the cortek core construction system

57
Core Construction Core Construction System System Presented By: Presented By: Aaron Rutledge Aaron Rutledge CorTek, Inc. CorTek, Inc. 999 Van Buren Ave. 999 Van Buren Ave. Loveland, CO 80537 Loveland, CO 80537 Phone: 970-663-2222 Phone: 970-663-2222 Fax: 970-663-9969 Fax: 970-663-9969 [email protected] [email protected] www.corteksystems.com www.corteksystems.com

Upload: aaron-rutledge

Post on 01-Jul-2015

2.022 views

Category:

Technology


3 download

DESCRIPTION

The CorTek Core Construction System is revolutionizing the way stair and elevator cores are being built.

TRANSCRIPT

Page 1: The CorTek Core Construction System

Core Construction Core Construction SystemSystemPresented By:Presented By:

Aaron RutledgeAaron RutledgeCorTek, Inc.CorTek, Inc.999 Van Buren Ave.999 Van Buren Ave.Loveland, CO 80537Loveland, CO 80537Phone: 970-663-2222Phone: 970-663-2222Fax: 970-663-9969Fax: 970-663-9969

[email protected]@corteksystems.comwww.corteksystems.comwww.corteksystems.com

Page 2: The CorTek Core Construction System

Product OverviewProduct Overview

► Stay-in-place modular form Stay-in-place modular form system for concrete core system for concrete core structuresstructures

► Factory built modules stack Factory built modules stack like building blocks.like building blocks.

► Custom-built to the specific Custom-built to the specific requirements of each requirements of each project.project.

Page 3: The CorTek Core Construction System

Features:Features:► Unequalled speed of Unequalled speed of

constructionconstruction

►High tolerance, all-High tolerance, all-steel construction.steel construction.

►Minimal field work.Minimal field work.

►Modules are load-Modules are load-bearing before bearing before concrete.concrete.

► Cost Competitive.Cost Competitive.

Page 4: The CorTek Core Construction System

Difficult/slow/error-prone Difficult/slow/error-prone field work brought into a field work brought into a controlled factory controlled factory environment set up for environment set up for efficiency and quality.efficiency and quality.

Computer aided Computer aided parametric design used parametric design used for rapid parametric for rapid parametric structural and structural and architectural design.architectural design.

Decreased site Decreased site congestion increases congestion increases project flow.project flow.

Freeing site schedule Freeing site schedule from concrete core from concrete core schedule increases schedule increases “battle plan” options.“battle plan” options.

An Advanced An Advanced Building SystemBuilding System

Page 5: The CorTek Core Construction System

Benefits:Benefits:► Immediate presence of stairs allows trades early Immediate presence of stairs allows trades early

and safe access to structureand safe access to structure

► Elimination of many dangerous field operationsElimination of many dangerous field operations

► Can eliminate the need for scaffoldingCan eliminate the need for scaffolding

► Reduction of poor fit-up and coordination problems Reduction of poor fit-up and coordination problems among tradesamong trades

► Cores generally part of the critical path—the CorTek Cores generally part of the critical path—the CorTek system cannot be beat for speed--reducing overall system cannot be beat for speed--reducing overall schedule by weeks or months on most projects.schedule by weeks or months on most projects.

Page 6: The CorTek Core Construction System

Target ProjectsTarget Projects

MULTI-STORY BUILDINGS OF ALL TYPES . . . . . .MULTI-STORY BUILDINGS OF ALL TYPES . . . . . . • Structural steel framed buildings. Structural steel framed buildings. • Wood framed buildings.Wood framed buildings.• Concrete framed buildings.Concrete framed buildings.• Industrial Structures.Industrial Structures.• Current production equipment tooled Current production equipment tooled

for 8” - 12” thick walls to target 3-12 for 8” - 12” thick walls to target 3-12 story buildings.story buildings.

Page 7: The CorTek Core Construction System
Page 8: The CorTek Core Construction System
Page 9: The CorTek Core Construction System

CompetitionCompetitionPrice for a typical stair core story Price for a typical stair core story

with 2 flights of stairs, 6 with 2 flights of stairs, 6 embeds and ledger angle at embeds and ledger angle at floor perimeter. Price includes floor perimeter. Price includes placed concrete and all placed concrete and all installation costsinstallation costs

► Conventional MethodsConventional Methods Cast-In-Place: $33,192/Story*Cast-In-Place: $33,192/Story* Pre-Cast: $44,529/Story*Pre-Cast: $44,529/Story* Masonry: $30,754*Masonry: $30,754*

► CorTek: $33,514 @ CorTek: $33,514 @ $14,380/Mod$14,380/Mod

*Based on independent estimate provided by Will Hopkins *Based on independent estimate provided by Will Hopkins of the Icon Groupof the Icon Group

Page 10: The CorTek Core Construction System
Page 11: The CorTek Core Construction System
Page 12: The CorTek Core Construction System
Page 13: The CorTek Core Construction System
Page 14: The CorTek Core Construction System

Optional wall thicknessOptional wall thicknessEffective thickness:

8”

10”

12”

Actual thickness:

10”

12”

14”Because of the much higher tolerances of the CorTek System, the resulting finished wall assembly can be thinner than conventional methods for many applications.

