First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva , Switzerland G. Y. Hsiung -1 The Vacuum Interlock System for the TLS Storage Ring Gao-Yu Hsiung Tsai-Fu Lin Tzong-Shyan Ueng Zong-Da Tsai June-Rong Chen [email protected]

Upload: livia

Post on 31-Jan-2016

44 views

Category:

Documents


0 download

DESCRIPTION

The Vacuum Interlock System for the TLS Storage Ring. Gao-Yu Hsiung Tsai-Fu Lin Tzong-Shyan Ueng Zong-Da Tsai June-Rong Chen. [email protected]. Abstract. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -1

The Vacuum Interlock System for the TLS Storage Ring

Gao-Yu Hsiung Tsai-Fu Lin Tzong-Shyan Ueng Zong-Da Tsai June-Rong Chen

[email protected]

Page 2: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -2

Abstract

In order to protect the vacuum system for the Taiwan Light Source (TLS), a vacuum interlock system has been developed. The status of all the vacuum devices, including the sector gate valves, ionization gauges, and the pumps, are monitored and hence the vacuum system can be protected as soon as a vacuum failure happened. In addition, an alarm system has been established to monitor the temperature of vacuum chamber as well as the flow rate of cooling water system, to avoid the vacuum chambers from melt-down. Recently, the interlock system has been upgraded by including the interlock systems of all the front ends and the temperature alarm system to assure the vacuum quality of the storage ring. This interlock system has been functioned well since the first operation. The architecture of logic design and the features of the interlock system will be described.

Besides, a program has been established for archiving the readings of all the vacuum devices and the temperature monitoring systems that can be accessed through the internet for real time comparison of the relationship of various signals. Some experiences of unexpected failures or the malfunctions of the vacuum devices will also be illustrated.

Page 3: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -3

Taiwan Light Source (TLS)

Electron Storage Ring

(1.5 GeV)

Booster Ring(1.5 GeV)

LINAC(50 MeV)

ID in operation

W20 (1995) 4 ~ 15 keV

U10 (1995) 3 ~ 500 eV

U5 (1997) 60 ~ 1500 eV

U9 (1999) 4 ~ 100 eV

EPU5.6 (1999) 60 ~ 1400 eV

SWLS (2002) 4 ~ 30 keV

SW6 (2004) 6.5 ~ 19 keV

New ID in planning

1× EPU-II (2006)

3× IASW6 (2006)

1993 – Operation 1.3 GeV 1996 – Ramping to 1.5 GeV 2000 – 1.5 GeV Full Energy Injection (200 mA) 2004 – Operation with Superconducting RF Cavity

Circumference – 120 m Critical Energy – 2.14 keV Natural Emittance – 25 n mrad Average Pressure (200 mA) – 90 nPa (Dose ~ 8000 Ah) Life Time – 10 h

VUV SX HX

HX

HX

VUVSX

SXVUV

HX

SXHX

Page 4: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -4

TLS Vacuum Interlock System (since 1993)Assembly of Interlock System• Mosaic Display Panel• PLC control• UPS + Emergency Elec. P/S• Dry contact interface

LED Lamps (Status)• Green – Ready, Open, Enable• Red – Fault, Close• Red Flash – Not Ready• Off – Disable

Button (Control)- Push twice in 3 sec for switching and confirming

3.2 m

2.2 m

Control modes- “Auto” shut off / trip closed- “Manual” turn on / press open

Page 5: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -5

Layout of Vacuum Devices (1/6 Section)

Straight Section

Bending Section

Front Ends

: Sector GV (SGV): Pumping GV (PGV)

SGV1SGV2

PGV1

PGV2

PGV3

PGV4

--- IG ---

--- IP ---

--- TMP+DP ---

Page 6: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -6

Layout of 1/6 Section Control Panel

Straight Section

Bending Section

Logic 2TMP Isolation

Logic 1IG Protection

Logic 4IP Protection

Logic 3SGV Permission

2

2

1

1

4

4

3

3

TMP/DP Roughing

IP

IG

SGV

(to Upstream Section) (to Downstream Section)

Page 7: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -7

The Protection Logic Design

Logic 1 – IG Protection (from burning off) IG* "on" permitted when TMP normal (< 1E-2 Pa).

(*Two IG’s or more in the same section determine the pressure.) Logic 2 – TMP Isolation (from UHV)

TMP Isolated (PGV closed) when IG < 4E-8 Pa. Logic 3 – SGV Permission (for UHV)

SGV open permitted when IG < 1.3E-4 Pa. Logic 4 – IP Protection (from μ-dust production)

IP on permitted when IG < 1.3E-4 Pa.

Page 8: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -8

Temperature Monitoring System and Alarm Procedure

Temperature Monitoring System

PLC

Alarm Procedure

Cooling Water- Flow Rate (Fw))

Vacuum Chamber- Temperature (Tch) Tch > 35 °C (Alarm level) ?

