The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon). December 2, 2009 David B. Matthews, Director Division of New Reactor Licensing Office of New Reactors. Part 52 - Fitting the Pieces Together. Pre-Construction. Early Site Permit. Construction Verification. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/1.jpg)
The New Reactor ProgramProcess, Progress, and Plans(And a Peek Over the Horizon)
December 2, 2009
David B. Matthews, Director Division of New Reactor Licensing
Office of New Reactors
![Page 2: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/2.jpg)
2
Part 52 - Fitting the Pieces Together
• Licensing decisions finalized before major construction begins• Inspections w/ITAAC to verify construction• Limited work may be authorized before COL issuance
Pre-ConstructionConstruction Verification
Early Site Permit
Standard Design Certification
Combined License Review, Hearing,
and Decision
Verification of Regulations
with ITAAC
ReactorOperationDecision
OptionalPre-Application
Review
![Page 3: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/3.jpg)
3
New Reactor Applications Under Review [Aug 2008]
• 11 Combined License Applications– Calvert Cliffs, South Texas, Bellefonte, North Anna, Lee, Harris,
Grand Gulf, Vogtle, Summer, Callaway, and Levy County
• 3 Design Certification (DC) Applications– General Electric Economic and Simplified Boiling Water Reactor
(ESBWR)– AREVA Evolutionary Power Reactor (EPR)– Mitsubishi U.S. Advanced Pressurized Water Reactor (US APWR)
• 1 Amended DC Application– Westinghouse AP1000 Certification Amendment
• 1 Early Site Permit/Limited Work Authorization– Vogtle
![Page 4: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/4.jpg)
44
New Reactor Applications [November 2009]
• 18 Combined License Applications
• 3 Design Certification (DC) Applications– General Electric Economic and Simplified
Boiling Water Reactor (ESBWR)– AREVA Evolutionary Power Reactor (EPR)– Mitsubishi U.S. Advanced Pressurized
Water Reactor (US APWR)
• 2 Amended DC Applications– Westinghouse AP1000 Certification
Amendment– ABWR Aircraft Impact Amendment (STP)
![Page 5: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/5.jpg)
![Page 6: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/6.jpg)
![Page 7: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/7.jpg)
7
Rulemaking
DC Review
COL -3
COL -4
One Issue,One Review,One Position
COL -2Mandatory
Hearing
COL -1 Reference
MandatoryHearing
MandatoryHearing
MandatoryHearing
![Page 8: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/8.jpg)
8
Potential DC Activity
• DC Renewal—2 for ABWR (2010)
• New DC (potentially 2012)
![Page 9: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/9.jpg)
9
Potential ESP Activity
• Victoria County (2010)
• PSEG (2010)
• Unnamed (2012)
• Unnamed (2013)
• S.O.C.E.P.A. (????)
![Page 10: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/10.jpg)
10
Potential COLA Activity
• Restart Nine Mile Point (2010)
• Blue Castle (2010)
• Unnamed COL (2010-2011)
• Unnamed COL (2011-2012)
• Southern COL (2012)
• Unnamed COL (????)
![Page 11: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/11.jpg)
11
Deferred/Cancelled COLAs
• River Bend (deferred)
• Grand Gulf (deferred)
• Callaway (cancelled)
• Victoria County (converted to ESP)
![Page 12: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/12.jpg)
12
Review Group Labels
• Focus Projects
• Sequenced Projects
• Suspended Projects
• Potential Projects
• Advanced Reactor Projects
![Page 13: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/13.jpg)
13
Looking Back…
• Challenges:– Infrastructure – Policies and procedures
• Successes:– Part 52 rulemaking– Limited Work Authorization rulemaking– Updated hearing policy– Interim staff guidance process– Designed Centered Approach
![Page 14: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/14.jpg)
Contested Hearings• Calvert Cliffs: 2 Contentions Admitted• Bellefonte: 2• North Anna (COL): 1 (pending)• Vogtle (COL): 1 (+2 pending)• Summer/Harris/Lee: none• South Texas: 5 (+2 pending)• Levy County: 3• Comanche Peak: 2 (+1 pending)• Bell Bend: none• Fermi: 4 (+1 pending)
14
![Page 15: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/15.jpg)
15
Lessons Learned
• Simultaneous review of many applications
• Incomplete applications challenge staff’s ability in making safety findings
• Applicants revising submission dates which challenge planning and availability of resources
• Staff and applicants have benefitted from pre-application interactions
• Staff is noticing trend in that COL applications are improving with respect to high quality submittals
![Page 16: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/16.jpg)
16
Looking Forward…
• Challenges:– Transition from initial licensing to construction
and beyond– Sequencing of reviews– Possible change in the rulemaking process– Review of design certification renewals– ITAAC verification and closure
![Page 17: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/17.jpg)
17
New Construction
• Nuclear plants will be built more rapidly than their predecessors
• Detailed engineering essentially complete by start of construction
• Modular construction techniques will be used• Fabrication of components may begin before
COL issuance• Components and modules will be fabricated in
other countries• Site preparation work will likely be performed
![Page 18: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/18.jpg)
Post-COL ChallengesOperator licensing
Vendor/module inspection
CIP implementation
Construction Assessment Process
ITAAC/DAC inspection
ITAAC closure process
License amendments
18
![Page 19: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/19.jpg)
19
Concluding Reminders
Project status and schedules can be tracked at www.nrc.gov by clicking on “Nuclear Reactors” and then “New Reactors.”
HELP US HELP YOU
![Page 20: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/20.jpg)
20
Key Terms in Part 52
(a) Early site permit means a Commission approval, issued under subpart A of this
part, for a site or sites for one or more nuclear power facilities.
(b) Standard design certification or design certification means a Commission
approval, issued under subpart B of this part, of a final standard design for a
nuclear power facility. A design so approved may be referred to as a certified
standard design.
(c) Combined license means a combined construction permit and operating license
with conditions for a nuclear power facility issued under subpart C of this part.
![Page 21: The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon)](https://reader034.vdocuments.net/reader034/viewer/2022042822/56814fb6550346895dbd6f88/html5/thumbnails/21.jpg)
21
Key Terms in Part 52 (cont.)
(e) Standard design approval or design approval means an NRC staff approval, issued
under subpart E of this part, of a final standard design for an entire nuclear power
facility or a major portion thereof.
(f) Manufacturing license means a license, issued under subpart F of this part,
authorizing the manufacture of nuclear power reactors but not their construction,
installation, or operation at the sites on which the reactors are to be operated.
ITAAC – the inspections, tests, and analyses that the licensee shall perform, and the
acceptance criteria that, if met, are necessary and sufficient to provide reasonable
assurance that the facility has been constructed and will be operated in conformity
with the license, the provisions of the Act, and the Commission’s regulations.