ODOT Quality Assurance Program October 2015 HOW TO USE THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE This guide summarizes the testing requirements for various materials used in the construction of ODOT projects. It indicates what tests must be performed, who must perform them, and how frequently they must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere for testing. When a contract requires Quality Control (QC) by the Contractor, samples that must be sent elsewhere for testing are delivered to the Project Manager along with the Sample Data Sheet (Form 734-4000). Examples of this and other test report forms are in Section 3 of this manual. Materials in this guide are listed in the numerical order of the Standard Specifications and the project special provisions. To find the testing requirements for a particular material, first determine what it will be used for and then refer to the appropriate Specifications Section for that product. For example, to look up testing requirements for aggregate to be used in asphalt concrete paving, refer to Section 00745. Definitions SOURCE REVIEW/PRODUCT COMPLIANCE TESTING – Refer to Section 4(A) for additional explanation. Certain QC tests on aggregates fall into this category. They are identified in this section by the words “Product Compliance.” SAMPLE SIZES – Refer to Section 4(C) for guidance on material sample sizes, containers, and labeling. Although designed for the ODOT Central Materials Laboratory (ODOT-CML), it is a good guide for samples being sent to any laboratory. ASPHALT CONCRETE MIX DESIGNS – If the ODOT-CML is preparing the AC mix design, submit samples of the materials shown in Section 4(C) of this manual.

Upload: others

Post on 21-Feb-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

OD

OT

Qua

lity

Ass

uran

ce P

rogr

am

O

ctob

er 2

015

HO

W T

O U

SE

THE

FIEL

D T

ESTE

D M

ATER

IALS

AC

CEP

TAN

CE

GU

IDE

This

gui

de s

umm

ariz

es t

he t

estin

g re

quire

men

ts f

or v

ario

us m

ater

ials

use

d in

the

con

stru

ctio

n of

OD

OT

proj

ects

. I

t in

dica

tes

wha

t tes

ts m

ust b

e pe

rform

ed, w

ho m

ust p

erfo

rm th

em, a

nd h

ow fr

eque

ntly

they

mus

t be

perfo

rmed

. It

incl

udes

m

ater

ials

whi

ch a

re s

ampl

ed a

nd te

sted

in th

e fie

ld a

nd m

ater

ials

whi

ch a

re fi

eld

sam

pled

but

sen

t els

ewhe

re fo

r tes

ting.

W

hen

a co

ntra

ct r

equi

res

Qua

lity

Con

trol (

QC

) by

the

Con

tract

or, s

ampl

es t

hat m

ust

be s

ent

else

whe

re f

or t

estin

g ar

e de

liver

ed to

the

Pro

ject

Man

ager

alo

ng w

ith th

e S

ampl

e D

ata

She

et (

Form

734

-400

0).

Exa

mpl

es o

f thi

s an

d ot

her

test

re

port

form

s ar

e in

Sec

tion

3 of

this

man

ual.

Mat

eria

ls in

this

gui

de a

re li

sted

in th

e nu

mer

ical

ord

er o

f the

Sta

ndar

d S

peci

ficat

ions

and

the

proj

ect s

peci

al p

rovi

sion

s.

To f

ind

the

test

ing

requ

irem

ents

for

a p

artic

ular

mat

eria

l, fir

st d

eter

min

e w

hat

it w

ill be

use

d fo

r an

d th

en r

efer

to

the

appr

opria

te S

peci

ficat

ions

Sec

tion

for t

hat p

rodu

ct.

For e

xam

ple,

to lo

ok u

p te

stin

g re

quire

men

ts fo

r agg

rega

te to

be

used

in

asp

halt

conc

rete

pav

ing,

refe

r to

Sec

tion

0074

5.

D

efin

ition

s SO

UR

CE

REV

IEW

/PR

OD

UC

T C

OM

PLIA

NC

E TE

STIN

G –

Ref

er to

Sec

tion

4(A

) fo

r ad

ditio

nal e

xpla

natio

n.

Cer

tain

QC

te

sts

on a

ggre

gate

s fa

ll in

to th

is c

ateg

ory.

The

y ar

e id

entif

ied

in th

is s

ectio

n by

the

wor

ds “P

rodu

ct C

ompl

ianc

e.”

SAM

PLE

SIZE

S –

Ref

er t

o Se

ctio

n 4(

C)

for

guid

ance

on

mat

eria

l sa

mpl

e si

zes,

con

tain

ers,

and

lab

elin

g.

Alth

ough

de

sign

ed f

or t

he O

DO

T C

entra

l M

ater

ials

Lab

orat

ory

(OD

OT-

CM

L),

it is

a g

ood

guid

e fo

r sa

mpl

es b

eing

sen

t to

any

la

bora

tory

. A

SPH

ALT

CO

NC

RET

E M

IX D

ESIG

NS

– If

the

OD

OT-

CM

L is

pre

parin

g th

e A

C m

ix d

esig

n, s

ubm

it sa

mpl

es o

f th

e m

ater

ials

sho

wn

in S

ectio

n 4(

C) o

f thi

s m

anua

l.

Page 2: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere
Page 3: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

OD

OT

Qua

lity

Ass

uran

ce P

rogr

am

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

___

Oct

ober

201

5 __

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

____

TYPE

S O

F TE

STS

The

follo

win

g ty

pes

of te

sts

will

be p

erfo

rmed

by

the

Con

tract

or o

r Eng

inee

r on

mat

eria

ls a

nd p

rodu

cts

requ

ired

for c

ontra

ct w

ork:

1.

Sou

rce

Rev

iew

– T

his

test

type

is a

ddre

ssed

in S

ectio

n 4(

A) o

f thi

s M

anua

l.

The

Eng

inee

r will

test

unp

roce

ssed

mat

eria

l fro

m a

n ag

greg

ate

sour

ce, i

f req

uest

ed b

y th

e C

ontra

ctor

, to

prov

ide

info

rmat

ion

abou

t th

e qu

ality

of m

ater

ial.

Tes

ts w

ill in

volv

e de

grad

atio

n, s

ound

ness

, and

abr

asio

n, b

ut m

ay in

volv

e ot

her t

ests

. Fa

vora

ble

test

resu

lts

do n

ot im

ply

that

pro

cess

ed m

ater

ial f

rom

the

sour

ce w

ill co

mpl

y w

ith s

peci

ficat

ions

afte

r it i

s pr

oces

sed

as re

quire

d fo

r the

pro

ject

.

2. P

rodu

ct C

ompl

ianc

e –

This

test

type

is a

ddre

ssed

in S

ectio

n 4(

A) o

f thi

s M

anua

l. T

he E

ngin

eer w

ill te

st p

roce

ssed

mat

eria

l if

proc

ess

cont

rol t

estin

g in

dica

tes

that

the

proc

esse

d m

ater

ial m

eets

the

cont

ract

qua

lity

requ

irem

ents

. Te

sts

will

invo

lve

degr

adat

ion,

sou

ndne

ss, a

bras

ion,

and

ligh

twei

ght p

iece

s, b

ut m

ay in

volv

e ot

her t

ests

. Th

e m

ater

ial s

hall

not b

e in

corp

orat

ed in

to

the

proj

ect u

nles

s P

rodu

ct C

ompl

ianc

e te

sts

show

favo

rabl

e re

sults

. 3.

Qua

lity

Con

trol

– T

he C

ontra

ctor

will

perfo

rm q

ualit

y co

ntro

l tes

ting

as d

escr

ibed

in S

ectio

n 2

and

spec

ified

in 4

(D) o

f thi

s M

anua

l or

as

mod

ified

by

the

Spe

cial

Pro

visi

ons

or S

uppl

emen

tal S

tand

ard

Spe

cific

atio

ns.

4. V

erifi

catio

n –

The

Eng

inee

r will

perfo

rm V

erifi

catio

n te

stin

g as

des

crib

ed in

Sec

tion

2 an

d sp

ecifi

ed in

Sec

tion

4(D

) of t

his

Man

ual.

N

ote:

The

requ

ired

10%

test

ing

of Q

ualit

y C

ontr

ol b

y th

e R

egio

n Q

A is

con

side

red

a m

inim

um fr

eque

ncy

and

test

ing

may

be

incr

ease

d w

hen

deem

ed n

eces

sary

by

the

engi

neer

. Th

ese

test

s pr

ovid

e th

e ba

sis

for t

he E

ngin

eer’s

dec

isio

n on

ac

cept

ance

of m

ater

ials

and

pro

duct

s. I

f Ind

epen

dent

Ass

uran

ce is

to b

e do

ne o

n a

mat

eria

l, a

split

of t

he V

erifi

catio

n sa

mpl

e w

ill be

giv

en to

the

Con

tract

or fo

r tes

ting.

5.

Ind

epen

dent

Ass

uran

ce –

Whe

re In

depe

nden

t Ass

uran

ce in

volv

es te

stin

g, th

e E

ngin

eer w

ill ev

alua

te te

st re

sults

from

spl

it sa

mpl

es to

ass

ure

that

Con

tract

or te

st re

sults

mee

t req

uire

d pa

ram

eter

s.

6. V

isua

l – V

isua

l Ins

pect

ion:

Exa

min

atio

n an

d as

sess

men

t of c

onst

ruct

ion

mat

eria

ls, b

y O

BSE

RVA

TIO

N, t

o de

term

ine

if th

e m

ater

ials

app

ear t

o m

eet t

he c

ontra

ct re

quire

men

ts a

nd a

re a

ccep

tabl

e fo

r inc

orpo

ratio

n in

to O

DO

T co

nstru

ctio

n pr

ojec

ts.

Vis

ual

insp

ectio

n, w

hen

stat

ed in

the

cont

ract

, is

a m

etho

d ge

nera

lly u

sed

by th

e P

roje

ct In

spec

tor i

n lie

u of

nor

mal

sam

plin

g an

d te

stin

g of

fie

ld te

sted

mat

eria

ls a

s de

fined

in s

ectio

n 00

165.

00 o

f the

Sta

ndar

d S

peci

ficat

ions

to d

ocum

ent q

ualit

y. S

uppo

rting

doc

umen

tatio

n fo

r vis

ual a

ccep

tanc

e is

, at a

min

imum

, a fi

eld

insp

ectio

n re

port.

Con

sult

the

cons

truct

ion

cont

ract

for o

ther

acc

epta

nce

docu

men

t re

quire

men

ts.

Page 4: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere
Page 5: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 1

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

T 99

3468

(for

Com

pact

ion)

B

ulk

Spe

cific

Gra

vity

T 85

3468

Fa

mily

of C

urve

sR

75

3468

FC

Com

pact

ion

Def

lect

ion

Test

ing

TM 1

5817

93S

Nuc

lear

Gau

ge

T

310

1793

SC

oars

e P

artic

le C

orre

ctio

nT

99D

efle

ctio

n Te

stin

gTM

158

1793

S

Sto

ne E

mba

nkm

ent M

ater

ial

(S

ee S

ec. 3

30.1

6(a)

)G

rada

tion

Com

pact

ion

Def

lect

ion

Test

ing

TM 1

5817

93S

1 pe

r Lay

er

Impo

rted

Tops

oil

Com

plia

nce

40

00S

ee S

ectio

n 4C

Sub

mit

to L

ab (S

ee S

ectio

n 01

040.

14(b

))1/

Sou

rce

& 1

/Typ

e of

Soi

l

1/S

oil t

ype

1/P

roje

ct

1 te

st p

er 5

00 y

d³1

test

per

300

0 yd

³

See

Tab

le 0

0330

-1

Bel

ow

1 te

st p

er 1

000

yd²

1 te

st p

er 3

000

yd²

TAB

LE 0

0330

-1 F

requ

ency

of Q

ualit

y C

ontr

ol T

estin

g (E

nglis

h)O

ver 3

500

yd² o

r yd³

1 te

st p

er 1

0 Q

C

Test

s pe

r Tab

le

0033

0-1

Emba

nkm

ents

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

Vis

ual

S

ee S

ectio

n 00

330.

16(b

)

Exca

vatio

ns a

nd F

inis

hed

Subg

rade

1 te

st p

er 1

000

yd²

1 te

st p

er 3

000

yd²

SEC

TIO

N 0

0330

- EA

RTH

WO

RK

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

1 te

st p

er 3

ft. i

n de

pth

Exis

ting

Gro

und

Surfa

ceIn

divi

dual

Are

asU

nder

350

0 yd

² or y

Page 6: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 2

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te b

ackf

illM

ater

ial m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0033

1.10

Vis

ual

Wat

er

Com

pact

ion

Vis

ual

SEC

TIO

N 0

0332

- SU

RFA

CIN

G S

TAB

ILIZ

ATIO

N A

ggre

gate

Bas

eV

isua

l

Com

pact

ion

Vis

ual

SEC

TIO

N 0

0333

- AG

GR

EGAT

E D

ITC

H L

ININ

G A

ggre

gate

S

ampl

ing

T 2

1/P

roje

ctR

educ

ing

R 7

6or

Sie

ve A

naly

sis

T 27

/T 1

117

921/

Sou

rce

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

340

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

332.

10

SEC

TIO

N 0

0331

- SU

BG

RAD

E ST

ABIL

IZAT

ION M

ater

ial m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0033

2

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

331

Page 7: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 3

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gra

nula

r Qui

cklim

eS

ieve

Ana

lysi

sT

2740

001/

Pro

ject

Sub

mit

Cal

cium

Hyd

roxi

de C

onte

nt in

lim

eT

219

4000

orto

1/

Sou

rce

Lab

Hyd

rate

d Li

me

Cal

cium

Chl

orid

e S

odiu

m C

hlor

ide

Por

tland

Cem

ent

Wat

er

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

T 99

(for

Com

pact

ion)

Max

imum

Spe

cific

Gra

vity

C

ompa

ctio

nD

efle

ctio

n Te

stin

gTM

158

1793

S

Def

lect

ion

Test

ing

TM 1

58N

ucle

ar G

auge

T 31

0C

oars

e P

artic

le C

orre

ctio

nT

99

1 te

st p

er 3

000

yd²

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

010

Mat

eria

ls m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0034

4.10

and

Tes

t R

esul

ts C

ertif

icat

e pr

ovid

ed a

ccor

ding

to S

ectio

n 00

165.

