the consortium for electrocardiographic imaging - …jcollfont/presentations/cinc2016_cei.pdfcei:...
TRANSCRIPT
CEI: THE CONSORTIUM FOR ELECTROCARDIOGRAPHIC IMAGING
Jaume Coll-Font, Jwala Dhamala, DanilaPotyagaylo, Walther Schulze, Jess D Tate, Maria S. Guillem, Peter van Dam, Olaf Dossel, Dana H Brooks, Rob S Macleod
Computing in Cardiology, 13th Sept. 2016
CinC 2016 - Jaume Coll-Font - [email protected] 1
Time
CEI
CinC 2016 - Jaume Coll-Font - [email protected] 2
Sept2014
CinCBoston
ECGIworkshop
March2015
CinCNice
Sept2015
2 days ago
CinCVancouver
• Broaden collaboration
• Improve Reproducibility
Online: www.ecg-imaging.org
• www.ecg-imaging.org
CinC 2016 - Jaume Coll-Font - [email protected] 3
EDGAR DATA REPOSITORY
Workgroups
EDGAR Datasets
CinC 2016 - Jaume Coll-Font - [email protected] 5
Sinus PVC Ischemia Scar Afib
Human ✔ ✔ ✔ ✔
Dog ✔ ✔ ✔
Pig ✔ ✔
Type
Sour
ce
Workgroups
CinC 2016 - Jaume Coll-Font - [email protected] 6
• Cross-group analysis
• Creation of benchmarks
• Topics:• Forward Modeling• Premature Ventricular Contractions• Atrial Arrhythmias
Workgroups: Forward Modeling
CinC 2016 - Jaume Coll-Font - [email protected] 7
Geometryscans
Forwardmodel
Communityaverage
Individualsegmentations
Workgroups:• Different geometries
• Different validation metrics
CinC 2016 - Jaume Coll-Font - [email protected] 8
Premature Ventricular Contractions
20
0
-20 mV
68
28
11 ms
premature excitation site
• New workgroup!
Workgroups: Atrial Arrhythmias
CinC 2016 - Jaume Coll-Font - [email protected] 9
Atrial Flutter Atrial FibrillationAtrial Tachycardia
• Validation of methods:
Workgroups: Atrial Arrhythmias
CinC 2016 - Jaume Coll-Font - [email protected] 10
Pedron J. Cardiovascular Electrophysiol 2016
Future
CinC 2016 - Jaume Coll-Font - [email protected] 11
Sept2014
CinCBoston
ECGIworkshop
March2015
CinCNice
Sept2015
CinCVancouver
Time2 days ago
• EDGAR• Atrial Arrhythmias• Healthy human subject
• Continuous evaluation of the field
• Continue increasing visibility of ECGI
Today
CinC 2016 - Jaume Coll-Font - [email protected] 12
Sept2014
CinCBoston
ECGIworkshop
March2015
CinCNice
Sept2015
2 days ago
CinCVancouver
Time
Questions?
now
• Research on ECGI lacks:• Reproducibility• Exchange of methods• Broad collaboration
• Started CEI inspired in hackathons
Time
CEI Timeline
CinC 2016 - Jaume Coll-Font - [email protected] 14
Sept2014
CinCBoston
ECGIworkshop
March2015
CinCNice
Sept2015
2 days ago
CinCVancouver