The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
DRAWING INDEX
SHEET TITLE
COVER SHEET
AP1 AERIAL PHOTOGRAPH
D1 DEVELOPMENT DATA
D2 ZONE BOUNDARY SITE PLAN
S1 SITE PHOTOGRAPHS
S2 SITE PHOTOGRAPHS
S3 SITE CIRCULATION DIAGRAM
L1 LANDSCAPE PLAN
L2 LANDSCAPE MATERIALS/PLANTING
A1 PLAZA LEVEL PLAN
A2 LOWER LEVEL PLAN
A3 P1 LEVEL PLAN
A4 P2 LEVEL PLAN (TYPICAL)
A5 P5 LEVEL PLAN
A6 SITE ELEVATIONS
A7 ENTRY PAVILION ELEVATIONS
A8 BUILDING MATERIALS
A9 BUILDING SECTION A-A
A10 BUILDING SECTION B-B
A11 BUILDING SECTIONS C-C & D-D
A12 PERSPECTIVE RENDERINGS
A13 PERSPECTIVE RENDERINGS
A14 LEED SCORECARD
C1 EXISTING CONDITIONS SURVEY
C2 DEMOLITION PLAN
C3 SEDIMENTATION AND EROSION CONTROL PLAN
C4 SITE GRADING PLAN
C5 UTILITY PLAN
C6 SITE DETAILS
C7 SEDIMENTATION AND EROSION CONTROL DETAILS
C8 DC/WASA DETAILS
OWNER / DEVELOPER: THE GEORGE WASHINGTON UNIVERSITY ARCHITECT: PERKINS + WILL; SHALOM BARANES ASSOCIATESLAND USE COUNSEL: GOULSTON & STORRSCIVIL ENGINEER: WILES MENSCH CORPORATION-DCLANDSCAPE ARCHITECT: OCULUS
The George Washington UniversitySquare 103 - Phase 1 DesignGarage Base Building
FOGGY BOTTOM CAMPUS PLAN PUDSECOND STAGE APPROVAL AUGUST 16, 2010
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SQUARE 103SQUARE 103
G STREET, NWG STREET, NW
21 S
T S
TRE
ET,
NW
21 S
T S
TRE
ET,
NW
20 T
H S
TRE
ET,
NW
20 T
H S
TRE
ET,
NW
F STREET, NWF STREET, NW
E STREET, NWE STREET, NW
H STREET, NWH STREET, NW
19 T
H S
TRE
ET,
NW
19 T
H S
TRE
ET,
NW
22 N
D S
TRE
ET,
NW
22 N
D S
TRE
ET,
NW
AERIAL PHOTOGRAPH
SITESITE
AP1
SQUARE: 103LOTS: 13, 14, 18, 809, 812-814, 819-820ZONE: R-5-D PUDSITE AREA: 38,328 SF (Measured)
DEVELOPMENT STANDARDSAPPROVED UNDER CAMPUS PLAN PUD
(Note 2)
FAR 3.5 4.85 0.194 TOTAL
GROSS FLOOR AREA (NOTE 1) 133,504 SF (MAX) 185,983 SF (MAX) 7,430 SF TOTAL
LOT OCCUPANCY 75.0% 90.0% 19.4%
BUILDING HEIGHT 90'-0" 80'-0" 27'-9" (TRELLIS)
PENTHOUSE HEIGHT 18'-6" -- NONE PROVIDED
PENTHOUSE AREA 0.37 FAR -- NONE PROVIDED
REAR YARD 4 IN/FT; 15'-0" MIN -- 12'-8"RELIEF REQUESTED
SIDE YARD NONE REQUIRED -- NONE PROVIDED3 IN/FT OF HT, 8 FT MIN IF PROVIDED
COURTS NON-RESIDENTIAL WIDTH = 3 IN/FT OF HT; 10 FT MIN -- MULTIPLE
(OPEN)
WIDTH = 4 IN/FT OF HT; 15 FT MIN --
PARKING SCHOOL: PER CAMPUS PLAN 450 SPACES(NOTE 3)
2 PER EACH 3 TEACHERS;+
1 PER 10 CLASSROOM SEATS1 PER 12 STADIUM SEATS OR1 PER 10 AUDITORIUM SEATS
(WHICHEVER IS GREATER)
LOADING SCHOOL PER CAMPUS PLAN(OTHER USE LESS THAN 100,000 SF):
1 BERTH @ 30 FT DEEP 1 BERTH @ 30 FT DEEP1 PLATFORM @ 100 SF 1 PLATFORM @ 100 SF
1 SERVICE @ 20 FT DEEP 8 SERVICE @ 20 FT DEEP
NOTES:
3. Includes 35 tandem spaces. Relief already granted per previously approved campus plan.
Z O N I N G T A B U L A T I O N S
2. PUD development standards per Campus Plan, Zoning Commission Order No. 06-11/06-12.
AREA = 2 X WIDTH SQUARED; 350 SF MIN (CLOSED)
1. Gross Floor Area includes a deduction for mechanical shafts, but does not include areas for (1) bays projecting over the property line, (2) parking access ramps, and (3) spaces with structural clearance less than 6'-6".
DCMR, TITLE 11 R-5-D DEVELOPMENT STANDARDS PROPOSED DEVELOPMENT
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
AERIAL VIEW LOOKING SOUTH
DEVELOPMENT DATA D1
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
G STREET, NW
F STREET, NW
E STREET, NW
H STREET, NW
20 T
H S
TRE
ET,
NW
21 S
T S
TRE
ET,
NW
SQUARE 103
PUD 242R-5-D
CAMPUSBOUNDARY
SITEBOUNDARY
ZONEBOUNDARY
22 N
D S
TRE
ET,
NW
23 R
D S
TRE
ET,
NW
19 T
H S
TRE
ET,
NW
18 T
H S
TRE
ET,
NW
I STREET, NWPENNSYLVANIA AVENUE, NW
KEY
ZONE BOUNDARY SITE PLAN
C-3-C
C-4
C-3-C
UNZONED
R-5-E
SP-2
SITE
D2
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
ALLEY
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SITE PHOTOGRAPHS
1. VIEW OF ALLEY LOOKING WEST FROM 20TH STREET
2. VIEW OF ADJACENT ROW STRUCTURES AT G AND 20TH STREETS LOOKING SW
3. VIEW OF ADJACENT ROW STRUCTURES FROM G STREET 4. VIEW OF ADJACENT STRUCTURES AT G AND 21ST STREETS LOOKING SE
S1
KEY PLAN
24
1
36
5
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SITE PHOTOGRAPHS
5. VIEW OF SITE FROM ALLEY, MID-BLOCK, LOOKING NORTH
6. VIEW OF SITE FROM G STREET, MID-BLOCK, LOOKING SOUTH
S2
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SITE CIRCULATION DIAGRAM
90’ R.O.W. - ONE WAYG STREET, NW
(20’ WIDE PROPOSED)EXISTING 16’-0” PUBLIC ALLEY
100’ R.O.W. - ONE WAYF STREET, NW
90’ R
.O.W
. - O
NE
WAY
21 S
T S
TRE
ET,
NW
90’ R
.O.W
. - O
NE
WAY
20 T
H S
TRE
ET,
NW
PARKING GARAGE ACCESS
LOADING ZONE
SURFACE PARKING
PEDESTRIAN PATH OF TRAVEL
KEY
S3
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
LANDSCAPE PLAN L1
LAWN WITH EARTHWORKS
TIGER EYES SUMAC
VIRGINIA CREEPER
SKYROCKET JUNIPERHICKS YEWSAUCER MAGNOLIA RED BUD
SEDUM GREEN ROOF
OVERDAM FEATHER REED GRASSHAMELN FOUNTAIN GRASSRUSSIAN SAGEHYPERICUM CALYCINUM
‘JOHN BURCH’ LIRIOPE DAFFODIL BENCH
SWEETGUM
NORTHWIND SWITCHGRASS
BOLLARD
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
LANDSCAPE MATERIALS/PLANTING L2
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
PLAZA LEVEL PLAN
NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY.
SURFACE PARKING
ENTRYPAVILION
PEDESTRIANPLAZA
LOADING ZONE
LAWN
QUIGLEY’S
G STREET, NW
EXISTING 16’-0” PUBLIC ALLEY
PARKINGATTENDANT
BOOTH
TRELLISABOVE
OVERHEADTRUCK BARRIER
COVEREDRAMP TOPARKING
SECURED BICYCLE RACKS
2004 G ST
SERVICE YARD
MECH
MECH
20TH
STR
EE
T, N
W
21S
T S
TRE
ET,
NW
EMERGENCYGENERATOR
LOADING PLATFORM
(20’ WIDTH PROPOSED)
4’-0”
PROPERTY LINE
A1
2002 G ST 2000 G ST
MECHANICALEQUIPMENT
WELL
12x3
0 LO
AD
ING
BE
RTH
10x2
0 S
ER
VIC
ED
ELI
VE
RY
A A
D
D
B
B
C
C
12’-8” REAR YARD
PROPERTY LINE
SKYLIGHTABOVE
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
LOWER LEVEL PLAN
NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY.