35(a

)

1 te

st p

er 1

000

yd²

1793

S

See

Tab

le 0

0344

-1

Bel

ow fo

r Tes

ting

Freq

uenc

y

3468

Fin

ishe

d Su

bgra

de

1/P

roje

ct a

nd 1

Te

st p

er 1

0 Q

C

test

s pe

r Tab

le

0034

4-1

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

340 U

nder

350

0 yd

² O

ver 3

500

yd²

TAB

LE 0

0344

-1 F

requ

ency

of Q

ualit

y C

ontr

ol T

estin

g

1/P

roje

ct o

r 1/

Sou

rce

Indi

vidu

al A

reas

SEC

TIO

N 0

0344

-TR

EATE

D S

UB

GR

ADE

Page 8: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 4

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gra

nula

r Dra

inag

e Bl

anke

tS

ampl

ing

T 2

Red

ucin

gR

76

S

ieve

Ana

lysi

sT

27/T

11

1792

San

d D

rain

age

Blan

ket

Sam

plin

gT

2R

educ

ing

R 7

6S

ieve

Ana

lysi

sT

27/T

11

1792

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

T 99

3468

(for

Com

pact

ion)

B

ulk

Spe

cific

Gra

vity

T 85

3468

Com

pact

ion

Def

lect

ion

Test

ing

TM 1

5817

93S

Def

lect

ion

Test

ing

TM 1

5817

93S

Nuc

lear

Gau

ge

T

310

Coa

rse

Par

ticle

Cor

rect

ion

T 99

1793

S

TAB

LE 0

0360

-1 F

requ

ency

of Q

ualit

y C

ontr

ol T

estin

g In

divi

dual

Are

as

Fin

ishe

d Su

rface

s1

test

per

100

0 yd

²

1/P

roje

ct

1 te

st p

er 3

ft. i

n de

pth

1/S

ourc

e an

d Ty

pe

1/su

blot

min

imum

1/

Sou

rce

per P

roje

ct

SEC

TIO

N 0

0360

- D

rain

age

Bla

nket

sA

sub

lot e

qual

s 10

00 T

ons

1 Te

st p

er 1

0 Q

C

Test

s pe

r Tab

le

0036

0-1

See

Tab

le 0

0360

-1

Bel

ow

Exis

ting

Gro

und

Surfa

ce1

test

per

100

0 yd

²U

nder

350

0 yd

² O

ver 3

500

yd²

1 te

st p

er 3

000

yd²

1 te

st p

er 3

000

yd²

Page 9: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 5

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0390

- R

IPR

AP P

RO

TEC

TIO

N F

ill M

ater

ial &

Rip

rap

Gra

datio

n

See

003

90.1

1(c-

1)

Deg

rada

tion

TM 2

08S

ubm

itS

ound

ness

T

104

to

App

aren

t Spe

cific

Gra

vity

& A

bsor

ptio

nT

8518

25La

b

Filt

er B

lank

etG

rada

tion

S

ee 0

0390

.13

Gro

uted

Rip

rap

San

dS

ampl

ing

T 2

Red

ucin

gR

76

Sie

ve A

naly

sis

T 27

/T 1

117

92

Sou

ndne

ss

T 10

4S

ubm

itLi

ghtw

eigh

t Pie

ces

T 11

3to

Lab

Por

tland

Cem

ent

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

010

See

Sec

tion

4(A

)

4000

4000

Vis

ual

See

Sec

tion

4(A

)

See

Sec

tion

4(A

)

Vis

ual

1/P

roje

ct

See

Sec

tion

4(A

)

Page 10: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 6

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0396

-SH

OTC

RET

E SL

OPE

STA

BIL

IZAT

ION

Agg

rega

te P

rodu

ctio

n an

d M

ixtu

reS

ampl

ing

T 2

(1) Q

AE

may

wai

veR

educ

ing

R 7

6af

ter 5

sub

lots

/shi

fts(2

)(3) S

ieve

Ana

lysi

sT

27/T

11

(3) Fi

nene

ss M

odul

us

T 27

/T 1

1 (2

) Coa

rse

Agg

rega

te

(1)(2

) Woo

d P

artic

les

TM 2

25(S

ee S

ectio

n 02

690.

20)

(3) S

and

Equ

ival

ent

T 17

6

(3) Fi

ne A

ggre

gate

Sou

ndne

ss

T 10

4(S

ee S

ectio

n 02

690.

30)

Abr

asio

nT

96D

egra

datio

nTM

208

Ligh

twei

ght P

iece

sT

113

Org

anic

sT

21

(2) D

ry R

odde

d U

nit

T 19

1825

Sta

rt of

W

eigh

t18

25C

prod

uctio

n an

d

(2

)(3) B

ulk

Spe

cific

T

84 &

whe

n ch

ange

s in

G

ravi

ty &

Abs

orpt

ion

T 85

aggr

egat

e oc

curs

Por

tland

Cem

ent

Adm

ixtu

res

Mix

ing

Wat

er P

rodu

ctio

n Te

stin

g (S

) Test

Pan

el (S

ee S

ectio

n 00

396.

14)

(S) 3

Cor

es m

inim

um p

er P

anel

Com

pres

sion

Tes

t Cor

esS

treng

thT

2240

00C

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

010

1825

1/S

et C

ores

per

Te

st p

anel

1792

4000

Two

Test

Pan

els

per M

ix D

esig

n &

Tw

o P

anel

s pe

r da

ys P

rodu

ctio

n S

ee S

ectio

n 00

396.

14(a

)2

See

Sec

tion

4A

1/S

ublo

t & S

tart

of

Pro

duct

ion

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

040

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

020

See

Sec

tion

4(A

)S

ubm

it to

Cen

tral

Lab

1 pe

r 10

Sub

lots

A S

ublo

t equ

als

1000

Ton

s

Sub

mit

to C

entra

l La

b

Page 11: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 7

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

TR

ENC

H F

OU

ND

ATIO

N -

Exca

vatio

n be

low

gra

de o

nly

S

elec

ted

gene

ral b

ackf

illV

isua

l

Sel

ecte

d gr

anul

ar b

ackf

illV

isua

l

Sel

ecte

d st

one

back

fill

Vis

ual

Oth

er a

ppro

ved

mat

eria

lV

isua

l E

stab

lishi

ng M

axim

um D

ensi

tyD

ensi

ty C

urve

T

9934

681/

Soi

l Typ

e

or A

ggre

gate

Bul

k S

peci

fic G

ravi

tyT

8534

68G

rada

tion

Fam

ily o

f Cur

ves

R 7

534

68FC

C

ompa

ctio

nN

ucle

ar G

auge

T

310

Coa

rse

Par

ticle

Cor

rect

ion

T 99

SEC

TIO

N 0

0405

- T

REN

CH

EXC

AVAT

ION

, BED

DIN

G, A

ND

BAC

KFI

LL

1tes

t per

300

ft. o

f Tr

ench

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

330.

13

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

330.

14

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

330.

15

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

405.

11

1793

S

Page 12: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 8

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Bed

ding

3

/8" -

0 P

CC

fine

agg

rega

teS

ampl

ing

T 2

(See

Sec

tion

0269

0.30

(h))

Red

ucin

gR

76

Sie

ve A

naly

sis

T 27

/T 1

117

92 C

omm

erci

al

3/4

" - 0

Agg

rega

te

No.

10

- 0S

ampl

ing

T 2

San

d dr

aina

ge b

lank

et m

ater

ial

Red

ucin

gR

76

(See

Sec

tion

0036

0.10

)S

ieve

Ana

lysi

sT

27/T

11

1792

Rea

sona

bly

wel

l gra

ded

s

and,

max

imum

3/8

" to

dust

Com

mer

cial

ava

ilabl

e 3/

8"-0

or

No.

10 -

0 sa

nd C

ontin

uous

cra

dle

of C

omm

erci

al G

rade

Con

cret

e

SEC

TIO

N 0

0405

- T

REN

CH

EXC

AVAT

ION

, BED

DIN

G, A

ND

BAC

KFI

LL (C

ON

TIN

UED

)

Vis

ual

1/S

ourc

e or

A

ggre

gate

G

rada

tion

Vis

ual

Vis

ual

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

Vis

ual

1/S

ourc

e or

A

ggre

gate

G

rada

tion

Page 13: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 9

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Fle

xibl

e Pi

pe

Rig

id P

ipe:

Agg

rega

te B

ase

Sam

plin

gT

2

1" -

0 o

r 3/4

" - 0

Agg

rega

te

Red

ucin

gR

76

Sie

ve A

naly

sis

T 27

1792

(See

Sec

tion

0263

0.10

)

R

igid

Pip

e: C

omm

erci

al

1

"- 0

or 3

/4" -

0 A

ggre

gate

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve(1

) T 9

934

68

(1) M

etho

d "A

" & O

DO

T TM

223

B

ulk

Spe

cific

Gra

vity

T 85

f

or D

ense

Gra

ded

Bas

e A

ggre

gate

Coa

rse

Par

ticle

Cor

rect

ion

T 99

3468

Com

pact

ion

Nuc

lear

Gau

ge

T 31

017

93B

1 te

st p

er 3

00 ft

. of

Tren

ch a

nd e

very

1.

5 ft.

of F

ill

SEC

TIO

N 0

0405

- T

REN

CH

EXC

AVAT

ION

, BED

DIN

G, A

ND

BAC

KFI

LL (C

ON

TIN

UED

)

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

1/S

ourc

e or

A

ggre

gate

G

rada

tion

Vis

ual

Use

the

List

ed M

ater

ial r

equi

rem

ents

und

er B

eddi

ng

1/S

ourc

e or

G

rada

tion

Pip

e Zo

ne M

ater

ial

Page 14: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 10

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Tre

nch

Bac

kfill

E

stab

lishi

ng M

axim

um D

ensi

tyD

ensi

ty C

urve

(1) T

99

3468

(1

) Met

hod

"A" &

OD

OT

TM 2

23

Bul

k S

peci

fic G

ravi

tyT

8534

68 f

or D

ense

Gra

ded

Bas

e A

ggre

gate

Fa

mily

of C

urve

sR

75

3468

FC

C

ompa

ctio

nN

ucle

ar G

auge

T 31

017

93S

C

oars

e P

artic

le C

orre

ctio

nT

99or

17

93B

(C) 1

test

per

300

ft.

of T

renc

h an

d ev

ery

1.5

ft. o

f Fill

SEC

TIO

N 0

0405

- T

REN

CH

EXC

AVAT

ION

, BED

DIN

G, A

ND

BAC

KFI

LL (C

ON

TIN

UED

)

(C) D

ensi

ty te

stin

g is

bas

ed o

n cu

mul

ativ

e lin

eal f

eet o

f pip

e pl

acem

ent.

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

Cla

ss C

Bac

kfill

- Cle

an s

and

with

10

0% m

inus

1/4

" mat

eria

l V

isua

l

Vis

ual

1/S

oil T

ype

or

Agg

rega

te G

rada

tion

Cla

ss B

Bac

kfill

- 1"-

0 or

3/4

"-0

Gra

nula

r Mat

eria

l

Cla

ss D

Bac

kfill

- P

it ru

n or

bar

run

mat

eria

l with

3" m

axim

um d

imen

sion

an

d w

ell g

rade

d fro

m c

oars

e to

fine

Cla

ss E

Bac

kfill

- C

ontro

lled

Low

S

treng

th M

ater

ial (

CLS

M)

Cla

ss A

Bac

kfill

- Nat

ive

or c

omm

on

Mat

eria

lM

ater

ial m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0064

1

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

330.

43

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

442

Page 15: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 11

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0430

- SU

BSU

RFA

CE

DR

AIN

S G

ranu

lar D

rain

Bac

kfill

Mat

eria

l

Sam

plin

gT

2

Red

ucin

gR

76

Sie

ve A

naly

sis

T 27

1792

Abr

asio

nT

96D

egra

datio

nTM

208

Spec

ial F

ilter

Mat

eria

lSe

e Se

ctio

n 00

430.

46(a

)C

ompa

ctio

n

Mix

ture

Sam

plin

gTM

2A

ir C

onte

ntT

152

Den

sity

(Uni

t Wei

ght)

T 12

1Y

ield

T121

Slu

mp

T 11

9C

oncr

ete

Tem

pera

ture

T

309

Mod

ifier

s A

dmix

ture

s P

ortla

nd C

emen

t

Exc

ept V

isua

l Acc

epta

nce

Item

s S

treng

thT

22 &

T 2

340

00C

(See

sec

tion

0044

0.14

(a))

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

040

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

030

(M)

(S) 1

Set

/20

yd3

Cum

ulat

ive

(Max

imum

1 S

et/d

ay)

Stre

ngth

T 22

& T

23

4000

C(M

)(S)

1 S

et /

Day

M

inim

um

1/Su

blot

(M

inim

um

1/

Pro

ject

)

See

Sect

ion

4A

(S) 1

per e

ach

set o

f cy

linde

rs

4000

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

010

(M) P

er M

ix D

esig

n &

Sour

ce

See

sect

ion

405

for c

ompa

ctio

n re

quire

men

ts

A Su

blot

equ

als

1000

Ton

s

(S) 1

Set

Rep

rese

nts

a m

inim

um o

f 3

Cyl

inde

rs

3573

WS

or

4000

C

SEC

TIO

N 0

0440

- C

OM

MER

CIA

L G

RAD

E C

ON

CR

ETE

Stru

ctur

al It

ems

Subm

it To

Lab

See

Sect

ion

4A

Page 16: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 12

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

CLS

M M

ixtu

reM

ix P

ropo

rtion

sTr

ial B

atch

S

treng

thT

22 &

T 2

340

00C

Mod

ifier

s

Adm

ixtu

res

Por

tland

Cem

ent

Tre

nch

Wor

k

Con

cret

e Bl

ocks

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

030

1/Pr

ojec

t or S

ourc

e

SEC

TIO

N 0

0442

- C

ON

TRO

LLED

LO

W S

TREN

GTH

MAT

ERIA

LS (C

LSM

)

Exca

vatio

n, b

eddi

ng, p

ipe

zone

and

tre

nch

back

fill

See

Sect

ion

0040

5 fo

r pip

es le

ss th

an 7

2"

Exca

vatio

n, b

eddi

ng, p

ipe

zone

and

tre

nch

back

fill

See

Sect

ion

0051

0 fo

r pip

es g

reat

er th

an 7

2"

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

040

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

010

SEC

TIO

N 0

0445

- SA

NIT

ARY,

STO

RM

, CU

LVER

T, S

IPH

ON

, AN

D IR

RIG

ATIO

N P

IPE

- IN

CLU

DED

WIT

H S

ECTI

ON

004

05

Page 17: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 13

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Com

mer

cial

Gra

de C

oncr

ete

in a

ppur

tena

nces

Tre

nch

Wor

k E

xcav

atio

n an

d Ba

ckfil

l T

renc

hes

in U

nsta

ble

Area

s

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve(1

) T 9

9

(1

) Met

hod

"A"

Bul

k S

peci

fic G

ravi

tyT

85

Coa

rse

Par

ticle

TM

223

Cor

rect

ion

Com

pact

ion

Nuc

lear

Gau

ge

T

310

1793

B

Mat

eria

l and

Ope

ratio

n m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0051

0.48

(d)

Stru

ctur

e Ba

ckfil

l

(S

ectio

n 00

450.

46)

Con

cret

e

SEC

TIO

N 0

0459

- C

AST

IN P

LAC

E C

ON

CR

ETE

PIPE

SEC

TIO

N 0

0450

- ST

RU

CTU

RAL

PLA

TE S

HAP

ED S

TRU

CTU

RES

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

Ope

ratio

ns m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0051

0

1 Te

st p

er 1

00 ft

. an

d 1

ft. o

f fill

1/A

ggre

gate

G

rada

tion

and

Sou

rce

Gra

nula

r Stru

ctur

al B

ackf

illM

ater

ial m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0051

0

3468

B

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

540,

with

acc

epta

nce

in

acco

rdan

ce w

ith S

ectio

n 00

540.

17

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

405.

14 a

nd b

e in

corp

orat

ed in

to th

e pr

ojec

t in

acco

rdan

ce w

ith S

ectio

n 00

405.

46 B

ackf

ill M

ater

ial

Page 18: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 14

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0460

- PA

VED

CU

LVER

T EN

D S

LOPE

S

Com

mer

cial

Gra

de C

oncr

ete

SEC

TIO

N 0

0470

- M

ANH

OLE

S, C

ATC

H B

ASIN

S AN

D IN

LETS

Com

mer

cial

Gra

de C

oncr

ete

Exc

avat

ion,

Bac

kfill

and

F

ound

atio

n St

abiliz

atio

n

Com

mer

cial

Gra

de C

oncr

ete

Den

se G

rade

d H

MAC

Mix

ture

Lev

el 2

, (1/

2")

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

744

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

SEC

TIO

N 0

0480

- D

RAI

NAG

E C

UR

BS

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

405

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

Bas

e D

rain

Bac

kfill

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

470.

17

Page 19: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 15

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Com

mer

cial

Gra

de C

oncr

ete

Hig

h E

arly

Stre

ngth

Con

cret

e

Bac

kfill

Ope

ratio

ns

Bac

kfill

Ope

ratio

ns (R

oadw

ay)

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve(1

) T 9

9

(1

) Met

hod

"A"

Bul

k S

peci

fic G

ravi

tyT

85

Coa

rse

Par

ticle

TM

223

Cor

rect

ion

C

ompa

ctio

nN

ucle

ar G

auge

T 31

0

Bac

kfill

Ope

ratio

ns L

ands

cape

d

or U

nim

prov

ed R

oadw

ays

Top

1.0

' of B

ackf

ill R

egio

n

Res

urfa

cing

Mat

eria

ls

1 Te

st p

er 1

00 ft

. an

d ev

ery

1.5'

of F

ill

3468

B1/

Agg

rega

te

Gra

datio

n an

d S

ourc

e

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440,

but

cem

ent

cont

ents

adj

uste

d ac

cord

ing

to 0

0490

.11

Bac

kfill

Exc

avat

ions

acc

ordi

ng to

sec

tion

405

Filli

ng A

band

oned

Pip

es, M

anho

les

and

Cat

ch B

asin

s (S

ee s

ectio

n 00

490.

