the principles of power distribution€¦ · · 2018-02-01the principles of power distribution...
TRANSCRIPT
The Principles of Power Distribution
Presented by
Dustin Hubert, GAL Power Systems, Mississauga, Ontario, Canada
David Mansbart, ABLE Equipment Rental, Deer Park, N.Y.
Sam Castillo, Tates Rents, Boise, Idaho
2/1/2018
1
THE PRINCIPLES OF POWER DISTRIBUTION
Panelists:
Dustin Hubert, GAL Power Systems, Mississauga, Ontario, Canada
Dave Mansbart, ABLE Equipment Rental, Deer Park, N.Y.
Sam Castillo, Tates Rents, Boise, Idaho
What questions need to be asked to ensure a successful power distribution project?
Dustin Hubert, GAL Power Systems, Mississauga, Ontario, Canada
Know your Audience!
• Who are you working with to develop your plan?
• Are you talking to the correct person?
• Do they know the actual requirements and understand electrical generation, and distribution?
• Ideally, you want to be working with an electrical contractor, electrician, engineer, or equivalent.
• Facility managers, building operators or maintenance staff may also have the required information.
2/1/2018
2
Local Regulations and Project Type
• Are there any specific local regulations that you will need to contend with for the project? Special permits, inspections, etc.
• What type of project is it? Commercial/Industrial, Special Event, Concert/Festival, etc.
• Exposure to the general public will typically involve additional safety measures. Cable protection mats, connection enclosures, fencing, labelling/signage, etc.
Total and Individual LoadsIn order to calculate the correct generator size you need to determine the total load requirement. Be mindful if using T-4 engines as minimum loads (+30%) need to be maintained.
Assuming typical North American low voltages (600V and below) and 60Hz.
• How many individual loads are there?
• What is the voltage and amperage requirement of each load?
oMulti voltage requirements will most likely require the use of XFOs.
• Are there any special connectors required? Hubble twistlock, C-Form, Joy, NEMA, etc.
2/1/2018
3
Site Layout and Cable Routing• Do you have a site plan? Many larger outdoor events will have a CAD
drawing for specific locations and cable runs.
• If a site plan is not available, a site visit may be required depending on how complex the distribution system is.
• What is the location for each load?
• You need to determine how long each cable run needs to be from the generator.
• Voltage drop could be a concern for longer cable runs. Especially at lower voltages, with smaller gauge cables.
• Generator grounding location and type. Plate or rod, bldg, hydrant, etc.
• Generator placement/parking location. Truck and service access. Minimize cables crossing roads if possible.
MC
CLE
AR
PL
GEORGE HISLOP PARK
31
6
56
7
27
B
56
5
60
8
77
61
30
7
87R
26
3R
71
5
58
0
33
5
57
0
27A
57
9
34
6
175
35
4
22
7R
22
20
56
0
56
45
62
56
0A
56
65
68
56
8A
66A
55
6
55
8
66.5
66B
78
74
7068
72
76
51
1
50
9
50
9. 5
