the nepal earthquake of april 25,2015 part 2: happenings during the first 24 … · 2018-11-16 ·...

51
THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours Walter Hays

Upload: others

Post on 13-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

THE NEPAL EARTHQUAKE

OF APRIL 25,2015

Part 2: Happenings During the

First 24 Hours

Walter Hays

Page 2: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

UPDATED REPORT AS OF

SATURDAY NIGHT:

AT LEAST 1,400 PEOPLE DEAD;

MANY INJURED; MANY MAY BE

TRAPPED UNDER RUBBLE

Page 3: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

NEPAL: COLLISION OF EURASIAN

AND INDO-AUSTRALIAN PLATES

Page 4: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

NEPAL: A NATION OF 27.8

MILLION

Page 5: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LOCATION: LAMJUNG—80

km NW of Kathmandu (USGS)

Page 6: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

KATHMANDU, THE

CAPITAL, DEVASTATED

The Kathmandu Valley is densely

populated with nearly 2.5 million people,

and the quality of building construction is

often poor.

Page 7: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

KATHMANDU SKYLINE:

BEFORE THE QUAKE

Page 8: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

TECTONIC

DEFORMATION

EARTHQUAKE

TSUNAMI

GROUND

SHAKING

FAULT RUPTURE

FOUNDATION

FAILURE

SITE

AMPLIFICATION

LIQUEFACTION

LANDSLIDES

AFTERSHOCKS

SEICHE

DAMAGE/LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/ LOSS

DAMAGE/LOSS

Page 9: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

INADEQUATE RESISTANCE TO

HORIZONTAL GROUND SHAKING

EARTHQUAKES

SOIL AMPLIFICATION

PERMANENT DISPLACEMENT

(SURFACE FAULTING & GROUND

FAILURE)

IRREGULARITIES IN ELEVATION

AND PLAN

FIRE FOLLOWING RUPTURE OF

UTILITIES

LACK OF DETAILING AND

CONSTRUCTION MATERIALS

INATTENTION TO NON-

STRUCTURAL ELEMENTS

CAUSES

OF

DAMAGE

GLOBAL

“DISASTER

LABORATORIES”

Page 10: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SIZE, LOCATION, AND DEPTH

AFFECT DAMAGE

• The quake's hypocenter was only 11

kilometers (7 miles) --- The bigger,

shallower, and closer the quake is, the

more destructive it usually is.

• Witnesses said the trembling and

swaying of the earth went on for

several minutes.

Page 11: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

AFTER THE EARTHQUAKE

CREDIT: ASSOCIATED

PRESS

These pictures are used only

for educational purposes with

zero financial benefit

Page 12: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DAMAGE (Credit: AP)

Page 13: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DAMAGED BUILDING

(Credit: AP)

Page 14: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DAMAGED BUILDING

(Credit: AP)

Page 15: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DAMAGED TEMPLE

(Credit: AP)

Page 16: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SURVIVORS OUTSIDE

TEMPLE (Credit: AP)

Page 17: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DAMAGED HOUSES

(Credit: AP)

Page 18: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

COLLAPSED BUILDING

(Credit: AP)

Page 19: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

TAXI BURIED IN DEBRIS

(Credit: AP)

Page 20: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

BASANTAPUR DUBAR

SQUARE Credit: AP)

Page 21: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

BASANTAPUR DUBAR

SQUARE Credit: AP)

Page 22: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

BASANTAPUR DUBAR

SQUARE Credit: AP)

Page 23: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

CLEARING DERBIS

(Credit: AP)

Page 24: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

CLEARING DEBRIS

(Credit: AP)

Page 25: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DEVASTATION AT SURBURBAN

LALITPUR (Credit: AP)

Page 26: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DAMAGED ROAD: (Credit: AP)

Page 27: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

DOWNED ELECTRICAL LINES:

(Credit: AP)

Page 28: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SAVING ANIMALS: (Credit: AP)

Page 29: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SIRVIVORS TRAPPED INSIDE:

(Credit: AP)

Page 30: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SEARCH AND RESCUE:

DAHARA TOWER: (Credit: AP)

Page 31: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SURVIVORS OUTSIDE MEDICARE

HOSPITAL (Credit: AP)

Page 32: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

INJURED TREATED OUTSIDE

MEDICARE HOSPITAL (Credit: AP)

Page 33: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

TRANSPORTING INJURED WO-

MAN TO LALITPUR: (Credit: AP)

Page 34: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

TRANSPORTING INJURED MAN

TO LALITPUR: (Credit: AP)

Page 35: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

SCHOOL USED AS EVACUATION

CENTER (Credit: AP)

Page 36: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

AFTERSHOCKS FORCE PEOPLE

OUTSIDE FOR NIGHT (Credit: AP)

Page 37: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

CONCERNED ABOUT AFTER-

SHOCKS IN INDIA (Credit: AP)

Page 38: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

RELIEF SUPPLIES BEING LOAD-

ED IN NEW DEHLI (Credit: AP)

Page 39: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LESSON: THE KNOWLEDGE AND TIMING

OF ANTICIPATORY ACTIONS IS VITAL

• The people who know: 1) what to

expect (e.g., strong ground motion,

damage, collapses, trapped

survivors), 2) where and why they

will happen, and 3) what they

should (and should not) do to cope

with them will survive.