44)

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

440

SEC

TIO

N 0

0490

- W

OR

K O

N E

XIST

ING

SEW

ERS

AND

STR

UC

TUR

ES

See

Sec

tion

0049

5.40

for M

ater

ial R

equi

rem

ents

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

330.

13

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

330.

11

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 26

30

1793

B

SEC

TIO

N 0

0495

- TR

ENC

H R

ESU

RFA

CIN

G

Page 20: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 16

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Gra

nula

r Str

uctu

re B

ackf

illS

ampl

ing

T 2

(S

ee S

ectio

n 02

630.

10)

Red

ucin

gR

76

(1

) Sie

ve A

naly

sis

T 27

Frac

ture

(Met

hod

1)T

335

San

d E

quiv

alen

tT

176

Pro

duct

Com

plia

nce

Abr

asio

nT

96D

egra

datio

nTM

208

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

(2) T

99

3468

1/S

oil t

ype

or

Agg

rega

te

(2) M

etho

d "A

" & O

DO

T TM

223

B

ulk

Spe

cific

Gra

vity

T 85

G

rada

tion

for

Den

se G

rade

d B

ase

Agg

rega

te

Coa

rse

Par

ticle

Cor

rect

ion

T 99

3468

Com

pact

ion

Nuc

lear

Gau

ge

T 31

017

93B

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Sub

mit

to L

abM

inim

um

1/P

roje

ct o

r 1/

Sou

rce

1/1

00 y

d3

min

imum

1/

proj

ect

SEC

TIO

N 0

0510

- ST

RU

CTU

RE

EXC

AVAT

ION

AN

D B

ACK

FILL

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

(1) P

erfo

rm a

min

imum

of 3

test

s Q

L's

requ

ired

1792

1/S

ublo

t

(M

inim

um 1

/Pro

ject

)

4000

See

Sec

tion

4C

1/S

ourc

e

Soils

, Soi

l/Agg

rega

te M

ixtu

res

and

Gra

ded

Aggr

egat

esA

Subl

ot e

qual

s 1,

000

Tons

Page 21: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 17

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gra

nula

r Wal

l Bac

kfill

Sam

plin

gT

2 (S

ee S

ectio

n 02

630.

11)

Red

ucin

gR

76

(1) S

ieve

Ana

lysi

sT

27Fr

actu

re (M

etho

d 2)

T 33

5

Pro

duct

Com

plia

nce

Abr

asio

nT

96D

egra

datio

nTM

208

(2) D

efle

ctio

n

TM 1

5817

93B

T

estin

g

C

ontr

acto

r mus

t dem

onst

rate

, by

com

pact

ion

test

ing

or a

ccep

tabl

e vi

sual

mea

ns, t

hat t

he m

ater

ial,

equi

pmen

t, an

d pr

oces

s us

ed fo

r co

mpa

ctio

n ac

hiev

es th

e sp

ecifi

catio

n re

quire

men

ts.

If th

e m

ater

ial,

equi

pmen

t, or

pro

cess

cha

nges

, or i

f oth

er c

ondi

tions

indi

cate

a n

on-

spec

ifica

tion

prod

uct,

the

Con

trac

tor m

ust r

e-de

mon

stra

te th

at s

peci

ficat

ion

requ

irem

ents

are

bei

ng a

chie

ved.

1792

1/S

ublo

t

(M

inim

um 1

/Pro

ject

)

1/S

ublo

t

(M

inim

um 1

/Pro

ject

)

A Su

blot

equ

als

1,00

0 To

ns

SEC

TIO

N 0

0510

- ST

RU

CTU

RE

EXC

AVAT

ION

AN

D B

ACK

FILL

(CO

NTI

NU

ED)

(1) P

erfo

rm a

min

imum

of 3

test

s Q

L's

requ

ired

Sub

mit

to L

abM

inim

um

1/P

roje

ct o

r 1/

Sou

rce

Soils

, Soi

l/Agg

rega

te M

ixtu

res

and

Gra

ded

Aggr

egat

es

(2) C

ompa

ctio

n

Not

e: C

ompa

ctio

n m

ust m

eet t

he

requ

irem

ents

of s

ectio

n 00

330.

43c

4000

See

Sec

tion

4C

1/S

ourc

e

Page 22: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 18

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0512

- D

RIL

LED

SH

AFTS

A

ggre

gate

Pro

duct

ion

Sam

plin

gT

2(1

) QA

E m

ay w

aive

Red

ucin

gR

76

afte

r 5 s

ublo

ts/s

hifts

(2)(3

)(4) S

ieve

Ana

lysi

sT

27/T

11

1792

(4) Fi

nene

ss M

odul

us

T 27

/T 1

1(1

)(3) W

ood

Par

ticle

sTM

225

(4) S

and

Equ

ival

ent

T 17

617

92

Sou

ndne

ss

T 10

440

00A

bras

ion

T 96

D

egra

datio

nTM

208

Ligh

twei

ght P

iece

sT

113

Org

anic

sT

2140

00

(3) D

ry R

odde

d U

nit W

eigh

t T

1918

2518

25C

(3)(4

) Bul

k S

peci

fic

T 84

&G

ravi

ty &

Abs

orpt

ion

T 85

Por

tland

Cem

ent

M

odifi

ers

Adm

ixtu

res

Dril

ling

Slur

ry

Gro

ut M

ixin

g W

ater

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

Sta

rt of

pro

duct

ion

and

whe

n ch

ange

s in

ag

greg

ate

occu

rs

Slu

rry

mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

512.

14 &

00

512.

43(g

)

Mat

eria

ls m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0200

1.10

(4) F

ine

Agg

rega

te

(See

Sec

tion

0269

0.30

)

(3

) Coa

rse

Agg

rega

te

(S

ee S

ectio

n 02

690.

20)

See

Sec

tion

4AS

ubm

it to

Lab

See

Sec

tion

4(A

)

A Su

blot

equ

als

1,00

0 To

ns

1/S

ublo

t

&

Sta

rt of

Pro

duct

ion

1 pe

r 10

Sub

lots

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

080

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

020

1825

Page 23: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 19

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0512

- D

RIL

LED

SH

AFTS

(CO

NTI

NU

ED)

Por

tland

Cem

ent C

oncr

ete

S

ampl

ing

TM 2

S

lum

pT

119

Proj

ects

und

er 1

00 y

d³ a

ll cl

asse

sC

oncr

ete

Tem

pera

ture

T 30

9

1/Pr

ojec

t rep

rese

ntin

g al

l cla

sses

of P

CC

Den

sity

(Uni

t Wei

ght)

T 12

1Y

ield

T121

W

ater

/Cem

ent R

atio

T 12

1

Pr

ojec

ts o

ver 1

00 y

d³ a

ll cl

asse

s

1/

500

yd³ p

er c

lass

min

imum

1/c

lass

Stre

ngth

T22/

2340

00C

af

ter r

each

ing

600

yd³

1 Se

t eac

h da

y

QA

Tes

ting

100

to 6

00 y

d³ o

n a

sing

le d

ay1

Set p

er e

ach

100

yd³ o

r por

tion

ther

eof

TAB

LE 0

0512

-1 F

requ

ency

of Q

ualit

y C

ontr

ol T

estin

g

(M) P

er M

ix D

esig

n &

Sou

rce

(S) 1

Set

Rep

rese

nts

a m

inim

um o

f 3

Cyl

inde

rs

0 to

100

yd³

on

a si

ngle

day

Min

imum

freq

uenc

ies

per C

lass

of c

oncr

ete

base

d on

dai

ly p

rodu

ctio

n re

cord

s.

1 Se

t per

eac

h 20

0 yd

³ or p

ortio

n th

ereo

fov

er 6

00 y

d³ o

n a

sing

le d

ay

Freq

uenc

ies

Q

uant

ity O

ver 1

00 y

Prod

uctio

n3573

WS

or

400

0C

(M)

(S) 1

per

Sha

ft an

d Te

st a

t m

inim

um

frequ

enci

es

acco

rdin

g to

tabl

e 00

512-

1. R

evie

w

spec

s.

Page 24: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 20

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0540

- ST

RU

CTU

RAL

CO

NC

RET

E A

ggre

gate

Pro

duct

ion

Sam

plin

gT

2(1

) QA

E m

ay w

aive

Red

ucin

gR

76

afte

r 5 s

ublo

ts/s

hifts

(2)(3

)(4) S

ieve

Ana

lysi

s

T 27

/T 1

117

92(4

) Fine

ness

Mod

ulus

T

27/T

11

(1)(3

) W

ood

Par

ticle

sTM

225

(4) S

and

Equ

ival

ent

T 17

617

92

Sou

ndne

ss

T 10

440

00A

bras

ion

T 96

Deg

rada

tion

TM 2

08Li

ghtw

eigh

t Pie

ces

T 11

3O

rgan

ics

T 21

4000

(3

) Dry

Rod

ded

Uni

t Wei

ght

T 19

1825

18

25C

(3)(4

) Bul

k S

peci

fic

T 84

&G

ravi

ty &

Abs

orpt

ion

T 85

Por

tland

Cem

ent

Mod

ifier

s A

dmix

ture

s

Mix

ing

Wat

er

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

Sta

rt of

pro

duct

ion

and

whe

n ch

ange

s in

ag

greg

ate

occu

rs

(

4) F

ine

Agg

rega

te

(S

ee

Sec

tion

0269

0.30

)

1 pe

r 10

Sub

lots

Mat

eria

ls m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0200

1.10

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

020

1/S

ublo

t

&

Sta

rt of

Pro

duct

ion

A Su

blot

equ

als

1,00

0 To

ns

(3)

Coa

rse

Agg

rega

te

(S

ee S

ectio

n 02

690.

20)

See

Sec

tion

4AS

ee S

ectio

n 4A

Sub

mit

To L

ab

1825

Page 25: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 21

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0540

- ST

RU

CTU

RAL

CO

NC

RET

E (C

ON

TIN

UED

) P

ortla

nd C

emen

t Con

cret

e

Sam

plin

gTM

2

A

ir C

onte

ntT

152

Proj

ects

und

er 1

00 y

d³ a

ll cl

asse

sS

lum

pT

119

1/

Proj

ect r

epre

sent

ing

all c

lass

es o

f PC

CC

oncr

ete

Tem

pera

ture

T 30

9D

ensi

ty (U

nit W

eigh

t)T

121

Y

ield

T121

Proj

ects

ove

r 100

yd³

all

clas

ses

Wat

er/C

emen

t Rat

ioT

121

1/

500

yd³ p

er c

lass

min

imum

1/c

lass

Stre

ngth

T22/

2340

00C

over

600

yd³

on

a si

ngle

day

3573

WS

or

400

0C

Freq

uenc

ies

100

to 6

00 y

d³ o

n a

sing

le d

ay

(S) 1

Set

Rep

rese

nts

a m

inim

um o

f 3

Cyl

inde

rs

QA

Tes

ting

(M)

(S) T

est a

t m

inim

um

frequ

enci

es

acco

rdin

g to

tabl

e 00

540-

1. R

evie

w

spec

s.

TAB

LE 0

0540

-1 F

requ

ency

of Q

ualit

y C

ontr

ol T

estin

g

1 Se

t per

eac

h 20

0 yd

³ or p

ortio

n th

ereo

f

Prod

uctio

n

1 Se

t per

eac

h 10

0 yd

³ or p

ortio

n th

ereo

f

Min

imum

freq

uenc

ies

per C

lass

of c

oncr

ete

base

d on

dai

ly p

rodu

ctio

n re

cord

s.

1 Se

t eac

h da

y

af

ter r

each

ing

600

yd³

0 to

100

yd³

on

a si

ngle

day

(M) P

er M

ix D

esig

n &

Sou

rce

Q

uant

ity O

ver 1

00 y

Page 26: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 22

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

Sam

plin

gT

2R

educ

ing

R 7

6S

ieve

Ana

lysi

sT

27

1792

Moi

stur

e C

onte

ntT

255/

265

1792

Pro

duct

Com

plia

nce

Abs

orpt

ion

T 84

A

bras

ion

Loss

T

327

P

olym

er R

esin

Moh

s H

ardn

ess

Sca

le

Mat

eria

l mus

t mee

t the

requ

irmen

ts o

f sec

tion

0055

6.10

Mat

eria

l mus

t mee

t the

requ

irem

ents

of s

ectio

n 00

556.

10

4000

1/P

roje

ct o

r

1/

Sou

rce

Sub

mit

to C

entra

l La

b

1/P

roje

ct o

r 1/

Sou

rce

SEC

TIO

N 0

0556

- M

ULT

I-LAY

ER P

OLY

MER

CO

NC

RET

E O

VER

LAY

Page 27: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 23

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

(1) Q

AE

may

wai

veS

ampl

ing

T 2

afte

r 5 s

ublo

ts/s

hifts

Red

ucin

gR

76

(2)(3

)(4) S

ieve

Ana

lysi

sT

27/T

11

1792

(4) Fi

nene

ss M

odul

us

T 27

/T 1

1(4

) San

d E

quiv

alen

tT

176

1792

(1)(3

) Woo

d P

artic

les

TM 2

25

(4) F

ine

Agg

rega

te

(See

Sec

tion

0269

0.30

& 0

0559

.10)

Abr

asio

nT

9640

00D

egra

datio

nTM

208

Sou

ndne

ss

T 10

4Li

ghtw

eigh

t Pie

ces

T 11

3O

rgan

ics

T 21

4000

(3

) Dry

Rod

ded

Uni

t Wei

ght

T 19

1825

1825

C(3

)(4) B

ulk

Spe

cific

T

84 &

Gra

vity

& A

bsor

ptio

nT

85

Por

tland

Cem

ent

Mod

ifier

s A

dmix

ture

s

Mix

ing

Wat

er

1/5

Sub

lots

& S

tart

of P

rodu

ctio

n

See

Sec

tion

4(A

)

1792

1825

(1)(3

) Elo

ngat

ed P

iece

s

TM

229

A S

ublo

t equ

als

500

Tons

. A

min

imum

one

per

shi

ft, w

hich

ever

resu

lts in

th

e gr

eate

st s

ampl

ing

frequ

ency

. (F

or p

repr

oduc

ed a

ggre

gate

s, 1

shi

ft sh

all m

ean

500

Tons

.)

(3)

Coa

rse

Agg

rega

te

(S

ee S

ectio

n 02

690.

20 &

005

59.1

0)

1 pe

r 10

Sub

lots

1/S

ublo

t & S

tart

of

Pro

duct

ion

SEC

TIO

N 0

0559

- SI

LIC

A FU

ME

AND

LAT

EX M

OD

IFIE

D C

ON

CR

ETE

OVE

RLA

YS

Mat

eria

ls m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0200

1.10

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

020

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

Sub

mit

to C

entra

l La

bS

ee S

ectio

n 4(

A)

Sta

rt of

pro

duct

ion

and

whe

n ch

ange

s in

ag

greg

ate

occu

rs

Page 28: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 24

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SFC

AN

D L

MC

S

ampl

ing

TM 2

Air

Con

tent

T 15

2S

lum

pT

119

Con

cret

e Te

mpe

ratu

re

T 30

9D

ensi

ty (U

nit W

eigh

t)T

121

Yie

ldT1

21W

/C R

atio

T

121

Late

x M

odifi

ed C

oncr

ete

Fine

Agg

rega

te M

oist

ure

T 25

5/T

265

1792

M

ixer

Cal

ibra

tion

SFC

and

LM

CS

treng

thT

22 &

T 23

(S) 1

Set

Rep

rese

nts

a m

inim

um o

f 3

Cyl

inde

rs

1 pe

r 10

Sub

lots

SEC

TIO

N 0

0559

- SI

LIC

A FU

ME

AND

LAT

EX M

OD

IFIE

D C

ON

CR

ETE

OVE

RLA

YS (C

ON

TIN

UED

)

A s

ublo

t equ

als

1 se

t of t

ests

per

50

yd3

1 / S

ublo

t or

Min

imum

1 p

er S

hift

1 S

et p

er

500

yd3

3573

WS

or

4000

C

4000

C(M

) (S

) 1 S

et C

ylin

ders

pe

r 50y

d3 M

inim

um 1

se

t/shi

ft

See

Sec

tion

0055

9.10

See

Sec

tion

0055

9.22

(M) P

er M

ix D

esig

n &

Sou

rce

Page 29: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 25

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

Gra

vel L

evel

ing

Pads

Bac

kfill

Abr

asio

nT9

6S

eeS

ubm

itS

ee (S

ee S

ectio

n 02

630.