50
5
50
7
50
7.5
51
3
48
5.5
48
9
48
3A
48
3
48
9B
48
9A
49
3
53
2
53
04
85
53
45
36
63
54
65
48
54
45
42
53
85
40
49
74
99
77
65
54
8A
49
5
52
6
88
94
86
84
90
92
81
57
15
73
82
80
56
9
59
9
60
3
59
5A
58
9
60
9
60
5
83
89
87
59
5
59
35
91
52
5149
25
53
9
59
6
52A
69
69.5
56
7
56
15
63
56
1A
78
56
5
23
21
33
4042
71
52
4
2325
21
15
29
27
29A
2A
2C
15A
2E2D
2B
36
53
1A
53
1
55
42
19
56
9.5
16
54
3
54
5
56
9
61
0
58
7A
59
5
59
1
2
59
3
61
26
14
61
6
58
9
58
76
18
75
0
75
27
54
27
2529
27
71
1
23
6
78
4
78
03
13
3
23
72
3
77
67
74
20
70
97
09
A7
60
76
2
25
72
5
10
12
14
65
7A
19
14A
12A
64
9
65
7
65
3
65
1
64
1-6
43
63
1
5
62
9
62
7
97
3
62
3B
62
5
78
2
69
86
47
64
3
73
63
48
42
29
33
23
62A
64
50
60
62
67
3
3
16
67
56
81
25
27
66
7
4
66
5
66
7A
69
9
103
101
99
75
94A
95
99A
94
47
69
67
65
0
54
117
88
80
62
8
70
68
72
7
10
8
12
71
9
32
34 24
25
6
72
1
36 22
27A
21
1 4
17
72
9
73
1
20
26
38
15
9
18
70
3
1715
70
5
9
20A
70
1
20
70
7
5
1113
7
31
21
29
69
3335
3835
44
57
55
71
5
1
3
47
2
47
0
7
47
4
10570 55
6
55
42A
56
8
52
65
28
54
4
54
8
54
2
53
6
53
45
30
47
1
246
5
46
3
45
5
45
1
45
7
1
6
20
45
0
51
3
52
7
2
52
15
197
52
7A
8
6A
50
1
50
5 651
1
50
7
50
9
50
3
51
1A
50
5A
30
49
0
66
60
62
49
2
70
49
6
46
25
64
48
4
33
4
51
5
51
7
51
3A
11
6
49
85
00
50
51
3B
40
40-50
69
0
2
8
12
60
96
07
61
1B
62
3A
62
1
61
76
15
61
9
62
3
9A9
5
3
59
5A
59
5B
61
3
60
56
03
59
9C
59
9D
60
1
59
7
68
0
67
4
68
2
69
6
67
269
26
94
65
26
50
64
8
64
6
59
9
64
4
63
25
99
B5
99
A6
28
63
0
59
7A
56
8
81
243245
81A
85
87
89
233
61
4
239
62
0
235237
131
10
0
227
71
7
28
5
281
238
77
40
6
44
0
114
46
0 40
4
40
0
33
9A
46
7
46
9
111
33
9
45
7
66
50
45
4
43
8
62
60
97
104
28
42
5
99
45
7A
29
7
83
29
93
01
27
9
30
3
27
728
9
29
52
93
29
1
110
25
526
12
63
33
0
24
9
27
32
75
27
1
26
52
67
26
9
108
550
12 12A
58
0
7779
34
30
61
15
71
63
7
1
70
0
2
57
1
46
71
57
3
60
2
2
50
1
50
1A
50
52
3
82
66
48
1
53
3
53
5
105 99
113
25
22
54
46
6
102
100
25
0
432
436
92
24
6
90
88
24
8
512
111
41
0
43
2
13
5 41
4
41
2
100
34
4
34
2
34
0
33
8
33
6
7
33
1
32
9
32
73
25
32
33
21
31
7
31
5
10
0
31
3
31
1
30
9
9088
30
5
95
72
84
80
70
34
20
51
05
08
50
6
37
50
4
33
25
26
12
475
14
95
85
91
43
8
120
110
100
84
127129
119
125
121
115117
33
7
9795
33
3
47
34
71
46
5
46
34
61
45
9
45
54
53
45
1
44
9
44
7
44
5
24
18
16
14
41
4
37
80
35
33
31
17
64
66
55
2
57
9
81
57
7
60
6
40
57
5
55
49
1
8
29
48
7
43
31
27
15
25
16
13
56
11
14
58
47
7
12
9
54
7
55
5
10 8
56
31
4
47
5
2
5250
48
47
3A
46
51
8
26
52
9
53
8
10
0
51
4
109
107105
103
51
0
101
506
50
4
36
24
6
8
10
88
58
5
38
58
3
73608
57
7
59
16
96
55
63
9
60
0
17
70
97
99
95
68
93
66
91
87
89
60
85
67
8
89A
83
67
6
50
34
557
32
30
30
28
24
66
8
22
20
18
26
66
6
1614
18
1210
6
67
8
4
65
66
2
59
2
2
55
5
63
6159
55
3
57
53
65
8
55
1
5553A
58
4
47
65
6
6
65
4
43A4341
45
39A
39
58
2
37
3331
50
29A
48
29
25
46
23
27
44
21
42
51
9
40
11
36
38
7
3432A
64
0
3230A
57
6
3028A
2826A26
63
4
49
2220
62
4
105
53
99
11
0
64
46
42
10
