the company has a long track record in
TRANSCRIPT
![Page 1: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/1.jpg)
![Page 2: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/2.jpg)
• The company has a long track record in developing tourism areas in Indonesia since 1969
• In order to develop tourism in Bali, in 1969 the Indonesian government with the assistance of UNDP initiated a study on
tourism in Bali conducted by SCETO, a tourism consultant from France. Based on this study, SCETO recommended a
basic scheme of Bali tourism development as an economic development, where the standard of living and welfare of
the community can be improved without compromising cultural values and social structure of the Balinese people
and the environment. Land suitable for this purpose was found in the hilly area of Nusa Dua, an unproductive area
with minimum rainfall and no surface water sources so that the land was not suitable for agriculture.
• To implement Nusa Dua Tourism Area development plan, a State-Owned Enterprise was established, namely PT
Pengembangan Pariwisata Bali (Persero) or Bali Tourism Development Corporation (BTDC). The initial role of the
Company was to obtain land, to prepare a master plan, to build area infrastructure at international level, and to
develop an attractive investment system for investors to invest in Nusa Dua.
• In line with the government’s plan for tourism development strategy in Indonesia, on May 16, 2014 BTDC changed its
name to PT Pengembangan Pariwisata Indonesia (Persero) or Indonesia Tourism Development Corporation (ITDC).
• ITDC is 100% owned by the Government of Indonesia with authorized capital of IDR 1,000,000,000,000.
1968
The Masterplan
of Nusa Dua
Tourist Resort
was made for
the first time by
SCETO
Hotel Bualu
(training hotel
& part of
school
complex)
1970
The Company
was
established by
the
Government of
the Republic
under PP No.
27 Year 1972
1972
The first investor
established
Nusa Dua
Beach Hotel
with
approximately
450 rooms
1980
Investors built
Melia Bali Sol
and Putri Bali
hotels
1985 1987
Revision on the
Masterplan of
Nusa Dua Tourist
Resort was made
by JCP (Japan
City Planning) and
investors built
Hotel Club Med
Nusa Dua
1990
Investors built
Nusa Indah
Hotel &
Convention
Centre and
Bali Hilton Hotel
1991
The 40th APTA (Asia
Pacific Travel
Association)
Conference was
attended by 50
countries with 1,500
delegates, held in
Nusa Dua Tourism
Resort
2008
The Company was
trusted to develop
Lombok Mandalika
Tourist Resort with the
area measuring around
1,175 ha by the
Indonesian government
2011
• 19th ASEAN summit
attended by the US
President Barack
Obama and 18 other
countries
• The operation of 14 star-
hotels with a total of
3,916 rooms
2013
APEC (Asia Pacific Economic
Forum) was convened in
Nusa Dua Tourist Resort and
was attended by more than
20 Heads of States
2014
Change Corporate name
from BTDC to ITDC
2015
• Establish new vision as
Indonesia’s foremost
integrated tourism
destination developer
• Improving Nusa Dua as
smart and green resort
![Page 3: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/3.jpg)
![Page 4: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/4.jpg)
4
Komitmen proteksi penuh Gubernur Bali untuk mendukung pembangunan Nusa Dua:Tidak memberikan IMB Hotel Bintang 4 & 5 di Bali sebelum pembangunan Nusa Duamencapai 70%. (Contoh: Sahid)
Perda I/1979Perda II/1979 Detail Masterplan Nusa Dua 1973 di tuangkan
dalam Perda ini sehingga menguatkan Nusa Dua menghadapi perubahan-perubahanRTRW Pemda Bali.
peruntukan wilayah Bali Selatan
![Page 5: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/5.jpg)
A 350 hectare Development
Project, the Nusa Dua is known for
delivering a high-end Integrated
Tourism Complex
ITDC’s Vision was to turn an
unproductive plot into an
internationally recognised resort
with over 5,000 Hotel Room Keys
and meeting capacity for over
10.000 guests
the Nusa Dua hosted major
events such as the APEC Summit
Conference, Miss World 2013, and
most recently The 85th General
Assembly of INTERPOL.