10)

Deg

rada

tion

TM 2

08S

ectio

n 4A

to L

abS

ectio

n 4A

Sam

plin

gT

2R

educ

ing

R 7

6S

ieve

Ana

lysi

sT

27S

and

Equ

ival

ent

T 17

6Fr

actu

re (M

etho

d 1)

T 33

517

921/

5 S

ublo

ts

(3) M

odul

ar B

lock

Cor

e an

d D

rain

age

Sou

ndne

ss

T 10

440

00B

ackf

illA

bras

ion

T 96

(Pro

duct

Com

plia

nce)

Deg

rada

tion

TM 2

08

Ligh

twei

ght P

iece

sT

113

4000

(3) (S

ee S

ectio

n 26

90.2

0(a)

thru

2690

.20(

e) &

269

0.20

(g)

(3) M

odul

ar B

lock

Cor

e an

d D

rain

age

Sam

plin

gT

2B

ackf

illR

educ

ing

R 7

6

(2) S

ieve

Ana

lysi

sT

27/T

11

1792

(1) Q

AE

may

wai

ve(1

) Woo

d P

artic

les

TM 2

25af

ter 5

sub

lots

/shi

ftsFr

actu

re (M

etho

d 2)

T

335

E

long

ated

Pie

ces

TM 2

2917

92

P

ipe

Dra

in B

ackf

illA

bras

ion

T 96

(Pro

duct

Com

plia

nce)

Deg

rada

tion

TM 2

08(S

ee S

ectio

n 00

430.

11)

S

ieve

Ana

lysi

sT2

740

001/

Sub

lot

Agg

rega

te P

rodu

ctio

n

4000

See

Sec

tion

4C

SEC

TIO

N 0

0596

A - M

ECH

ANIC

ALLY

STA

BIL

IZED

EAR

TH R

ETAI

NIN

G W

ALLS

SEC

TIO

N 0

0596

A - M

ECH

ANIC

ALLY

STA

BIL

IZED

EAR

TH R

ETAI

NIN

G W

ALLS

Test

ing

Freq

uenc

y fo

r Pro

duct

Com

plia

nce

per S

ourc

e1/

5,00

0 To

ns M

inim

um 1

/Pro

ject

See

Sec

tion

4C

&

02

690

Sub

mit

To L

ab

4000

A Su

blot

equ

als

1,00

0 To

ns M

inim

um 1

/Pro

ject

See

Sec

tion

4C

Test

ing

Freq

uenc

y fo

r Pro

duct

Com

plia

nce

per S

ourc

e1/

5,00

0 To

ns M

inim

um 1

/Pro

ject

1/S

ublo

t

1792

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

A Su

blot

equ

als

1,00

0 To

ns

Sub

mit

To L

abS

ee S

ectio

n 4C

1/S

ublo

t

Page 30: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 26

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gab

ion

Bask

et F

illD

egra

datio

nTM

208

Sub

mit

(Pro

duct

Com

plia

nce)

Sou

ndne

ss

T 10

4to

(S

ee S

ectio

n 00

390.

11(b

))A

ppar

ent S

peci

fic G

ravi

ty &

Abs

orpt

ion

T 85

1825

Lab

Gra

datio

n

Vis

ual

See

Sec

tion

4C

See

Sec

tion

4C40

00

Page 31: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 27

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

MSE

Gra

nula

r Wal

l Bac

kfill

Abr

asio

nT9

640

00 (P

rodu

ct C

ompl

ianc

e)D

egra

datio

nTM

208

(Als

o re

fere

nce

0263

0.10

)S

ieve

Ana

lysi

sT

11

Pla

stic

ity In

dex

T

90

pHT

289

Res

istiv

ityT

288

Org

anic

Con

tent

T 26

740

00

MSE

Gra

nula

r Wal

l Bac

kfill

Sam

plin

gT

2R

educ

ing

R 7

6(1

) Sie

ve A

naly

sis

T 27

San

d E

quiv

alen

tT

176

Frac

ture

(Met

hod

1)T

335

1792

Pla

cem

ent

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

(1) T

99

3468

(1

) M

etho

d A

B

ulk

Spe

cific

Gra

vity

T 85

Coa

rse

Par

ticle

TM

223

Cor

rect

ion

3468

Com

pact

ion

Nuc

lear

Gau

ge

T 31

0

D

efle

ctio

n Te

stin

gTM

158

1793

B1

per l

ayer

See

Sec

tion

4CS

ubm

it to

Cen

tral

Lab

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

1/5,

000

Tons

Min

imum

1/P

roje

ct

1/ 1

00 y

d3

(Min

imum

1/d

ay)

Visu

al S

ee s

ectio

n 00

596A

.47(

c-5)

(1) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

1/5

Sub

lots

1/A

ggre

gate

G

rada

tion/

Per

S

ourc

e

1793

B

See

Sec

tion

4C

A Su

blot

Equ

als

2,00

0 To

ns

SEC

TIO

N 0

0596

A - M

SE R

ETAI

NIN

G W

ALLS

Test

ing

Freq

uenc

y fo

r Pro

duct

Com

plia

nce

per S

ourc

e

1/S

ublo

t

1792

Page 32: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 28

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

Gra

vel L

evel

ing

Pad

s B

ackf

illA

bras

ion

T96

See

Sub

mit

See

(See

Sec

tion

0263

0.10

)D

egra

datio

nTM

208

Sec

tion

4Ato

Lab

Sec

tion

4A

Sam

plin

gT

2R

educ

ing

R 7

6S

ieve

Ana

lysi

sT

27S

and

Equ

ival

ent

T 17

6

Frac

ture

(Met

hod

1)T

335

1792

1/5

Sub

lots

(3) M

odul

ar B

lock

Cor

e an

d D

rain

age

Sou

ndne

ss

T 10

440

00B

ackf

illA

bras

ion

T 96

(Pro

duct

Com

plia

nce)

Deg

rada

tion

TM 2

08

Ligh

twei

ght P

iece

sT

113

(3) (S

ee S

ectio

n 26

90.2

0(a)

thru

2690

.20(

e) &

269

0.20

(g)

(3) M

odul

ar B

lock

Cor

e an

d D

rain

age

Sam

plin

gT

2D

rain

age

Bac

kfill

Red

ucin

gR

76

(2

) Sie

ve A

naly

sis

T 27

/T 1

117

92(1

) QA

E m

ay w

aive

(1) W

ood

Par

ticle

sTM

225

afte

r 5 s

ublo

ts/s

hifts

Frac

ture

(Met

hod

2)

T 33

5

Elo

ngat

ed P

iece

sTM

229

1792

P

ipe

Dra

in B

ackf

illA

bras

ion

T 96

(Pro

duct

Com

plia

nce)

Deg

rada

tion

TM 2

08(S

ee S

ectio

n 00

430.

11)

S

ieve

Ana

lysi

sT2

740

001/

Sub

lot

A Su

blot

equ

als

1,00

0 To

ns

1792

1/S

ublo

t

Test

ing

Freq

uenc

y fo

r Pro

duct

Com

plia

nce

per S

ourc

e1/

5,00

0 To

ns M

inim

um 1

/Pro

ject

Sub

mit

To L

abS

ee S

ectio

n

4C

SEC

TIO

N 0

0596

B -

PREF

ABR

ICAT

ED M

OD

ULA

R R

ETAI

NIN

G W

ALLS

A Su

blot

equ

als

1,00

0 To

ns M

inim

um 1

/Pro

ject

1/S

ublo

t

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

4000

See

Sec

tion

4CS

ubm

it To

Lab

See

Sec

tion

4C

4000

See

Sec

tion

4C

&

02

690

Page 33: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 29

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

Gab

ion

Bas

ket F

illD

egra

datio

nTM

208

Sub

mit

(Pro

duct

Com

plia

nce)

Sou

ndne

ss

T 10

4to

(S

ee S

ectio

n 00

390.

11(b

))A

ppar

ent S

peci

fic G

ravi

ty &

Abs

orpt

ion

T 85

1825

Lab

Gra

datio

n

Vis

ual

SEC

TIO

N 0

0596

B -

PREF

ABR

ICAT

ED M

OD

ULA

R R

ETAI

NIN

G W

ALLS

Test

ing

Freq

uenc

y fo

r Pro

duct

Com

plia

nce

per S

ourc

e1/

5,00

0 To

ns M

inim

um 1

/Pro

ject

4000

See

Sec

tion

4C

See

Sec

tion

4C

Page 34: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 30

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

R

etai

ning

Wal

l Gra

nula

r Bac

kfill

Abr

asio

nT9

640

00 (P

rodu

ct C

ompl

ianc

e)D

egra

datio

nTM

208

(Als

o re

fere

nce

0263

0.10

)S

ieve

Ana

lysi

sT

11

Pla

stic

ity In

dex

T

9040

00

Ret

aini

ng W

all G

ranu

lar B

ackf

illS

ampl

ing

T 2

Red

ucin

gR

76

(1) S

ieve

Ana

lysi

sT

27S

and

Equ

ival

ent

T 17

6

Frac

ture

(Met

hod

1)T

335

1792

Plac

emen

t

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

(1) T

99

3468

(1

) M

etho

d A

B

ulk

Spe

cific

Gra

vity

T 85

Coa

rse

Par

ticle

TM

223

Cor

rect

ion

3468

Com

pact

ion

Nuc

lear

Gau

ge

T 31

0

D

efle

ctio

n Te

stin

gTM

158

1793

B1

per l

ayer

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

SEC

TIO

N 0

0596

B -

PREF

ABR

ICAT

ED M

OD

ULA

R R

ETAI

NIN

G W

ALLS

1/5,

000

Tons

Min

imum

1/P

roje

ctTe

stin

g Fr

eque

ncy

for P

rodu

ct C

ompl

ianc

e pe

r Sou

rce

See

Sec

tion

4CS

ubm

it to

Cen

tral

Lab

See

Sec

tion

4C

1792

1/S

ublo

t

1/ 1

00 y

d3

(Min

imum

1/d

ay)

1/5

Sub

lots

1/A

ggre

gate

G

rada

tion/

Per

S

ourc

e

1793

B

A Su

blot

Equ

als

2,00

0 To

ns

(1) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

Visu

al S

ee s

ectio

n 00

596B

.47(

b-6)

Page 35: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 31

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

Pip

e D

rain

Bac

kfill

Abr

asio

nT

96(P

rodu

ct C

ompl

ianc

e)D

egra

datio

nTM

208

(See

Sec

tion

0043

0.11

)S

ampl

ing

T 2

Red

ucin

gR

76

S

ieve

Ana

lysi

sT2

740

001/

Sub

lot

R

etai

ning

Wal

l Gra

nula

r Bac

kfill

Ret

aini

ng W

all G

ranu

lar B

ackf

illA

bras

ion

T96

4000

(Pro

duct

Com

plia

nce)

Deg

rada

tion

TM 2

08 (A

lso

refe

renc

e 02

630.

10)

Sie

ve A

naly

sis

T 11

P

last

icity

Inde

x

T 90

4000

Ret

aini

ng W

all G

ranu

lar B

ackf

illS

ampl

ing

T 2

Red

ucin

gR

76

(1) S

ieve

Ana

lysi

sT

2717

92

Frac

ture

(Met

hod

1)T

335

1792

1/5

Sub

lots

SEC

TIO

N 0

0596

C -

CAS

T-IN

-PLA

CE

CO

NC

RET

E R

ETAI

NIN

G W

ALLS

See

Sec

tion

4CS

ubm

it To

Lab

See

Sec

tion

4C

A Su

blot

Equ

als

2,00

0 To

ns

1/S

ublo

t

(1) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

Test

ing

Freq

uenc

y fo

r Pro

duct

Com

plia

nce

per S

ourc

e

See

Sec

tion

4CS

ubm

it to

Cen

tral

Lab

See

Sec

tion

4C

1/5,

000

Tons

Min

imum

1/P

roje

ct

4000

Page 36: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 32

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Plac

emen

t

Ret

aini

ng W

all G

ranu

lar B

ackf

ill

Est

ablis

hing

Max

imum

Den

sity

Den

sity

Cur

ve

(1) T

99

3468

(1

) M

etho

d A

B

ulk

Spe

cific

Gra

vity

T 85

Coa

rse

Par

ticle

TM

223

Cor

rect

ion

3468

Com

pact

ion

Nuc

lear

Gau

ge

T 31

0

Def

lect

ion

Test

ing

TM 1

5817

93B

1 pe

r lay

er

SEC

TIO

N 0

0596

C -

CAS

T-IN

-PLA

CE

CO

NC

RET

E R

ETAI

NIN

G W

ALLS

1/A

ggre

gate

G

rada

tion/

Per

S

ourc

e

1793

B

Con

trac

tor m

ust d

emon

stra

te, b

y co

mpa

ctio

n te

stin

g or

acc

epta

ble

visu

al m

eans

, tha

t the

mat

eria

l, eq

uipm

ent,

and

proc

ess

used

for

com

pact

ion

achi

eves

the

spec

ifica

tion

requ

irem

ents

. If

the

mat

eria

l, eq

uipm

ent,

or p

roce

ss c

hang

es, o

r if o

ther

con

ditio

ns in

dica

te a

non

-sp

ecifi

catio

n pr

oduc

t, th

e C

ontr

acto

r mus

t re-

dem

onst

rate

that

spe

cific

atio

n re

quire

men

ts a

re b

eing

ach

ieve

d.