0
4042
64
0
62
5
30
63
8
63
6
63
4
14
39
66
81
75
8
83
75
6
30
69
5
90
62
0
69
16
89
68
7
96
68
5
55
92
90A
45
88
15
72
66
66
3
48
66
1
65
9
65
5
64
5
80
60
0
121
52
5048
4644A
SYOR QS
SIR
MA
N L
AN
E
LUSCOMBE LANE
CHURCH ST CHURCH ST CHURCH ST
YONGE STYONGE STYONGE ST
BLO
OR
ST
E
JARVIS ST JARVIS ST JARVIS ST
CA
RLT
ON
ST
WO
OD
ST
HA
YDEN
ST
MUTUAL ST
MA
ITLA
ND
ST
GLO
UC
EST
ER S
T
DU
ND
ON
ALD
ST
MAITLAND TER
MO
NT
EIT
H S
T
ALEXANDER PL
DONNA SHAW LANE
ISA
BE
LLA
ST
CH
AR
LES
ST E
GLO
UC
EST
ER
ST
TED ROGERS WAY
GLOUCESTER LANEREVEREND PORTER LANE
No
rth
Pri
de
To
ron
to
Site
Mas
ter
Pla
n2
01
6 F
est
ival
ye
ar
Lege
nd
Stre
etf
air
Ve
nd
or
Bo
oth
Sp
ace
Ro
ad G
ate
s
A1
A2A3A4
A5A6
A7
A8A9
A10A11
A12
A13
A14A15
A16
A17A18
A19
A20
A21
A22
A23A24
A25A26
A27A28
A29A30A31
A32
A33A34A35
A36A37
A38
A39A40A41
A42
A43A44
A45
A46
A47
A48
A49A50
A51
A52
A53A54
A55
A56
A57A58
A59A60A61
A62
A63
B1B2B3B4B8B9B10
B11
B12
B13
B14
B15
B16
B17
B18
B19
B20
B21
B22
B28
B29
B30
B31
B32
B33
B34
B35
B36
B37
B38
B39
B40
B41
B42
B43
B44
B45
B46
B47
B48
B49
B50
B59
B60
B61
B62
B63
B64
B65
B66
B67
B68
B69
B70
B71
B72
B73
B74
B75
B76
B77
B78
C1C2
C3C4
C5C6
C7C8
C9C1
0C1
1C1
2C1
3C1
4C1
5C1
6C1
7C1
8C1
9C2
0C2
1C2
2C2
3C2
4C2
5C2
6C2
7C2
8C2
9C3
0C3
1C3
2C3
3
C34
C35
C36
C37
C38
C39
C40
C41
C42
C43
C44
C45
C46
C47
C48
C49
C50
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
D21
D22
D23
D24
D25
D26
D27
D28
D29
D30
D31
D32
D33
D34
D35
D36
D37
D38
D39
D40
D41
6' G
ap
6' G
ap
6' G
ap
10' G
ap
15' G
ap
24' G
ap
29'G
ap
20' G
ap
20' G
ap
15' G
ap
10' E
xtra
9' G
ap
5' G
ap
5' G
ap
5' G
ap
6' G
ap
6' G
ap
6' G
ap
5' G
ap5'
Gap
88' G
ap14
' Gap
14' G
ap27
' Gap
WE
LLE
SLE
Y ST
E
ALE
XA
ND
ER
ST
CA
WTH
RA
SQ
57
2
STOR
STOR
STOR
STOR
10
`x1
0`
Ten
t
20
`x2
0`
Ten
t
Acc
ess
ible
To
ilet
Ice
Mac
hin
eG
en
era
tor
Han
d-w
ash
Sta
tio
n
Toile
t
Ligh
t Fi
xtu
re
Ele
ctri
cal O
utl
et
Sto
rage
Un
it
6' F
en
cin
g Li
ne
4' B
arri
cad
e L
ine
F5
BIXI
DRIVEWAY
F.O.H
.
ATM
F3
51'x
24'
16' H
igh
RECY
CLE
GAR
BAG
E
RECY
CLE
GAR
BAG
E
40
yd G
arb
age
Du
mp
ste
r
40
yd R
ecy
clin
g D
um
pst
er
FOH
RECY
CLE
GAR
BAG
E
Info
Cen
tre
Info
Cen
tre
Info
Cen
tre
Founta
in
Whe
el T
rans
Dro
p-of
f
FOH
VIL
LAG
E ST
AG
E
52' G
ap
TRA
NS
SPA
CE
Wel
com
e &
Info
Cen
tre
5' G
ap
CP-2
4 Br
oadc
ast
ACCE
SSIB
LE V
IEW
ING
ARE
A
Sund
ay O
nly
Elm
St
ACCE
SSIB
LE V
IEW
ING
ARE
ARo
ad L
evel
- W
ood
St.
Frid
ay -
Sund
ay
Note:
Beyond
sidew
alk ap
proxim
ately 5
'
VIP
STAN
DD
undo
nald
St
Sund
ay o
nly
ACCE
SSIB
LE V
IEW
ING
ARE
AIs
abel
la S
tFr
iday
, Sat
urda
y, S
unda
y
ACCE
SSIB
LE V
IEW
ING
ARE
ASt
. Mar
y's S
tSa
turd
ay, S
unda
y
ACCESS VIA ST NICHOLAS ST
RE
FER
FOH
F1F2
ENTE
R
EXIT
Ente
r/Ex
it
EXISTI
NG FE
NCE
EXISTING WALL
Note:
25' Ga
p betw
een wa
lland
back l
ine of
stage
ACCESS VIA LANEWAY
EM
S H
EA
DQ
UA
RTE
RS
Toro
nto
Polic
e D
ispat
ch U
nit
Whe
el T
rans
Dro
p-of
f
Whe
el T
rans
Dro
p-of
f
ICE
SUPP
LY
STAGE
REFE
R
STAGE
MA
ITLA
ND
TE
R
STAGE
BRO
