
ReferencesTurkmenbashi Refinery TDSP Project
Challenge
Solution
• Controlling and approval of the documents prepared by Foster Wheeler
• All engineering activities out of Foster Wheeler scope
• Procurement activities
• Supplier relationship management
• The aim of the projects is to add a new DCU (Delayed Coker Unit), SDA
(Solvent Deasphalting Unit) and auxiliary services to the existing plant.
Short project information:
Customer: Lotus Enerji
Location: Turkmenbashi, Turkmenistan
Start: 2013
Finish: Ongoing
Gizil Enerji
ReferencesMKE Barutsan Seveso II Project - P&IDs and PFDs
Challange
Çözüm
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All lines in the context of Seveso studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of MKE Barutsan Elmadağ
Plant in the context of SEVESO II compliance works
Short project information:
Customer: Armada Danışmanlık
Location: Ankara, Turkey
Start: March, 2016
Finish: Ongoing
Gizil Enerji
ReferencesAkım Tek Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All oil, LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Akım Tek
Ankara Güvercinlik Plant in the context of SEVESO II compliance works
Short project information:
Customer: Armada Danışmanlık
Location: Ankara, Turkey
Start: February, 2016
Finish: Ongoing
Gizil Enerji
ReferencesLikit Kimya Exproof Tanks Turnkey Project
Challenge
Solution
• Inspection of as-is stituation
• Definition and classification of hazordous zone areas
• Engineering calculations and selection of suitable products
• Prepare data sheets
• Material requisition forms
• Develop cable list
• Lighting projects
• Installation on site
• Commissioning and startup activities
• The aim of the project is transforming of the tank dykes in Likit Kimya
Tekirdağ plant into exproof with the suitable mechanical, electrical and
automation products.
Short project information:
Customer: Likit Kimya
Location: Tekirdağ, Turkey
Start: February, 2016
Finish: Ongoing
Gizil Enerji
ReferencesLikit Kimya Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All process, hydraulic, fire fighting and utility lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Likit Kimya
Tekirdağ plant in the context of SEVESO II compliance works
Short project information:
Customer: Likit Kimya
Location: Tekirdağ, Turkey
Start: February, 2015
Finish: Ongoing
Gizil Enerji
ReferencesAkça Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Akça Gaz’s
plants in the context of SEVESO II compliance works
Short project information:
Customer: Mavi Sinerji
Location: Kocaeli-Denizli, Turkey
Start: January, 2016
Finish: Ongoing
Gizil Enerji
ReferencesMir Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Mir Gaz
Kırıkkale plant in the context of SEVESO II compliance works
Short project information:
Customer: Mavi Sinerji
Location: Kırıkkale, Turkey
Start: February, 2016
Finish: Ongoing
Gizil Enerji
Referencesİpragaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• P&ID and PFDs of 19 different sites studied in 3 months
• Steam and water lines addition to the LPG, propane, hydraulic and fire
fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc
• The aim of the project is drawing of P&IDs and PFDs of İpragaz’s 19
plants in the context of SEVESO II compliance works
Short project information:
Customer: Türk Loydu
Location: İstanbul, Turkey
Start: April, 2015
Finish: July, 2015
Gizil Enerji
ReferencesHabaş Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• P&ID and PFDs of 6 different sites studied in 2 months
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Habas’s 6 plants
in the context of SEVESO II compliance works
Short project information:
Customer: Habaş
Location: İstanbul, Turkey
Start: August, 2015
Finish: October, 2015
Gizil Enerji
ReferencesEr Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of ErGaz’s 8 plants
in the context of SEVESO II compliance works
Short project information:
Customer: Ergaz
Location: Istanbul, Turkey
Start: December, 2015
Finish: Ongoing
Gizil Enerji
ReferencesAnt Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Ant Gaz’s plant
in the context of SEVESO II compliance works
Short project information:
Customer: Mavi Sinerji
Location: Antalya, Turkey
Start: December, 2015
Finish: January, 2015
Gizil Enerji
ReferencesAnadolu Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• P&ID and PFDs of 4 different sites studied in 1 month
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Anadolugaz’s 4
plants in the context of SEVESO II compliance works
Short project information:
Customer: Anadolu Gaz
Location: Ankara, Turkey
Start: June, 2015
Finish: August, 2015
Gizil Enerji
ReferencesLafarge Conveyor Automation Project
Challenge
Solution
• Procurement of all electrical and instrumentation equipment
• Prepare data sheets
• Material requisition forms
• Cable routings and projects
• Electrical panel one line diagram
• Cable lists
• Cable section calculations
• All relevant technical drawings
• Other all relevant works
• The aim of the project is automation of cement conveyor line constructed
by Intra Danismanlik
Short project information:
Customer: Intra Danismanlik
Location: France
Start: August, 2015
Finish: Ongoing
Gizil Enerji
ReferencesKümaş Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All process, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Kümaş Manyezit
Sanayi plant in the context of SEVESO II compliance works
Short project information:
Customer: TMGD A.Ş.
Location: Kütahya, Turkey
Start: March, 2016
Finish: Ongoing
Gizil Enerji
ReferencesAksa Akrilik Piping and Instrumentation Diagrams
Challenge
Solution
• All P&IDs are created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• The aim of the project is revision of some P&IDs in the context of
SEVESO II compliance works
Short project information:
Customer: Proje Dizayn
Location: Yalova, Turkey
Start: 2015
Finish: Finished
Gizil Enerji
ReferencesClariant Isometric Drawings
Challenge
Solution
• Site analysis
• Measurement
• Drawing of isometrics using Autocad software
• The aim of the project is drawing of some isometrics
Short project information:
Customer: Aveskon
Location: Kocaeli, Turkey
Start: 2015
Finish: Finished
Gizil Enerji
ReferencesGSD AS CCPP in Georgia
Challenge
Solution
• Relevant pipe hangers are manufactured and delivered in very short time
schedule which is only 4 week days.
• The customer is asking for the relevant pipe hangers in very short
delivery time which is critical to the rest of the process
Short project information:
Customer: GSD A.Ş.
Location: Georgia
Start: April, 2015
Finish: May, 2015
Gizil Enerji
ReferencesActions speak louder than voice
ʻʻOur philosophy is what you do is more important than
what you say. So, let’s talk to our customers.
Gizil Enerji
ContactKeep in Touch
ʻʻWe remain at your disposal
Do not hesitate to contact us whenever you need…
6
Gizil Enerji
ContactWe remain at your disposal
Address: Esentepe Mah. Milangaz Cad. No:77 A2 Blok
D: 217 34860 Dumankaya Vizyon Plaza, Kartal-İstanbul
Phone: +90 (216) 511 59 43
E-mail: [email protected]
www.gizilenerji.com.tr
Direct Contact:
Esma Gulten Can
E-mail: [email protected]
ʻʻIf you have any support, please feel free to
contact us:
Gizil Enerji