www.all4inc.com | Philadelphia | Atlanta | Houston | Washington DC The Petroleum Refinery Sector Rule: What’s all the fuss about and what are the key implications for Texas (including other industry sectors)?” Kristin M. Gordon, P.E.| [email protected] | 281.937.7553 x301 AWMA Central Texas Chapter Meeting January 21, 2016 Presented by All4 Inc.

Upload: others

Post on 18-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

www.all4inc.com | Philadelphia | Atlanta | Houston | Washington DC

The Petroleum Refinery Sector Rule: What’s all the fuss about and what are the key

implications for Texas (including other industry sectors)?”

Kristin M. Gordon, P.E.| [email protected] | 281.937.7553 x301

AWMA Central Texas Chapter Meeting

January 21, 2016

Presented by All4 Inc.

Page 2: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

2 Your environmental compliance is clearly our business.

Agenda

Background

What’s New? What Changed?

• Delayed Coking Units

• Flares

• Storage Vessels

• Fenceline Monitoring

• ERT/CEDRI

• Startup, Shutdown and Malfunction

Texas/Gulf Coast Implications

Questions

Page 3: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

3 Your environmental compliance is clearly our business.

Refinery Sector Rule

• 40 CFR Part 63, Subparts CC and UUU (“Refinery MACT 1” and “Refinery MACT 2”)

• 40 CFR Part 60, Subpart J and Ja

• regulations.gov @ EPA-HQ-OAR-2010-0682-0840

Rulemaking timeline

• Proposed – June 30, 2014, 200k+ comments

• Signed – Final` September 29, 2015

• Federal Register – December 1, 2015

• Effective Date – February 1, 2016

Varying Effective Compliance Dates

Background

Page 4: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

4 Your environmental compliance is clearly our business.

U.S. Refineries By State

0

5

10

15

20

25

30

# o

f R

efi

ne

rie

s

States

2015 EIA data

Page 5: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

5 Your environmental compliance is clearly our business.

Delayed Coking Units

• Existing and New – Set MACT Floor per MACT 1

• Existing

Drum pressure less than 2 psig before decoking

Averaging provisions across facility (60 batch average)

Steam Ejector System

• New

Drum pressure less than 2.0 psig before decoking

Per source, per-coking cycle basis

Closed Blowdown System

What’s New? What Changed?

Page 6: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

6 Your environmental compliance is clearly our business.

Flares

• Bulk of changes in MACT 1, some in MACT 2

• Cross reference removed to General Provisions, Part 63 Subpart A

• Changes

Method of Operation

Operating Limits

Monitoring Requirements

Work Practice Standards

What’s New? What Changed?

Page 7: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

7 Your environmental compliance is clearly our business.

Storage Vessels

• Refinery MACT 1

• Part 63/Subpart WW (Generic MACT) Requirements

Guidepole controls and other fitting controls for existing external or internal floating roof tanks

• Revised Group 1 definition

Includes smaller capacity storage vessels and/or storage vessels containing materials with lower vapor pressures

Some Group 2 tanks become Group 1

What’s New? What Changed?

Page 8: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

8 Your environmental compliance is clearly our business.

Benzene Fenceline Monitoring

• Action Level – 9.0 ug/m3 rolling annual average (2.8 ppb)

• Monitors at Fenceline

• Refinery MACT 1

What’s New? What Changed?

Page 9: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

9 Your environmental compliance is clearly our business.

Benzene Fenceline Monitoring

• # Monitors

• Where:

Facility Configuration

Fenceline Security

Building Downwash

Background

Neighbors

What’s New? What Changed?

Refinery SizeNumber of Monitors

< 750 acres 12

750-1,500 acres 18

>1,500 acres 24

Page 10: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

10 Your environmental compliance is clearly our business.

Benzene Fenceline Monitoring

• Passive diffusion tubes + blanks+ duplicates

• Sampling Period = 2 weeks

• Tubes to lab, deploy replacement tubes

• Method 325A

VOCs from Fugitive and AreaSources

• Method 325B

Sampler Preparation and Analysis

What’s New? What Changed?

Page 11: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

11 Your environmental compliance is clearly our business.

Benzene Fenceline Monitoring

• Collect 1 year of data, report quarterly via CEDRI (stay tuned)

• Neighbors

Background Concentrations

Near Field Sources

• Meteorological Monitoring Station

• Site Specific Monitoring Plan

What’s New? What Changed?

Page 12: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

12 Your environmental compliance is clearly our business.

Benzene Fenceline Monitoring

• Corrective Action Plan/Root Cause Analysis

• Reduced Monitoring

• Alternative Monitoring

• 2 years after effective date

Wait? What should facilities be doing now?

What’s New? What Changed?

Page 13: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

13 Your environmental compliance is clearly our business.

What’s New? What Changed?

CEDRI/ERT

• Increasing # of NSPS and NESHAPs/MACT require electronic reporting, or “E-Reporting”.

• E-Reporting is completed using U.S. EPA’s Compliance and Emissions Data Reporting Interface (CEDRI).

• CEDRI is located on U.S. EPA’s Central Data Exchange (CDX).

• Some reports (e.g., stack test results) compiled using the Electronic Reporting Tool (ERT) before being uploaded to CEDRI.

Two separate entities

Page 14: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

14 Your environmental compliance is clearly our business.

CEDRI/ERT cont’d• Final revisions to Refinery MACT 1 and Refinery MACT 2

reporting provisions require use of ERT and CEDRI. Fenceline monitoring data [40 CFR §63.655(h)(8)]

Results of performance tests or CEMS performance evaluations [40 CFR § § 63.655(h)(9) and 63.1575(k)]

• Note: other Subparts refineries may be subject to (i.e., Boiler MACT) may also have E-Reporting requirements.

What’s New? What Changed?

Page 15: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

15 Your environmental compliance is clearly our business.

CEDRI/ERT cont’d

• E-Reporting includes the following:

Performance test results

Monitoring data

Ongoing compliance reports

Emissions reports

Notifications [e.g., Notification of Compliance Status (NOCS)]

What’s New? What Changed?

Page 16: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

16 Your environmental compliance is clearly our business.

Startup, Shutdown and Malfunction (SSM)

• SSM exemptions removed per 2008 DC Circuit vacature

• No excess emissions exemption

• No SSM Plan requirement

• Alt Limits or Work Practice Standards for select sources

• MACT 1 – PRDs, MPVs, Flares, Others

• MACT 2 – FCCU, CRU, SRU

What’s New? What Changed?

Page 17: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

17 Your environmental compliance is clearly our business.

Startup, Shutdown and Malfunction (SSM)

• General Duty to minimize emissions (MACT 1 and 2)

• NSPS SSM exemption still applies

Ja – FCC and SRU

• Existing Permit Considerations

Texas MSS

What’s New? What Changed?

Page 18: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

18 Your environmental compliance is clearly our business.

Rule Implementation and Compliance Challenges over the next 3 yrs+

Impacts on other rules/industry

• Fenceline Monitoring

• Removal of any SSM relief

• Flares

• Public Role

• Aligning with NextGenCompliance

Texas/Gulf Coast Implications

Page 19: The Petroleum Refinery Sector Rule · 2016-02-29 · 3 Your environmental compliance is clearly our business. Refinery Sector Rule •40 CFR Part 63, Subparts CC and UUU (“Refinery

www.all4inc.com | Philadelphia | Atlanta | Houston | Washington DC

Questions?

Contact Information:

Kristin Gordon, P.E. Houston Office Director [email protected](281) 937-7553 x301