Visu

al S

ee s

ectio

n 00

596C

.42(

f)

1/ 1

00 y

d3

(Min

imum

1/d

ay)

Page 37: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 33

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Agg

rega

te S

ubba

se

Gra

ding

Abr

asio

nT

9640

001/

Sou

rce

(See

006

35.1

0)

Sam

plin

gT

21/

Sub

lot

Red

ucin

gR

76

&S

ieve

Ana

lysi

sT

27S

tart

ofS

and

Equ

ival

ent

T 17

6P

rodu

ctio

nSam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A S

ublo

t equ

als

1000

Ton

sS

ee S

ectio

n 4(

A)

1792

SEC

TIO

N 0

0635

- G

RID

-RO

LLED

AG

GR

EGAT

E SU

BB

ASE

Sub

mit

To C

entra

l La

b

Page 38: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 34

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A

ggre

gate

Pro

duct

ion

Abr

asio

nT

9640

00S

ee S

ec. 4

A A

ggre

gate

Sub

base

Gra

ding

Sam

plin

gT

2 (S

ee 0

0641

.10(

b))

Red

ucin

gR

76

Sie

ve A

naly

sis

T 27

San

d E

quiv

alen

tT

176

Agg

rega

te B

ase

and

Shou

lder

sA

bras

ion

T96

See

Sub

mit

See

Deg

rada

tion

TM 2

08S

ectio

n 4A

to L

abS

ectio

n 4A

Gra

ding

Agg

rega

te B

ase

(See

026

30)

Sam

plin

gT

21/

Sub

lot

Agg

rega

te S

houl

der (

See

026

40)

Red

ucin

gR

76

&

Ope

n G

rade

d A

ggre

gate

Bas

e(1

) Sie

ve A

naly

sis

T 27

Sta

rt of

(S

ee 0

2630

.11)

(2)

San

d E

quiv

alen

tT

176

Pro

duct

ion

(1

) Per

form

at l

east

3 te

sts

(2

) May

be

wai

ved

by Q

AE

Frac

ture

(Met

hod

1)T

335

1792

1/5

Sub

lots

Pla

cem

ent

Agg

rega

te B

ase

P

lant

Mix

App

licat

ions

Onl

y A

ggre

gate

(Mix

ture

)S

ampl

ing

T 2

Red

ucin

gR

76

Moi

stur

eT

255

&T

265

D

ensi

ty C

urve

(3

) T 99

3468

BC

oars

e P

artic

le

TM 2

23C

orre

ctio

n

(3)

Met

hod

A

Bul

k S

peci

fic G

ravi

tyT

8534

68 B

Com

pact

ion

D

efle

ctio

n Te

stin

gTM

158

1793

B1

per S

ublo

t

Nuc

lear

Gau

ge

T3

10

A S

ublo

t equ

als

2000

Ton

s

(D) 1

(5 T

ests

) pe

r 10

Sub

lots

Esta

blis

hing

Max

imum

Den

sity

&

Opt

imum

Moi

stur

e (M

ix D

esig

n)E

ach

Siz

e

per

Sou

rce

1/S

ublo

t or m

inim

um

1/D

ay1

per 1

0 S

ublo

ts

1/P

roje

ct

1792

(D) 5

Tes

ts P

er

Sub

lot

1793

B (D

) (Ind

ivid

ual t

ests

mus

t mee

t Sp

ecifi

catio

n)

A S

ublo

t equ

als

2000

Ton

s

Sub

mit

To C

entra

l La

bS

ee S

ectio

n 4(

A)

1/P

roje

ct

or

1/

Sou

rce

Vis

ual

SEC

TIO

N 0

0641

- AG

GR

EGAT

E SU

BB

ASE,

BAS

E, A

ND

SH

OU

LDER

S

1 pe

r 10

Sub

lots

1792

4000

1792

Page 39: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 35

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Pla

cem

ent

Agg

rega

te S

ubba

se

Com

pact

ion

Def

lect

ion

Test

ing

TM 1

5817

93 B

1 pe

r Lay

erV

isua

l

SEC

TIO

N 0

0641

- AG

GR

EGAT

E SU

BB

ASE,

BAS

E, A

ND

SH

OU

LDER

S (C

ontin

ued)

Page 40: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 36

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

006

80 -

STO

CK

PILE

D A

GG

REG

ATES

Agg

rega

te B

ase

and

Shou

lder

s

(S

ee S

ectio

n 00

641)

Abr

asio

nT

96S

eeS

eeD

egra

datio

nTM

208

Sec

tion

4AS

ectio

n 4A

Sam

plin

g

1792

1/S

ublo

t

Red

ucin

gR

76

&

(1) S

ieve

Ana

lysi

sT

27S

tart

of

(2

) S

and

Equ

ival

ent

T 17

617

92P

rodu

ctio

n(2

) May

be

wai

ved

by Q

AE

Frac

ture

(Met

hod

1)T

335

1792

1/5

Sub

lots

Aggr

egat

e (S

andi

ng A

ggre

gate

)

Sam

plin

gT

217

921/

Sub

lot

Red

ucin

gR

76

&S

ieve

Ana

lysi

sT

27S

tart

of(1

) May

be

wai

ved

by Q

AE

(1) C

lean

ness

Val

ueTM

227

1792

Pro

duct

ion

Abr

asio

nT

9640

00S

eeD

egra

datio

nTM

208

Sec

tion

4ALi

ghtw

eigh

t Pie

ces

T 11

340

00

Frac

ture

(Met

hod

1)T

335

1792

Elo

ngat

ed P

iece

sTM

229

Woo

d P

artic

les

TM 2

2517

92

Sub

mit

to L

ab

(1) P

erfo

rm a

t lea

st 3

test

s, Q

L's

requ

ired

A Su

blot

equ

als

1000

Ton

s

1/5

Sub

lots

& S

tart

of P

rodu

ctio

n1

per 1

0 S

ublo

ts

1 pe

r 10

Sub

lots

4000

Sub

mit

to L

ab

A Su

blot

equ

als

2,00

0 To

ns

1 pe

r 10

Sub

lots

See

Sec

tion

4A

Page 41: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 37

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

006

80 -

STO

CK

PILE

D A

GG

REG

ATES

(CO

NTI

NU

ED)

Em

ulsi

fied

AC A

ggre

gate

Agg

rega

te P

rodu

ctio

n

Abr

asio

nT

9640

00D

egra

datio

nTM

208

(1) Q

AE

may

wai

veS

ound

ness

T

104

afte

r 5 s

ublo

ts/s

hifts

Ligh

twei

ght P

iece

sT

113

4000

S

ampl

ing

T 2

R

educ

ing

R 7

6(5

) Fra

ctur

e (M

etho

d 1)

T 33

517

92(1

) Woo

d P

artic

les

TM 2

25(1

)(4) E

long

ated

Pie

ces

TM

229

(2) S

ieve

Ana

lysi

sT2

7/T

11(3

) Cle

anne

ss V

alue

TM 2

2717

92(3

) May

be

wai

ved

by Q

AE

Dry

Rod

ded

Uni

t Wei

ght

T 19

1825

Sta

rt of

(4

) Not

requ

ired

for D

ry K

ey M

ater

ial

1825

Cpr

oduc

tion

and

(5

) 1/5

Sub

lots

& S

tart

of P

rodu

ctio

nw

hen

chan

ges

in

aggr

egat

e oc

curs

Agg

rega

te (O

ther

)

(2) P

erfo

rm a

t lea

st 3

test

s (Q

L's

requ

ired)

, QA

E m

ay w

aive

wet

sie

ve

afte

r 5 s

ublo

ts/s

hifts

if a

cor

rela

tion

to

dry

siev

e ca

n be

dem

onst

rate

d

See

Sec

tion

4A

1 pe

r 10

Sub

lots

(See

Sec

tions

007

05, 0

0706

, 007

10,

0071

1, 0

0712

and

007

15)

Use

sam

plin

g an

d te

stin

g fre

quen

cies

requ

ired

for p

ropo

sed

end

prod

uct u

se

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift,

whi

chev

er re

sults

in th

e gr

eate

st

sam

plin

g fre

quen

cy

1/S

ublo

t & S

tart

of

Pro

duct

ion

See

Sec

tion

4AS

ubm

it to

Lab

Page 42: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 38

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Agg

rega

te P

rodu

ctio

nS

ampl

ing

T 2

1/S

ublo

t &R

educ

ing

R 7

6S

tart

ofS

ieve

Ana

lysi

sT

2717

92P

rodu

ctio

n

Asp

halt

Cem

ent

Com

plia

nce

R 6

640

00S

ee S

ectio

n 4C

(Em

ulsi

on)

1/50

Ton

s(S

ubm

it A

ll)

Agg

rega

te P

rodu

ctio

n

Sam

plin

gT

21/

Sub

lot

Red

ucin

gR

76

&(1

) Sie

ve A

naly

sis

T 27

/T 1

117

92S

tart

of

Pro

duct

ion

Em

ulsi

fied

Asph

alt C

emen

t E

mul

sifie

d A

spha

ltC

ompl

ianc

e

4000

See

P

olym

er M

odifi

ed E

mul

sion

Sec

tion

4C1/

50 T

ons

(Sub

mit

All)

Add

itive

s

Min

eral

Fille

r

Mix

ture

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

706.

13

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

706.

16

(1)

Per

form

at l

east

3 te

sts,

QL'

s re

quire

d

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A s

ublo

t equ

als

1000

Ton

s. A

min

imum

1 p

er s

hift

1/5

QC

S

ampl

es

(Ran

dom

)

1/5

QC

S

ampl

es

(Ran

dom

)

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift

whi

chev

er re

sults

in th

e gr

eate

st s

ampl

ing

frequ

ency

Sub

mit

to C

entra

l La

b

1 pe

r 10

Sub

lots

Sub

mit

to C

entra

l La

b

SEC

TIO

N 0

0705

- EM

ULS

IFIE

D A

SPH

ALT

PRIM

E C

OAT

and

EM

ULS

IFIE

D A

SPH

ALT

FOG

CO

AT A

ggre

gate

Cov

er M

ater

ial

Asp

halt

Prim

e an

d Fo

g C

oat

SEC

TIO

N 0

0706

- EM

ULS

IFIE

D A

SPH

ALT

SLU

RR

Y SE

AL S

UR

FAC

ING

Page 43: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 39

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A

ggre

gate

Pro

duct

ion

Abr

asio

nT

9640

00D

egra

datio

nTM

208

Sou

ndne

ss

T 10

4Li

ghtw

eigh

t Pie

ces

T 11

340

00

(1) Q

AE

may

wai

veS

ampl

ing

T 2

afte

r 5 s

ublo

ts/s

hifts

Red

ucin

gR

76

(5) Fr

actu

re (M

etho

d 1)

T 33

517

92(1

) Woo

d P

artic

les

TM 2

25(1

)(4) E

long

ated

Pie

ces

TM

229

(2) S

ieve

Ana

lysi

sT2

7/T

11(3

) Cle

anne

ss V

alue

TM 2

2717

92

(3) M

ay b

e w

aive

d by

QA

ED

ry R

odde

d U

nit W

eigh

tT

1918

25S

tart

of

1825

Cpr

oduc

tion

and

(4

) Not

requ

ired

for D

ry K

ey M

ater

ial

whe

n ch

ange

s in

(5) 1

/5 S

ublo

ts &

Sta

rt of

Pro

duct

ion

aggr

egat

e oc

curs

Asp

halt

Cem

ent (

Em

ulsi

on)

Com

plia

nce

R 6

640

00

Com

plia

nce

of a

ggre

gate

s pr

oduc

ed a

nd s

tock

pile

d be

fore

the

awar

d da

te o

r not

ice

to p

roce

ed o

f thi

s co

ntra

ct w

ill be

det

erm

ined

by

the

follo

win

g: 1

. C

ontin

uing

pro

duct

ion

reco

rds

mee

ting

the

abov

e re

quire

men

ts o

f Sec

tion

0071

0.10

and

710

.15,

Agg

rega

te P

rodu

ctio

n.

2.

Furn

ish

reco

rds

of te

stin

g fo

r the

ent

ire s

tock

pile

acc

ordi

ng to

Sec

tion

0071

0.10

and

710

.15

Agg

rega

te P

rodu

ctio

n ex

cept

cha

nge

the

sam

plin

g

fre

quen

cy to

the

follo

win

g: a

. O

ne P

er 5

sub

lots

mea

ns "O

ne S

et o

f Tes

ts P

er 2

500

Tons

".

c.

Pro

vide

one

sto

ckpi

le s

ampl

e fo

r eac

h se

t of t

ests

requ

ired

abov

e. b

. O

ne P

er s

ublo

t mea

ns "O

ne S

et o

f Tes

ts P

er 5

00 T

ons"

with

a m

inim

um o

f 3 s

ets

of S

ieve

Ana

lysi

s te

sts

per p

roje

ct.

SEC

TIO

N 0

0710

- SI

NG

LE A

PPLI

CAT

ION

EM

ULS

IFIE

D A

SPH

ALT

SUR

FAC

E TR

EATM

ENT

1/50

Ton

s S

ubm

it A

llS

ubm

it to

Lab

1/5

QC

S

ampl

es

(Ran

dom

)

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift,

whi

chev

er re

sults

in th

e gr

eate

st s

ampl

ing

frequ

ency

S

ee S

ectio

n 4A

Sub

mit

to C

entra

l La

b S

ee S

ectio

n 4A

1/S

ublo

t & S

tart

of

Pro

duct

ion

1 pe

r 10

Sub

lots

(2) P

erfo

rm a

t lea

st 3

test

s (Q

L's

requ

ired)

, QA

E m

ay w

aive

wet

sie

ve

afte

r 5 s

ublo

ts/s

hifts

if a

cor

rela

tion

to

dry

siev

e ca

n be

dem

onst

rate

d

Prep

rodu

ced

Aggr

egat

e

Page 44: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 40

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A

ggre

gate

Pro

duct

ion

Abr

asio

nT

9640

00D

egra

datio

nTM

208

Sou

ndne

ss

T 10

4Li

ghtw

eigh

t Pie

ces

T 11

340

00

(1) Q

AE

may

wai

veS

ampl

ing

T 2

afte

r 5 s

ublo

ts/s

hifts

Red

ucin

gR

76

(5) Fr

actu

re (M

etho

d 1)

T 33

517

92(1

) Woo

d P

artic

les

TM 2

25(1

)(4) E

long

ated

Pie

ces

TM

229

(2) S

ieve

Ana

lysi

sT2

7/T

11(3

) Cle

anne

ss V

alue

TM 2

2717

92

(3) M

ay b

e w

aive

d by

QA

ED

ry R

odde

d U

nit W

eigh

tT

1918

25S

tart

of

1825

Cpr

oduc

tion

and

(4

) Not

requ

ired

for D

ry K

ey M

ater

ial

whe

n ch

ange

s in

(5) 1

/5 S

ublo

ts &

Sta

rt of

Pro

duct

ion

aggr

egat

e oc

curs

Asp

halt

Cem

ent

Com

plia

nce

R 6

640

00

Com

plia

nce

of a

ggre

gate

s pr

oduc

ed a

nd s

tock

pile

d be

fore

the

awar

d da

te o

r not

ice

to p

roce

ed o

f thi

s co

ntra

ct w

ill be

det

erm

ined

by

the

follo

win

g: 1

. C

ontin

uing

pro

duct

ion

reco

rds

mee

ting

the

abov

e re

quire

men

ts o

f Sec

tion

0071

1.10

and

711

.15,

Agg

rega

te P

rodu

ctio

n.

2.

Furn

ish

reco

rds

of te

stin

g fo

r the

ent

ire s

tock

pile

acc

ordi

ng to

Sec

tion

0071

1.10

and

711

.15

Agg

rega

te P

rodu

ctio

n ex

cept

cha

nge

the

sam

plin

g

fre

quen

cy to

the

follo

win

g: a

. O

ne P

er 5

sub

lots

mea

ns "O

ne S

et o

f Tes

ts P

er 2

500

Tons

".

c.

Pro

vide

one

sto

ckpi

le s

ampl

e fo

r eac

h se

t of t

ests

requ

ired

abov

e.

SEC

TIO

N 0

0711

- PR

E-C

OAT

ED A

GG

REG

ATE

ASPH

ALT

SUR

FAC

E TR

EATM

ENT

1/50

Ton

s S

ubm

it A

llS

ubm

it to

Lab

1/5

QC

S

ampl

es

(Ran

dom

)

Prep

rodu

ced

Aggr

egat

e

b.

One

Per

sub

lot m

eans

"One

Set

of T

ests

Per

500

Ton

s" w

ith a

min

imum

of 3

set

s of

Sie

ve A

naly

sis

test

s pe

r pro

ject

.

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift

whi

chev

er re

sults

in th

e gr

eate

st s

ampl

ing

frequ

ency

S

ee S

ectio

n 4A

Sub

mit

to C

entra

l La

b S

ee S

ectio

n 4A

1/S

ublo

t & S

tart

of

Pro

duct

ion

1 pe

r 10

Sub

lots

(2) P

erfo

rm a

t lea

st 3

test

s (Q

L's

requ

ired)

, QA

E m

ay w

aive

wet

sie

ve

afte

r 5 s

ublo

ts/s

hifts

if a

cor

rela

tion

to

dry

siev

e ca

n be

dem

onst

rate

d

Page 45: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 41

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Mix

ture

Acc

epta

nce

Met

er M

etho

dR

eadi

ngs

back

ed

TM 3

21by

Tan

k M

easu

re &

(1

) TM 3

22P

rodu

ctio

n R

ecor

ds

Dai

ly

(1) R

equi

red

at s

tart

of

prod

uctio

n an

d if

met

ers

Col

d Fe

ed M

oist

ure

T 25

5/26

5fa

il to

mee

t spe

cific

atio

n

Pla

nt D

isch

arge

Moi

stur

eA

spha

lt M

ix M

oist

.T

329

2277

1/S

ublo

t

Asp

halt

Cem

ent

Com

plia

nce

R 6

640

00

2277

SEC

TIO

N 0

0711

- PR

E-C

OAT

ED A

GG

REG

ATE

ASPH

ALT

SUR

FAC

E TR

EATM

ENT

(CO

NTI

NU

ED)

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift,

whi

chev

er re

sults

in th

e gr

eate

st s

ampl

ing

frequ

ency

1/5

QC

S

ampl

es

(Ran

dom

)

1/S

ublo

t or M

in.

