by James Henry of ProSys and Craig Wagoner of Cornerstone Chemical CompanyTRANSCRIPT
![Page 1: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/1.jpg)
The Short Path to ISA 18.2 Alarm Management Compliance
![Page 2: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/2.jpg)
Photography & Video Recording Policy
Photography and audio/video recording is not permitted in any session, or in the exhibition areas, without press credentials or written
permission from the Emerson Exchange Board of Directors. Inquiries should be directed to:
Thank you!
![Page 3: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/3.jpg)
Presenters
James Henry
Craig Wagoner
![Page 4: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/4.jpg)
Introduction
Define an Alarm Flood What causes Floods? Impact of Alarm Floods on your plant New process for alarm rationalization that reduces
time commitment of plant personnel Dynamic Alarm Management and its ability to control
alarm floods – example of nested logic tree Results before and after Dynamic Alarm Management
![Page 5: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/5.jpg)
Definition of Alarm Flood
Alarm Flood defined by ISA 18.2 as -“10 or more annunciated alarms in any 10 minute
period per operator”
![Page 6: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/6.jpg)
What causes an Alarm Flood?
Configuring an alarm is cheaper than deciding if it is needed or not…
Lack of Clear Alarm Philosophy Alarms are typically configured for normal
running conditions, therefore many alarms are triggered upon a change of process state:• Plant State 1 to Plant State 2• Run to Shutdown
![Page 7: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/7.jpg)
Impact of Alarm Floods?
ISA recommendations have become RAGEGEP– Plant Management expect scrutiny of alarm performance
during OSHA audits. Reports show that 70% of plant incidents occur on startup,
shutdown or transitions. Could incidents be caused by critical alarms being hidden
within a flood?– We know this to be true
Are incidents caused by operators starting up the plant without alarms?– Both literally and figuratively true
![Page 8: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/8.jpg)
Impact of Alarm Floods?
Product quality, plant profitability and equipment damage – have any of these suffered when alarm floods were a significant distraction for the operator?
Has an incident review identified that a critical alarm was missed? Was a flood of alarms even considered as a distraction for the operator?
How many loss of containment incidents, injuries, or worse can be tracked back to alarm floods?
![Page 9: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/9.jpg)
Alarm Rationalization
Alarm rationalization facts:– Alarms must:
• Be clear and relevant to the operator
• Indicate an abnormal process condition that has consequences of inaction and a defined response
• Be unexpected
• Be unique
– Quality rationalization requires quality people (facilitator)• Experienced process engineer
• Alarm management experience
• Capable of challenging participants to keep process on track and in agreement with alarm philosophy
– Requires significant time and economic commitment, which is often not available.
Alarm rationalization myths:– The goal of rationalization is to get rid of alarms
– Configured alarm priority distribution doesn’t matter
![Page 10: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/10.jpg)
Optional Rationalization Process
Save time by minimizing or eliminating design-by-committee rationalization
Develops a fully rationalized system using plant data, operating procedures, MOC reports, and consequence of deviation analysis
Process is submitted to the rationalization team in advance for review and comments.
Rationalization team records comments and identifies exceptions necessary for final review
![Page 11: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/11.jpg)
Optional Rationalization Process
Final review is focused on about 15% of the total tag count with exceptions. The balance of alarms are accepted as designed
Quality is improved because of focus on exceptions
Time savings over standard rationalization is approximately 60%.
![Page 12: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/12.jpg)
Dynamic Alarm Management
Improved Quality of Alarms– Alarm relevancy by state
– Responsive configuration
Correct Technology, Methodology and Resources– Plant is divided into systems and sub-systems
– Complete and thorough review of process documents
– Interviews with engineers and operators
![Page 13: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/13.jpg)
Dynamic Alarm Management
Dynamic rationalization is rationalization for more than one process state
Static rationalizations can become dynamic when the question “When” is added to the discussion for each point
Control of alarm floods is vastly more important than improving average alarm rates
![Page 14: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/14.jpg)
Dynamic Alarm Management
Dynamic Alarm Management is the only way to control alarm floods
Dynamic Alarm Management– Transition manager configurable for every alarm– Smooth transitions from state to state– True Dynamic Alarm Management software able to handle 700+
dynamic points per operator– Enables meeting or exceeding ISA 18.2 metrics
![Page 15: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/15.jpg)
![Page 16: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/16.jpg)
Online Solution
![Page 17: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/17.jpg)
![Page 18: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/18.jpg)
Simplified Nested Logic 1
![Page 19: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/19.jpg)
Simplified Nested Logic 2
![Page 20: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/20.jpg)
![Page 21: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/21.jpg)
![Page 22: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/22.jpg)
Results from Dynamic Alarm Management
April 2013Parameter April ’13
BeforeJune ’14
StaticSept ’14Dynamic
ISA 18.2 Target
Peak Alarm Rate / 10 min 299 190 53 10
Average Alarm Rate / 10 min 4.8 3.9 1.0 1
% of Time in Flood Condition 9% 15.6% 3.0% <1%
Total Flood Count per Month 218 387 46
Total Chattering Alarm per Month
3438 4852 781
![Page 23: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/23.jpg)
Results from Dynamic Alarm Management
Priorities April ’13Before
June ’14Static
Sept ’14Dynamic
ISA 18.2 Target
Urgent 49.4% 15% 4% 5%
High 50.6% 18% 18% 15%
Low <0.1% 67% 78% 80%
![Page 24: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/24.jpg)
Total Flood Counts per Month
![Page 25: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/25.jpg)
Total Chattering Alarms - late June to mid-Sept.
![Page 26: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/26.jpg)
Annunciated Alarms per 10 min by Month
![Page 27: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/27.jpg)
Annunciated Alarms per 10 min by Month
![Page 28: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/28.jpg)
Percent Time of Day in Flood by Month
![Page 29: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/29.jpg)
Summary
Dynamic Alarm Management has had a massive impact on plant’s ability to control alarm floods.
Culture of operating by alarm is changing. Optional rationalization process saved 416 man hours of
plant personnel time with excellent rationalization results. ISA 18.2 Target Metrics are not yet fully reached but well on
the way – Dynamics implemented about 1 month ago and some system tuning is needed
Plant personnel impressed by the ability to dynamically suppress alarms.
![Page 30: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/30.jpg)
Where To Get More Information
Questions?
For More Information Contact:[email protected]@cornerstonechemco.com
![Page 31: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/31.jpg)
Thank You for Attending!
Enjoy the rest of the conference.
![Page 32: The Short Path to ISA 18.2 Alarm Management](https://reader033.vdocuments.net/reader033/viewer/2022061601/558953e9d8b42aea0b8b46e1/html5/thumbnails/32.jpg)
Metric Comparison
Before - 14721 Alarms (8757 Enabled)– Critical : 3371 (38.5%)– Warning : 1884 (21.5%)– PVBAD : 1022 (11.7%)– Prompt : 24 (0.3%)– SIM : 2456 (29.1%)
After - 14721 Alarms (1807 Enabled)– Critical : 109 (6.0%)– High : 354 (19.6%)– Low : 1344 (74.4%)