User Information
Instructions for assembly and use (Method statement)
Copyright User Information DokaRex alignment strut
© by Doka Danmark, DK-4621 Gadstrup
2 Version3 07/2016
User Information DokaRex alignment strut Contents
Version3 07/2016 3
Contents
Introduction 5
Elementary safety warnings 5
Eurocodes at Doka 9
Product description 10
Declaration of conformity 15
Instructions for assembly and use 16
Structural design 21
Possible incorrect usages 23
Technical conditions 24
Transport, stacking and storing 25
Component overview 27
Introduction User Information DokaRex alignment strut
4 Version3 07/2016
Introduction
Elementary safety warnings
User target groups
▪ This manual is aimed at all persons who will be working with the Doka product or system that it describes. It
contains information on the standard design for setting up this system, and on correct, compliant utilisation of
the system.
▪ All persons working with the product described herein must be familiar with the contents of this manual and
with all the safety instructions it contains. Persons who are incapable of reading and understanding this booklet,
or who can do so only with difficulty, must be instructed and trained by the customer.
▪ The customer is to ensure that the information materials provided by Doka (e.g. User Information booklets,
Instructions for Assembly and Use, Operating Instruction manuals, plans etc.) are available to all users, and
that they have been made aware of them and have easy access to them at the usage location. In the relevant
technical documentation and formwork utilization plans, Doka shows the workplace safety precautions that are
necessary in order to use the Doka products safely in the usage situations shown.
▪ In all cases, users are obliged to ensure compliance with national laws, Standards and rules throughout the
entire project and to take appropriate additional or alternative workplace safety precautions where necessary.
Hazard assessment
▪ The customer is responsible for drawing up, documenting, implementing and continually updating a hazard
assessment at every job-site. This document serves as the basis for the site-specific hazard assessment, and
for the instructions given to users on how to prepare and utilise the system. It does not substitute for these,
however.
Planning
▪ Provide safe workplaces for those using the formwork (e.g. for when it is being erected/dismantled, modified or
repositioned etc). It must be possible to get to and from these workplaces via safe access routes!
▪ If you are considering any deviation from the details and instructions given in this booklet, or any
application which goes beyond those described in the booklet, then revised static calculations must be
produced for checking, as well as supplementary assembly instructions.
Remarks on this document
▪ This manual can also be used as a generic method statement or incorporated with a site-specific method
statement.
▪ Many of the illustrations in this booklet show the situation during formwork assembly and are therefore
not always complete from the safety point of view.
▪ Any safety accessories not shown in these illustrations must still be used by the customer, in accordance with
the applicable rules and regulations.
User Information DokaRex alignment strut Introduction
Version3 07/2016 5
▪ Further safety instructions, especially warnings, will be found in the individual sections of this
document!
Regulations; industrial safety
▪ All laws, Standards, industrial safety regulations and other safety rules applying to the utilization of our
products in the county and/or region in which you are operating must be observed at all times.
▪ If a person of object falls against, or into, the side guard component and/ or any of its accessories, the
component affected may only continue in use after it has been inspected and passed by an expert.
Rules applying during all phases of the assignment:
▪ The customer must ensure that this product is erected and dismantled, reset and generally used for its
intended purpose in accordance with the applicable laws, Standards and rules, under the direction and
supervision of suitably skilled persons. These persons' mental and physical capacity must not in any way be
impaired by alcohol, medicines or drugs.
▪ Doka products are technical working appliances which are intended for industrial/commercial use only, always
in accordance with the respective Doka User Information booklets or other technical documentation authored
by Doka.
▪ The stability of all components and units must be ensured during all phases of the construction work!
▪ The functional/technical instructions, safety warnings and loading data must all be strictly observed and
complied with. Failure to do so can cause accidents and severe (even life-threatening) damage to health, as
well as very great material damage.
▪ Fire-sources are not permitted anywhere near the formwork. Heating appliances are only allowed if properly
and expertly used, and set up a safe distance away from the formwork.
▪ The work must take account of the weather conditions (e.g. risk of slippage). In extreme weather, steps must
be taken in good time to safeguard the equipment, and the immediate vicinity of the equipment, and to protect
employees.
▪ All connections must be checked regularly to ensure that they still fit properly and are functioning correctly.
It is very important to check all screw-type connections and wedge-clamped joins whenever the construction
operations require (particularly after exceptional events such as storms), and to tighten them if necessary.
