the contemporary home collection

6
The Contemporary Home Collection

Upload: yaphet

Post on 24-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

The Contemporary Home Collection. The Contemporary Home Collection.  High efficienc y wat er heat ers  Energy Star labeled exhaust fans  Rough-in radon protection  No added urea f ormaldehyde OSB and casework components  Low or no VOC adhesives, paints and caulks - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Contemporary Home Collection

The Contemporary Home Collection

Page 2: The Contemporary Home Collection

The Contemporary Home Collection

• green construction process includes: • Recycled program and was te elimination • programs used in the plant • High efficienc y plumbing fixtures • Efficient water distribution designs • Indoor fabrication of modular units • No tropical woods • Environmentally preferable products • Enhanc ed framing techniques used in plant • construction • Installation of ERV system • Zoned, not-ducted HVAC s ystems

• High efficienc y wat er heat ers • Energy Star labeled exhaust fans • Rough-in radon protection • No added urea f ormaldehyde OSB and • casework components • Low or no VOC adhesives, paints and caulks • Energy efficient thermal envelope • Carbon monoxide monitors each floor • Energy Star lighting package • High performance Energy Star rat ed windows • Dramatically reduced on-site waste and • minimal plant waste.

Page 3: The Contemporary Home Collection

• http://www.guerdonmodularbuildings.com/video/green_video.html

Page 4: The Contemporary Home Collection

Harbour Landing Apartments

Page 5: The Contemporary Home Collection

Harbour Landing Apartments • Project Experience Highlights:• Installation of the modular units is managed onsite by Guerdon and Guerdon’s on-

site installation contractors.• Site work and plant construction began in 4th Quarter 2010. By the end of January

2011, the first of 6 buildings were dried-in. The target date for the first building’s Certificate of Occupancy is April 2011.• Working with extremely cold climate conditions, the team’s in-depth knowledge of

modular construction and its diligent work ethic were clearly demonstrated with this project.• Guerdon’s scope of work included the installation and structural connections of the

building, close-up for weather protection, framing and decking of the drop-in corridor floors,

Page 6: The Contemporary Home Collection

• http://www.guerdonmodularbuildings.com/video/harbour_video.html