A2
PARKING ENTRANCE RAMP
ITMECH
LAW LEARNING CENTER
GARAGE EXHAUST
MECH
ELEC
STORMWATERMANAGEMENT
PL
P L
PL
P L
FUEL OIL STORAGE
INTAKE SHAFT
LINE OF FUTUREBUILDING ABOVE
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
P1 LEVEL PLAN
NOTE: INTERIOR DESIGN AND PARKING LAYOUT ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY.
A3
STORAGE
RAMP TO P2
OFFICES STORAGE
FIREPUMP
PL
P L
PL
P L
MECHSTORMWATERMANAGEMENT
EXHAUST SHAFT
INTAKE SHAFT
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
P2 LEVEL PLAN (TYPICAL)
NOTE: INTERIOR DESIGN AND PARKING LAYOUT ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY.
RAMP TO P3
PL
P L
PL
P L
A4
EXHAUST SHAFT
INTAKE SHAFT
HANDICAP ( HC ) COMPACT ( C ) STANDARD ( S ) FUEL EFFICIENT TANDEM ( T ) 10' X 20' TOTAL8'X16' 9'X19' VEHICLES (FE)
GROUND LEVEL 23 35 58
P1 LEVEL 3 15 35 4 6 63(Includes 2 HC Van Spaces)
P2 LEVEL 2 38 58 98
P3 LEVEL 2 36 68 106
P4 LEVEL 2 36 68 106
P5 LEVEL 13 6 19
TOTAL 9 138 258 4 35 6 450
LEVEL
P A R K I N G S U M M A R Y
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
P5 LEVEL PLAN
NOTE: INTERIOR DESIGN AND PARKING LAYOUT ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY.
RAMP TO P4
PL
P L
PL
P L
A5
Parking relief for use of tandem/valet spaces already granted per previously approved campus plan. In accordance with this approval, the University may modify the parking garage operation further to add or remove tandem/valet spaces to accommodate parking demand needs.
INTAKE SHAFT
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
ELEVATION 2.0 NORTH SITE AT G STREET
ELEVATION 1.0 SOUTH SITE AT ALLEY
PAINTED ALUMINUM TRELLIS
WOOD SCREEN WALL
RAIN CISTERNPAINTED METAL PANELS
PATTERNED SPLIT-FACED CMU
PAINTED METAL PANELS
OVERHEAD DOOR
PAINTED METAL PANELS
OVERHEAD TRUCK BARRIER,8’-0” CLEAR (PAINTED METAL)
PATTERNED SPLIT-FACED CMU
PAINTED METAL PANELS
PAINTED ALUMINUM TRELLIS
PAINTED METAL PANELS
SITE ELEVATIONS A6
PATTERNED SPLIT-FACED CMU
PAINTED METAL SCREEN
14’-1” 11’-7”19’-10”
24’-2” 27’-9”
KEY PLAN
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
2.0
1.0
NOTE: BUILDING HEIGHTS ARE TAKEN FROM MEASURING POINT: 65.39’ (T.C. AT G STREET).