▪ It is strictly forbidden to weld Doka products – in par-ticular anchoring/tying components, suspension
components, connector components and castings etc. – or otherwise subject them to heating. Welding causes
serious change in the microstruc-ture of the materials from which these components are made. This leads to a
dramatic drop in the failure load, representing a very great risk to safety. The only articles which are allowed to
be welded are those for which the Doka literature expressly points out that welding is permitted.
Assembly
▪ The equipment/system must be inspected by the customer before use, to ensure that it is in suitable condition.
Steps must be taken to rule out the use of any components that are damaged, deformed, or weakened due to
wear, corrosion or rot.
▪ Combining our formwork systems with those of other manufacturers could be dangerous, risking damage to
both health and property. If you intend to combine different systems, please contact Doka for advice first.
▪ The equipment/system must be assembled and erected in accordance with the applicable laws, Standards and
rules by suitably skilled personnel of the customer's, having regard to any and all required safety inspections.
Introduction User Information DokaRex alignment strut
6 Version3 07/2016
▪ It is not permitted to modify Doka products; any such modifications constitute a safety risk.
Closing the formwork
▪ Doka products and systems must be set up in such a way that all loads acting upon them are safely transferred!
Pouring
▪ Do not exceed the permitted fresh-concrete pressures. Excessively high pouring rates lead to formwork
overload, cause greater deflection and risk causing breakage.
Stripping out the formwork
▪ Do not strip out the formwork until the concrete has reached sufficient strength and the person in charge has
given the order for the formwork to be stripped out!
▪ When stripping out the formwork, never use the crane to break concrete cohesion. Use suitable tools such as
timber wedges, special pry-bars or system features such as Framax stripping corners.
▪ When stripping out the formwork, do not endanger the stability of any part of the structure, or of any scaffolding,
platforms or formwork that is still in place!
Transporting, stacking and storing
▪ Observe all regulations applying to the handling of formwork and scaffolding. In addition, the Doka slinging
means must be used this is a mandatory requirement.
▪ Remove any loose parts or fix them in place so that they cannot be dislodged or fall free!
▪ All components must be stored safely, following all the special Doka instructions given in the relevant sections
of this manual!
Maintenance
▪ Only original Doka components may be used as spare parts. Repairs may only be carried out by the
manufacturer or authorised facilities.
Miscellaneous
We reserve the right to make alterations in the interests of technical progress.
User Information DokaRex alignment strut Introduction
Version3 07/2016 7
Symbols used
The following symbols are used in this booklet:
Important note!
Failure to observe this may lead to malfunction or damage.
CAUTION/WARNING/DANGER
Failure to observe this may lead to material damage, and to injury to health which may range up to the
severe or even life-threatening.
Sight-check
Indicates that you need to do a sight-check to make sure that necessary actions have been carried
out.
► Instruction
This symbol indicates that actions need to be taken by the user.
Tip
Points out useful practical tips.
Reference
Refers to other documents and material
User Information DokaRex alignment strut Product description
Version3 07/2016 9
Product description
The fast, lightweight and precise DokaRex alignment strut
The new DokaRex alignment strut for precast elements and columns is quick to install and easy to adjust.
Ergonomic
Weights up to 20% less than similar products on the market.
Lightweight and ergonomically design enables easy and ergonomically convenient working, easy to handle
and superbly adaptable to and building-construction project.
Fast
With only 4 different strut types a length range of 1.80m to 10.20m is covered. A turn-prevention and a pin-
insertion guarantees an easy and fast length adjustment.
The low weight and precise adjustment enables a quick installment and easy adjustment, which contributes
to high productivity and less crane-costs.
Highly engineered
The high quality galvanization of the DokaRex alignment strut 305 provides the basis for a long life span of
this steel strut.
The three longer strut types are made from Aluminum. The extruded alu-profile offers a great durability
against damages and weather. The powder coating guarantees fast cleaning and prevents adherence of
concrete.
Highly engineered, DokaRex features a handle for exact adjustments.
DokaRex alignment strut 305 DokaRex alignment strut 450
Product description User Information DokaRex alignment strut
10 Version3 07/2016
DokaRex alignment strut 305 IB
First rough adjustment will be done by fixing the strut with it’s length adjustment pin.
Afterwards, the fine adjustment will be obtained by the threaded spindles. The top and bottom spindle have to
have the same extension length. The length adjustment pin may only be used when in closed position.
