This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 636012. Thematic Workshop Italy Pillar B Deliverable 6.10 - Summary report of Thematic Workshop B (Italy), current and future dissemination activities to promote the eLIPTIC project aims, actions and outcomes to Italian stakeholders in regards to the electrification of public transport in cities. Authors Emanuele PROIA; Daniela CARBONE - ASSTRA Status (D: draft; F: final) F Document’s privacy (Public: PU; Private: PR) PU Reviewed by Yannick Bousse, UITP Hendrik Koch, City of Bremen Ref. Ares(2017)3794843 - 28/07/2017

Upload: others

Post on 17-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 636012.

Thematic Workshop Italy Pillar B

Deliverable

6.10 - Summary report of Thematic Workshop B (Italy), current and future dissemination activities to promote the eLIPTIC project aims, actions and outcomes to Italian stakeholders in regards to the electrification of public transport in cities.

Authors Emanuele PROIA; Daniela CARBONE - ASSTRA

Status (D: draft; F: final) F

Document’s privacy

(Public: PU; Private: PR) PU

Reviewed by Yannick Bousse, UITP Hendrik Koch, City of Bremen

Ref. Ares(2017)3794843 - 28/07/2017

Page 2: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

1

D6.10 Thematic Workshop Pillar B

SUMMARY SHEET Programme Horizon 2020 Contract N. 636012 Project Title Electrification of public transport in cities Acronym ELIPTIC

Coordinator Free Hanseatic City Of Bremen Web-site http://www.eLIPTIC-project.eu/ Starting date 1 June 2015 Number of months 36 months Deliverable N. 6.10 Deliverable Title Thematic Workshop Pillar B Milestones N/a Version V1 Date of issue 12-07-2017 Distribution External Dissemination level Public Abstract The Thematic Pillar B Workshop – titled “Electrification of Public Transport

in cities: first results of upgrading and/or regenerating electric Public Transport Systems (flywheel, reversible substations)” - was held on the 12th June 2017 in Rome at ASSTRA headquarter. The workshop was arranged by the ASSTRA to show the principal results about ELIPTIC use cases and to present some European/Italian experiences on electric public transport jointly with Italian stakeholders (local administrations, PTOs, PTAs, industry, universities and consultants). Through ASSTRA’s membership community and wider industry contacts about 40 delegates attended the workshop and via website further disseminate the outcomes.

Keywords Workshop, Dissemination, Pillar B, ELITPTIC, CITIVAS, Horizon2020, ASSTRA, Italy

Critical risks

This report is subject to a disclaimer and copyright. This report has been carried out under a contract awarded by the European Commission, contract number: 636012

Page 3: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

2

D6.10 Thematic Workshop Pillar B

DOCUMENT CHANGE LOG Version Date Main area of changes Organnisation Comments

0.1 21/07/2017 n/a ASSTRA n/a

0.2 24/07/2017 Review of document City of Bremen n/a

0.3 25/07/2017 Review of document UITP n/a

0.4 26/07/2017 Review of document ASSTRA n/a

1 27/07/2017 Final document ASSTRA n/a

PARTNER CONTRIBUTION Company Sections Description of the partner contribution

ASSTRA Entire document Document leader

UITP Entire document Review of document

City of Bremen Entire document Review of document

Page 4: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

3

D6.10 Thematic Workshop Pillar B

Table of Contents SUMMARY SHEET ............................................................................................................... 1

DOCUMENT CHANGE LOG ...................................................................................... 2 PARTNER CONTRIBUTION ...................................................................................... 2 1. Executive Summary .......................................................................................... 4 2. Workshop Description ...................................................................................... 5

a. Workshop Objective ................................................................................................... 5 b. Organization of the Workshop .................................................................................... 6 c. Overview .................................................................................................................... 8 d. Participants .............................................................................................................. 10

3. Workshop Dissemination ............................................................................... 11 4. Conclusions ..................................................................................................... 12 5. Annex I: Workshop Agenda ............................................................................ 13 6. Annex II: Workshop Participants List ............................................................ 15 7. Annex III: Workshop Pictures ......................................................................... 17 8. Annex V: Thankyou Letter .............................................................................. 24

Page 5: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

4

D6.10 Thematic Workshop Pillar B

1. Executive Summary The Pillar B Workshop – “Electrification of Public Transport in cities: first results of upgrading and/or regenerating electric Public Transport Systems (flywheel, reversible substations)” - was held on the 12th June 2017 in Rome at ASSTRA headquarter.