Page 15: The CorTek Core Construction System

Pre-installed stairsPre-installed stairs

Page 16: The CorTek Core Construction System

Railings shipped ready to Railings shipped ready to bolt onbolt on

Page 17: The CorTek Core Construction System

Optional Stair & Railing Optional Stair & Railing DesignsDesigns

Pan treads

Checkered plate treads

Grating treads

Parallel tube rails

Picket rails

Wire mesh rails

Page 18: The CorTek Core Construction System

Parallel Tube RailingParallel Tube Railing

Page 19: The CorTek Core Construction System

Mesh RailingMesh Railing

Page 20: The CorTek Core Construction System

Picket RailingPicket Railing

Page 21: The CorTek Core Construction System

Elevator CoreElevator Core

Page 22: The CorTek Core Construction System

Safety—A Job Site’s Most Safety—A Job Site’s Most Important ConsiderationImportant Consideration

Moving formwork to a controlled factory environment eliminates many dangerous field operations

Page 23: The CorTek Core Construction System
Page 24: The CorTek Core Construction System
Page 25: The CorTek Core Construction System
Page 26: The CorTek Core Construction System

Where’s the rest of the Where’s the rest of the structure?structure?

Page 27: The CorTek Core Construction System

Framing does not wait for formwork—saving weeks to months on project schedule

Concurrent FramingConcurrent Framing

Page 28: The CorTek Core Construction System

CompetitionCompetitionPrice for a typical stair core story Price for a typical stair core story

with 2 flights of stairs, 8 with 2 flights of stairs, 8 embeds and ledger angle at embeds and ledger angle at floor perimeter. Price includes floor perimeter. Price includes placed concrete and all placed concrete and all installation costsinstallation costs

► Conventional MethodsConventional Methods Cast-In-Place: $38,574/Story*Cast-In-Place: $38,574/Story* Pre-Cast: $49,219/Story*Pre-Cast: $49,219/Story* Masonry: $34,346/Story*Masonry: $34,346/Story*

► CorTek: $36,786CorTek: $36,786**Based on independent estimate provided by the Icon Based on independent estimate provided by the Icon

Group September 2008Group September 2008

Page 29: The CorTek Core Construction System

A Load Bearing FormA Load Bearing Form

► Vertical and horizontal Vertical and horizontal structural elements support structural elements support construction loads and allow construction loads and allow form to be modularized. form to be modularized.

► Structural skeleton allows for Structural skeleton allows for support of stairs, landings, support of stairs, landings, structural framing, scaffolding, structural framing, scaffolding, personnel, and other personnel, and other construction loadsconstruction loads

► Form does not require Form does not require strippingstripping

► Finished wall structurally Finished wall structurally equal to a conventional 8”-12” equal to a conventional 8”-12” CIP concrete wallCIP concrete wall

Page 30: The CorTek Core Construction System

DesignDesign

► Direct Replacement for Conventional Cast-In-PlaceDirect Replacement for Conventional Cast-In-Place—no extra work required for Architect or Structural —no extra work required for Architect or Structural Engineer.Engineer.

► Conventional concrete rebar configurations.Conventional concrete rebar configurations.

► No proprietary design methods or material No proprietary design methods or material strengths.strengths.

► No requirement for special code approvals.No requirement for special code approvals.

Page 31: The CorTek Core Construction System

Complete Detailed Complete Detailed Shop DrawingsShop Drawings

► Stair and Railing LayoutsStair and Railing Layouts

► Rebar detailsRebar details

► Framing and Floor ConnectionsFraming and Floor Connections

► 3D Revit model available for each project.3D Revit model available for each project.

Page 32: The CorTek Core Construction System

QualityQuality► Parametric modeling essentially eliminates Parametric modeling essentially eliminates

detailing mistakes.detailing mistakes.

► Controlled manufacturing environment.Controlled manufacturing environment.

►Multiple failsafing operations.Multiple failsafing operations.