Fw < 3 L/min ?

t > 15 min ?

ButtonReset

Page 9: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -9

Renew TLS Vacuum Interlock System (since 2004)

1/6 SectionStraight Section

Bending Section

Front Ends

• IG• IP

• IG• IP

• BLV• IG Vacuum of Front Ends – Included

Status of Tch and Fw – Included TMP Roughing Systems – Removed圖八(a):21前端區連鎖控制系統正面板顯示圖

3 2 1

IG1

IP1

HMS MGVPAB FCV

IG2

IP2

CP-Air

DI-Water Beam LineVacuum

Front EndStatus

MCR_ILCEnable

GV1

Beam LineReady

Front End Interlock System

• Tch• Fw

Temperature Monitoring System

4

4

3

3

5(Remaining)

Page 10: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -10

The Protection Logic Design (renew) Logic 3 – SGV Permission (for UHV)

SGV open permitted when IG < 1.3E-4 Pa. Logic 4 – IP Protection (from μ-dust production)

IP on permitted when IG < 1.3E-4 Pa. Logic 5 – FE Vacuum Ready

SGV open allowed when FE IG < 1.3E-6 Pa and the BLV (Beam Line Valve between B-chamber and FE) opened.

A Tch/Fw fault lasted longer than 15 min without reset will trip one of SGV closed.

Page 11: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland G. Y. Hsiung -11

Data Archiving System

Concept Layout of Structure Hardware and Software Features

1. Categories of signals to be selected.

2. Date to be selected.

3. Number of Dates to be quoted.

4. Mathematic applications.

5. Transfer to a text-format data file.

6. Functional non-zero, formula, re-scale,…

1

2 3

4 5

6

Page 12: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland G. Y. Hsiung -12

Concept

Diagnostics by retrieving the historical data Compare the signals between different subsy

stems Access easily (fast and friendly)

Remote archive (in the office, at home, worldwide, etc.)

Local display (on PC) Mathematic applications

+/- , statistics (σ), FFT, Normalize, …

Page 13: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland G. Y. Hsiung -13

Layout of Structure

(a)

(a) 2 servers for data storage

(b)

(b) 1 mirror server for internet access

(Viewer outside NSRRC).

Ethernet

Hub

Sub-systems - Magnet, Safety, ILC control

Viewer inside NSRRC

Local PC’s(FE/PBPM,…)

Other sub-systems(Utilities, water, …)

(c)

(c) Machine Sub-Systems (Mechanical Positioning)

(Chiller)

Page 14: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland G. Y. Hsiung -14

Contents of Archive system Hardware

PC – for data storage Servers – for data retrieving, Mirror (for internet) Hubs UPS

Software Operation System (XP, Win2000, etc.) Programming – Labview, Matlab, Active X, etc.

Features Data acquisition rate – 1 s, 10 s, 30 s, .. Number of signals in all system – 5500 Archive speed – internet access dependent Capacity – 300 GB; 2 servers + 1 mirror server; collecting da

ta since July, 2001.

Page 15: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, SwitzerlandG. Y. Hsiung -15

Problems subjected to the Operation

Noise pickup to the gaugeSynchrotron Radiation Hitting ProblemsHigh Temperature Baking ProblemsRadiation Damage Problems

Page 16: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, SwitzerlandG. Y. Hsiung -16

Noise pickup to the gauge

The reading of a gauge near a kicker changed due to the noise pickup when kicker was fired. It has been solved by shielding the gauge with Al foil and isolating the grounding of kicker from the chambers.

Page 17: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, SwitzerlandG. Y. Hsiung -17

Synchrotron Radiation Hitting Problems

Mass spectrum near a bending chamber shows CxFy contamination from the O-ring of a gate valve (BLV) that subjected the synchrotron irradiation. All the BLV’s have been replaced by all metal ones afterwards.

Page 18: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, SwitzerlandG. Y. Hsiung -18

High Temperature Baking Problems

A feedthrough of the ion pump was broken due to high voltage sparking when degassing during the baking. Number of times for switching the IP on are reduced to < 3 times.

Page 19: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, SwitzerlandG. Y. Hsiung -19

Radiation Damage Problems

An O-ring for a turbo-molecular pump located near the extraction chamber of 1.5 GeV booster synchrotron was damaged after high dosage rate irradiation. The pumps with O-ring contained will be removed from high dosage area after using.

Page 20: The Vacuum Interlock System for the TLS Storage Ring

First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland

G. Y. Hsiung -20

Summaries

The vacuum interlock system runs well. No malfunction has been found. Renewed interlock system includes all the front ends that vacuum performance of SR is more assured.

The archiving program is useful for the machine diagnostics and the machine performance can be improved a lot after solving those problems.

Development of the programs for the auto-correlation system are undergoing.