Permissible Loads (Tests results processed in compliance with EN norms, calculation methods and safety factors)
25,00
18,00
25,00
0,00
5,00
10,00
15,00
20,00
25,00
30,00
1,80 1,90 2,00 2,10 2,20 2,30 2,40 2,50 2,60 2,70 2,80 2,85 2,90 2,95 3,00 3,05
Pe
rmis
sib
le L
oad
s [k
N]
Length [m]
Loadability
User Information DokaRex alignment strut Product description
Version3 07/2016 11
DokaRex alignment strut 450 IB
First rough adjustment will be done by fixing the strut with it’s length adjustment pin.
Afterwards, the fine adjustment will be obtained by the final threaded spindles, which must be extracted at the
same length. All pins have to be always secured with the linch pins.
Permissible Loads (Tests results processed in compliance with EN norms, calculation methods and safety factors)
20,00 20,00
11,00
0,00
5,00
10,00
15,00
20,00
25,00
3,05 3,10 3,20 3,30 3,40 3,50 3,60 3,70 3,80 3,90 4,00 4,10 4,20 4,30 4,40 4,50
Pe
rmis
sib
le L
oad
s [k
N]
Length [m]
Loadability
Product description User Information DokaRex alignment strut
12 Version3 07/2016
DokaRex alignment strut 750 IB
First rough adjustment will be done by fixing the strut with it’s length adjustment pin.
Afterwards, the fine adjustment will be obtained by the final threaded spindles, which must be extracted at the
same length. All pins have to be always secured with the linch pins.
Permissible Loads (Tests results processed in compliance with EN norms, calculation methods and safety factors)
25,00 25,00
16,00
0,00
5,00
10,00
15,00
20,00
25,00
30,00
4,45 5,00 5,50 6,00 6,10 6,20 6,30 6,40 6,50 6,60 6,70 6,80 6,90 7,00 7,10 7,20 7,30 7,40 7,50
Pe
rmis
sib
le L
oad
s [k
N]
Length [m]
Loadability
User Information DokaRex alignment strut Product description
Version3 07/2016 13
DokaRex alignment strut 1020 IB
First rough adjustment will be done by fixing the strut with it’s length adjustment pins.
Afterwards, the fine adjustment will be obtained by the final threaded spindles, which must be extracted at the
same length. All pins have to be always secured with the linch pins.
Permissible Loads (Tests results processed in compliance with EN norms, calculation methods and safety factors)
30,00 30,00
24,00
0,00
5,00
10,00
15,00
20,00
25,00
30,00
35,00
7,08 7,50 8,20 8,30 8,40 8,60 8,80 9,00 9,20 9,40 9,60 9,80 10,00 10,20
Pe
rmis
sib
le L
oad
s [k
N]
Length [m]
Loadability
Declaration of Conformity User Information DokaRex alignment strut
14 Version3 07/2016
Declaration of Conformity
The DokaRex alignment struts, as described in these instructions for assembly and use, in association
with the Doka brand name are products of TheFormwork.
The table below sets out the corresponding products and declares the conformity, confirmed by the
manufacturer, of those products having different designations and article numbers.
857508001 DokaRex alignment strut 305 IB 857508001 TF Strut Ste 180-305
857508002 DokaRex alignment strut 450 IB 857508002 TF Strut Alu 305-450
857508003 DokaRex alignment strut 750 IB 857508003 TF Strut Alu 445-750
857508004 DokaRex alignment strut 1020 IB 857508004 TF Strut Alu 708-1020
857508005 DokaRex docking head M20 857508005 Self locking head
857508006 DokaRex strut shoe EB M16 857508006 Standard shoe
857508007 DokaRex strut shoe EB M16/M20 857508007 Heavy shoe
857508008 DokaRex strut head EB M20 857508008 Fixing head
857508009 DokaRex-strut head EB M20 weldable 857508009 Fixing head
Article n
o Article desciption Article n
o Article description
User Information DokaRex alignment strut Instructions for assembly and use
Version3 07/2016 15
Sight-check:
Always make sure that the DokaRex docking head M20 is correctly closed
As an additional precaution when in use
on the site, the DokaRex docking head
M20 can be secured with a spring cotter
5mm to prevent accidental opening
Instructions for assembly and use
Connection of DokaRex docking head M20
The DokaRex docking head M20 will be secured and ready to work, only when the red latch area isn’t
visible anymore! To remove the DokaRex alignment strut push down the latch of the DokaRex docking
head M20. Do not remove the pin.
