The Future of Railway
Electrification ControlDr Paul Hodgson
3rd May 2018
![Page 2: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/2.jpg)
UK Electrified Railways
![Page 3: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/3.jpg)
UK Electrified Railways
![Page 4: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/4.jpg)
UK Electrified Railways
![Page 5: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/5.jpg)
UK Electrified Railways
![Page 6: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/6.jpg)
UK Electrified Railways
![Page 7: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/7.jpg)
UK Electrified Railways
![Page 8: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/8.jpg)
UK Electrified Railways
![Page 9: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/9.jpg)
UK Electrified Railways
![Page 10: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/10.jpg)
UK Electrified Railways
![Page 11: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/11.jpg)
UK Electrified Railways
![Page 12: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/12.jpg)
UK Electrified Railways
![Page 13: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/13.jpg)
Canterbury
Paddock Wood
Eastleigh
Romford
Rugby
Raynes ParkLewisham
Selhurst
Brighton
Sandhills
Crewe
York
Cathcart
The 13 Existing Electrical
Control Locations
AC Control Location
DC Control Location
![Page 14: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/14.jpg)
Operational Integration
Planning Facilities
Safety & Security
Factors leading to Improvement
and Optimisation
Factors leading to Avoidance of
Service Degradation
Factors leading to Incremental
Baseline Improvement
Traction Power Control System Hierarchy
Instrumentation
Control
SCADA
Decision
Support
ERM
Plant
Interface
Data
Gathering
Command
& Control
Electrical Model – Planning
& Operational Response
Energy Resource Management,
Remote Securing / Remote EarthC
urr
en
t P
ow
er
SC
AD
A
Na
tio
na
l P
ow
er
Co
ntr
ol S
yste
m-
TP
CM
S
Safety & Security(Supply/Access)
Digital Railway
Integration
![Page 15: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/15.jpg)
TPCMSTraction Power Centralised
Management System
National Traction Power Control
![Page 16: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/16.jpg)
Network Rail &
Public Telephony
Data Centres
Secure Connection
TPCMS: The Solution
Manchester
ROC
Three Bridges
ROC
Core Network
![Page 17: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/17.jpg)
![Page 18: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/18.jpg)
New RTUs &
PMUs
Data Centres
Electrical Control Operations
Configuration Management
TPCMS: The Solution
Manchester
ROC
Three Bridges
ROC
Existing RTUs
Training
![Page 19: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/19.jpg)
New RTUs &
PMUs
TPCMS: The Solution
Manchester
ROC
Three Bridges
ROC
MK: Energy
Management &
Reporting
Existing RTUs
Operations (ECRs)Operations
(ROCs)
![Page 20: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/20.jpg)
Controlled Device Operates
Feedback Indication Generated
Security: At the Heart of the System
Traction Power Location
Electrical Control
Operator
![Page 21: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/21.jpg)
The Future
Wireless
Devices
Lineside /
Traction
Power
Devices
Operational Systems
New Electrification
Schemes
![Page 22: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/22.jpg)
• TPCMS is one System
TPCMS is Live
Thanks for listening – are there any questions?
It is the single platform for an integrated traction power control management system
• TPCMS is Live
The Data Centres are in service: secure, reliable, managed and supported
Control of Anglia from Romford ECR since 12-February
• TPCMS is the Future
It is flexible, scalable and configurable
![Page 23: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/23.jpg)
Romford ECR
![Page 24: The Future of Railway Electrification Control...Devices Operational Systems New Electrification Schemes • TPCMS is one System TPCMS is Live Thanks for listening –are there any](https://reader030.vdocuments.net/reader030/viewer/2022040103/5e5f8fcdaf2b651c3b453b28/html5/thumbnails/24.jpg)
Thank you