The workshop started at 12.00 and ended around 17.15 with a light lunch break and coffee break in between. It was structured in three sections:

• The first section “Institutional framework” started with a welcome from the ASSTRA Director and a speech about Tram systems in Italy.

• The second section “The eLIPTIC use cases” focuses on the Pillar B Use cases. First, was presented the eLIPTIC project and the evaluation process of the eLIPTIC Use Cases and the general contents of Pillar B Use Cases; then were presented four presentations about eLIPTIC Pillar B Use cases – Brussels, Lanciano, Bremen, Gdynia.

• The third section “Other European/Italian Experiences” started with a presentation about the ELIPTIC concepts in integrating electric buses in existing electric public transport, to keep on with other experiences from Cagliari, Bergamo and Szeged.

The workshop was attended by about 35 delegates from local administrations, PTOs (public transport operators), PTAs (public transport authorities), manufacturers, industry and universities representatives as well as consultants.

The table below shows all the speakers in order of appearance:

Emanuele Proia ASSTRA ASSTRA WELCOME Giovanni Mantovani Consultant TRAM SYSTEM IN ITALY: STATE OF ART Daniela Carbone ASSTRA COORDINATOR Hendrik Koch ELIPTIC Project

Coordinator THE ELIPTIC PROJECT

Maria Vittoria Corazza

UNIROMA 1 EVALUTATION OF THE ELIPTIC USE CASES

Veronica Usai Rail Office ASSTRA PILLAR B USE CASES DESCRIPTION Benjamin Roeland STIB Brussels ENERGY RECOVERY LIGHT RAIL SYSTEMS:

MEASUREMENT RESULTS IN TRAM NETWORK Sandro Imbastaro TUA Lanciano LANCIANO USE CASE Jürgen Kappus BSAG Bremen EXPERIENCE ON FLYWHEEL STORAGE SYSTEMS IN

BREMEN Marta Woronowicz PKT Gdynia GDYNIA USE CASE Yannick Bousse UITP ELIPTIC CONCEPTS IN INTEGRATING ELECTRIC BUSES

IN EXISTING ELECTRIC PUBLIC TRANSPORT Francesco Caredda CTM Cagliari THE ELECTRICALLY POWERED EXPERIENCE IN CTM Paolo Rapinesi ATB Bergamo LINE C PROJECT Ádám Németh Zoltán ZKT Szeged EXTENSION OF A TROLLEYBUS LINE IN SZEGED WITH

TROLLEYBUS-HYBRIDS

The presentation slides from the day are available on the ASSTRA website:

http://www.asstra.it/eventi/anno_in_corso/convegni-e-seminari/giugno/workshop-progetto-europeo-electrification-of-public-transport-in-cities-eLIPTIC.html

Page 6: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

5

D6.10 Thematic Workshop Pillar B

2. Workshop Description a. Workshop Objective

Within the eLIPTIC project, they have been planned three thematic workshops on the three thematic pillars:

A. Safe integration of e-buses into existing electric PT infrastructure

B. upgrading and/or regenerating electric public transport systems

C. Multipurpose use of electric public transport infrastructure.

The workshops aimed to increase the visibility of the project and to stimulate public’s interest towards eLIPTIC.

In particular, ASSTRA organized the “Thematic workshop Italy” on the pillar B “Upgrading and/or regenerating electric public transport systems” pursuing the following objectives:

• to inform Italian municipalities, transport operators and mobility practitioners about eLIPTIC Use Cases on Pillar B;

• to share some other interesting European and Italian experiences with the audience in order to stimulate the debate among the stakeholders;

• to exchanges views and ideas around regenerating electric public transport systems jointly with Italian and European stakeholders.

Page 7: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

6

D6.10 Thematic Workshop Pillar B

b. Organization of the Workshop

The organization of the workshop was cared by ASSTRA – Italian Public Transport Association, following the next steps:

• Planning of the first draft of the agenda, starting with what is included in the DoW and taking into account the results of the Pillar B use cases.

• Sharing and validation of the draft of the agenda with the eLIPTIC project coordinator and the responsible of WP 6 “Dissemination”.

• Mailing invitations to the speakers to collect the acceptances and updating the agenda.

• Predisposition of the definitive programme.