1/D

ay20

43

and

2401

Dai

ly P

rodu

ctio

n

2277

1/S

ublo

t or M

in.

1/D

ay

1/50

Ton

s S

ubm

it A

llS

ubm

it to

Lab

Page 46: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 42

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A

ggre

gate

Pro

duct

ion

Abr

asio

nT

9640

00D

egra

datio

nTM

208

Sou

ndne

ss

T 10

4Li

ghtw

eigh

t Pie

ces

T 11

340

00

(1) Q

AE

may

wai

veS

ampl

ing

T 2

afte

r 5 s

ublo

ts/s

hifts

Red

ucin

gR

76

(5) Fr

actu

re (M

etho

d 1)

T 33

517

92(1

) Woo

d P

artic

les

TM 2

25(1

)(4) E

long

ated

Pie

ces

TM

229

(2) S

ieve

Ana

lysi

sT2

7/T

11(3

) Cle

anne

ss V

alue

TM 2

2717

92

(3) M

ay b

e w

aive

d by

QA

ED

ry R

odde

d U

nit W

eigh

tT

1918

25S

tart

of

1825

Cpr

oduc

tion

and

(4

) Not

requ

ired

for D

ry K

ey M

ater

ial

whe

n ch

ange

s in

(5) 1

/5 S

ublo

ts &

Sta

rt of

Pro

duct

ion

aggr

egat

e oc

curs

Asp

halt

Cem

ent (

Em

ulsi

on)

Com

plia

nce

R 6

640

00

Com

plia

nce

of a

ggre

gate

s pr

oduc

ed a

nd s

tock

pile

d be

fore

the

awar

d da

te o

r not

ice

to p

roce

ed o

f thi

s co

ntra

ct w

ill be

det

erm

ined

by

the

follo

win

g: 1

. C

ontin

uing

pro

duct

ion

reco

rds

mee

ting

the

abov

e re

quire

men

ts o

f Sec

tion

0071

2.10

and

712

.15,

Agg

rega

te P

rodu

ctio

n.

2.

Furn

ish

reco

rds

of te

stin

g fo

r the

ent

ire s

tock

pile

acc

ordi

ng to

Sec

tion

0071

2.10

and

712

.15

Agg

rega

te P

rodu

ctio

n ex

cept

cha

nge

the

sam

plin

g

fre

quen

cy to

the

follo

win

g: a

. O

ne P

er 5

sub

lots

mea

ns "O

ne S

et o

f Tes

ts P

er 2

500

Tons

".

c.

Pro

vide

one

sto

ckpi

le s

ampl

e fo

r eac

h se

t of t

ests

requ

ired

abov

e.

See

Sec

tion

4AS

ubm

it to

Cen

tral

Lab

See

Sec

tion

4A

1/S

ublo

t & S

tart

of

Pro

duct

ion

1 pe

r 10

Sub

lots

1/5

QC

S

ampl

es

(Ran

dom

)

SEC

TIO

N 0

0712

- D

RY

KEY

EM

ULS

IFIE

D A

SPH

ALT

SUR

FAC

E TR

EATM

ENT

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift,

whi

chev

er re

sults

in th

e gr

eate

st s

ampl

ing

frequ

ency

Sub

mit

to L

ab

(2) P

erfo

rm a

t lea

st 3

test

s (Q

L's

requ

ired)

, QA

E m

ay w

aive

wet

sie

ve

afte

r 5 s

ublo

ts/s

hifts

if a

cor

rela

tion

to

dry

siev

e ca

n be

dem

onst

rate

d

1/50

Ton

s S

ubm

it A

ll

Prep

rodu

ced

Aggr

egat

e

b.

One

Per

sub

lot m

eans

"One

Set

of T

ests

Per

500

Ton

s" w

ith a

min

imum

of 3

set

s of

Sie

ve A

naly

sis

test

s pe

r pro

ject

.

Page 47: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 43

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Agg

rega

te P

rodu

ctio

n

Abr

asio

nT

9640

00D

egra

datio

nTM

208

Sou

ndne

ss

T 10

4Li

ghtw

eigh

t Pie

ces

T 11

340

00

(5) Fr

actu

re (M

etho

d 1)

T 33

517

92(1

) Woo

d P

artic

les

TM 2

25(1

)(4) E

long

ated

Pie

ces

TM

229

(2) S

ieve

Ana

lysi

sT2

7/T

11(3

) Cle

anne

ss V

alue

TM 2

2717

92

(3) M

ay b

e w

aive

d by

QA

ED

ry R

odde

d U

nit W

eigh

tT

1918

25S

tart

of

1825

Cpr

oduc

tion

and

(4

) Not

requ

ired

for D

ry K

ey M

ater

ial

whe

n ch

ange

s in

(5) 1

/5 S

ublo

ts &

Sta

rt of

Pro

duct

ion

aggr

egat

e oc

curs

Asp

halt

Cem

ent (

Em

ulsi

on)

Com

plia

nce

R 6

640

00

Com

plia

nce

of a

ggre

gate

s pr

oduc

ed a

nd s

tock

pile

d be

fore

the

awar

d da

te o

r not

ice

to p

roce

ed o

f thi

s co

ntra

ct w

ill be

det

erm

ined

by

the

follo

win

g: 1

. C

ontin

uing

pro

duct

ion

reco

rds

mee

ting

the

abov

e re

quire

men

ts o

f Sec

tion

0071

5.10

and

715

.15,

Agg

rega

te P

rodu

ctio

n.

2.

Furn

ish

reco

rds

of te

stin

g fo

r the

ent

ire s

tock

pile

acc

ordi

ng to

Sec

tion

0071

5.10

and

715

.15

Agg

rega

te P

rodu

ctio

n ex

cept

cha

nge

the

sam

plin

g

fre

quen

cy to

the

follo

win

g: a

. O

ne P

er 5

sub

lots

mea

ns "O

ne S

et o

f Tes

ts P

er 2

500

Tons

".

c.

Pro

vide

one

sto

ckpi

le s

ampl

e fo

r eac

h se

t of t

ests

requ

ired

abov

e.

1/S

ublo

t & S

tart

of

Pro

duct

ion

1 pe

r 10

Sub

lots

1/5

QC

S

ampl

es

(Ran

dom

)

Prep

rodu

ced

Aggr

egat

e

b.

One

Per

sub

lot m

eans

"One

Set

of T

ests

Per

500

Ton

s" w

ith a

min

imum

of 3

set

s of

Sie

ve A

naly

sis

test

s pe

r pro

ject

.

(2) P

erfo

rm a

t lea

st 3

test

s (Q

L's

requ

ired)

, QA

E m

ay w

aive

wet

sie

ve

afte

r 5 s

ublo

ts/s

hifts

if a

cor

rela

tion

to

dry

siev

e ca

n be

dem

onst

rate

d

1/50

Ton

s S

ubm

it A

llS

ubm

it to

Lab

SEC

TIO

N 0

0715

- M

ULT

IPLE

APP

LIC

ATIO

N E

MU

LSIF

IED

ASP

HAL

T SU

RFA

CE

TREA

TMEN

T

A s

ublo

t equ

als

500

Tons

. A

min

imum

1 p

er s

hift,

whi

chev

er re

sults

in th

e gr

eate

st s

ampl

ing

frequ

ency

S

ee S

ectio

n 4A

Sub

mit

to C

entra

l La

b S

ee S

ectio

n 4A

Page 48: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 44

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

20 -

CO

LD IN

-PLA

CE

REC

YCLE

D A

SPH

ALT

CO

NC

RET

E PA

VEM

ENT

(CIR

)

Asp

halt

Cem

ent

Com

plia

nce

R 6

640

00S

ee

(Em

ulsi

fied

Rec

yclin

g A

gent

)S

ectio

n 4C

1/50

Ton

s 40

00(S

ubm

it A

ll)

Wat

erC

ompl

ianc

e

Agg

rega

te P

rodu

ctio

nS

ampl

ing

T 2

1/S

ublo

t & C

hoke

Agg

rega

teR

educ

ing

R 7

6S

tart

of (S

ee 0

0705

)S

ieve

Ana

lysi

sT

2717

92P

rodu

ctio

n

SEC

TIO

N 0

0725

- H

OT

IN-P

LAC

E R

ECYC

LED

(HIR

) ASP

HAL

T C

ON

CR

ETE

PAVE

MEN

T

Rec

yclin

g A

gent

Com

plia

nce

R 6

640

00S

ee

(See

007

45.1

1)S

ectio

n 4C

Rec

yclin

g A

gent

Com

plia

nce

R 6

640

00 A

spha

lt C

oncr

ete

Mix

ture

Tac

kC

ompl

ianc

eR

66

4000

See

Sec

tion

4C1/

50 T

ons

Min

imum

1/

Pro

ject

A S

ublo

t equ

als

1000

Ton

s

1/5

QC

S

ampl

es

(Ran

dom

)

SEC

TIO

N 0

0721

- C

OLD

REC

YCLE

D E

MU

LSIF

IED

ASP

HAL

T C

ON

CR

ETE

PAVE

MEN

T (C

RP)

Sub

mit

to C

entra

l La

b

See

Sec

.003

40.1

0

1/5

0 To

ns o

r A

ll Q

C S

ampl

es

1/5

QC

S

ampl

es

(Ran

dom

)S

ubm

it to

Lab

Sub

mit

to L

ab

Sub

mit

to L

ab

SEC

TIO

N 0

0730

- A

SPH

ALT

TAC

K C

OAT

New

Asp

halt

Con

cret

e m

ixtu

re w

ill m

eet t

he re

quire

men

ts o

f Sec

tion

0074

4

1/50

Ton

s

The

type

of r

ecyc

ling

agen

t will

be li

sted

in th

e S

peci

al P

rovi

sion

s

Page 49: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 45

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

35 -

EMU

LSIF

IED

ASP

HAL

T C

ON

CR

ETE

PAVE

MEN

T A

ggre

gate

pro

duct

ion

Abr

asio

nT

9640

00D

egra

datio

nTM

208

Sou

ndne

ss

T 10

4Li

ghtw

eigh

t Pie

ces

T 11

340

00

Sam

plin

gT

2R

educ

ing

R 7

6(1

) Sie

ve A

naly

sis

T 27

/T 1

117

92(2

) May

be

wai

ved

by Q

AE

(2) C

lean

ness

Val

ueTM

227

Frac

ture

(Met

hod

1 &

2)

T 33

5(3

) QA

E m

ay w

aive

(3) E

long

ated

Pie

ces

TM 2

29af

ter 5

sub

lots

/shi

fts(3

) Woo

d P

artic

les

TM 2

2517

92

Cho

ke A

ggre

gate

Sie

ve A

naly

sis

T 27

1792

1/S

ublo

t1/

Pro

ject

1/S

ublo

t & S

tart

of

Pro

duct

ion

(1) P

erfo

rm a

t lea

st 3

test

s, Q

L's

requ

ired

A S

ublo

t equ

als

1000

Ton

s. A

min

imum

one

per

shi

ft, w

hich

ever

resu

lts in

the

grea

test

sam

plin

g fre

quen

cy.

(For

pre

prod

uced

agg

rega

tes,

1 s

hift

shal

l mea

n 10

00

Tons

1 pe

r 10

Sub

lots

Sub

mit

to L

abS

ee S

ectio

n 4A

See

Sec

tion

4A

Page 50: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 46

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

35 -

EMU

LSIF

IED

ASP

HAL

T C

ON

CR

ETE

PAVE

MEN

T (C

ON

TIN

UED

) M

ixtu

re A

ccep

tanc

e

Sam

plin

gT

2R

educ

ing

R 7

6S

ieve

Ana

lysi

sT

27/T

11

2277

Moi

stur

e C

onte

ntT

255

2277

% E

mul

sifie

d A

spha

ltM

eter

Bac

ked

T

M 3

2124

01(1

) R

equi

red

at s

tart

of

by T

ank

Mea

sure

(1) TM

322

&pr

oduc

tion

and

if m

eter

sD

aily

2043

fail

to m

eet s

peci

ficat

ion

Em

ulsi

fied

Asp

halt

Cem

ent

Com

plia

nce

R 6

6S

ee S

ectio

n 4C

1/S

ublo

t(S

ubm

it A

ll)

SEC

TIO

N 0

0740

- C

OM

MER

CIA

L AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T (C

ACP)

A S

ublo

t equ

als

1000

Ton

s of

Mix

ture

See

Spe

cific

atio

ns w

hen

Test

ing

is R

equi

red

by A

genc

y

1 pe

r 10

Sub

lots

1/S

ublo

t1

per 1

0 S

ublo

ts

Sub

mit

to L

ab40

001/

5 Q

C

Sam

ples

(R

ando

m)

Dai

ly P

rodu

ctio

n

Page 51: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 47

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

43 -

POR

OU

S AS

PHAL

T C

ON

CR

ETE

(PAC

) A

ggre

gate

Pro

duct

ion

Sou

ndne

ss

T 10

440

00A

bras

ion

T 96

Deg

rada

tion

TM 2

08

Ligh

twei

ght P

iece

sT

113

P

last

icity

Inde

x

T 90

4000

(1) Q

AE

may

wai

veaf

ter 5

sub

lots

/shi

fts

(2) N

ot re

quire

d fo

r ATP

B M

ix S

ampl

ing

T 2

1/S

ublo

tR

educ

ing

R 7

6&

(3)(4

) Sie

ve A

naly

sis

T 27

/T 1

1S

tart

of(1

)(4) S

and

Equ

ival

ent

T 17

6P

rodu

ctio

n

(1

)(2)

(3) E

long

ated

Pie

ces

TM 2

29(3

)(4) Fr

actu

re (M

etho

d 2)

T 33

517

92

Com

plia

nce

of a

ggre

gate

s pr

oduc

ed a

nd s

tock

pile

d be

fore

the

awar

d da

te o

r not

ice

to p

roce

ed o

f thi

s co

ntra

ct w

ill be

det

erm

ined

by

the

follo

win

g: 1

. C

ontin

uing

pro

duct

ion

reco

rds

mee

ting

the

abov

e re

quire

men

ts o

f Sec

tion

0074

3.10

Agg

rega

te P

rodu

ctio

n.

2.

Furn

ish

reco

rds

of te

stin

g fo

r the

ent

ire s

tock

pile

acc

ordi

ng to

Sec

tion

0074

3.10

Agg

rega

te P

rodu

ctio

n ex

cept

cha

nge

the

sam

plin

g

fre

quen

cy to

the

follo

win

g: a

. O

ne P

er 5

sub

lots

mea

ns "O

ne S

et o

f Tes

ts P

er 5

000

Tons

".

c.

Pro

vide

one

sto

ckpi

le s

ampl

e fo

r eac

h se

t of t

ests

requ

ired

abov

e.

(1)(

2)(3

) Woo

d P

artic

les

TM

225

1/5

Sub

lots

& S

tart

of P

rodu

ctio

n

b.

One

Per

sub

lot m

eans

"One

Set

of T

ests

Per

100

0 To

ns" w

ith a

min

imum

of 3

set

s of

Sie

ve A

naly

sis

test

s pe

r pro

ject

.

Sub

mit

to L

abS

ee S

ectio

n 4A

See

Sec

tion

4A

A S

ublo

t equ

als

1000

Ton

s. A

min

imum

one

per

shi

ft w

hich

ever

resu

lts in

th

e gr

eate

st s

ampl

ing

frequ

ency

Prep

rodu

ced

Aggr

egat

e1792

(3) C

oars

e A

gg (+

No.

4)

(4) Fi

ne A

gg (

- No.

