  • 8/12/2019 the Rig - Drilling Equipment

    1/39

    1

    PETE 405Well Dri l l ing

    Lesson 3

    Th e Rig - Dr i ll ing Equ ipm en t

  • 8/12/2019 the Rig - Drilling Equipment

    2/39

    2

    Contents

    Rig PumpsSolids Control Equipment

    Air DrillingThe Rotary SystemThe Swivel

    The Well Control SystemThe Well Monitoring SystemOffshore Drilling

  • 8/12/2019 the Rig - Drilling Equipment

    3/39

    3

    A s s ign men t s :

    READ: A DE Ch. 1, to p .30

    HW #1: A DE 1.1, 1.2, 1.3

    NOTE: A ns w ers in bo ok are no talway s c o rrec t ...

  • 8/12/2019 the Rig - Drilling Equipment

    4/39

    4

    Schematicof Rig

    CirculatingSystem for

    liquid

    drillingfluid

  • 8/12/2019 the Rig - Drilling Equipment

    5/39

    5

  • 8/12/2019 the Rig - Drilling Equipment

    6/39

    6

    Exam p le 1.3

    Compute the pump factor in units ofbarrels per stroke for a double-actingduplex pump having:

    6.5-inch liners (d L) 2.5 inch rods (d r ) 18-inch strokes (LS ) and a volumetric efficiency of 90%. (E V)

  • 8/12/2019 the Rig - Drilling Equipment

    7/39

    7

    Solu t ion :

    The pump factor for a duplex pump canbe determined using Equation 1.10

    stroke

    d d E L F r LV S p

    /in991,1

    5.25.629.0182

    22

    3

    22

    22

  • 8/12/2019 the Rig - Drilling Equipment

    8/39

    8

    Recall :

    There are 231 in. 3 in a U. S. gallon and42 U.S. gallons in a U.S. barrel. Thusconverting to the desired field unitsyields:

    1,991 in. 3/stroke * gal/231 in. 3 * bbl/42 gal.= 0.2052 bbl/stroke.

    Thus: Pump Factor = 0.2052 bbl/stroke

  • 8/12/2019 the Rig - Drilling Equipment

    9/39

    9

    Pump Factor = 3 * /4 d L2 LS E V / (231 * 42)

  • 8/12/2019 the Rig - Drilling Equipment

    10/39

    10

    Example :

    Pump Factor for Triplex Pump

    3

    3

    2

    VS

    2

    L

    inbbl

    422311

    strokein0.90126

    43

    ELd4

    3

    bbl/stroke0.09442Factor Pump

  • 8/12/2019 the Rig - Drilling Equipment

    11/39

    11

    Example : Pump Rate

    = Pump Factor * Strokes/min

    = 0.09442

    = 7.554 bbl/min

    = 317.3 gal/min

    min

    stks

    80stk

    bbl

    Pump Rate = 317 gal/min

  • 8/12/2019 the Rig - Drilling Equipment

    12/39

    12

    Pumps of the future

    Source: drilling contractor, sept/oct 2002

  • 8/12/2019 the Rig - Drilling Equipment

    13/39

    13

    Pumps of the future

    BENTECs SOFT PUMP SYSTEM (SPS)

  • 8/12/2019 the Rig - Drilling Equipment

    14/39

    14

    Hydrocyclone

    desander desilter

    * No moving parts* Low cost* Pressure drop* Diameter

  • 8/12/2019 the Rig - Drilling Equipment

    15/39

    15Decanting Centrifuge Use?

  • 8/12/2019 the Rig - Drilling Equipment

    16/39

    16

    l

    l

    Use?

  • 8/12/2019 the Rig - Drilling Equipment

    17/39

    17

    Fig. 1.33 Schematic

    of RotarySystem

  • 8/12/2019 the Rig - Drilling Equipment

    18/39

    18

    Fig. 1.34 Cutaway

    View ofSwivel

    ROTATING * Seals* Bearings

  • 8/12/2019 the Rig - Drilling Equipment

    19/39

    19

    Fig. 1.38

    Cutaway View andDimensions forExample Tool Joint

    PINBOX

    TJShoulder

  • 8/12/2019 the Rig - Drilling Equipment

    20/39

    20

    Fig. 1.39 Stabilizer

    * Keeps pipe in center of hole

    * Aids in drilling straight hole

    * Prolongs bit life

  • 8/12/2019 the Rig - Drilling Equipment

    21/39

    21

    Fig. 1.41 Kick Detection During

    Drilling Operations

    1

    2

    3

    KICK

    GAIN IN PIT VOLUME EQUALTO KICK VOLUME

  • 8/12/2019 the Rig - Drilling Equipment

    22/39

    22

    Fig. 1.46 RemoteControl

    Panel for

    operatingBlowout

    PreventersCHOKE

    What to do if KICK occurs?