• Dissemination of the event through several communication channels: dedicated circulars of the Association to its members; promotion on the ASSTRA web site and newsletter; direct e-mail invitation to eLIPTIC partners, ASSTRA Committee and working groups.

• Workshops in Rome at ASSTRA headquarter.

• Mailing the thankyou letter to all the speakers in order to thank them for their precious cooperation which contributed to the success of the initiative.

• Dissemination of the event’s results through several communication channels: publishing workshop presentations on the ASSTRA website; circulars of the Association to its members to inform them on the publishing workshop presentations; direct e-mail to eLIPTIC partners to inform them on the publishing workshop presentations; news on FERPRESS – Newsletter and magazine – Public Transport press agency.

The flow chart below summarized all the described steps.

Page 8: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

7

D6.10 Thematic Workshop Pillar B

Figure 1 – Workshop Flow Chart

Page 9: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

8

D6.10 Thematic Workshop Pillar B

c. Overview

The workshop was held at the ASSTRA headquarter in Rome, Italy. The room was very comfortable to accommodate 35 delegates, and there was a small lunch at the beginning of the event in an adjacent room and a coffee break during the event in the afternoon. A dedicated bag was given to all attendees (speakers and delegates) and to the principal representatives of Italian institutions, including some gadget: ASSTRA copybook, pen, ASSTRA power bank and Italian red pepper gift box.

The workshop started at 12.00 welcomed by Mr Emanuele Proia (ASSTRA) introducing the workshop agenda followed by a keynote speech. The event was structured in three sessions:

• 1st Section “Institutional framework”

• 2nd Section “The ELIPTIC use cases”

• 3rd Section “Other European/Italian Experiences”

In total there were twelve presentations and the workshop finished at 17.15. In the evening there was a social dinner in a typical Italian restaurant.

The complete agenda is attached to this document (see Annex I).

Below are summarized the main topics covered by each presentation.

1st Section “Institutional framework”

Mr Giovanni Mantovani – Consultant, presented a state of the art of Tram System in Italy. Actually, the tram system is present in 13 cities: Milan, Turin, Trieste, Rome and Naples where the lines are never been dismissed; Bergamo, Florence, Palermo, Messina, Cagliari and Sassari have new lines in operation; in Padova and Venice there is a new tramway on tyres in operation.

2nd Section “The ELIPTIC use cases”

The section was coordinated by Mrs Daniela Carbone - Head of Technological Innovations Department ASSTRA - introducing the speakers. In this section the eLIPTIC use cases regarding the pillar B “Electrification of Public Transport in cities: first results of upgrading and/or regenerating electric Public Transport Systems (flywheel, reversible substations)” were illustrated.

Mr Hendrik Koch – eLIPTIC Project Coordinator, Bremen - gave an overview of eLIPTIC project structure. The project has involved public transport operator, Associations, University, Research and innovation sector and the universities, is structured in six work package and provides 20 use cases, 11 twins and 22 User Forum members.

Ms Maria Vittoria Corazza - Researcher UNIROMA 1 – showed the adopted method to evaluate the eLIPTIC use case. The evaluation procedure (which takes place in the specific WP3) is two‐pronged: on the one hand it includes the assessment of results of the eLIPTIC use cases and on the other it includes the assessment of the implementation

Page 10: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

9

D6.10 Thematic Workshop Pillar B

of eLIPTIC, the assessment of the eLIPTIC process itself. For what concerns the impacts assessment, the core of the task is to have comparable results before the implementation of the eLIPTIC measures (the NO eLIPTIC scenario) and during (the ELIPTIC scenario).

Ms Veronica Usai – Rail Office ASSTRA – has provided an overview of the Pillar B use cases, highlighting the role of the coordinator. Pillar B aimed to analyze smart energy management concepts for upgrading existing (electric) public transport infrastructure. The Pillar B Use cases are: Bremen, Brussels, Gdynia, Lanciano.

Mr Benjamin Roeland – STIB Brussels – showed the Brussels use case regarding the energy recovery light rail systems, with a focus on the measurement results in tram network. The STIB’s scope of work is to improve energy efficiency of tramway infrastructure, to study the potential of braking energy recovery technologies, to measure tramways energy consumption, to analyze how to reduce this consumption.

Mr Sandro Imbastaro – TUA Lanciano – illustrated the Lanciano use case regarding a feasibility study on an upgrading existing railway networks with a new tramway. The choice of tramway was made because this system provides high accessibility for users (thanks to the low floor) and high-speed commercial, less impact on traffic and on town roads and a good chance to develop and improve urban architecture.

Mr Jürgen Kappus – BSAG Bremen – gave an overview on the Bremen use case regarding a refurbishment of a flywheel energy storage system. From the analysis carried out by BSAG, it is clear that the system never left trial-run status. It’s not mature for service due to strong vibration, vacuum leaking, overheating of the system, local overheating at bearings, malfunction of inverter, moreover the control-algorithms to be optimized.

Ms Marta Woronowicz – PKT Gdynia - showed the Gdynia use case regarding optimised braking energy recovery in trolleybus network thanks to implementation of bidirectional energy supply in on two spots of Gdynia trolleybus network. The project showed that bilateral supply works! It was recorded a reduction of energy consumption 2 – 5 % and a reduction of voltage drops so much that to plan for extending it to further spots on the network.

3rd Section “Other European/Italian Experiences”

Also this section was coordinated by Mrs Daniela Carbone - Head of Technological Innovations Department ASSTR - introducing the speakers. In this section were been illustrated some very interesting European and Italian Experiences on electric Public Transport Systems.

Mr Yannick Bousse –Project manager – Research and Innovation UITP - gave an overview of eLIPTIC safe integration of electric buses into existing electric PT infrastructure. Regarding the integration ebuses into existing electric public transport infrastructure, the several use cases have analyzed two different cluster technology: "Electricity from existing public transport grids to power e-bus charging points" and "Hybrid Trolleybus". Moreover it was illustrated Barcelona's experience: the opportunity fast charging and slow overnight charging of electric buses based on metro infrastructure.

Mr Francesco Valentino Caredda – CTM Cagliari – showed the CTM Cagliari experience

Page 11: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

10

D6.10 Thematic Workshop Pillar B

on the electrically powered. Cagliari took part to ZeEUS project to experiment the use, in the ordinary scheduled service, of a ZEV trolleybus fleet, powered with innovative technologies to use in the sections without overhead line, with great performances. Regarding eLIPTIC project, CTM Cagliari is twinning partner with PKT Gdynia in the use case aimed to replacing of diesel bus lines by extending trolleybus network with trolley-hybrids.

Mr Paolo Rapinesi – Mobility Infrastructure Technologies and Fleet Maintenance Manager ATB Bergamo – presented the ATB Bergamo Project “Line C” on 12 new electric buses (Kick-off scheduled for January 2018) aimed to improve the transport local attractiveness, investing in an ecological service and offering a new public transport service with advanced technology on board and in the smart bus shelter. The project provides 5 new reserved lanes on the route in addition to the existing 6, traffic lights optimization, 12 new electric buses, recharge stations in the depot and 16 new smart bus shelters.

Mr Ádám Németh Zoltán – ZKT Szeged – showed the ZKT Szeged project about the extension of a trolleybus line with trolleybus-hybrids. This system has many opportunity including lower mass, lower energy consumption, potential development in BMS system optimization for opportunity charging. For test operation Petőfitelep terminus is optimal, with route 20, the charging system is recommended to be compatible with trolleybuses. For trolleybus route extension the experimental operation route Egyetem tér (TIK) – Öthalmi diáklakások (ELI) is recommended, with battery mode in the city centre, and beyond the current at terminus.

At the end of the presentations the participants asked some technical information on the involved thematics to the speakers showing a great interest on the workshop contents.

d. Participants Organisations that participated to the eLIPTIC Pillar B workshop included:

Bremen (eLIPTIC project coordinator), BSM Ayuntamiento de Barcelona, Maribor Municipality.

City Council

ASSTRA (Associazione Trasporti), CIFI (Collegio Ingegneri Ferroviari Italiani), TÜV (Technische Überwachung), UITP (International Public Transport Associations).

Associations

ATB (Bergamo), CTM (Cagliari), MAFER (Bologna), PKT (Gdnya), STIB (Brussels), TPER (Bologna), TUA (Chieti), ZKT (Szeged).

Public Transport Operators (PTO)

TII - Transport Infrastructure Ireland (Dublin). Public Transport Authority (PTA) Alstom, Vossloh Kiepe Industry LA SAPIENZA (Roma), Maribor University (Maribor), RWTH (Aachen).

University

Rupprecht Consult. Consultant

A list of the attendees and their representatives is attached to this document (see Annex II).