4)

Page 52: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 48

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gra

datio

n Igni

tion

met

hod

2327

IC

Igni

tion

met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

(R

esid

ual a

ggre

gate

from

Sie

ve a

naly

sis

T 30

AA

SH

TO T

308

)

Asp

halt

Con

tent

Igni

tion

Met

hod

2327

IC

Igni

tion

Met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

Asp

halt

Con

tent

T 30

822

77

Met

er M

etho

dR

eadi

ngs

back

edTM

321

by T

ank

mea

sure

(2) TM

322

(2

) R

equi

red

at s

tart

of

& P

rodu

ctio

n R

ecor

ds20

43pr

oduc

tion

and

if m

eter

sD

aily

and

fail

to m

eet s

peci

ficat

ion

2401

Cal

ibra

te In

cine

rato

r TM

323

Cal

ibra

te In

cine

rato

r TM

323

1/S

ublo

t

or

Min

. 1/d

ay

SEC

TIO

N 0

0743

- PO

RO

US

ASPH

ALT

CO

NC

RET

E (P

AC) (

CO

NTI

NU

ED)

1/JM

F &

Eac

h C

alen

dar Y

ear.

1/S

ublo

t or M

in.

1/D

ay

1/S

ublo

t or M

in.

1/da

y

1/S

ublo

t or M

in. 1

/day

Dai

ly P

rodu

ctio

n

Met

er M

etho

d is

requ

ired

for P

AC

ev

en w

hen

acce

ptan

ce is

by

Igni

tion

Met

hod

A S

ublo

t eq

uals

100

0 To

ns

A S

ublo

t eq

uals

100

0 To

ns

1/JM

F &

Eac

h C

alen

dar Y

ear.

2277

Mix

ture

Acc

epta

nce

- PAC

with

RAP

2277

Page 53: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 49

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

43 -

POR

OU

S AS

PHAL

T C

ON

CR

ETE

(PAC

) (C

ON

TIN

UED

)

Gra

datio

n

Col

d Fe

ed M

etho

dS

ampl

ing

T 2

Red

ucin

gR

76

Sie

ve A

naly

sis

T 27

/T 1

122

77

Igni

tion

met

hod

Cal

ibra

te In

cine

rato

r(1

) TM

323

2327

IC

Igni

tion

met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

(R

esid

ual a

ggre

gate

from

Sie

ve a

naly

sis

T 30

AA

SH

TO T

308

)

Asp

halt

Con

tent

Igni

tion

Met

hod

Cal

ibra

te In

cine

rato

r TM

323

2327

IC

Igni

tion

Met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

Asp

halt

Con

tent

T 30

822

77

Met

er M

etho

dR

eadi

ngs

back

edTM

321

by T

ank

mea

sure

(2) TM

322

&

Pro

duct

ion

Rec

ords

2043

Dai

lyan

d24

01

1/S

ublo

t or M

in.

1/D

ay

A S

ublo

t eq

uals

100

0 To

ns

A S

ublo

t eq

uals

100

0 To

ns

1/JM

F &

Eac

h C

alen

dar Y

ear.

1/S

ublo

t or M

in.

1/da

y22

77

1/S

ublo

t

or

Min

. 1/d

ay

2277

1/S

ublo

t or M

in. 1

/day

Dai

ly P

rodu

ctio

n

1/S

ublo

t or M

in.

1/D

ay

Mix

ture

Acc

epta

nce

- PAC

with

out R

AP

Met

er M

etho

d is

requ

ired

for P

AC

ev

en w

hen

acce

ptan

ce is

by

Igni

tion

Met

hod

(2) R

equi

red

at s

tart

of p

rodu

ctio

n an

d if

met

ers

fail

to m

eet

spec

ifica

tion

1/JM

F &

Eac

h C

alen

dar Y

ear.

(1) N

ot re

quire

d if

Asp

halt

Con

tent

A

ccep

ted

by M

eter

Met

hod

Page 54: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 50

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Mix

Des

ign

Verif

icat

ion

Test

ing

Col

d Fe

ed M

oist

ure

T255

/T26

5

P

lant

Dis

char

ge M

oist

ure

Asp

halt

Mix

Moi

st.

T 32

9

(1) If

app

licab

le(1

) RA

P M

oist

ure

T

329

Rea

ding

s ba

cked

TM32

1by

Tan

k m

easu

re(2

) TM 3

22&

Pro

duct

ion

Rec

ords

Dai

ly

A

spha

lt C

emen

tC

ompl

ianc

eR

66

(2) R

equi

red

at s

tart

of

prod

uctio

n an

d if

met

ers

fail

to m

eet s

peci

ficat

ion

A S

ublo

t eq

uals

100

0 To

ns

1/5

QC

S

ampl

es

(Ran

dom

)

2401

&

20

43D

aily

Pro

duct

ion

1/S

ublo

t or M

in.

1/D

ay22

77

1/S

ublo

t or M

in.

1/D

ay22

77

Sub

mit

to L

ab40

00

SEC

TIO

N 0

0743

- PO

RO

US

ASPH

ALT

CO

NC

RET

E (P

AC) (

CO

NTI

NU

ED)

1/S

ublo

t - S

ee

sect

ion

4C

Mix

ture

Acc

epta

nce

- PAC

with

and

with

out R

AP

1/S

ublo

t or M

in.

1/D

ay22

77

Page 55: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 51

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A

ggre

gate

Pro

duct

ion

Mix

ture

Acc

epta

nce

Gra

datio

n

Igni

tion

met

hod

Cal

ibra

te In

cine

rato

r T

M 3

2323

27IC

Igni

tion

met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

(Res

idua

l agg

rega

te fr

omS

ieve

ana

lysi

sT

30A

AS

HTO

T 3

08)

Asp

halt

Con

tent

Igni

tion

Met

hod

Cal

ibra

te In

cine

rato

r TM

323

2327

IC

Igni

tion

Met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

Asp

halt

Con

tent

T 30

822

77

Mix

Des

ign

Verif

icat

ion

Test

ing

Pla

nt D

isch

arge

Moi

stur

eA

spha

lt M

ix M

oist

.T

329

2277

1/S

ublo

t

Max

imum

Den

sity

Tes

t Gm

mM

ax. S

peci

fic G

ravi

tyT

209

MA

MD

TM 3

05

1/S

ublo

t or M

in.

1/D

ay22

77

See

Spe

cific

atio

ns w

hen

Agg

rega

te T

estin

g is

Req

uire

d by

the

Age

ncy

1/JM

F &

Eac

h C

alen

dar Y

ear.

1/S

ublo

t or M

in.

1/D

ay

2050

A S

ublo

t eq

uals

100

0 To

ns

SEC

TIO

N 0

0744

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T

1/JM

F &

Eac

h C

alen

dar Y

ear.

1/S

ublo

t

or

M

in. 1

/day

A S

ublo

t eq

uals

100

0 To

ns

1st S

ublo

t Dai

ly

or

M

in. 1

/Day

A S

ublo

t eq

uals

100

0 To

ns

Page 56: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 52

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Com

pact

ion

Nuc

lear

Den

sity

T

355

(D) A

vera

ge 1

0 te

sts

per S

ublo

t or M

in.

10/D

ay, S

ee S

ectio

n 00

744.

49

SEC

TIO

N 0

0744

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T (C

ON

TIN

UED

)

1793

A

Page 57: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 53

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A

ggre

gate

Pro

duct

ion

Sou

ndne

ss

T 10

440

00A

bras

ion

T 96

Deg

rada

tion

TM 2

08(1

) QA

E m

ay w

aive

Ligh

twei

ght P

iece

sT

113

afte

r 5 s

ublo

ts/s

hifts

Pla

stic

ity In

dex

T

9040

00

S

ampl

ing

T 2

1/S

ublo

tR

educ

ing

R 7

6&

(2)(3

)(4) S

ieve

Ana

lysi

sT

27/T

11

Sta

rt of

(1)(4

) San

d E

quiv

alen

tT

176

Pro

duct

ion

(1)(3

) Elo

ngat

ed P

iece

s TM

229

(3)(4

) Frac

ture

(Met

hod

2)T

335

(1)(3

) Woo

d P

artic

les

TM 2

25

Sie

ve A

naly

sis

T 27

RA

S Pr

oduc

tion

(Rec

laim

ed A

spha

lt S

hing

les)

Sam

plin

gT

2R

educ

ing

R 7

6S

ieve

Ana

lysi

sT

27

Com

plia

nce

of a

ggre

gate

s pr

oduc

ed a

nd s

tock

pile

d be

fore

the

awar

d da

te o

r not

ice

to p

roce

ed o

f thi

s co

ntra

ct w

ill be

det

erm

ined

by

the

follo

win

g: 1

. C

ontin

uing

pro

duct

ion

reco

rds

mee

ting

the

abov

e re

quire

men

ts o

f Sec

tion

0074

5.10

Agg

rega

te P

rodu

ctio

n.

2.

Furn

ish

reco

rds

of te

stin

g fo

r the

ent

ire s

tock

pile

acc

ordi

ng to

Sec

tion

0074

5.10

Agg

rega

te P

rodu

ctio

n ex

cept

cha

nge

the

sam

plin

g

fre

quen

cy to

the

follo

win

g: a

. O

ne P

er 5

sub

lots

mea

ns "O

ne S

et o

f Tes

ts P

er 5

000

Tons

".

c.

Pro

vide

one

sto

ckpi

le s

ampl

e fo

r eac

h se

t of t

ests

requ

ired

abov

e.

Del

eter

ious

Mat

eria

ls T

M 3

35

Del

eter

ious

Mat

eria

ls T

M 3

35

1/5

Sub

lots

& S

tart

of P

rodu

ctio

n

Subm

it to

Lab

Sub

mit

to L

ab

4000

1 / 5

00 T

ons

1792

(3) C

oars

e A

gg (+

No.

4)

(4) Fi

ne A

gg (-

No.

4)

1792

b.

One

Per

sub

lot m

eans

"One

Set

of T

ests

Per

100

0 To

ns" w

ith a

min

imum

of 3

set

s of

Sie

ve A

naly

sis

test

s pe

r pro

ject

.

Not

e: S

ampl

e A

ggre

gate

bef

ore

Lim

e Tr

eatm

ent

See

Sec

tion

4A

A S

ublo

t equ

als

1000

Ton

s. A

min

imum

one

per

shi

ft w

hich

ever

resu

lts in

th

e gr

eate

st s

ampl

ing

frequ

ency

Prep

rodu

ced

Aggr

egat

e

See

Sec

tion

4A

1 pe

r 10

Sub

lots

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E

(2) P

erfo

rm a

min

imum

of 3

test

s Q

L's

requ

ired

1792

1 / 5

0 To

ns

Page 58: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 54

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gra

datio

n Igni

tion

met

hod

2327

IC

Igni

tion

met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

(R

esid

ual a

ggre

gate

from

Sie

ve a

naly

sis

T 30

AA

SH

TO T

308

)

Asp

halt

Con

tent

Igni

tion

Met

hod

2327

IC

Igni

tion

Met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

Asp

halt

Con

tent

T 30

822

77

A S

ublo

t eq

uals

100

0 To

ns

Cal

ibra

te In

cine

rato

r TM

323

Cal

ibra

te In

cine

rato

r TM

323

1 pe

r 10

Sub

lots

1/JM

F &

Eac

h C

alen

dar Y

ear.

1 pe

r 10

Sub

lots

1/S

ublo

t

Mix

ture

Acc

epta

nce

- AC

P W

ithou

t RAP

1/JM

F &

Eac

h C

alen

dar Y

ear.

2277

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E (C

ON

TIN

UED

)

A S

ublo

t eq

uals

100

0 To

ns

1/S

ublo

t

or

M

in. 1

/day

1/S

ublo

t

1 pe

r 10

Sub

lots

1/JM

F &

Eac

h C

alen

dar Y

ear.

1/JM

F &

Eac

h C

alen

dar Y

ear.

Page 59: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 55

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Mix

Des

ign

Verif

icat

ion

Test

ing

Fa

bric

atio

nG

yrat

ory

Spe

cim

enTM

326

2050

GV

M

axim

um D

ensi

ty T

est

Max

. Spe

cific

Gra

vity

T 20

920

50*5

068

*256

0D

eter

min

atio

n of

Gm

bB

ulk

Spe

cific

Gra

vity

T 16

6*5

069

Stri

ppin

g S

usce

ptib

ility

Tens

ile S

treng

th R

atio

T 28

3

*Cat

-II c

ompl

ete

& s

ubm

it

as

requ

ired,

See

Sec

tion

745.

16(b

)

Pla

nt D

isch

arge

Moi

stur

eA

spha

lt M

ix M

oist

.T

329

2277

1/S

ublo

t

Max

imum

Den

sity

Tes

t Gm

mM

ax. S

peci

fic G

ravi

tyT

209

MA

MD

TM 3

05

Per

form

ing

Con

trol S

trip

Con

trol S

trip

TM 3

0620

84*5

069

Com

pact

ion

Nuc

lear

Den

sity

T

355

1793

A

Asp

halt

Cem

ent

Com

plia

nce

R 6

640

00S

ubm

it to

Lab

1/S

ublo

t See

S

ectio

n 4C

1/JM

F

S

ee S

ectio

n 00

745.

16 (b

)-1-

f

1/S

ublo

t &

acco

rdin

g to

Sec

tion

0074

5.16

(b)-

1-d

2050

(D) A

vera

ge 5

test

s pe

r Sub

lot o

r Min

. 1/

Day

, See

Sec

tion

0074

5.49

(b)-

2

Dev

elop

Rol

ling

Pat

tern

See

Spe

cs.

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E (C

ON

TIN

UED

)

1st S

ublo

t Dai

ly

or

M

in. 1

/Day

A S

ublo

t eq

uals

100

0 To

ns

(D) S

ee T

355

Yel

low

shee

t for

Den

sity

Te

st L

ocat

ions

1 pe

r 10

Sub

lots

Mix

ture

Acc

epta

nce

- AC

P W

ithou

t RAP

(D) 1

per 1

0 S

ublo

ts

1/5

QC

S

ampl

es

(Ran

dom

)

1 pe

r 10

Subl

ots

2050

tsr

Page 60: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 56

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Mix

Des

ign

Verif

icat

ion

Test

ing

M

eter

Met

hod

Rea

ding

s ba

cked

TM

321

by T

ank

Mea

sure

&

(2) TM

322

Pro

duct

ion

Rec

ords

D

aily

(2) R

equi

red

at s

tart

of

prod

uctio

n an

d if

met

ers

Col

d Fe

ed M

oist

ure

T 25

5/26

5fa

il to

mee

t spe

cific

atio

n

Lim

e

Late

x

(3) %

Hyd

rate

d Li

me

TM 3

2122

77(2

) TM 3

22(S

tock

pile

OR

Mix

ture

Pro

duct

ion)

2277

Rea

ding

s ba

cked

by

Tank

Mea

sure

& P

rodu

ctio

nR

ecor

ds D

aily

Sm

ooth

ness

Cer

tific

atio

n of

Pro

filer

Equ

ipm

ent

TM 7

69 D

eter

min

ing

Pro

file

Inde

xTM

770

Det

erm

inin

g In

tern

atio

nal

TM 7

72 R

ough

ness

Inde

x

A S

ublo

t eq

uals

100

0 To

ns

1 pe

r 10

Sub

lots

See

Spe

cial

P

rovi

sion

s

1/S

ublo

t

Dai

ly P

rodu

ctio

n

Lim

e or

Lat

ex T

reat

men

t of

A

ggre

gate

Met

er M

etho

d is

requ

ired

for A

CP

even

whe

n ac

cept

ance

is b

y Ig

nitio

n M

etho

d

2043

an

d 24

01

1/S

ublo

t or M

in.

1/D

ay1

per 1

0 S

ublo

ts

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 20

90

See

Spe

cial

Pro

visi

ons

for L

atex

Req

uire

men

ts

Mix

ture

Acc

epta

nce

- AC

P W

ithou

t RAP

(3) S

ee J

MF

for D

etai

ls

1/S

ublo

t or M

in.

