the georgia dome 8 16 2007
TRANSCRIPT
GEORGIA DOME RENOVATION PHASE 2
August 16, 2007
General Admission Concourse Lower Level
Option A
Option B
Option C
Score Board Upgrade
Seating Bowl Color Study – All Red Option
Seating Bowl Color Study – Red & Black Option
Seating Bowl Color Study
Seating Bowl Color Study – All Red Option
Seating Bowl Color Study – Red & Black Option
General Admissions Seating Club Seating Suite Seating
Exterior Painting Study Option D
Exterior Painting Study Option D
Seating Bowl w/ Window
$1,376,000
Remove existing metal panels at the drum and add back new curtain wall glazing system with motorized blackout shades.
EXTERIOR GLAZING