ITDC’s Legacy
![Page 6: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/6.jpg)
![Page 7: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/7.jpg)
![Page 8: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/8.jpg)
![Page 9: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/9.jpg)
9
REGULATION OVERVIEW
PERPRES NO. 3 TAHUN 2016 Percepatan Proyek Strategis Nasional - Penetapan
Mandalika sebagai proyek strategis Nasional
INPRES NO.1 TAHUN 2016 Percepatan Pelaksanaan Proyek Strategis Nasional
PP NO. 52/2014 Tentang Kawasan Ekonomi Khusus (KEK) Mandalika –
dengan insentif:
• PP No.96/2015 – Fasilitas dan Kemudahan di KEK
• PMK 104/PMK.010/2016 – Perlakuan Perpajakan,
Kepabeanan, dan Cukai pada KEK
• Permen ATR/BPN No. 24/2016 – Standar Pelayanan
dan Pengaturan Agraria, Tata Ruang dan Pertanahan
di KEK
PERMEN PARIWISATA NO.18 TAHUN 2016
Pendaftaran Usaha Pariwisata – TDUP dan PTSP
PERDA NTB NO. 8 TAHUN
2016
Fasilitas dan Kemudahan Pajak Daerah dan Retribusi
Daerah di KEK Mandalika
PERDA NO.2 TAHUN 2016LEMBARAN DAERAH PROVINSI
NUSA TENGGARA BARAT
Pariwisata Halal – Peraturan Daerah tentang Pariwisata
Halal
![Page 10: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/10.jpg)
Delivering a 1.175 ha of tourism related mixed use products, the Mandalika is positioned as an Ecotourism Destination incorporating environmental friendly technologies, such as Solar Farms, SWRO Plants. and allocating over 51,0% as dedicated ‘Green Space’.
KEY FACILITIESHotel rooms
Residential Units Commercial & Retails
MICE Capacity Entertainment
Others
UNITSover 10.0003.074792.025 m²5.000 & 7.000 participantsTheme park, Eco park, Water park, Mangrove Park marina, international street circuit & golf course
![Page 11: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/11.jpg)
Marina Entertainment Destination(with Circuit, Theme Park, Golf Cource, Mandalika Beach Walk, etc)
Differentiation Factor at the Mandalika
Eco Friendly
Solar power plant dengan
green organic farm
Sea water reverse
osmosis untuk air bersih
Green building
standardization
![Page 12: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/12.jpg)
NURUL BILAD MOSQUE
SWRO
KUTA MANDALIKAROAD INFRASTRUCTURE
![Page 13: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/13.jpg)
![Page 14: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/14.jpg)
![Page 15: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/15.jpg)
![Page 16: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/16.jpg)
Ku
taB
ea
ch
wa
lk
X2
Ho
tel
Pa
ram
oo
un
t
Pu
llma
n
Ro
ya
l Tulip
Pe
ke
rjaa
n
Tam
an
da
nJa
lan
C-I, I-I1
ITDC
Offic
e
Pe
mb
en
tuk
an
RO
W
K O
P Q
L M N
E
Clu
bm
ed
Pe
ke
rjaa
nJa
lan
Ru
as
R-R
1
Ma
sjid N
uru
lB
ilad
IPA
L
Pe
ke
rjaa
nR
ua
s
Jala
nd
an
Tam
an
E R
S T
Lag
oo
n B
ara
t
![Page 17: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/17.jpg)
17
![Page 18: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/18.jpg)
![Page 19: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/19.jpg)
BRIEF PROJECT PROFILE
PROJECT OWNER ITDC
NAME OF PROJECT Detail Engineering Desain Infrastruktur
START Jan 2017
DEC 2017 PROGRESS 100 %
![Page 20: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/20.jpg)
BRIEF PROJECT PROFILE
PROJECT OWNER ITDC
NAME OF PROJECT Kuta Beachwalk
GROUNBREAKING Dec 2016
TARGET FINISH Jan 2018
DEC 2017 PROGRESS 94.01%
NAME OF PROJECT Road and Streetscape C-I, I-I1
GROUNBREAKING Dec 2016
TARGET FINISH Jan 2018
DEC 2017 PROGRESS 90.06 %
NAME OF PROJECT Road and Streetscape E-R-S-T
GROUNBREAKING Dec 2016
TARGET FINISH Jan 2018
DEC 2017 PROGRESS 94.01 %
Jalan dan Taman Ruas E-R-S-T
Jalan dan Taman Ruas C-I, I-I1
Penataan Pantai Kuta
![Page 21: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/21.jpg)
BRIEF PROJECT PROFILE
PROJECT OWNER ITDC
NAME OF PROJECT ROW Forming of K-O-P-Q-L-M-N-E Street
GROUNBREAKING Dec 2016
TARGET FINISH Jul 2017
OCT 2017 PROGRESS 100 %
Progress Ruas K-O-P-Q
Progress Ruas N-EProgress Ruas N-E
![Page 22: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/22.jpg)
22
• Part of Corporate Social Responsibility (CSR) Project carried out by ITDC to fulfill the basic needs of local communitry.