1/D

ay22

77

2043

an

d 24

01

2277

1 pe

r 10

subl

ots

Dai

ly P

rodu

ctio

n

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E (C

ON

TIN

UED

)

Page 61: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 57

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Gra

datio

n Igni

tion

met

hod

Cal

ibra

te In

cine

rato

r T

M 3

2323

27IC

Igni

tion

met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7(R

esid

ual a

ggre

gate

from

Sie

ve a

naly

sis

T 30

2277

AA

SH

TO T

308

)

A

spha

lt C

onte

ntIg

nitio

n M

etho

dC

alib

rate

Inci

nera

tor

TM 3

2323

27IC

Igni

tion

Met

hod

Sam

plin

gT

168

Red

ucin

g

R 4

7

Asp

halt

Con

tent

T 30

822

77

RA

P P

erce

ntag

eM

eter

Met

hod

TM 3

2122

77(1

) TM 3

22

(1) R

equi

red

at s

tart

of

RA

P M

oist

ure

T

329

prod

uctio

n an

d if

met

ers

Col

d Fe

ed M

oist

ure

T255

/T26

522

77fa

il to

mee

t spe

cific

atio

n

Rea

ding

s ba

cked

TM 3

21by

Tan

k m

easu

re(1

) TM 3

22&

Pro

duct

ion

Rec

ords

Dai

ly

A S

ublo

t eq

uals

100

0 To

ns

Met

er M

etho

d is

requ

ired

for A

CP

even

whe

n ac

cept

ance

is b

y Ig

nitio

n M

etho

d

1/S

ublo

t

or

M

inim

um 1

/Day

1 pe

r 10

Sub

lots

1/JM

F &

Eac

h C

alen

dar Y

ear.

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E (C

ON

TIN

UED

)

1/JM

F &

Eac

h C

alen

dar Y

ear.

1/S

ublo

t

A S

ublo

t eq

uals

100

0 To

ns

1 pe

r 10

Sub

lots

1/S

ublo

t

or

Min

. 1/d

ay

1 pe

r 10

Sub

lots

1/JM

F &

Eac

h C

alen

dar Y

ear.

Dai

ly P

rodu

ctio

n24

01

&

2043

1/JM

F &

Eac

h C

alen

dar Y

ear.

Mix

ture

Acc

epta

nce

- AC

P W

ith R

AP

Page 62: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 58

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Fa

bric

atio

nG

yrat

ory

Spe

cim

enTM

326

2050

GV

Max

imum

Den

sity

Tes

tM

ax. S

peci

fic G

ravi

tyT

209

2050

*506

8*2

560

Det

erm

inat

ion

of G

mb

Bul

k S

peci

fic G

ravi

tyT

166

*506

9

Stri

ppin

g S

usce

ptib

ility

Tens

ile S

treng

th R

atio

T 28

3

*Cat

-II c

ompl

ete

& s

ubm

it

as

requ

ired,

See

Sec

tion

745.

16(b

)

Pla

nt D

isch

arge

Moi

stur

eA

spha

lt M

ix M

oist

.T

329

2277

1/S

ublo

t

Max

imum

Den

sity

Tes

t Gm

mM

ax. S

peci

fic G

ravi

tyT

209

MA

MD

TM 3

05

Per

form

ing

Con

trol S

trip

Con

trol S

trip

TM 3

0620

84*5

069

Com

pact

ion

Nuc

lear

Den

sity

T

355

Asp

halt

Cem

ent

Com

plia

nce

R 6

640

00S

ubm

it to

Lab

(D) A

vera

ge 5

test

s pe

r S

ublo

t or M

in. 1

/Day

, S

ee S

ectio

n 00

745.

49

(b)-2

1st S

ublo

t Dai

ly o

r M

in. 1

/Day

20

50

Dev

elop

Rol

ling

Pat

tern

See

Spe

cs.

(D) S

ee T

355

Yel

low

shee

t for

Den

sity

Te

st L

ocat

ions

1/S

ublo

t See

S

ectio

n 4C

1

per 1

0 S

ublo

ts

1793

A

A S

ublo

t eq

uals

100

0 To

ns

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E (C

ON

TIN

UED

)

Mix

Des

ign

Verif

icat

ion

Test

ing

1 pe

r 10

Sub

lots

1/JM

F

S

ee S

ectio

n 00

745.

16 (b

)-1-

f

1/S

ublo

t &

acco

rdin

g to

Sec

tion

0074

5.16

(b)-

1-d

Mix

ture

Acc

epta

nce

- AC

P W

ith R

AP

2050

tsr

(D) 1

per

10

Sub

lots

1/5

QC

Sam

ples

(R

ando

m)

Page 63: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 59

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Mix

Des

ign

Verif

icat

ion

Test

ing

Lim

e

Late

x

(3) %

Hyd

rate

d Li

me

TM 3

2122

77(2

) TM 3

22(S

tock

pile

OR

Mix

ture

Pro

duct

ion)

2277

(2) R

equi

red

at s

tart

of

Rea

ding

s ba

cked

by

Tank

2401

prod

uctio

n an

d if

met

ers

Mea

sure

& P

rodu

ctio

nan

dfa

il to

mee

t spe

cific

atio

nR

ecor

ds D

aily

2043

Sm

ooth

ness

Cer

tific

atio

n of

Pro

filer

Equ

ipm

ent

TM 7

69 D

eter

min

ing

Pro

file

Inde

xTM

770

Det

erm

inin

g In

tern

atio

nal

TM 7

72 R

ough

ness

Inde

x

(3) S

ee J

MF

for D

etai

ls

Mix

ture

Acc

epta

nce

- AC

P W

ith R

AP

A S

ublo

t eq

uals

100

0 To

ns

Lim

e or

Lat

ex T

reat

men

t of

Agg

rega

te

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 20

90

See

Spe

cial

Pro

visi

ons

for L

atex

Req

uire

men

ts

SEC

TIO

N 0

0745

- AS

PHAL

T C

ON

CR

ETE

PAVE

MEN

T - S

TATI

STIC

AL A

CC

EPTA

NC

E (C

ON

TIN

UED

)

See

Spe

cial

P

rovi

sion

s

Dai

ly P

rodu

ctio

n

1 pe

r 10

Sub

lots

1/S

ublo

t

Page 64: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 60

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

54 -

PLAI

N C

ON

CR

ETE

PAVE

MEN

T R

EPAI

R S

ECTI

ON

007

55 -

CO

NTI

NU

OU

SLY

REI

NFO

RC

ED C

ON

CR

ETE

PAVE

MEN

T S

ECTI

ON

007

56 -

PLAI

N C

ON

CR

ETE

PAVE

MEN

T S

ECTI

ON

007

58 -

CO

NTI

NU

OU

SLY

REI

NFO

RC

ED C

ON

CR

ETE

PAVE

MEN

T R

EPAI

R A

ggre

gate

Pro

duct

ion

Sam

plin

gT

2(1

) QA

E m

ay w

aive

Red

ucin

gR

76

afte

r 5 s

ublo

ts/s

hifts

(2)(3

)(4) S

ieve

Ana

lysi

sT

27/T

11

1792

(4) S

and

Equ

ival

ent

T 17

617

92

(1)(3

) Woo

d P

artic

les

TM 2

2517

92(3

) Frac

ture

(Met

hod

2)

T 33

517

92

Abr

asio

nT

9640

00S

eeD

egra

datio

nTM

208

Sec

tion

Sou

ndne

ss

T 10

44A

Ligh

twei

ght P

iece

sT

113

and

Org

anic

sT

2140

0002

690

(3) D

ry R

odde

d U

nit W

eigh

t T

1918

2518

25C

(3)(4

) Bul

k S

peci

fic

T 84

&G

ravi

ty &

Abs

orpt

ion

T 85

(4) Fi

nene

ss M

odul

us

(1)(3

) Elo

ngat

ed P

iece

s T

M 2

29

1 pe

r 10

Sub

lots

1/5

Sub

lots

& S

tart

of P

rodu

ctio

n

(3)

Coa

rse

Agg

rega

te

(S

ee S

ectio

n 02

690.

20)

(4

) Fin

e A

ggre

gate

(See

Sec

tion

0269

0.30

)

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

1825

Sub

mit

to C

entra

l La

b

1/S

ublo

t & S

tart

of

Pro

duct

ion

Sta

rt of

pro

duct

ion

and

whe

n ch

ange

s in

ag

greg

ate

occu

rs

See

Sec

tion

4A

A S

ublo

t eq

uals

100

0 To

ns

Page 65: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 61

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

S

ECTI

ON

007

54 -

PLAI

N C

ON

CR

ETE

PAVE

MEN

T R

EPAI

R S

ECTI

ON

007

55 -

CO

NTI

NU

OU

SLY

REI

NFO

RC

ED C

ON

CR

ETE

PAVE

MEN

T S

ECTI

ON

007

56 -

PLAI

N C

ON

CR

ETE

PAVE

MEN

T S

ECTI

ON

007

58 -

CO

NTI

NU

OU

SLY

REI

NFO

RC

ED C

ON

CR

ETE

PAVE

MEN

T R

EPAI

R (C

ON

TIN

UED

)M

ixtu

re

Por

tland

Cem

ent

Mod

ifier

s A

dmix

ture

s

Cur

ing

Com

poun

ds

Mix

ing

Wat

er

Mix

ture

Sam

plin

gTM

2A

ir C

onte

ntT

152

S

lum

pT

119

D

ensi

ty (U

nit W

eigh

t)T

121

3573

WS

Yie

ldT1

21or

C

oncr

ete

Tem

pera

ture

T

309

4000

CW

ater

/Cem

ent

.T

121

Rat

io

B

atch

ing

Stre

ngth

T 22

&T

23

Sm

ooth

ness

Cer

tific

atio

n of

Pro

filer

Equ

ipm

ent

TM 7

69 D

eter

min

ing

Pro

file

Inde

xTM

770

Thi

ckne

ss o

f Pav

emen

tS

itcki

ng M

easu

reTM

775

See

Spe

cs

See

Spe

cial

P

rovi

sion

s

(M) P

er M

ix D

esig

n &

Sou

rce

1 pe

r 10

Sub

lots

(M)

(S) 1

Set

of

Cyl

inde

rs p

er S

ublo

t or

Min

imum

1 s

et p

er

Day

4000

C

(S) 1

Set

Rep

rese

nts

a m

inim

um o

f 3

Cyl

inde

rs

1/ s

ublo

t or

Min

imum

1 p

er D

ay1

per 1

0 S

ublo

ts

A S

ublo

t equ

als

1000

lane

feet

of s

lip fo

rmed

pav

emen

t or 1

00 y

d3

of n

on-

slip

form

ed P

CC

Mat

eria

ls m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0200

1.10

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

020

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

050

Page 66: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 62

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

In-P

lace

Eva

luat

ion

of

TM 7

77

Ret

rore

flect

ivity

Usi

ng

Pro

cedu

re e

valu

ates

Dur

able

and

H

and-

Ope

rate

d

Hig

h P

erfo

rman

ce P

avem

ent

Inst

rum

ent

M

arki

ngs

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

SEC

TIO

N 0

0850

- C

OM

MO

N P

RO

VISI

ON

S FO

R P

AVEM

ENT

MAR

KIN

GS

Pla

cem

ent E

valu

atio

n "R

etro

refle

ctiv

ity"

4101

th

ru

4105

See

Spe

cial

P

rovi

sion

s an

d Te

st

Pro

cedu

re fo

r Te

stin

g Fr

eque

ncy

Page 67: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 63

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Agg

rega

te P

rodu

ctio

nS

ampl

ing

T 2

(1) Q

AE

may

wai

veR

educ

ing

R 7

6af

ter 5

sub

lots

/shi

fts(2

)(3)(4

) Sie

ve A

naly

sis

T 27

/T 1

117

92(4

) Fine

ness

Mod

ulus

T

27/T

11

(1)(3

) W

ood

Par

ticle

sTM

225

(4) S

and

Equ

ival

ent

T 17

617

92

Sou

ndne

ss

T 10

440

00A

bras

ion

T 96

D

egra

datio

nTM

208

Ligh

twei

ght P

iece

sT

113

Org

anic

sT

2140

00

(3) D

ry R

odde

d U

nit W

eigh

t T

1918

2518

25C

(3)(4

) Bul

k S

peci

fic

T 84

&G

ravi

ty &

Abs

orpt

ion

T 85

Por

tland

Cem

ent

M

odifi

ers

Adm

ixtu

res

Dril

ling

Slur

ry

Gro

ut M

ixin

g W

ater

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

A Su

blot

equ

als

1,00

0 To

ns

1/S

ublo

t

&

Sta

rt of

Pro

duct

ion

1 pe

r 10

Sub

lots

(2) P

erfo

rm a

min

imum

of 3

test

s,

QL'

s re

quire

d

(3

) Coa

rse

Agg

rega

te

(S

ee S

ectio

n 02

690.

20)

See

Sec

tion

4AS

ubm

it to

Lab

See

Sec

tion

4(A

)

(4

) Fin

e A

ggre

gate

(S

ee S

ectio

n 02

690.

30)

Sta

rt of

pro

duct

ion

and

whe

n ch

ange

s in

ag

greg

ate

occu

rs18

25

Mat

eria

ls m

ust m

eet t

he re

quire

men

ts o

f Sec

tion

0200

1.10

Slu

rry

mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 00

921.

14 &

00

921.

43(g

)

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

080

Mat

eria

l mus

t mee

t the

requ

irem

ents

of S

ectio

n 02

020

SEC

TIO

N 0

0921

- M

AJO

R S

IGN

SU

PPO

RT

DR

ILLE

D S

HAF

TS

Page 68: THE FIELD TESTED MATERIALS ACCEPTANCE GUIDE...ey must be performed. It includes materials which are sampled and tested in the field and materials which are field sampled but sent elsewhere

Page 64

FIE

LD T

ESTE

D M

ATE

RIA

LS A

CC

EPTA

NC

E G

UID

E

(R

evis

ed N

ovem

ber 2

017)

MAT

ERIA

LD

ESC

RIP

TIO

N

TE

ST M

ETH

OD

FOR

M Q

UAL

ITY

ASSU

RAN

CE

AND

OF

734-

Con

trac

tor

Inde

pend

ent A

ssur

ance

/Ver

ifica

tion

OPE

RAT

ION

TEST

OD

OT

WAQ

TCAA

SHTO

Qua

lity

Proj

ect

Reg

ion

Mat

eria

lsC

ontr

olM

anag

erQ

ualit

yLa

bora

tory

Assu

ranc

e

Sam

e Fr

eque

ncy

for a

ll Te

sts

(Min

imum

s)

Por

tland

Cem

ent C

oncr

ete

S

ampl

ing

TM 2

Slu

mp

T 11

9

Pr

ojec

ts u

nder

100

yd³

all

clas

ses

Con

cret

e Te

mpe

ratu

reT

309

1/

Proj

ect r

epre

sent

ing

all c

lass

es o

f PC

CD

ensi

ty (U

nit W

eigh

t)T

121

Yie

ldT1

21

Wat

er/C

emen

t Rat

ioT

121

Proj

ects

ove

r 100

yd³

all

clas

ses

1/50

0 yd

³ per

cla

ss m

inim

um 1

/cla

ssS

treng

thT2

2/23

4000

C

(S) 1

Set

Rep

rese

nts

a m

inim

um o

f 3

Cyl

inde

rsTA

BLE

005

12-1

Fre

quen

cy o

f Qua

lity

Con

trol

Tes

ting

QA

Tes

ting

(M)

(S) 1

per

Sha

ft an

d Te

st a

t m

inim

um

frequ

enci

es

acco

rdin

g to

tabl

e 00

512-

1. R

evie

w

spec

s.

SEC

TIO

N 0

0921

- M

AJO

R S

IGN

SU

PPO

RT

DR

ILLE

D S

HAF

TS

3573

WS

or

400

0C

af

ter r

each

ing

600

yd³

Min

imum

freq

uenc

ies

per C

lass

of c

oncr

ete

base

d on

dai

ly p

rodu

ctio

n re

cord

s.(M

) Per

Mix

Des

ign

& S

ourc

ePr

oduc

tion

Freq

uenc

ies

0 to

100

yd³

on

a si

ngle

day

1 Se

t eac

h da

y

Q

uant

ity O

ver 1

00 y

d³10

0 to

600

yd³

on

a si

ngle

day

1 Se

t per

eac

h 10

0 yd

³ or p

ortio

n th

ereo

fov

er 6

00 y

d³ o

n a

sing

le d

ay1