► Rigid Quality Assurance ProgramRigid Quality Assurance Program

► Jigs, Fixtures and Design provide Jigs, Fixtures and Design provide extraordinarily tight tolerancesextraordinarily tight tolerances

Page 33: The CorTek Core Construction System

Job Site EfficiencyJob Site Efficiency>Enabling Lean Construction>Enabling Lean Construction

► Drastic reduction of field labor. Drastic reduction of field labor.

► Just In Time Delivery minimizes site congestion.Just In Time Delivery minimizes site congestion.

► Core construction can be concurrent with frame Core construction can be concurrent with frame construction.construction.

► Re-work from misplaced embeds, doors, bulging Re-work from misplaced embeds, doors, bulging concrete and leaning or twisted towers eliminatedconcrete and leaning or twisted towers eliminated

► Several cores can be constructed simultaneouslySeveral cores can be constructed simultaneously

Page 34: The CorTek Core Construction System

Installation Sequence and Installation Sequence and DetailsDetails

Page 35: The CorTek Core Construction System

Foundation EmbedsFoundation Embeds

Page 36: The CorTek Core Construction System

Base ModuleBase Module

Page 37: The CorTek Core Construction System

Core Leveling DetailCore Leveling Detail

Page 38: The CorTek Core Construction System
Page 39: The CorTek Core Construction System

Install Vertical ReinforcementInstall Vertical Reinforcement

Page 40: The CorTek Core Construction System

Vertical Reinforcement In Vertical Reinforcement In PlacePlace

Page 41: The CorTek Core Construction System

Base Connection WeldBase Connection Weld

Page 42: The CorTek Core Construction System

Going VerticalGoing Vertical

Page 43: The CorTek Core Construction System

Module Alignment DetailModule Alignment Detail

Page 44: The CorTek Core Construction System

Non-contact Vertical Rebar Non-contact Vertical Rebar SplicesSplices

Page 45: The CorTek Core Construction System

Vertical steel attached to Vertical steel attached to each moduleeach module

Page 46: The CorTek Core Construction System

Vertical Bar Alignment Vertical Bar Alignment GuidesGuides

Page 47: The CorTek Core Construction System

Beam Attachments and Ledger Beam Attachments and Ledger Angle Pre-installedAngle Pre-installed

Page 48: The CorTek Core Construction System

Contractor drops in steel Contractor drops in steel beam and bolts it together.beam and bolts it together.

Page 49: The CorTek Core Construction System

Interior and Exterior finishesInterior and Exterior finishes

►ExteriorExterior

► Exposed MetalExposed Metal►DrywallDrywall►MasonryMasonry► StuccoStucco► Thin set brick Thin set brick

►Interior Interior

► Exposed MetalExposed Metal►DrywallDrywall►Hardboard PanelHardboard Panel► Tile Tile

Page 50: The CorTek Core Construction System

Optional pre-installed hat channel Optional pre-installed hat channel accommodates exceptionally thin accommodates exceptionally thin

finish facefinish face

Page 51: The CorTek Core Construction System

Hat-channel can be field shot directly Hat-channel can be field shot directly on to walls and finished conventionallyon to walls and finished conventionally

Page 52: The CorTek Core Construction System

Optional pre-installed masonry tie Optional pre-installed masonry tie backs accelerate masonry field workbacks accelerate masonry field work

Page 53: The CorTek Core Construction System

Exposed metal interior is an Exposed metal interior is an aesthetic alternate to aesthetic alternate to

concreteconcrete

Page 54: The CorTek Core Construction System

Green BenefitsGreen Benefits

►No wood forms and No wood forms and resulting site wasteresulting site waste

►No form oilNo form oil

►Greatly minimizes Greatly minimizes site labor site labor installationinstallation

► Recycled and Recycled and recyclable steel recyclable steel used in used in construction.construction.

► Perfect delivery Perfect delivery method for high method for high volume fly ash volume fly ash concreteconcrete

Page 55: The CorTek Core Construction System

ConclusionConclusion

► Eliminates the need for Eliminates the need for scaffolding and forms scaffolding and forms

► Reduces Critical Path Reduces Critical Path construction time construction time associated with associated with building coresbuilding cores

► Pre-installed stairsPre-installed stairs► Pre-installed floor and Pre-installed floor and

beam connectionsbeam connections►Modules do not require Modules do not require

stripping.stripping.

► CorTek cores are CorTek cores are individually designed individually designed for each job in a for each job in a controlled controlled environmentenvironment

► Simultaneous Simultaneous construction with floor construction with floor framingframing

► Structurally equivalent Structurally equivalent to 8”-12” CIP concrete to 8”-12” CIP concrete shear wall.shear wall.

► Cost effective Cost effective

Page 56: The CorTek Core Construction System

Questions & CommentsQuestions & Comments

Page 57: The CorTek Core Construction System

www.corteksystems.comwww.corteksystems.com