  • 8/12/2019 the Rig - Drilling Equipment

    23/39

    23Fig. 1.44 Annular Blowout Preventer

    DPTJDCOH

    Press

  • 8/12/2019 the Rig - Drilling Equipment

    24/39

    24

    Ram Blowout Preventer

  • 8/12/2019 the Rig - Drilling Equipment

    25/39

    25Ram Blowout Preventer -contd

    SHEAR / BLIND

    RAM ASSEMBLY

  • 8/12/2019 the Rig - Drilling Equipment

    26/39

    26Fig. 1.48 Rotating Blowout Preventer

  • 8/12/2019 the Rig - Drilling Equipment

    27/39

    27

    Fig. 1.51 High-

    PressureCirculating

    System forWell

    Control

    Operations

    Keep BHP const.

    Kick

  • 8/12/2019 the Rig - Drilling Equipment

    28/39

    28

    Fig. 1.56 Subsurface

    Well

    MonitoringSystem

    MWD

  • 8/12/2019 the Rig - Drilling Equipment

    29/39

    29Fig. 1.57 Spread Mooring Systems

    OFFSHORE DRILLING

  • 8/12/2019 the Rig - Drilling Equipment

    30/39

    30

    Fig. 1.58

    Schematic ofEquipmentfor Marine

    Drilling

  • 8/12/2019 the Rig - Drilling Equipment

    31/39

    31

    Fig. 1.59 Operation of aHeave Compensator

  • 8/12/2019 the Rig - Drilling Equipment

    32/39

    32

    Fig. 1.60 Subsea

    BOPStack

  • 8/12/2019 the Rig - Drilling Equipment

    33/39

    33

    Fig. 1.63 Subsea Equipment

    Installation Procedure

  • 8/12/2019 the Rig - Drilling Equipment

    34/39

    34

    Ty pic al Casin g Str ing s

    Water Level

    Depth Seafloor Below ML

    Conductor pile 36 30 200

    Conductor Casing 26 20 1000

    Surface Casing 17 1/2 13 3/8 4000

    Hole Csg. Depth

  • 8/12/2019 the Rig - Drilling Equipment

    35/39

    35

    Som e Typ ical Cas ing Str ing s

    Depth Below ML

    Conductor pile 36 30 200

    Conductor Casing 26 20 1000

    Surface Casing 17 1/2 13 3/8 4000

    Hole Csg. Depth

  • 8/12/2019 the Rig - Drilling Equipment

    36/39

    36

    Example Hole and String Sizes (in)

    Structural casing

    Conductor string

    Surface pipe

    Intermediate String

    Production Liner

    Hole Size30 20

    13 3/8

    9 5/8

    7

    Pipe Size 36 26

    17 1/2

    12 1/4

    8 3/4

  • 8/12/2019 the Rig - Drilling Equipment

    37/39

    37Capacity = Area * Length

  • 8/12/2019 the Rig - Drilling Equipment

    38/39

    38

    What is the capacity of 10,000 ft of 5OD, 19.50 lb/ft drillpipe?

    Capacity = Area * Length

    Area = /4 d 2 = /4 * 4.276 2 = 14.36 in 2

    Length = 10,000 ft = 120,000 in

    Capacity = 14.36 *120,000 in 3 /(231*42 in 3 /bbl)

    Capacity = 177.6 bbls

  • 8/12/2019 the Rig - Drilling Equipment

    39/39

    What is the displacement of 10,000 ftof 5 OD, 19.50 lb/ft drillpipe?

    Capacity = Area * Length

    Area = /4 (od 2 - id 2 ) = /4 * (5 2 - 4.276 2)

    = 5.275 in 2

    Length = 10,000 ft = 120,000 in

    Displ. = 5.276 * 120,000 in3

    /(231 * 42 in3

    /bbl)

    Displacement = ? bbls