ADCA
ST T
RUCK
Sund
ay O
nly
Gre
nvill
e St
Full
Clos
ure,
Sun
day
05:0
0hrs
Yong
e St
to 1
00' W
est o
f Yon
ge S
t
ACCESS VIA ST LUKE LANE ACCESS VIA ST LUKE LANEACCESS VIA
ST NICHOLAS ST
MISTING
STATION
Ice
Cre
am T
ruck
5' E
xtra
16x
Barr
icad
e, D
rop-
off
20x
Barr
icad
e, S
et-u
p
39x Barricade, Drop-off
8x F
ence
, Dro
p-of
f
1x Fence, Drop-off
4x F
ence
, Set
-up
20x
Fenc
e, S
et-u
p
13x
Fenc
e, S
et-u
p w
ith sc
reen
ing
9x F
ence
, Set
-up
15x
Barr
icad
e, D
rop-
off
10x
Barr
icad
e, se
t up
40x
Barr
icad
e, se
t up
5x Barricade, Set-up
16x Fence, Set-up
SOU
TH S
TAG
EC
apac
ity
- 2
,25
0
HAI
R O
F TH
E D
OG
PAT
IO
ALE
XA
ND
ER
PA
RK
ETT
E
CE
NTR
AL
STA
GE
Cap
acit
y -
80
0
EXIT
ENTE
R
NO
TE: 5
' Gap
NOTE:
10' Ga
p betw
eenbac
k wall
of stag
eand
proper
ty line
NOTE:
12' Ga
p betw
eenligh
t post a
nd bac
k line o
f stage
FAM
ILY
PR
IDE
Ch
urc
h S
t P
ub
lic S
cho
ol
Sou
th G
ate
Gat
e #
2G
ate
#1
Gat
e #
4B
Gat
e #
4A
Gat
e #
3A
Gat
e #
5G
ate
#6
We
st G
ate
Pau
l Kan
e P
arke
tte
CLE
AN
SO
BER
&P
RO
UD
PLA
CE
Eas
t G
ate
FEST
IVA
LH
EA
DQ
UA
RTE
RS
Gat
e #
7
Gat
e #
9G
ate
#8
Gat
e #
10
Gat
e #
11
A
Whe
el T
rans
Dro
p-of
f
Gat
e #
13
Gat
e #
12
No
rth
Gat
e
WE
LLE
SLE
Y ST
AG
EC
apac
ity
- 3
,50
0
EXIT
ENTE
R
17x
Barr
icad
es, S
et-u
p
11x Barricades, Drop-off
7x B
arric
ades
, Set
-up
30x
Barr
icad
es, S
et-u
p
18x
Fenc
e, S
et-u
p
38x Fence, Set-up with Screening
23x
Fenc
e, S
et-u
p
7x F
ence
, Set
-up
30x
Barr
icad
e, S
et-u
p
8x B
arric
ade,
Set
-up
16 x
Bar
ricad
es, S
et-u
p
4x F
ence
, Set
-up
3x F
ence
, Set
-up
on S
idew
alk
3x F
ence
, D
rop-
off
3x F
ence
, Dro
p-of
f 7x Fence, Set-up with Screening
43x Barricade (CITY)
Barr
icad
ing
mus
t clo
se t o
exi
stin
g fe
nce
4x B
arric
ade,
Dro
p-of
f
4x B
arric
ade,
Dro
p-of
f
7x B
arric
ade,
Dro
p-of
f
26x Barricade Set-up
POWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWERED POWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWEREDPOWERED
POWERED
POWERED
POWEREDPOWERED
POWEREDPOWERED
PARKING ACCESS
POWE
REDPO
WERED
POWE
REDPO
WERED
POWE
REDPO
WERED
POWE
REDPO
WERED
POWE
REDPO
WERED
POWE
RED
51
9 C
hu
rch
St
Co
mm
un
ity
Ce
ntr
e
S/S
Woo
d St
Lan
e Re
stric
tions
200'
Eas
t of C
hurc
h St
to M
utua
l St
N/S
Mai
tland
St L
ane
Rest
rictio
nsYo
nge
St to
Don
na S
haw
Ln
N/S
Mai
tland
St L
ane
Rest
rictio
nsYo
nge
St to
Don
na S
haw
Ln
N/S
Mai
tland
St L
ane
Rest
rictio
nsYo
nge
St to
Don
na S
haw
Ln
S/S
Dun
dona
ld S
tO
ccup
ied
sidew
alk,
05:
00hr
s Sun
day
Yong
e St
to 1
00' E
ast o
f Yon
ge S
t
S/S
Dun
dona
ld S
tRe
stric
ted
Lane
, 05:
00hr
s Sun
day
Yong
e St
to 1
00' E
ast o
f Yon
ge S
t
S/S
Isab
ella
St
Rest
ricte
d La
ne a
nd O
ccup
ied
Side
wal
k13
:00h
rs F
riday
, Yon
ge S
t to
60' e
ast o
f Yon
ge S
t
St. M
ary'
s St
Full
Clos
ure,
06:
00hr
s Sat
urda
yYo
nge
St to
100
' wes
t of Y
onge
St
Be
er
Gar
de
n -
Bar
bar
a H
all P
ark
Par
ade
Ro
ute
Dyk
e M
arch
Ro
ute
Tran
s M
arch
Ro
ute
Bar
bar
a H
all P
ark
Em
erg
en
cy A