The DokaRex docking head M20 works only in connection with the DokaRex alignment struts 450, 750 and
1020.
Security latch
DokaRex docking head M20
DokaRex alignment strut
DokaRex docking head M20
DokaRex alignment strut
Precasted wall Precasted wall
Instructions for assembly and use User Information DokaRex alignment strut
16 Version3 07/2016
Connection of DokaRex strut head EB M20 weldable
The DokaRex strut head EB M20 weldable will be secured and ready to work, only when the Pin and Linch
pin are properly fixed!
The DokaRex docking head EB M20 weldable works only in connection with the DokaRex alignment struts 450,
750 and 1020.
DokaRex strut head EB M20 weldable
Pin
Linch pin
DokaRex alignment strut
DokaRex alignment strut
DokaRex strut head EB M20 weldable
Pin
Linch pin
User Information DokaRex alignment strut Instructions for assembly and use
Version3 07/2016 17
Connections in detail
DokaRex strut shoe EB M16
The DokaRex strut shoe EB M16 works in connection with the DokaRex alignment struts 305, 450 and 750 as shoe.
The transfer of loads to be checked by user.
For the DokaRex alignment strut 305, the Strut Shoe EB M16 works also as head. The same loading charts apply.
DokaRex strut head EB M20
The DokaRex strut head EB M20 weldable can get used as alternative option to the DokaRex docking head M20
for the DokaRex alignment struts 450, 750 and 1020.
DokaRex docking head M20
The DokaRex docking head M20 works in connection with the DokaRex aligment struts 450, 750 and 1020.
Instructions for assembly and use User Information DokaRex alignment strut
18 Version3 07/2016
DokaRex strut shoe EB M16/20
The DokaRex strut shoe EB M16/M20 works in connection with the DokaRex alignment struts 1020 as shoe. It can
be used also for DokaRex alignment struts 450 and 750 when the loads are bigger than the ones DojaRex strut
shoe M16 can bear (fixing bolt loadability). The transfer of loads to be checked by user.
User Information DokaRex alignment strut Instructions for assembly and use
Version3 07/2016 19
Connection of DokaRex docking head M20
PH Pv ANGLE (α)0,97 0,71 45°
0,82 0,77 50°
0,50 0,87 60°
EXAMPLE of DokaRex docking head M20 Fixing Bolt dimensioning: As an example, the force F, applied on the considered DokaRex alignment strut, is fixed to 11 kN, (always refere to the loadabilty graphs previously showed for each DokaRex alignment strut model, in order to determine the admissible loadability given a certain extraction); it’s assumed that the shear force RV, will be equal to FV (resulting from vectorial composition of the force F), so only FH vector component have to be parameterized, by the PH values indicate in related tables from above.
With above mentioned premises, proceed as following:
Force F assumed value 11,00 kN
Angle between DokaRex alignment strut and bearing basement 50°
RH = F x PH = 11,0 kN x 0,82 = 9,02 kN
RV = F x PV = 11,0 kN x 0,77 = 8,47 kN
Be sure to use DokaRex alignment strut ONLY on vertical (90°) precast elements; any different application have to be accurately verified before any works, based on this User Manual indicated loadabilities
Instructions for assembly and use User Information DokaRex alignment strut
20 Version3 07/2016
Connection of DokaRex strut head EB M20
PH Pv ANGLE (α)0,87 0,71 45°
0,73 0,77 50°
0,50 0,87 60°
EXAMPLE of DokaRex strut head EB M20 Fixing Bolt dimensioning:
As an example, the force F, applied on the considered DokaRex alignment strut, is fixed to 11 kN (always refere to the loadabilty graphs previously showed for each DokaRex alignment strut model, in order to determine the admissible loadability given a certain extraction); it’s assumed that the shear force RV, will be equal to FV (resulting from vectorial composition of the force F), so only FH vector component have to be parameterized, by the PH values indicate in related tables from above.