• The Mosque is developed on 20 Hectares land plot with direct access to Kuta Beach
• The property consists of; Plaza, the Mosque, parking space, multi-purpose building, and commercial area for small and medium enterprises
• The mosque will also be utilized as point of interest to attract tourist into the destination.
![Page 23: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/23.jpg)
BRIEF PROJECT PROFILE
PROJECT OWNER ITDC
NAME OF PROJECT Masjid Nurul Bilad Stage 1
GROUNDBREAKING Jan 2017
TARGET FINISH Oct 2017
DEC 2017 PROGRESS 100 %
Suasana Idul Adha
![Page 24: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/24.jpg)
BRIEF PROJECT PROFILE
PROJECT OWNER ITDC
NAME OF PROJECT ITDC & SEZ Office stage 1
GROUNDBREAKING 2018
TARGET FINISH 2019
DEC 2017 PROGRESS 12,98%
NAME OF PROJECT Waste Water Treatment Plant
GROUNDBREAKING 2018
TARGET FINISH 2019
DEC 2017 PROGRESS 5,56 %
![Page 25: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/25.jpg)
BRIEF PROJECT PROFILE
PROJECT OWNER ITDC
NAME OF PROJECT Pullman Hotels & Resorts Mandalika
GROUNDBREAKING 2017
TARGET FINISH 2019
DED STATUS 100%
NAME OF PROJECT CLubMed Mandalika
GROUNDBREAKING 2018
TARGET FINISH 2020
DEC 2017 PROGRESS 0.28 % in total58% Design Progress
![Page 26: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/26.jpg)
![Page 27: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/27.jpg)
ENTERTAINMENT & SPORTS DISTRICT
GOLF DISTRICT
![Page 28: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/28.jpg)
![Page 29: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/29.jpg)
![Page 30: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/30.jpg)
RACE CIRCUIT :
4.32KM SEASONAL STREET RACE CIRCUIT (TO MOTOGP STANDARD)
![Page 31: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/31.jpg)
31
In 2018, ITDC will undertake the construction of micro and small business centers with 303 units
of capacity for hawkers and small shop owners located within the Mandalika area and/or
around the perimeter of the Mandalika.
ITDC collaborated with the UKM Cooperative Office of Central Lombok and Province of NTB
and the Ministry of Cooperatives and UKM for Capacity Building Program Planning.
![Page 32: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/32.jpg)
10 new homestays and restos
in the Western Zone – in 1 year
Community Development –
“Balkondes” Ende Village
organizing the Small Medium Enterprise (SME’s) around Kuta
Beach to improve local economicTraining and Education at any level of local communities
![Page 33: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/33.jpg)
![Page 34: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/34.jpg)
34
![Page 35: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/35.jpg)
35
![Page 36: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/36.jpg)
36
![Page 37: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/37.jpg)
37
![Page 38: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/38.jpg)
38
![Page 39: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/39.jpg)
39
![Page 40: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/40.jpg)
40
![Page 41: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/41.jpg)
41
![Page 42: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/42.jpg)
42
![Page 43: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/43.jpg)
43
![Page 44: The company has a long track record in](https://reader031.vdocuments.net/reader031/viewer/2022012502/617c77f7d21f9e5d217127c2/html5/thumbnails/44.jpg)
HEAD OFFI CE
G EDUNG MENAR A BCA L T. 39JALAN MOH . THAM RIN NO . 1JAKAR TA PUSAT 10310JAKAR TA – I NDONESIA
P . +62 21 8064 2790
THE MANDALI KA
KAWASAN E KONOM I KHUSUS
PARIWISAT A MAND ALIK A LOM BOK
LOM BOK – I NDONESIA
P . +62 370 752 5001
WWW. I TDC .CO . I D
I NVEST@ I TDC .CO . I D