cce
ss
NORMAN JEWISON PARKETTE
Securit
y
NOTE:
5' Gap
betwe
en pro
perty l
ine an
d riser
VIP/
Acce
ssibi
lity
View
ing R
iser
42
81
18
8
8286
25
28
8
50
27
0
20
0
77
R
130
31
2
29
7
18
6
38
28
4
23
31
0
27
2
38
28
0
160
104
27
4
76
37
5
78
11
42
9A
55
28
3
28
1
27
9
17
33
1-3
33
16
350
3
33
5
4
1
346 340
36
9
36
537
1
40
43
5
17
9
43
3
43
9
40
9
41
1
41
54
15
A
41
5B
40
3
42
3
42
5
41
942
1
42
7
43
7 43
1
31A
35
93
59
A
36
340
5A
20
38
5
40
1
22380
379
31
38
7
3
21
52
48
50
54
56
46
40
44
42
38
45
42
9
25
23
24
20
28
30
22
26
15210
1
87
A
83
B
161
139
19
08
3
19
2
135
129
137
133
131
10
5
136-144
157
10
3
10
7
19
4
20
0
159
163
88
105
30
0-3
04
111
96
29
8
108
99
86
78
8082
101
93
122
231
110
114
112
120
116118
58
61
62
60
414
61A
70
72
68
64
66
103
40
4
412
74 72110.5
365
39
8
64
66
37
0
36
8
36
6
74
76
55
375373
112.5112
78
80
106104
385
89A
377
389
87
22
7A
10-12
20
0
24
4
23
2
7
21
23
7-2
41
80
26
19
33
258
23
5A
22
7
23
5
23
1
23
7
23
3
78
70
21
0
22
9
22
0
23
7A
54
81
A
85
81
81
85
A
83
A
65
18
7-1
89
53
.5
69 67
51
A5
1
53
40R
33
44
46
40
50
300
160
87
43
340
341
99
147145
108
165 139155
290
105
29
6
163 159
30
2
135
240
133
150
80
140
325
89
83
112120126
60
63322
40
21
7
24
2
21
7A
21
9
55
24
4
53
105
22
9 21
9A
101
103A103
98
10066
68
5856
251
253
74
6264
70
131
88
82
9694
8684
80
24
1
24
1A
9290
101
99
104102
106
127
125
91
98100
26
6
26
02
58
8
10
6
4
14
12
1621
32
3
32
1
32
5
10
31
9
31
7
20
32
7
31
1
31.5
6464B
22
5
187
166
25
4
22
78
22
7
108
26
4
99.5
60
95
202
122126
89
111
109
.5
118
100
98
96
109
107
105
103
101
99
116A
114112A
116
110
355
76
345
55
31
0
11
3 11
1
66
56
38
61
59
19
7
55
17
0
19
5
90
19
3
53
A
19
1
49
66
70
68
57
134
132
155
151
147
149
117
22
5 22
3
91
22
1
77
21
5
250
75
21
32
11
86
73
20
9
71 69
205
67
24
0
65
178
75
63
20
1
19
9
154
222
24
5
106
26
21
77
25
6
145
25
0
18
81
86
18
418
2
27
8
110
102
117
101
134
132
130128
126
124
122120
29
6 29
0
28
8
121
117
119
115
113
19
31
91 1
89
28
0
105
31
4
225
30
8
22
32
21
21
9
121
119
117
21
7
115
113
21
5
21
32
11
A
21
12
09
A
20
9 20
7
20
5A
20
5
20
3 20
11
99
A
19
9
19
7
19
5
11
1
24
9
25
2
26
7
22
7
26
3
22
1
25
7
25
3
21
5
24
7
24
5
24
3
24
1
20
9
23
9
27
5
27
3
27
1
26
9
26
1
12
5
122
11
5
11
6
285
112
11
0
10
4
277 33
65
25
9
32
9
13
7
40
7
39
9
38
1
37
9
37
7
36
7
36
1
35
7A
35
7.5
35
73
55
A3
55
35
3
35
1
34
9
34
7
34
1
64
97
97A
41
8
79
81
77
41
6
7573
71
65
82
8684
80
78
76
74
72
68
66
75
77
7371
6967656361
59
70
27
7
59
57
57A
55A
55
53
53A
47
51A
51
43
49A
49
39
45
41
35
37
31
33
29.5
29
62
27
56
5856.5
54.5
60
21
52.5
54
52
50
46
48
4244
40
36A
34
36
30A30
32
28
26
24
22
20
18
27
23
25
21
26
39
9
10
9
CHURCH ST CHURCH ST
GER
RA
RD
ST
E
SHU
T ER
ST
YONGE STYONGE ST
JARVIS ST JARVIS ST
DU
ND
AS
S T E
BOND ST
DALHOUSIE ST
GR
AN
BY
ST
MC
GIL
L ST
VICTORIA STREET LANE
MUTUAL ST
OKEEFE LANEOKEEFE LANE
VICTORIA ST
FRA
NK
NA
TAL E
LA
NE
SHEARD ST
VICTORIA ST
GO
ULD
ST
MUTUAL ST
DU
ND
AS
ST E
STAG
E
5' G
ap
Access
. Stor.
