theater opening syndicate

1
STRONG SOLDIERS, STRONG TEAMS! UNCLASSIFIED As of 11 SEP 11 SbS 12 IPC In Brief UNCLASSIFIED Provide input to the exercise plan Determine movement costs for exercise execution Draft transportation and movement concept Draft manning document to support theater opening Draft theater opening specific life support requirements Develop base operations plan for theater opening exercise locations Draft command and control structure for Theater Opening Joint Task Force Draft a synchronized Procurement Strategy with NAVEUR/MARFOREUR contracting assets Develop initial equipment listing Determine mode/source of exercise cargo based on available budget and timeline Publish initial timeline for decision points and requirements submission Confirm TO specific site survey requirements and timeline 1 Theater Opening Syndicate Syndicate leaders – LTC Looney / MAJ Toompalu / Responsibilities:

Upload: patience-leblanc

Post on 31-Dec-2015

36 views

Category:

Documents


1 download

DESCRIPTION

Theater Opening Syndicate. Syndicate leaders – LTC Looney / MAJ Toompalu / Responsibilities :. Provide input to the exercise plan Determine movement costs for exercise execution Draft transportation and movement concept Draft manning document to support theater opening - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Theater Opening Syndicate

STRONG SOLDIERS, STRONG TEAMS!

UNCLASSIFIED

As of 11 SEP 11SbS 12 IPC In BriefUNCLASSIFIED

• Provide input to the exercise plan• Determine movement costs for exercise execution• Draft transportation and movement concept • Draft manning document to support theater opening• Draft theater opening specific life support requirements • Develop base operations plan for theater opening exercise locations• Draft command and control structure for Theater Opening Joint Task Force• Draft a synchronized Procurement Strategy with NAVEUR/MARFOREUR

contracting assets • Develop initial equipment listing• Determine mode/source of exercise cargo based on available budget and

timeline• Publish initial timeline for decision points and requirements submission• Confirm TO specific site survey requirements and timeline

1

Theater Opening SyndicateSyndicate leaders – LTC Looney / MAJ Toompalu /

Responsibilities: