the nature and significance of control

23
1 NATURE AND SIGNIFICANCE OF CONTROL & CONTROL PROCESS

Upload: pranav-kumar-ojha

Post on 20-Jan-2015

1.347 views

Category:

Technology


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: The nature and significance of control

1

THE NATURE AND SIGNIFICANCE OF CONTROL &

CONTROL PROCESS

Page 2: The nature and significance of control

2

THE NATURE AND SIGNIFICANCE OF CONTROL

Page 3: The nature and significance of control

3

Control consist in verifying whether everything occurs in conformity with the plan adopted, the instructions issued and the principles established. It has for it’s object to point out weakness and errors in order to rectify them and prevent recurrences.

‘HENRI FAYOL’

What is CONTROLLING????????

Page 4: The nature and significance of control

4

Controlling is measuring and correcting of activities of subordinates to ensure that events confirms to plan.

‘ KOONTZ & O’DONNELL’

Page 5: The nature and significance of control

5

Objective Elements Responsibility Spheres Inevitable & Dynamic activity Forward looking Inter-dependence

NATURE OF CONTROL

Page 6: The nature and significance of control

6

Proper execution of management function. Proper use of human and material

resources. Facilitates decision-making. Maintains discipline. Improve morale. Increases output. Effectiveness.

Significance of Controlling

Page 7: The nature and significance of control

7

To achieve planned objective. To discover and identify deficiency. To develop suitable actions. To provide proper directions.

Objectives of Controlling

Page 8: The nature and significance of control

8

Market control Bureaucratic control Clan control

Approaches to Control

Page 9: The nature and significance of control

9

It is a three step process : • Measuring actual performance ,• Comparing it against a standard • Taking managerial actions to correct

deviations or inadequate standards.

THE CONTROL PROCESS

Page 10: The nature and significance of control

10

Measuring actual

performance

Taking managerial

actions

GOALS AND OBJECTIVES

organizationaldivisional

departmentalindividual

Comparing actual Performance againstStandard.

STEP 1

STEP 3

THE CONTROL PROCESS

STEP 2

Page 11: The nature and significance of control

11

Purpose is to determine the actual performance of an employee.

HOW WE MEASURE? There are four ways;

1. personal observation. 2. statistical reports. 3. oral reports. 4. written reports. In general ,combination these are used by

the manager to get reliable information.

Step 1: MEASURING

Page 12: The nature and significance of control

12

Involves measuring the works in terms of control standards and communicating the appraisal to the persons who can take corrective actions.

Tangible aspects can be measured easily as standards are clear. These can measured in terms of numbers ,quantity ,money , time etc and can easily be compared against standards.

Difficulty arises when it comes to measure intangible aspects , which are measured indirectly ,for example ,company goodwill & reputation is measured on the basis of trend of sales , readiness of creditors ,ease of getting loans ,value of shares in market and so on.

What we measure?

Page 13: The nature and significance of control

13

advantages drawbacks Firsthand knowledge. Proper covering of

work activities.

Easy visualization.

Faster way. Allows feedback.

Comprehensive Formal Easy documentation.

Personal biases. Time consuming.

Limited information.

Ignore subjective issues.

Information can be filtered.

Information can`t be documented.

Time consuming.

Personal observation

Statistical reports

Oral reports

Written reports

Page 14: The nature and significance of control

14

Final step in the control process. Manager can choose from three possible

course of action: FIRST: if results are satisfactory no

corrective action is taken. SECOND: Correction of actual performance. THIRD: Revision of standards.

TAKING MANAGERIAL ACTIONS

Page 15: The nature and significance of control

15

If variation in performance is due to unsatisfactory works ,corrective action is required.

These measures could be changing strategy , changing structures ,compensation practices ,training program ,redesigning jobs ,or firing employees.

Immediate corrective action corrects problems at once to get performance back on track.

Basic corrective action looks at how and why performance has deviated and then proceeds to correct the reasons of deviation.

CORRECTION OF ACTUAL PERFORMANCE

Page 16: The nature and significance of control

16

If the variation was a result of an unrealistic standards i.e. the goals are too high or too low ,then the standards require corrective attention.

But one must keep in mind that it is these standards which are generally blamed for variation even when the main reason is underperformance ,so one must be sure about the fairness and achievability of standards.

REVISION OF STANDARDS

Page 17: The nature and significance of control

17

Control can be implemented before an activity begins: FEEDFORWARD CONTROL.

During the time an activity is going on : CONCURRENT CONTROL.

After an activity has been completed: FEEDBACK CONTROL.

BALANCED SCORECARD: it is performance measurement tool.

BENCHMARKING: a standard setting tool.

TOOLS FOR CONTROLING

Page 18: The nature and significance of control

18

Here managerial actions are taken before a problem arises.

Feed forward control is the most desirable because it prevent problems rather than correcting them when the damage has occurred.

Since it requires timely and accurate information managers generally end up using other types of controls.

FEEDFORWARD CONTROL

Page 19: The nature and significance of control

19

In this type of control problems can be corrected before they become too costly.

The best form of this control is direct supervision , where manager monitors the action of the employees and correct problems as they occur.

Here balanced scorecard method could be used to measure the performance of the employee.

CONCURRENT CONTROL

Page 20: The nature and significance of control

20

Most popular type of control process. Feedback tells how efficient was the

planning . Feedback also enhance employee

motivation. Drawback to feedback control is that till we

apply control waste or damage have already occurred.

FEEDBACK CONTROL

Page 21: The nature and significance of control

21

A performance measurement tool that looks at four areas- financial ,customer ,internal process and people/innovation/growth assets- that contribute to a company’s performance.

With this approach managers should develop goals in each of the four areas and measure to determine if these goals are met.

This scorecard reflect the strategy of the company.

BALANCED SCORECARD

Page 22: The nature and significance of control

22

Benchmarking is the search for the best practices among competitors ,non-competitors or self that leads to their or our superior performance.

Benchmark is the standard of excellence against which to measure and compare the performance of the company.

As a tool of setting standards benchmarking can be used to identify specific performance gap and potential areas of development.

BENCH MARKING

Page 23: The nature and significance of control

23

Thank you.