5' G
ap
Toro
nto E
MS
Hosp
ital B
us
40'x
30'
12' H
igh
Note:
45' Ga
p betw
een sou
thlan
eway
and ba
ck line
of sta
ge
40'x
30'
12' H
igh
Rise
r
19x
Fenc
e, S
et-u
p w
ith sc
reen
ing
26' G
ap35
' Gap
10' G
ap
44' G
ap30
' Gap
10' G
ap
36' G
ap
14' G
ap
NO
TE: D
o no
t im
pact
gar
dens
E4E5
E6E7
E8E9
Gat
e #
11
B
3x F
ence
, Dro
p-of
f on
Side
wal
k
34' G
ap
B23
B24
B25
B26
B27
POWERED
3' E
xtra
FLO
ATS
MA
RCH
ERS
NO
MU
SIC
BEYO
ND
THIS
PO
INT
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
ENTE
R/EX
IT
VIP &
ACC
ESSIB
LEVI
EWIN
G AR
EA
H20
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD ATM Vehicle
TD Waste
Disposal
TD Waste
Disposal
TD Waste
Disposal
H20
MER
CH
POWERED
H20
H20
Pri
de
20
16
Gat
e #
3B
S/S
Alex
ande
r St L
ane
Resr
ictio
nsM
utua
l St t
o 60
' Wes
t of M
utua
l St
Alex
ande
r St,
Full
Clos
ure
Chur
ch S
t to
130'
Eas
t of M
aitla
nd T
erra
ce10
:00h
rs-2
2:00
hrs,
Sat
urda
y &
Sun
day
PA
RA
DE
FO
RM
ATI
ON
AR
EA
Ro
sed
ale
Val
ley
Ro
ad -
Ve
hic
les
On
ly
Tent
s lo
cate
d al
ong
Rose
dale
Val
ley
Road
Toile
ts lo
cate
d al
ong
Rose
dale
Val
ley
Road
Par
ade
Mar
che
r R
egi
stra
tio
nSu
nday
onl
y
PA
RA
DE
Mar
che
r m
arsh
allin
g ar
ea
Blo
or
St, C
hu
rch
St
to T
ed
Ro
gers
Way
POLI
CECO
NTR
OLL
EDIN
TERS
ECTI
ON
Pede
stri
anEx
it
Seco
ndar
yV
ehic
leEx
it
Pede
stri
anEx
it
PA
RA
DE
DE
STA
GIN
G A
RE
AEx
it
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
& T
TC A
CC
ESS
PO
INT
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
ELM
ST
ED
WA
RD
ST
WA
LTO
N S
TN
O E
XIT
STA
GE
YON
GE
-DU
ND
AS
SQU
AR
E
EMERGENCY ACCESS VIA ST LUKE LANEEMERGENCY ACCESS VIA ST LUKE LANEEMERGENCY ACCESS VIA ST LUKE LANE
EMERGENCY ACCESS VIA ST LUKE LANE
EMERGENCY ACCESS VIA ST NICHOLAS ST
EMERGENCY ACCESS VIA ST NICHOLAS STEMERGENCY ACCESS VIA ST NICHOLAS ST
EXISTI
NG FE
NCE SI
TE V
EHIC
LEPA
RKIN
G &
STO
RAG
E
SOU
THSU
PP
OR
TC
EN
TRE
4x B
arric
ade,
Dro
p-of
f
Hay
den
StFu
ll Cl
osur
e, 1
2:00
hrs S
unda
yYo
nge
St to
100
' eas
t of Y
onge
St
ACCE
SSIB
LE V
IEW
ING
ARE
AM
aitla
nd S
t
Sun
day
ACCE
SSIB
LE V
IEW
ING
ARE
ABr
eada
lban
e St
Satu
rday
& S
unda
y
Whe
el T
rans
Dro
p-of
f
ACCE
SSIB
LE V
IEW
ING
ARE
AEd
war
d St
Sund
ay O
nly
Whe
el T
rans
Dro
p-of
f
Edw
ard
StLa
ne O
ccup
atio
n, 0
5:00
hrs S
unda
yYo
nge
St to
100
' wes
t of Y
onge
St
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
& T
TC A
CC
ESS
PO
INT
En
d P
oin
tD
YKE
MA
RC
H
Wel
com
e &
Info
Cent
re
4x Fence, Set-up on Sidewalk
POWERED
Info
Cen
tre
3x F
ence
, D
rop-
off
Info
Cen
tre
3x F
ence
, D
rop-
off
Info
Cen
tre
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
FAM
ILY PR
IDE
STAG
E
PART
NER
PROG
RAM
FAM
ILY PR
IDE
LOAD
ING
ZONE
WAT
ERPL
AYAR
EA
MUR
AL
LOST
CHILD
MEE
TING
PLAC
E
FAM
ILYPR
IDE
WEL
COM
EAR
EA
STRO
LLER
PARK
ING
FAM
ILY PR
IDE
LOAD
ING
ZONE
TD Waste
Disposal
1x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
INFO
SECU
RITY
SHED
Sun
day
On
ly
120' Concert Barricading
FOH
8x F
ence
, Set
-up
RECY
CLE
GAR
BAG
E
TD Waste
Disposal
1x Fenc
e, Set-u
p
60' C
once
rt Ba
rrica
ding
Express Check-in
Check-in
8x B
arric
ade,
Set
-up
10x Barricade, Set-up
76x Barricade, Set-up
45x Barricade, Set-up
20x B
arrica
de, Se
