the virtual instruments

10
The Virtual The Virtual Instruments Instruments Presented by: Presented by: Peter Blach and Jace Peter Blach and Jace Curtis Curtis Advisor: Dr. Arthur Advisor: Dr. Arthur Broderson Broderson

Upload: chester-tyler

Post on 30-Dec-2015

30 views

Category:

Documents


3 download

DESCRIPTION

The Virtual Instruments. Presented by: Peter Blach and Jace Curtis Advisor: Dr. Arthur Broderson. Objectives. Development of software package (Windows 95/98) virtual oscilloscope power supply function generator multimeter. Specific Aims. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Virtual Instruments

The Virtual InstrumentsThe Virtual Instruments

Presented by: Presented by:

Peter Blach and Jace CurtisPeter Blach and Jace Curtis

Advisor: Dr. Arthur BrodersonAdvisor: Dr. Arthur Broderson

Page 2: The Virtual Instruments

ObjectivesObjectives

Development of software package Development of software package (Windows 95/98)(Windows 95/98)– virtual oscilloscopevirtual oscilloscope– power supplypower supply– function generatorfunction generator– multimetermultimeter

Page 3: The Virtual Instruments

Specific AimsSpecific Aims

Develop software and perform Develop software and perform multiple tests (make sure software multiple tests (make sure software works)works)

Incorporate work into EECE 213 Incorporate work into EECE 213 Laboratory (Labs 1-9)Laboratory (Labs 1-9)

Page 4: The Virtual Instruments

EquipmentEquipment

National Instruments LabView 5.0National Instruments LabView 5.0 National Instruments PCI-16E-MIO National Instruments PCI-16E-MIO

Data Acquisition boardsData Acquisition boards Standard Desktop computersStandard Desktop computers

Page 5: The Virtual Instruments

ScheduleSchedule

January 31, 2000 - OscilloscopeJanuary 31, 2000 - Oscilloscope February 15, 2000 - Function GeneratorFebruary 15, 2000 - Function Generator February 18, 2000 - Power SupplyFebruary 18, 2000 - Power Supply March 14, 2000 - Phase MeasurementMarch 14, 2000 - Phase Measurement March 31, 2000 - Rough draft of labsMarch 31, 2000 - Rough draft of labs

Page 6: The Virtual Instruments

ProgressProgress

Week 1 (Jan 10) - first meetingWeek 1 (Jan 10) - first meeting Week 2 (Jan 17) - schedule of Week 2 (Jan 17) - schedule of

needsneeds Week 3 (Jan 24) - oscilloscopeWeek 3 (Jan 24) - oscilloscope

Page 7: The Virtual Instruments

OscilloscopeOscilloscope

Page 8: The Virtual Instruments

Function GeneratorFunction Generator

Page 9: The Virtual Instruments

WebpageWebpage

Updates and progress monitored Updates and progress monitored via world wide web at via world wide web at http://http://vubmevubme..vusevuse..vanderbiltvanderbilt..eduedu/group19_99/group19_99

Page 10: The Virtual Instruments

AcknowledgementsAcknowledgements

Thanks to Dr. Broderson and Lason Thanks to Dr. Broderson and Lason for the help so farfor the help so far