Page 40: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LESSON: TIMELY, REALISTIC

DISASTER SCENARIOS SAVE LIVES

• The people who have timely,

realistic, advance information that

facilitates reduction of

vulnerabilities, and hence the risks

associated with strong ground

shaking and ground failure will

survive.

Page 41: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LESSON: EMERGENCY RESPONSE

SAVES LIVES

• The “Uncontrollable and

Unthinkable” events will always

hinder the timing of emergency

response operations, especially the

search and rescue operations that

should be accomplished within “the

golden 48 hours.”

Page 42: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LESSON: EMERGENCY MEDICAL

PREPAREDNESS SAVES LIVES

• The local community’s capacity for

emergency health care (i,e., coping

with damaged hospitals and medical

facilities, lack of clean drinking

water, food, and medicine, and

high levels of morbidity and

mortality) is vital for survival.

Page 43: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LESSON: EARTHQUAKE ENGINEERED

BUILDINGS SAVE LIVES

• Buildings engineered to withstand

the risks from an earthquake’s

strong ground shaking and ground

failure that cause damage, collapse,

and loss of function, is vital for

protecting occupants and users

from death and injury.

Page 44: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

LESSON: THE INTERNATIONAL

COMMUNITY ALWAYS PROVIDES AID

• The International Community

provides millions to billions of

dollars in relief to help “pick up the

pieces, ” but this strategy is not

enough by itself to ensure

earthquake disaster resilience.

Page 45: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

FACT MOST OF THE 200 + NATIONS

NEED EARTHQUAKE DISASTER

RESILIENCE POLICIES THAT ARE

BASED ON LESSONS LEARNED

FROM PAST EARTHQUAKE

DISASTER LABORATORIES

Page 46: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

YOUR

COMMUNITY

DATA BASES

AND INFORMATION

HAZARDS: GROUND SHAKING

GROUND FAILURE

SURFACE FAULTING

TECTONIC DEFORMATION

TSUNAMI RUN UP

AFTERSHOCKS

•MONITORING

•HAZARD MAPS

•INVENTORY

•VULNERABILITY

•LOCATION

RISK

ACCEPTABLE RISK

UNACCEPTABLE RISK

BOOKS OF

KNOWLEDGE

•PREPAREDNESS

•PROTECTION

•EM RESPONSE

•RECOSTRUCTION AND

RECOVERY

EARTHQUAKE DISASTER

RESILIENCE

Page 47: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

PILLARS OF EARTHQUAKE DISASTER

RESILIENCE

Preparedness

Protection: Adoption and Implementation of a

Modern Earthquake Engineering Building Code

and Lifeline Standards

Prevention: Land Use Planning and Base

Isolation

Page 48: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

PILLARS OF EARTHQUAKE DISASTER

RESILIENCE (continued)

Monitoring

Realistic Earthquake Disaster Scenarios

Timely Emergency Response (including search

and Rescue and Emergency Medical Services)

Cost-Effective Recovery and Reconstruction

Page 49: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

THE CHALLENGE:

CHANGING EXISTING POLICIES:

CREATE, ADJUST, AND REALIGN

PROGRAMS, PARTNERS AND PEOPLE UNTIL

YOU HAVE CREATED THE KINDS OF TURNING

POINTS NEEDED FOR MOVING TOWARDS

EARTHQUAKE DISASTER RESILIENCE

Page 50: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

AN UNDER-UTILIZED GLOBAL

STRATEGY

To Create Turning Points for

Earthquake Disaster Resilience

USING EDUCATIONAL SURGES CONTAINING THE PAST AND PRESENT LESSONS TO FOSTER

AND ACCELERATE POLICY CHANGES

Page 51: THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 … · 2018-11-16 · THE NEPAL EARTHQUAKE OF APRIL 25,2015 Part 2: Happenings During the First 24 Hours

MOVING TOWARDS THE MUST-

HAPPEN GLOBAL STRATEGY

To Achieve Earthquake Disaster

Resilience

INTEGRATION OF SCIENTIFIC AND TECHNICAL SOLUTIONS WITH POLITICAL

SOLUTIONS IN EVERY NATION FOR REALISTIC POLICIES ON PREPAREDNESS,

PROTECTION, DISASTER SCENARIOS, EMERGENCY RESPONSE,

RECONSTRUCTION, AND RECOVERY