Scope Full turnkey project including civil engineering and civil works. Design and engineering of two double cable systems. Project management. Manufacturing of 132 km of 380 kV XLPE cables, conductor cross-section of 2,500 mm 2 , partly with integrated optical fibres. Manufacturing of correspondent accessories. Parallel installation. Quality and functionality testing including an online PD test with mobile test trailors. Tailor-made logistics concept. Innovative solution for horizontal drillings. FLYenBB181101WEB NKT TM is a trademark of NKT Group. © 2018 All rights reserved NKT GmbH & Co. KG Düsseldorfer Str. 400 / Chempark 51061 Cologne Germany T: +49 221 676 0 [email protected] nkt.com NKT is signatory of the Europacable Industry Charter: A commitment towards superior quality. ® Client: TenneT TSO B.V. Location of the project: Delft, Netherlands Quantity of order: A turnkey 380 kV cable system with a 2635 MW power rating Total cable route length: 11 km Duration: 2008 2012 Key Facts The turnkey cable system secures the energy supply of the Randstad region in the Netherlands. The Randstad380 Zuidring project Location Delft NETHERLANDS Den Haag Rotterdam nkt.com

Upload: others

Post on 02-May-2020

80 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Randstad380 Zuidring project€¦ · Full turnkey project including civil engineering and civil works. Design and engineering of two double cable systems. Project management

Scope▪ Full turnkey project including civil engineering and civil works.

▪ Design and engineering of two double cable systems.

▪ Project management.

▪ Manufacturing of 132 km of 380 kV XLPE cables, conductor cross-section of 2,500 mm2, partly with integrated optical fibres.

▪ Manufacturing of correspondent accessories.

▪ Parallel installation.

▪ QualityandfunctionalitytestingincludinganonlinePDtestwithmobiletesttrailors.

▪ Tailor-madelogisticsconcept.

▪ Innovativesolutionforhorizontaldrillings.

FLYe

nBB

1811

01W

EB

N

KTT

M is

a t

rad

emar

k of

NK

T G

roup

. © 2

018

All

right

s re

serv

ed

NKT GmbH & Co. KG Düsseldorfer Str. 400 / Chempark51061 CologneGermany

T: +49 221 676 [email protected]

NKT is signatory of the Europacable Industry Charter: A commitment towards superior quality.

®

Client:TenneT TSO B.V.

Location of the project:Delft, Netherlands

Quantity of order:A turnkey 380 kV cable system with a 2635 MW power rating

Total cable route length:11 km

Duration:2008 – 2012

Key Facts

The turnkey cable system secures the energy supply of the Randstad region in the Netherlands.

The Randstad380 Zuidring project

Location

Delft

NETHERLANDS

Den Haag

Rotterdam

nkt.com

Page 2: The Randstad380 Zuidring project€¦ · Full turnkey project including civil engineering and civil works. Design and engineering of two double cable systems. Project management

“Through the Randstad380 Zuidring project, we earned another excellent reference in the world of turnkey high-voltage projects.”Outstanding competence

in power transmission.NKT met all the engineering challenges and delivered a complete solution.

The project The future energy supply of the Randstad region was to be secured by new connections.

NKT received an order for the project in 2008 from the Dutch electricity grid operator TenneT TSO B.V. At this time, it was the biggest 380 kV turnkey cable project in the world.

The Randstad region includes big cities like Rotterdam and Amsterdam, what made the project of connecting the two transfer stations of Wateringen and Bleiswijk highly challenging. Among others, the cable route had to cross two railway lines, a motorway, some sports facilities, several dikes, a river and several watercourses. Extremely varied territory profiles, soft moorland, a high water table, deep sand layers and expected submergences of up to 0.5 m in civil engineering were other huge challenges the NKT engineering teams had to face.

About 11 km of the distance were to be covered by underground cables and about 14 km by overhead lines. TenneT approached NKT for a complete solution for the engineering, production and delivery of the cable system and accessories. NKT was also to be responsible for the project management, the accessory installation and the final testing. We took care of the civil engineering and cable-laying as well, with the support of a partner.

The solutionThanks to NKT’s flexible solutions we were able to provide a turnkey cable system.

The cable system and accessories were produced at our state-of-the-art facility in Cologne, Germany. To minimize construction time, we also designed a special logistics concept and established a storage place in the Netherlands.

We managed to overcome the challenges of the cable route. Together with TenneT and the authorities we decided to install plastic tubes through horizontal drilling to minimize adverse effects. There were drillings of up to 530 m with a total length of more than 50 km. To act in an environmentally friendly way in the complex landscape, we used a very narrow working area.

NKT provided a 380 kV connection with dual systems consisting of 132 km of 380 kV XLPE cable, partly with integrated optical fibres. Our specialists performed all installations, whereof some needed to take place simultaneously to match the project schedule.

We used our own test trailers plus two additional ones for the onsite testing, and completed the final high-voltage test at 374 kV for one hour on all cables and accessories. Partial discharge measure- ment was also performed on all accessories.

This successful project demonstrates our out-standing competence in handling projects to customer’s benefit by responding to their needs and providing cost-efficient, ecological solutions. The Randstad380 Zuidring project is a remarkable milestone – not only for us at NKT.