MP (T.C.)65.39’
MP (T.C.)65.39’
4.0
3.0 5.0
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
ELEVATION 5.0 ENTRY PAVILION - EAST ELEVATION
ELEVATION 3.0 ENTRY PAVILION - WEST ELEVATION ELEVATION 4.0 ENTRY PAVILION - NORTH ELEVATION
GLAZED WALL SYSTEM W/ CLEAR GLASS
PAINTED METAL PANELS
PAINTED METAL PANELS
GLAZED WALL SYSTEM W/ FRIT COATED GLASS
PAINTED METAL PANELS
CLEAR GLASS
PAINTED ALUMINUM TRELLIS
PAINTED ALUMINUM TRELLIS
PAINTED ALUMINUM TRELLIS
ENTRY PAVILION ELEVATIONS A7
KEY PLAN
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
SKYLIGHT
GLAZED WALL SYSTEM W/ CLEAR GLASS
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
PAINTED METAL PANELS
ALUMINUM TRELLIS
TEXTURED CONCRETE MASONRY
GLAZED WALL SYSTEM
GLAZED WALL SYSTEM
WOOD SCREEN
BUILDING MATERIALS A8
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET AA
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SECTION A-A: EAST-WEST SECTION LOOKING NORTH
MECHANICALLAW LEARNING CENTER
ENTRY PAVILION
STORAGE
PARKING
PARKING
PARKING
PARKING
GARDEN
STORAGE
20th ST., NW21st ST., NW
SURFACE PARKING
PLPLSITE
BUILDING SECTION A-A A9
NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. KEY PLAN
STUART HALL BEYONDBELL HALL BEYOND
LISNER HALL BEYOND
WOODHULL HOUSE BEYOND
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
B
B
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
LAW LEARNING CENTER
LOADING AREA
PARKING
G STREET, NW
EXISTING 16’-0” WIDEPUBLIC ALLEY
ENTRY PAVILION
ALLEY
SECTION B-B: NORTH-SOUTH SECTION LOOKING WESTLP LP
SITE
QUIGLEY’S PHARMACY BEYOND
PROPOSED 20’-0” WIDE ALLEY
BUILDING SECTION B-B A10
NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. KEY PLAN
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
D
D
C
C
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
LAW LEARNING CENTER
LOADING AREA
PARKING
G STREET, NW
GARDEN
ALLEY
PARKING
PARKING
PARKING
ALLEYSURFACE PARKINGG STREET, NW
LAW LEARNING CENTER
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
SECTION C-C: NORTH-SOUTH SECTION LOOKING EASTLP LP
SECTION D-D: NORTH-SOUTH SECTION LOOKING WESTLP LP
SITE SITE
QUIGLEY’S PHARMACY BEYOND
TOWNHOUSES BEYOND
GARAGE ENTRY STRUCTURE BEYOND
EXISTING 16’-0” WIDEPUBLICALLEY
PROPOSED 20’-0” WIDE ALLEY
EXISTING 16’-0” WIDEPUBLICALLEY
PROPOSED 20’-0” WIDE ALLEY
BUILDING SECTIONS C-C & D-D A11
NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY.
COVERED BICYCLE PARKING
KEY PLAN
REAR YARD 12’-8”
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
PERSPECTIVE RENDERINGS
VIEW B ENTRY PAVILION FROM G STREET - LOOKING WESTVIEW A GARDEN AND ENTRY PAVILION FROM G STREET - LOOKING SOUTH
A12
KEY PLAN
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
BA
G STREET
20 T
H S
TRE
ET
21 S
T S
TRE
ET
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
PERSPECTIVE RENDERINGS
VIEW D ENTRY PAVILION FROM GARDEN - LOOKING EASTVIEW C GARDEN AND ENTRY PAVILION FROM G STREET - LOOKING SOUTH
A13
KEY PLAN
C
D
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
LEED SCORECARD A14
NOTE:
THE 2007 FOGGY BOTTOM CAMPUS PLAN COMMITS GWU TO ACHIEVING THE EQUIVALENT OF 16 POINTS, USING USGBC’S LEED V2.2 SCORECARD AS AN EVALUATOR OF THE SUSTAINABLE QUOTIENT OF A PROJECT. THIS SCORECARD REFLECTS GWU’S ANTICIPATED GOAL OF SUBMITTING TO GBCI THIS PROJECT UNDER THE LEED V.3 (OR 2009) CERTIFICATION PROGRAM, AND ACHIEVING SILVER LEVEL CERTIFICATION.
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
EXISTING CONDITIONS SURVEY C1
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
DEMOLITION PLAN C2
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SEDIMENTATION AND EROSION CONTROL PLAN C3
C4
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SITE GRADING PLAN
C5
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
UTILITY PLAN
C6
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SITE DETAILS
C7
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
SEDIMENTATION AND EROSION CONTROL DETAILS
C8
© 2010 Sha lom Baranes Assoc ia tes , P.C. shalom baranes associates architects
P E R K I N SW I L L
The George Washington University - Square 103 Phase 1 DesignAugust 16, 2010 FOGGY BOTTOM CAMPUS PLAN PUD
DC/WASA DETAILS