t-up
VEHICLE ACCESS
F6
ENTE
R
ENTE
R
EXIT
ENTE
R
25x
Barr
icad
e, S
et-u
p
CAPA
CITY
1880
SUBW
AYPA
RKIN
G
VIP Riser
TD Waste
Disposal
8x Fence with Screen
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
Pride Waste
Disposal
1x Fenc
e, Set-u
p
1x Fenc
e, Set-u
p
RECY
CLE
GAR
BAG
E
Mai
tland
St
Lane
& S
idew
alk
Occ
upat
ion,
05:
00hr
s Sun
day
Yong
e St
to 1
00' e
ast o
f Yon
ge S
t
Elm
St
Lane
Occ
upat
ion,
05:
00hr
s Sun
day
Yong
e St
to 1
00' w
est o
f Yon
ge S
t
Media
Pen
RE
FER
Todd
ler Pl
ayAr
eaPLAY
GROU
ND
E1E2
RISE
R
MER
CH
POWERED
E3E1
0
O'GRAD
YSPati
o Extens
ion
GAR
BAG
E
Obsta
cleCo
urse
PA
RA
DE
STA
GIN
GP
EN
STOR
8x B
arric
ade,
Set
-up
DYKE
MAR
CHM
arsh
alling
Are
a
6x B
arric
ade,
Dro
p-of
f
Mar
cher
s ent
er A
llan G
arde
nsVe
hicles
ente
r tra
ffic
PA
RA
DE
EM
ER
GE
NC
YV
EH
ICLE
AC
CE
SS P
OIN
T
4x B
arric
ade,
Dro
p-of
f
MED
IA PE
N
Light
ing Tr
uss
28
3
7
21
26
19
33
20
22
277 33
DU
ND
AS
ST E
FLO
ATS
MA
RCH
ERS
NO
MU
SIC
BEYO
ND
THIS
PO
INT
STA
GE
INFO
SECU
RITY
SHED
ENTE
R
120' Concert Barricading
ENTE
R
SUBW
AYPA
RKIN
G
Yon
ge-D
un
das
Sq
uar
eSa
turd
ay O
nly
13x Barricade, Set-up
REFE
R
CH
AR
LES
ST E
YON
GE
-DU
ND
AS
SQU
AR
E
Satu
rday
On
ly
Info
Cen
tre
3x F
ence
Info
Cen
tre
Acce
ssibi
lity A
rea
2x Fenc
e, Set-u
p
TD Waste
Disposal
1x Fenc
e, Set-u
p
POWERED Med
ia HQ2x F
ence, S
et-up
Brea
dalb
ane
St
Lane
& S
idew
alk
Occ
upat
ion,
05:
00hr
s Sat
urda
yYo
nge
St to
100
' wes
t of Y
onge
St
Woo
d S
tLa
ne &
Sid
ewal
k O
ccup
atio
n, 1
7:00
hrs F
riday
Yong
e St
to 1
00' e
ast o
f Yon
ge S
t
Yong
e-D
unda
s Squ
are
Lane
Full
Clos
ure,
05:
00hr
s Frid
ayYo
nge
St to
O'K
eefe
Lan
e
LED
Scre
en
2x B
arric
ade
DUND
ONAL
D AC
CESS
ROU
TE
ACCESS FOR DUNDONALD ST RESIDENTS
ACCE
SS LA
NE 15
' 7"
26' 9
"
11' 9
"
11' 9
"
11' 9
"
SMITH
PATIO
EXTE
NSIO
N
8x B
arric
ade,
set u
p
F5F4
F3F2
F1
POWE
REDPO
WERED
CHURCH
MOUSE
Patio Ex
tension
GARAGE
Patio Ex
tension
B5B6B7
9' G
ap
GREE
NSPA
CE PA
TIO EX
TENS
ION
11' (o
ne la
ne) o
f Chu
rch S
t)
5' G
ap
POWERED POWERED
B51
B52
B53
5' G
ap
5' G
ap
B54
B55
B56
B57
B58
POWERED6' G
ap
ALLE
Y AC
CESS
MAI
NTA
INED
PARK
ING
ACC
ESS
MAI
NTA
INED
Wel
com
e &
Info
Cen
tre
4x F
ence
, Set
-up
POWE
RED
POWE
RED
Wel
com
e Ce
ntre
& A
cces
sibili
ty H
Q
4x F
ence
, Set
-up
POWE
RED
MED
IA A
CCES
S
VO
LH
Q
Artist
Relatio
ns
Media
HQ
EXIT EN
TER
EMS
Tent
FOH
8x F
ence
, Set
-up
F6
VIP Riser
13x Barricade
REFE
R
LED
Scre
en
EXIT EN
TER
EMS
Tent
3x F
ence
25x
Fenc
e w
ith S
cree
n
15x
Fenc
e w
ith S
cree
n
13x
Fenc
e w
ith S
cree
n
23x
Barr
i cad
es
16x
Barr
icad
e, S
et-u
p
25x
Fenc
e w
ith S
cree
n
15x
Fenc
e w
ith S
cree
n
13x
Fenc
e w
ith S
cree
n
16x
Barr
icad
e, S
et-u
p
CA
PA
CIT
Y 2
55
0
5x b
arric
ades
4x fe
nces
Vol W
elcome
17x
Fenc
e w
ith S
cree
ning
5x b
arric
ades
24x
Barr
icad
es
En
d P
oin
tTR
AN
S M
AR
CH
Mar
cher
s ent
er A
llan G
arde
nsVe
hicles
ente
r tra
ffic
VIP
ACCE
SS
2/1/2018
4
Determining Final Requirements
• Once total load is calculated and the appropriately sized, generator is selected along with quantity and length of cables to each individual load, you will be able to determine what quantity and type of distribution panels you will need.
