the mem evaluation cycle for the fourth round (2005-2006)
DESCRIPTION
THE MEM EVALUATION CYCLE FOR THE FOURTH ROUND (2005-2006). OCTOBER - 2005. Third Round Cycle (2003-2004). Third Round Questionnaire Sent in Oct 2003. Rec. Follow-up Form Sent in Aug 2005. GEG Meetings in May 2004, Oct 2004, and Feb 2005. GEG Meetings in Nov 2005, and Mar 2006. - PowerPoint PPT PresentationTRANSCRIPT
THE MEM EVALUATION THE MEM EVALUATION CYCLE FOR THE FOURTH CYCLE FOR THE FOURTH
ROUND (2005-2006)ROUND (2005-2006)
OCTOBER - 2005
2
Third Round Cycle (2003-2004)Third Round Cycle (2003-2004)
Publication of Full Evaluation Report in
Jun 2005
Publication of Follow-Up Report in Jun 2006
Third Round Questionnaire Sent in
Oct 2003
GEG Meetings in May 2004, Oct 2004,
and Feb 2005
CICAD Commission approves reports in
Apr 2005
CICAD Commission approves reports in
Apr 2006
GEG Meetings in Nov 2005, and Mar
2006
Rec. Follow-up Form Sent in Aug 2005
3
Third Round Cycle (2003-2004)Third Round Cycle (2003-2004)
Full Evaluation Phase
• The evaluation process starts early, at the end of first evaluated year (2003).
• Few countries had full 2004 data for the last GEG meeting.• Limited time between the last GEG meeting and the CICAD
spring session.
Recommendation Follow-up Phase
• Limited time for the countries to implement recommendations.• Limited time between the last GEG meeting and the CICAD
spring session.
4
• Enough time should be provided for:
• Countries to answer the questionnaire.
• Countries to provide all of the requested data.
• The MEM Unit to prepare the documents for their review during the sessions of the GEG.
• Experts to carry out preparatory work between meetings.
• Countries to review their report before final approval.
• Countries to implement the MEM recommendations, after the evaluation report is published.
Criteria for Choosing Criteria for Choosing an Evaluation Cyclean Evaluation Cycle
• The cycle should balance the need for quality product with the need for the report to be published in a timely fashion.
5
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
MEM Fourth Evaluation Round MEM Fourth Evaluation Round Cycle Options (2005-2006)Cycle Options (2005-2006)
• Six options in total for the publication of the reports of the 4th MEM Evaluation Round (2005-2006).
• Each option takes into account the publication dates of the full evaluation report and the recommendation follow up report.
• Publication months are either June or December, because the reports have to be approved by the CICAD Commission.
• The minimum time between the publication date of these reports is one year.
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
1 2
3 4
5 6
6
OPTION 1• Publishing the full evaluation report in
June 2007 gives a limited time for countries to provide full 2006 data.
• Publishing the recommendation follow-up report in June 2008 gives limited time for countries to respond to recommendations.
OVERALL EFFECTSFull Evaluation Report• Quality will suffer due to lack of time.• Will be published 6 months after the
end of the evaluated period.
Recommendation Follow- Report• Quality will suffer due to lack of time.• Will be published one year after the
evaluation reports.
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
1
MEM Fourth Evaluation Round MEM Fourth Evaluation Round Cycle Options (2005-2006)Cycle Options (2005-2006)
7
OPTION 2• Publishing the full evaluation report in
June 2007 gives a limited time for countries to provide full 2006 data.
• Publishing the recommendation follow-up report in December 2008 gives enough time for countries to respond to recommendations.
OVERALL EFFECTSFull Evaluation Report• Quality will suffer due to lack of time.• Will be published 6 months after the
end of the evaluated period.
Recommendation Follow- Report• Quality will be improved.• Will be published one year and a half
after the evaluation reports.
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
2
MEM Fourth Evaluation Round MEM Fourth Evaluation Round Cycle Options (2005-2006)Cycle Options (2005-2006)
8
OPTION 3• Publishing the full evaluation report in
December 2007 gives a enough time for countries to provide full 2006 data.
• Publishing the recommendation follow-up report in December 2008 gives limited time for countries to respond to recommendations.
OVERALL EFFECTSFull Evaluation Report• Quality will be improved.• Will be published one year after the
end of the evaluated period.
Recommendation Follow- Report• Quality will suffer due to lack of time.• Will be published one year after the
evaluation reports.
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
3
MEM Fourth Evaluation Round MEM Fourth Evaluation Round Cycle Options (2005-2006)Cycle Options (2005-2006)
9
• Publishing the full evaluation report in December 2007 gives enough time for countries to provide full 2006 data.
• Publishing the recommendation follow-up report in June 2009 gives enough time for countries to respond to recommendations.
OVERALL EFFECTSFull Evaluation Report• Quality will be improved• Will be published one year after the
end of the evaluated period.
Recommendation Follow- Report• Quality will be improved.• Will be published one year and a half
after the evaluation reports.
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
4
OPTION 4
MEM Fourth Evaluation RoundMEM Fourth Evaluation RoundCycle Options (2005-2006)Cycle Options (2005-2006)
10
OPTION 5• Publishing the full evaluation report in
June 2008 gives a long time for countries to provide full 2006 data.
• Publishing the recommendation follow-up report in June 2009 gives limited time for countries to respond to recommendations.
OVERALL EFFECTSFull Evaluation Report• Quality will be improved.• Will be published one year and a half
after the end of the evaluated period.
Recommendation Follow- Report• Quality will suffer due to lack of time.• Will be published one year after the
evaluation reports.
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
5
MEM Fourth Evaluation Round MEM Fourth Evaluation Round Cycle Options (2005-2006)Cycle Options (2005-2006)
11
OPTION 6• Publishing the full evaluation report in
June 2008 gives a long time for countries to provide full 2006 data.
• Publishing the recommendation follow-up report in December 2009 gives enough time for countries to respond to recommendations.
OVERALL EFFECTSFull Evaluation Report• Quality will be improved.• Will be published one year and a half
after the end of the evaluated period.
Recommendation Follow- Report• Quality will be improved.• Will be published one year and a half
after the evaluation reports.
Publication in Jun 2007
Follow-Up Pub. In Jun 2008
Publication in Dec 2007
Follow-Up Pub. In Dec 2008
Follow-Up Pub. In Jun 2009
Publication in Jun 2008
Follow-Up Pub. In Jun 2009
Follow-Up Pub. In Dec 2009
Publication in Jun 2007
Follow-Up Pub. In Dec 2008
Publication in Dec 2007
Publication in Jun 2008
6
MEM Fourth Evaluation Round MEM Fourth Evaluation Round Cycle Options (2005-2006)Cycle Options (2005-2006)
12
Comparative Cost of GEG Meetings during Comparative Cost of GEG Meetings during the 3rd and 4th Evaluation Roundsthe 3rd and 4th Evaluation Rounds
Third Round Fourth Round3 GEG Meetings 2 GEG Meetings
Cost Cost (Estimated)US$ 386,026 US$ 290,000
Total savings by doing 1 less session: US$ 96,026
Martín CubasMartín CubasMEM Unit SpecialistMEM Unit [email protected]
(202) 458 6151(202) 458 6151