the road to ghana: a toll road infrastructure ppp case study this presentation will probably involve...

45
The Road to Ghana: A Toll Road Infrastructure PPP Case Study

Upload: yosef-hedger

Post on 15-Jan-2016

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

The Road to Ghana: A Toll Road Infrastructure

PPP Case Study

Page 2: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Table of Contents

1. Introduction

2. Major Projects

3. Our Mandate

4. Why Accra to Kumasi roadway

5. Our Challenge

6. Roadway Design

7. Project Benefits

Page 3: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Table of Contents

8. General Benefits of the Tolling Regime

9. Implementation Considerations

10. Transportation Integration

11. Economic Evaluation

12. Utilizing PPP in Infrastructure

13. Risk Assessment

14. Political and Commercial Challenges

15. In Closing

Page 4: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Introduction

Road transportation constitutes an integral part of a nation’s

development

In Africa, roads form one of the most important and valuable

public assets as it carries about 90% of its passengers and

major access to its rural communities, which forms the food

basket of every nation

It is all encompassing and pervasive and therefore affects the

social, economic, and the political life of every citizen

In Ghana, road transportation accounts for 94% of freight and

97% of all traffic movements Good road network will enhance poverty reduction, by Nonor Daniel Ghana Ministry of Transportation September 2006 - © Ghana Chronicle

Page 5: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Introduction

In the growth of countries such as India and China, we

have seen that there is a positive correlation between

investment in road transportation and growth and poverty

reduction.

In Ghana, completed and maintained roads have lead to a

20% increase in visits to hospitals,

A major lowering of the cost of traveling to market

centers, and

Efficient delivery of farm produce to urban centers

by farmers which empowers them financially and

reduces food costs

Page 6: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Introduction

The Ghanaian government has undertaken to ensure that transport is used as a means to achieve the targets set under the Growth and Poverty Reduction Strategy (GPRS II) and to achieve the Millennium Development Goals and the attainment of middle income status by 2015

Page 7: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Introduction

Social and Economic Impact In North America, Road Transportation has had a major

social and economic impact

The United States and Canada developed the Eisenhower

Interstate Highway System in the 1950’s and Canada, the

Trans-Canada Highway, linking the Atlantic and Pacific

major undertakings that promoted prosperity with a

substantial economic benefit that has had a profound

long-term economic and social benefit which has

changed the face of the United States and Canada and

the lives of its people

Page 8: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Who we are

A Ghanaian corporation comprised of Global companies headed by multi-national seasoned infrastructure and construction industry professionals with diverse experience in all aspects of infrastructure and construction including:

Project development,

Structural and architectural engineering design,

Financing,

Construction,

Concessions, and

Management and operations

Page 9: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major ProjectsIntegrated commercial inter-modal urban complexes

Page 10: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major ProjectsThe National Football League Buffalo Bills Stadium

Page 11: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major Projects

Power Plants, Dams and pipeline infrastructure

Page 12: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major ProjectsCommercial and Residential Complexes

Page 13: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major projects

Highway and Bridge Infrastructure

Page 14: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major projectsDSC International - Raipur Durg Toll Expressway, India

Page 15: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Major projectsUniversities, affordable housing, houses of worship, schools, hospitals

Page 16: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Our mandate

Arterial Toll Road Company Limited was selected by the Government of Ghana

to develop, construct and finance an Arterial Highway System and Tolling Regime linking the land-locked African countries to the Port of Accra and to produce the Ghanaian link of the Intercontinental Highway System being planned for the Continent, and

develop a cost-efficient, user-friendly approach to financing roadways and highways allowing for its individual users, no matter their nationality, to pay the cost of the roadways, without unduly burdening the country’s citizens

Page 17: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items
Page 18: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Why the Kumasi-Accra roadway

Serves:the most economic active area of the country and links the two major commercial centres of Ghana – Accra and Kumasi

Provides:primary access to the northern parts of the country as well as an international transit route for Ghana’s landlocked neighbours such as Bukina Faso and Niger

Its strategic location:makes it one of the most important links in Ghana’s roadway network as it serves the northern, central, western, and southern parts of Ghana, and a major influence on transportation for the almost 20 million people of Ghana

Page 19: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Why the Kumasi-Accra roadway

Prone to Accidents:

over-speeding and inadequate provisions for broken down vehicles have contributed to the high rate of accidents on this road which habours about 38% of the “black spots” (accident prone locations) in the country.