With above mentioned premises, proceed as following:
Force F assumed value 11,00 kN
Angle between DokaRex alignment strut and bearing basement 50°
RH = F x PH = 11,0 kN x 0,73 = 8,03 kN
RV = F x PV = 11,0 kN x 0,77 = 8,47 kN
Be sure to use DokaRex alignment struts ONLY on vertical (90°) precast elements; any different application have to be accurately verified before any works, based on this User Manual indicated loadabilities
User Information DokaRex alignment strut Instructions for assembly and use
Version3 07/2016 21
Connection of DokaRex strut shoe EB M16
PH Pv ANGLE (α)0,71 0,79 45°
0,64 0,91 50°
0,50 1,13 60°
EXAMPLE of DokaRex strut shoe EB M16 Fixing Bolt dimensioning:
As an example, the force F, applied on the considered DokaRex alignment strut, is fixed to 11 kN (always refere to the loadabilty graphs previously showed for each DokaRex alignment strut model, in order to determine the admissible loadability given a certain extraction); it’s assumed that the shear force RH, will be equal to FH (resulting from vectorial composition of the force F), so only FV vector component have to be parameterized, by the PV values indicate in related tables from above.
With above mentioned premises, proceed as following:
Force F assumed value 11,00 kN
Angle between DokaRex alignment strut and bearing basement 50°
RH = F x PH = 11,0 kN x 0,64 = 7,04 kN
RV = F x PV = 11,0 kN x 0,91 = 10,01 kN
Be sure to use DokaRex alignment strut ONLY on vertical (90°) precast elements; any different application have to be accurately verified before any works, based on this User Manual indicated loadabilities
Instructions for assembly and use User Information DokaRex alignment strut
22 Version3 07/2016
Connection of DokaRex strut shoe EB M16/M20
PH Pv ANGLE (α)0,71 0,70 45°
0,64 0,86 50°
0,50 1,14 60°
EXAMPLE of DokaRex strut shoe EB M16/M20 Fixing Bolt dimensioning:
As an example, the force F, applied on the considered DokaRex alignment strut, is fixed to 11 kN, (always refere to the loadabilty graphs previously showed for each DokaRex alignment strut model, in order to determine the admissible loadability given a certain extraction); it’s assumed that the shear force RH, will be equal to FH (resulting from vectorial composition of the force F), so only FV vector component have to be parameterized, by the PV values indicate in related tables from above.
With above mentioned premises, proceed as following:
Force F assumed value 11,00 kN
Angle between DokaRex alignment strut and bearing basement 50°
RH = F x PH = 11,0 kN x 0,64 = 7,04 kN
RV = F x PV = 11,0 kN x 0,86 = 9,46 kN
Be sure to use DokaRex alignment strut ONLY on vertical (90°) precast elements; any different application have to be accurately verified before any works, based on this User Manual indicated loadabilities
User Information DokaRex alignment strut /Structural design
Version3 07/2016 23
Structural design
Important note!
It is the customers responsibility to calculate, which forces will appear from erecting the wall element –
based on the weight of the element, height (wind), area factor, year factor, etc…
After the choice of the right strut (length) and the amount of struts the reaction force have to get calculated
by the customer to decide on the according inserts.
The max. allowable loads of the struts as mentioned before have to get considered.
The2/3 of H anchoring point height indication is a “general rule”, to be followed as the easiest way to work safely;
different positions could be chosen only by a previous verification and calculation, based on this User Manual
prescriptions and indications.
DokaRex alignment struts to be used only on Vertical Precast Elements (90°). Any different application
to be previously carefully verified, statically and operatively, strictly following all prescriptions,
indications and loadabilities indicated and contained in this User Manual.
Safety Information: The height of anchoring must be coordinated with the deliverer of the pre-fabricated parts or must be noticed in the adequate construction- or part drawings. The length calculation does not give consideration to the arising loads. These must be calculated separately
Warning: Anchor the DokaRex alignment strut so that it is resistant to tensile and compressive forces!
For details regarding “Fixing to the ground”, see the relevant User Information booklets of the chosen supplier. For more information, see the Calculation Guide “Wind loads to the Eurocodes”.
Important note! Every pre-cast member must be secured by at least 2 DokaRex alignment struts.
/ /Possible incorrect usages User Information DokaRex alignment strut
24 Version3 07/2016
Possible incorrect usages
WARNING
The uses illustrated below are prohibited, as are other, similar uses!
Not to be used as floor prop
Important note!
To set up and shore pre-cast concrete members safely, it is necessary for the DokaRex alignment struts to be fixed both to the prefabricated member and to the floor.
Before the type of anchorage can be decided, the design and load-calculation (wind loads, loads from working platforms etc.) for the strut must be carried out in accordance with the relevant standards.
