the f acility for a ntiproton and i on r esearch in europe
DESCRIPTION
The F acility for A ntiproton and I on R esearch in Europe. FAIR @ Darmstadt. Member States. All numbers in 2005 € ( e scalation until 2018 ca. +50%) Spain expected to join soon ( with 11.87 M€ ) Negotiation with the UK on Associate FAIR Member status - PowerPoint PPT PresentationTRANSCRIPT
The Facility for Antiprotonand Ion Research
in Europe
Günther Rosner NuPECC, Sevilla, 5/10/12 1
FAIR @ Darmstadt
Günther Rosner NuPECC, Sevilla, 5/10/12 2
NuPECC, Sevilla, 5/10/12 3
Member StatesContracting Party
Contribution (in 2005 M€)
Finland 5.00
France 27.00
Germany 705.00
India 36.00
Poland 23.74
Romania 11.87
Russia 178.05
Slovenia 12.00
Sweden 10.00
Total 1.008,66
Günther Rosner
• All numbers in 2005 €(escalation until 2018 ca. +50%)
• Spain expected to join soon (with 11.87 M€)
• Negotiation with the UK on Associate FAIR Member status
• Talks with China on Associate FAIR Member status
• Contribution to experiments (6.6 M€)
NuPECC, Sevilla, 5/10/12 4
Modularised Start Version
Günther Rosner
APPA
CBM/HADES
NuSTAR
PANDAExperiments
M1: APPAM1: CBM/HADESM2: NuSTARM3: PANDA
M0
M1
M2M3
M3
July 2012
Günther Rosner NuPECC, Sevilla, 5/10/12 5
• 526 M€ German contribution to civil construction– largest BMBF grant
ever
Further CC Planning08 / 2012 09 / 2012 10 / 2012 11 / 2012
Update of basic design due to change requirements of the authorities
Detailed design architecture
Structural design
Günther Rosner NuPECC, Sevilla, 5/10/12 6
CC LicensingII / 12 III / 12 IV / 12 I / 13
Permission for piling works
Permission for ground water management
Application for soil storage
Partial permissions of radiation protection
14.09.12
Günther Rosner NuPECC, Sevilla, 5/10/12 7
CC Current Preparatory Work09 / 12 10 / 12 11 / 12 12 / 12
Relocation of cables (below SiS 100)
Ground water measuring points
Piling works
Internal site roads
Günther Rosner NuPECC, Sevilla, 5/10/12 8
CC Tendering and ContractingWork section Status
Relocate cables below SiS 100 in progress; end of work in Oct. 2012
Measuring points for ground water date of submission: 28.08.2012; start of work in Oct. 2012
Piling works date of submission: 06.09.2012; start of work in Nov. 2012
Interal site roads date of submission: 26.09.2012; start of work in Jan. 2013
Site logistics in preparation, announcement estimated in Oct. 2012
Günther Rosner NuPECC, Sevilla, 5/10/12 9
Experimental Site
Günther Rosner NuPECC, Copenhagen, 15/6/12 10
11
Compact & cost effectiveFast cycling superconducting magnets
dB/dt ~ 4T/s
Accelerators• SIS100 magnets are being
built.• Contracts/tenders for
many other parts of SIS100 and CR in preparation.
• HESR grant allocated to FAIR; ready for being built/tendered by FZJ and FAIR.
• IKRB meeting on 9/10/12.• MAC meeting on 26-
27/11/12.
Günther Rosner NuPECC, Sevilla, 5/10/12
Experiments• Project
– structure defined– staff in place
• Experiment Coordinators – employed
• Expert Committee Experiments– First meeting
19 Nov. 2012• Resources Review
Boards– First mtgs.
beginning of 2013
FAIR Scientific Council
MartinoBoard of FAIR Collaborations
NilssonResearch Division
Rosner
APPA
Neff, Stiebing, BD
Resources Review Board
Rosner
CBM
Müller, Eschke
Resources Review Board
Rosner
NuSTAR
Gerl, Herlert
Resources Review Board
Rosner
PANDASchmitt,
Schepers
Resources Review Board
Rosner
Expert Committee Experiments
3 APPA, 2 CBM,2 NuSTAR, 2 PANDA
Project OfficeLehmann
Liaison OfficeVarentsov
Third Party Issues
Nicmorus
Günther Rosner 12NuPECC, Sevilla, 5/10/12
Status• Technical Design Reports on experiments– Required by most funding agencies– Currently
• NUSTAR: 4 approved + 3 review in progress• PANDA: 2 approved + 3 review in progress• APPA: 1 review in progress• CBM: submission 2013
• Risk assessment experiments– first one completed
• In preparation– Detailed common timelines– Construction Memoranda of Understanding
Günther Rosner 13NuPECC, Sevilla, 5/10/12
NuPECC, Sevilla, 5/10/12 14
Timeline
Günther Rosner
20122011 2013 201620152014
6
Building permitsSite preparationCivil construction contractsBuilding of accelerator & detector componentsCompletion of civil construction workInstallation & commissioning of accelerators and detectorsStart Data taking
7 108
2017 2018 2019
12
6
7
89
11
12
10
119
Thank you very much
Günther Rosner NuPECC, Sevilla, 5/10/12 15