Traffic Flow:

the existing route of the highway passes through many towns and commercial areas with its inherent traffic delays contributing to a 5+ hour travel time to transverse the 230 Km from Accra to Kumasi

Page 20: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Why the Kumasi-Accra roadway

Proof of Performance:

its traffic flow supports an affordable Tolling structure

allowing for reasonable tolling rates and the ability to

repay debt over a reduced timeframe while providing

to the International community Proof of Performance

to substantiate the expansion of the dualization of the

roadway system under a commercial financial

structure without direct government guarantees

Page 21: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Our challenge

To design, construct, finance, and operate a dualized highway system and tolling regime that is

user-friendly, for both public & commercial usesafefair as to Tolling for all its usershas continuous Traffic Flow without on-road checkpoints, Tolling stations, and Hawkingeconomical, andan integral component of a unified cohesive transit system for Ghana

Page 22: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Our challenge

Being the link between the two main commercial

centres and the creation of a true DEVELOPMENT

CORRIDOR, we are providing for future ’ribboning’

once completed with expected and anticipated

SUBSTANTIAL commercial and residential growth

Page 23: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Design of roadway

A 4-lane urban and rural roadway with town bypasses, flyovers and amenities incorporating and renovating an existing 2-lane roadway

Associated Facilities for the highway include: restaurants, food stalls, fuel stations Government approved & licensed community stalls Rest and convenience stops accident and Trauma Centres, with an integrated Bus Intercity Transit system

Landscaping is designed to prevent erosion, improve aesthetics, and create natural barriers to prevent unauthorized

access to the roadway

Page 24: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Project Benefits

A value-added faster safer mode of transportation bringing the two major centers of commerce together with over 3 million consumers with a resultant

• Reduction of driving time from 5 ½ hours to 2 ¼ hours• Bypassing towns and cities • Fuel savings ( >10L PER 100KM)• Commercial transportation cost savings including

drivers time and salaries• Reduced food spoilage of transport to urban centres• Maintenance, major repairs and insurance savings• Most importantly, major reduction in accidents and

highway deaths

Page 25: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Project Benefits

Generates revenue for Ghana by providing primary access to the northern parts of the country for goods transportation as well as an international transit route for Ghana’s landlocked neighbours such as Bukina Faso and Niger to the Port at Accra

A fair and user-friendly revenue model that provides the ability for financing and continuously maintain the highway system and its benefits (user cost savings > toll rates)

Page 26: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

General Benefits of theTolling Regime

Toll payments are based on type of and amount of usage - commercial vs. residentialTolls are paid by both foreign and local usersGovernments can utilize budgetary funds for other projectsAlleviates and manages traffic congestionProvides funding for ongoing road maintenanceEnables governments to build projects fasterInnovative and more user-friendlyJob creationNo requirement for Government appropriationsRevenue generatorThe dramatic reduction in the cost of congestion to society in terms of lost time, increased productivity and wasted fuel.

Page 27: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Implementation considerations

During the process one must consider the following:

Legal and structure considerations

Financing and risk assessment

Public Awareness, Marketing and Governmental cooperation

Environmental and social impact monitoring and management

Harmonization of ongoing maintenance, rehabilitation and construction projects on the highway, and

Security and safety issues

Page 28: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Transportation integration

Dualization of the roadway system should take into consideration current and future integration with other modes of transportation

The ability to access bus and/or rail and air travel at future integrated terminals is a goal of an integrated roadway system

At selected Interchanges of the Roadway, Bus Terminals will be located to allow for an effective alternative to the absence of mass transit between communities and between Accra and Kumasi

Consideration has been given to the needs of the Railway and Airline sectors, and existing rail lines and airport terminals through discussions with the proper authorities and departments within the government

Page 29: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Economic evaluationOur studies substantiated that the Accra to Kumasi roadway was viable, practical and necessary after assessing:

its overall project and construction costs road survey, design and engineering studies a safety audit, environmental and social impact study a transportation and traffic studies of the roadway the need for weighing stations to minimize overloading affordability of Toll Rates the stability, priority and willingness of the Government the current physical status of the roadway, and the needs of the community