Only use the DokaRex docking head M20 in the vertical.
Important note!
Handle & length adjustment pin & top fork is forbidden to use as crane attachment point.
User Information DokaRex alignment strut / /Possible incorrect usages
Version3 07/2016 25
The DokaRex docking head M20’s red latch area must not be visible any more to operate safely!
Must be checked before any operation!
Technical condition User Information DokaRex alignment strut
26 Version3 07/2016
Technical condition
Screw jack
Must be clean and action must be smooth over entire length.
Anti-dropout lock of the screw jack
Must be in full working order.
The following quality criteria define the extent of damage permissible in terms of load-bearing strength. Use is prohibited if damage is beyond these limits.
User Information DokaRex alignment strut Transport, stacking and storing
Version3 07/2016 27
Transport, stacking and storing
Doka stacking pallet 1.55x0.85m
Ideal for all sizes of floor props, timber formwork beams, Dokadur panels and formwork sheets.
Galvanized – stackable – safe to lift by crane
Loading capacity of the stacking pallet Follow the directions in the Operating Instructions!
Bolt-on castor set B
The Bolt-on caster set B turns the stacking pallet into a fast and maneuverable transport trolley.
Suitable for drive-through access openings > 90cm.
The Bolt-on caster set B can be mounted to the following multi-trip packaging items:
Doka stacking pallets
Utilise the benefits of Doka multi-trip packaging on your site.
Multi-trip packaging such as containers, stacking pallets and skeleton transport boxes keep everything in place on the site, minimise time wasted searching for parts, and streamline the storage and transport of system components, small items and accessories.
9720-332-01
Max. load: 1100 kg
DokaRex alignment struts DokaRex alignment strut 305 IB tbd
DokaRex alignment strut 450 IB 28 units
DokaRex alignment strut 750 IB 15 units
DokaRex alignment strut 1020 IB tbd
Transport, stacking and storing User Information DokaRex alignment strut
28 Version3 07/2016
Doka accessory box
Doka multi-trip transport box 1.20x0.80m
Storage and transport devices for small items: Durable Stackable
Suitable transport appliances: Crane Pallet stacking truck Forklift truck
Important note!
Multi-trip packaging items that each contain very different loads must be stacked with the heaviest ones at the bottom and the lightest ones at the top!
The rating plate must be attached and clearly legible.
Follow the directions in the Operating Instructions!
Max. load: 1500 kg
Permitted imposed load: 7900 kg
User Information DokaRex alignment strut Component Overview
Version3 07/2016 29
Component Overview
[kg] Article no [kg] Article n
o
DokaRex alignment strut 305 IB
Length: 180-305cm
Steel
galvanised
17,5 857508001 DokaRex docking head M20
galvanised
2,7 857508005
DokaRex alignment strut 450 IB
Length: 305-450cm
Aluminum
Outer tube:
Powder coated blue
20,2 857508002 DokaRex strut shoe EB M16
galvanised
1,5 857508006
DokaRex alignment strut 750 IB
Length: 445-750cm
Aluminum
Outer tube:
Power coated blue
42,7 857508003 DokaRex strut shoe EB M16/20
galvanised
2,3 857508007
DokaRex alignment strut 1020 IB
Length: 704-1020cm
Aluminum
Outer tube:
Powder coated blue
93,0 857508004 DokaRex strut head EB M20
galvanised
1,3 857508008
Component Overview User Information DokaRex alignment strut
30 Version3 07/2016
DokaRex strut head EB M20
weldable
untreated
1,3 857508009
Doka stacking pallet 1.55x0.85m
Galvanised
height: 77cm
follow the directions in
the Operating instrutctions
41,0 586151000
Doka multi-trip transport box
1.20x0.80m
Galvanised
Height: 78cm
follow the directions in
the Operating instrutctions
70,0 583011000
Bolt-on castor set B
Painted blue
33,6 583168000
User Information DokaRex alignment strut Component Overview
Version3 07/2016 31
Near to you, worldwide
Doka is one of the world leaders in developing,
manufacturing and distributing formwork technology for
use in all fields of the construction sector.
With more than 160 sales and logistics facilities in over
70 countries, the Doka Group has a highly efficient
distribution network which ensures that equipment and
technical support are provided swiftly and professionally.
An enterprise forming part of the Umdasch Group, the
Doka Group employs a worldwide workforce of more
than 5600.