Page 12: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

11

D6.10 Thematic Workshop Pillar B

3. Workshop Dissemination The event was promoted in the following ways:

Before the event

• Direct email invitation to eLIPTIC partners and User Forum members.

• Direct email invitation to ASSTRA Committee and working group members: Technological Commission, Rail Commission, Bus Working Group, ITS working Group.

• Dedicated circulars of the Association to its members.

• ASSTRA website.

• ASSTRA newsletter “Pillole di mobilità”.

• ASSTRA Twitter

“eLIPTIC PROJECT WORKSHOP “ELECTRIFICATION OF PUBLIC TRANSPORT IN CITIES” @AssTrasporti http://www.consumersforum.it/voce-ai-soci/3765-eLIPTIC-project-workshop-electrification-of-public-transport-in-cities.html#.WSV6USg6Ypo.twitter …”

After the event

• Publishing workshop presentations on the ASSTRA website.

http://www.asstra.it/eventi/anno_in_corso/convegni-e-seminari/giugno/workshop-progetto-europeo-electrification-of-public-transport-in-cities-eLIPTIC.html

• Direct e-mail to eLIPTIC partners to inform them on the publishing workshop presentations.

• Dedicated circular by ASSTRA to its members to inform them on the publishing workshop presentations.

• News on FERPRESS – Newsletter and magazine – Public Transport press agency.

Page 13: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

12

D6.10 Thematic Workshop Pillar B

4. Conclusions The organization of the workshop aimed to inform the relevant stakeholders at local, national, but also European and international levels and ensure a wide visibility of the project and of the involved issues. Increasing the project’s visibility is possible to broaden the project acceptance and influence the uptake potential.

All the speeches were greatly appreciated contributing to the success of the initiative. Subsequent debates developed with the participants in the Workshop allowed us, from the exchange of information, to draw interesting guidelines and suggestions for the operators, inspiring a broader political debate about the potential of electrification for strengthening the role of sustainable transport modes. To reduce atmospheric pollution, son of our generation, the role of Public Transport is strategic. It is necessary to reverse the current unsustainable trends, focusing on the development and modal shift towards low emission transport.

Page 14: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

13

D6.10 Thematic Workshop Pillar B

5. Annex I: Workshop Agenda

Page 15: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

14

D6.10 Thematic Workshop Pillar B

Page 16: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

15

D6.10 Thematic Workshop Pillar B

6. Annex II: Workshop Participants List

Page 17: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

16

D6.10 Thematic Workshop Pillar B

Page 18: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

17

D6.10 Thematic Workshop Pillar B

7. Annex III: Workshop Pictures

Image 01: Attendees to the ELIPTIC Pillar B workshop. They included representatives from PTOs, PTAs, associations, industry, universities and consultancies.

Page 19: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

18

D6.10 Thematic Workshop Pillar B

Image 02: Attendees to the ELIPTIC Pillar B workshop.

Image 03: Mr. G. Mantovani gave an overview on tram systems in Italy.

Page 20: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

19

D6.10 Thematic Workshop Pillar B

Image 04: Mr. H. Koch - Project Coordinator, Bremen - gave an overview of eLIPTIC project structure.

Page 21: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

20

D6.10 Thematic Workshop Pillar B

Image 05: Some speakers of the ELIPTIC Pillar B workshop.

(Mrs D. Carbone, Mr H. Koch, Mrs M. Corazza, Ms V. Usai)

Page 22: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

21

D6.10 Thematic Workshop Pillar B

Image 06: Some speakers of the ELIPTIC Pillar B workshop

(Mrs D. Carbone, Mr J. Kappus, Ms M. Woronowicz, Ms V. Usai)

Page 23: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

22

D6.10 Thematic Workshop Pillar B

Image 07: Mr Y. Bousse – WP 6 Responsible participants - gave an overview of ELIPTIC concept in integrating electric buses.

Page 24: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

23

D6.10 Thematic Workshop Pillar B

Image 08: Workshop bag including some gadget: ASSTRA copybook, pen, ASSTRA power bank and Italian red pepper gift box.

Page 25: Thematic Workshop Italy - ELIPTIC project · Mr Jürgen Kappus BSAG Bremen – gave an overview on the Br– emen use case regarding a refurbishment of a flywheel energy storage system

24

D6.10 Thematic Workshop Pillar B

8. Annex V: Thankyou Letter