Page 30: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Economic evaluationIn evaluating its feasibility, it was also important to review Ghanaian fiscal, legal, economic and political stability

● Ghana’s government is a Constitutional Democracy, supported by a Constitution that has been adhered to stringently by its political parties

● Ghana’s Legal system is based on English common law and customary law, and

● Ghana is well endowed with natural resources: oil reserves, gold, timber, diamonds, bauxite, manganese, fish, rubber, hydropower, petroleum, silver, salt and limestone

Page 31: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Economic evaluation

Upon completion, the Accra to Kumasi roadway will:

provide the Ghanaian people with timely and

necessary road infrastructure, and as important

demonstrate to the international community Proof of

Performance through the successful completion of a

major dualized roadway corridor including successful

introduction of a economically viable Tolling regime

using a cost-efficient approach with minimum of risk

Page 32: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Utilizing Public Private Partnership (PPP) in infrastructure development

Why should a Government utilize a PPP development structure?Public-private partnerships (PPPs) provide flexibility and involve the supply by the private sector of infrastructure and services deriving from infrastructure assets which have traditionally been supplied by the public sector.

Although initially there was a fear by the financial community that such arrangements were initially an attempt to evade expenditure controls and hide public budget deficits. PPPs are now spreading worldwide. They are used in transportation infrastructure, such as roads, bridges, tunnels, rail, air and sea ports; utilities, such as water and electricity supply, sewage, and waste disposal; prisons; schools; and hospitals.

Public-Private Partnerships: A Public Economics Perspective – an IMF Working Paper Prepared by Efraim Sadka March 2006 - © 2006 International Monetary Fund

This Working Paper does not represent the views of the IMF

Page 33: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Utilizing Public Private Partnership (PPP) in infrastructure development

PPPs are not normally seen as genuine partnerships as they may not properly or efficiently share risks and liabilities (or profits) and, can be a means to mask conventional contracting undertaking which would normally be subject to standard budgeting processes (undertakings carried out by governments off budget).

However, properly formed PPPs have developed into genuine partnerships aimed at properly pricing scarce public resources and efficiently sharing and managing risks.

When properly designed and transparently reported, they can play a useful role in enhancing the efficient provision of infrastructure and services that were previously supplied solely by the public sector.

Page 34: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Utilizing Public Private Partnership (PPP) in infrastructure development

The most common forms of PPP’s are variations of design-build-finance-operate (DBFO) projects, in which a private sector concessionaire designs, builds, and finances a certain facility and then operates them for government, or build-operate-transfer (BOT), in which a concessionaire finances and builds a facility, operates it, and in both cases then transfers it to the government at the end of the concession period.

In our case, we are designing, financing, building and operating the Accra to Kumasi roadway over a 30-year Concession.

PPP’s play a useful role in enhancing a proper cost-benefit analysis and reducing the likelihood of government building “white elephants”.

Page 35: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Utilizing Public Private Partnership (PPP) in infrastructure development

With a PPP the private sector is the final “adjudicator” of a project, providing the economic viability of the project calculated at socially appropriate prices.

This is a very important aspect of our relationship with the Government of Ghana, where, similarly as in the case of how funding was designated by the Millennium Fund provided by the USA, the private sector determines how funds are utilized in developing the necessary infrastructures.

Essentially, all funding properly ends up in the developing, designing and building of infrastructures at much reduced overhead and a minimum of extraneous costs.

Page 36: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Utilizing Public Private Partnership (PPP) in infrastructure development

PPP’s also play an important roll in enhancing the efficiency of resource allocation. When properly designed, in particular with respect to sharing risks between the public and private partners, PPPs can improve the quality of services previously provided by the public sector without raising their costs to society as a whole.

PPP’S SHOW THAT IT IS A FALSE DICHOTOMY TO BELIEVE THAT ONLY THE PUBLIC SECTOR SHOULD DEVELOP, CONSTRUCT, OWN, LEASE OR OPERATE INFRASTRUCTURE.

Page 37: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Risk Assessment

Ghana has one of the strongest economies in Sub-Saharan Africa.

The areas that we concentrated on in our risk assessment were PRODUCTION, MANAGEMENT , POLITICAL STABILITY AND ECONOMIC GROWTH.

PRODUCTION - With production starting on new gold deposits, record cocoa harvests and projected oil production, economic activity has been registering positive performance. The expansion of services and increased spending on social programs and government infrastructure should continue to fuel growth this year. Easing inflationary pressures, allows the Central Bank to relax monetary policy, and benefits the economy.

Page 38: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Risk Assessment

MANAGEMENT – Governmental tight management has facilitated the consolidation of public sector finances, promoted transparency with the institution of Procurement laws and regulations that has enhanced the reputation of Ghana in the international community.

POLITICAL STABILITY - Ghana's political stability has facilitated implementation of reforms intended to develop a business environment more hospitable to the private sector.

ECONOMIC GROWTH - Ghana is experiencing major economic growth with an anticipated increase in GNP of over 13% in 2011.

Page 39: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Risk Assessment

Through a PPP, a Concessionaire can mitigate risk though government providing fundamentals such as cash flow guarantees, Sovereign guarantees, Political Risk Insurance, and Currency devaluation guarantees.

However, what is important for risk mitigation is assessing the risk rating of the Government, its ability to retain politically stable, the ability of the Government and the infrastructure users to accept the Tolling regime and understand its benefits, maintain a constant revenue stream and MOST OF ALL, the economic and commercial viability of the project.

In our evaluation of our project, which we consider to be the premier toll road project in Sub-Saharan Africa, we decided to take the path of least governmental and IMF resistance, and not include any Governmental or Sovereign guarantees in the Concession and undertake it as a fully commercial project.

Page 40: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Risk Assessment

The benefits of this structure are self-evident, from both a political and control perspective; still, within our Concession Agreement we have provided transparency and overseer capacity to the Government of Ghana providing the Government with direct input in all of the aspects of the project throughout the Concession Term.

And, as important, once it is proven that projects such as the Accra to Kumasi roadway can be seen to be economically viable, providing a true ‘proof of performance’, this will open up Ghanaian infrastructure investment to the International community without affecting the budgetary pressures that Sovereign Guarantees put on a country.

Page 41: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Political and Commercial challenges

As is similar in many break-through projects, we meet a number of Political and Commercial challenges:

Politically, the introduction of PPP Concession Agreements to dualize the major arteries in Ghana privatizes major roadways and diminishes the effect of the Ministries that are responsible for and tenders these roadways, creating an inherent conflict of interest which had caused us major technocratic delays and stumbling blocks. Other political challenges included an necessary reassessment of the Ghanaian Highway Act, highway policing and control of Commercial Trucking Weighing Stations to police variances of axle weight limits.Only ‘true’ political resolve and perseverance can help developers and sponsors overcome these stumbling blocks.

Page 42: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Political and Commercial challenges

We also had to overcome a number of commercial challenges centering around the reality that there were no financially viable existing major Toll Roads in West Africa with its inherent negative financial preconceptions

Other commercial challenges to be resolved included:

Effect of any potential future political unrest, either within Ghana or its neighbours

Currency devaluation and FOREX risk

And most importantly PPP and Concession Agreements are new to Ghana with no previous experience for Government to rely on, with preconditioned prejudices against the Private Sector in doing their work

Inexperience of Government within a PPP process should require Government to retain independent outside advisors to facilitate the Private Sector by reducing timelines

Page 43: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Political and Commercial challenges

These challenges cause major delays and timelines that created an unreasonable time loss and risk funding in order to obtain the necessary Government approvals; in that our encompassed two administrations and 8 years; however, the current Government’s political resolve and our perseverance has allowed us to successfully complete the necessary approval processes.

It is most important for Developers to be able to internally fund the development phases of a project in-houseprior to receiving the necessary approvals and obtaining Financial Close; and in doing so, the benefits to the Developer can outweigh the risks and provide for Africa its necessary infrastructure.

Page 44: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

In closing

Our Ghanaian experience has shown that with PPPs,

the International business community has the ability

to help Africa and its Governments help themselves

in developing the necessary infrastructure that is so

urgently needed to improve the social, economic,

and the political life of every citizen.

Page 45: The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items

Contact Information:Howard Hurst, CEOArterial Toll Roads Company [email protected]