• 400A – 1200A I-Line panels to break down larger loads into smaller ones.
• 208V 200A 3PH Panels to break 3PH power into 1PH.
• 120V 50A 1PH panels to break 240V into 110V outlets.
Parallel Units
Parallel units could be required if…
• Your total load exceeds the capacity of a single generator.
• If redundancy is required (healthcare, data centers, other critical power scenarios).
• Live broadcasts will typically required parallel units to guarantee zero downtime or interruption.
• If the generator is required for redundancy or back-up purposes, do you need an ATS (automatic transfer switch)?
2/1/2018
5
Additional Considerations
• Are multiple voltages required? You may want to consider a separate generator instead of a transformer.
• If voltage drop is a concern, you may also need to use a separate generator for that specific load. Be careful if your trying to adjust generator output voltage to correct for V-drop.
• Fuel capacity vs. generator runtime. What refueling schedule is required?
• Keep away from building fresh air intakes or building overhangs.
• For longer rentals, consider PMS schedule.
Size MattersDon’t get caught short
Dave Mansbart, ABLE Equipment Rental, Deer Park, N.Y.
2/1/2018
6
Ohm’s Law
Generator Ratings
• Single-phase vs. three-phase
• What happens when you use the voltage selector switch
• .8 Power factor
Single-phase vs. Three-phase
Single-phase Three-phase
2/1/2018
7
Power Factor
Power Factor – the easy way
Sizing Considerations
• Types of loads
• Power factor
• Voltage drop
• Exhaust temperature
2/1/2018
10
Formulas and AMP Chart
Rules of Thumb• Motor starting HP x 2 = kW
• Motor running HP x .74 = kW
• Sequence the largest motor to start first.
• UPS KVA x 3 = kW
• Lighting wattage x 125% = kW
• Tier 4 base load = 40% +/-
2/1/2018
11
Generator Hazards and Best Practices
Sam Castillo, Tates Rents, Boise, Idaho
Shock or Electrocution Hard wiring generators improperly can be deadly
Electricity is the 2nd leading cause of death in construction
_ _, _ _ _ non fatal accidents yearly
_ _ _ fatalities on average yearly due to electrocution
Leading Causes
1. Drilling or cutting through cable
2. Failure to de-energize circuits and follow proper
Lockout/Tag-out procedures
3. Failure to guard live parts from accidental contact
4. Moisture in the working area
5. Ground has failed
6. Fire hazards, weather an Arc Flash or Arc Blast
Shock or Electrocution • Proper PPE
• Make sure that you generator has proper ground rod assembly,
this is a must do!!!
• Always assume the generator has power running through it
• Do a dry run prior to turning on the power
• Check your numbers, make sure the load and all equipment match up
• Make sure you don’t overload generator, this can cause things to overheat
or even catch fire
• Make sure all accessories are connected properly prior to operation,
always check twice
• Make sure that your working area is hazard free
• Make sure all guards for any conductors are in place
2/1/2018
12
Carbon-Monoxide or
Air Contaminants
• Cleanliness plays a huge role
• Make sure all circuits and breakers are working properly and
fail safes are in working order
• Overloading can cause overheating and possible fire
• Always know where your closest fire extinguisher is located
• PPE
Fire Hazards
Noise Decibels
• Knowing output of machine
• Lawn Mower is generally about _______ dB
• In general sounds above _______ dB are harmful
• Make sure if in contained area you know dB levels
• Make sure that all doors on generator are shut while in operation
• If above the dB level of negative exposure, make sure hearing
protection is provided or recommended
2/1/2018
13
Proper Towing
• Make sure all components are right sizes, hitch and ball or pintle hitch is
appropriate size, classified correctly to trailer and hitch towing regulations
• Make sure that towing vehicle is suitable for generator size, make sure to
account for fuel weight…6.9 lbs./gallon of fuel
• Make sure safety chains, pins and latches are all present and in working order
• Make sure that all of your tires are checked and in working order prior to
delivery or will call
• Make sure all door and panels will shut and open without becoming a hazard
while towing
• Like any other trailer make sure that all lights are functional and signals are
clean and in working condition
Use of Safety Accessories
Maintenance
2/1/2018
14
Cleanliness
• Make sure that the machine is clean, most importantly any flammable or
combustible fluids left over from servicing
• Make sure that you use only non combustible cleaners
• Clean and tight connections on generator outlets, make sure they are not too
tight or loose
• Be sure all accessories items are also clean of debris and are in working order
• Make sure you don’t spray water directly on to panels, make sure they are clean
and dry upon rental
Proper Function of Outlets and Breakers
• Make sure that your GFCI outlets actually work by testing prior to rental, there are
several different GFCI testers that make this an easy process
• Along with the outlet check your temp boxes and panels GFCI outlets
• Test breakers and output on all outlets to make sure all circuits will work properly
• Test the load with approved tester according to
manufacturer standards
• Make sure that when testing any outlets proper
PPE is worn
Time for Questions
Sam CastilloTates Rents
Dustin HubertGAL Power Systems
Dave MansbartABLE Equipment Rental