George Theodossopoulos CV 2015 Revision B + photo - 1 - CURRICULUM VITAE CURRICULUM VITAE PERSONAL DATA Name Address Date of Birth Nationality Tel & Fax Mobile Skype e-mail URL George Theodossopoulos 20 M. Alexandrou str, Ag. Stefanos Attikis, ATHENS - GR 14565 July 3 rd 1964 Greek & Italian +30 210 8144271 +30 6944691145 theodossopoulos [email protected] www.georgetheodossopoulos.com TITLE EUR ING Msc CIVIL ENGINEERING CURRENT POSITION Free Lancer KEY QUALIFICATIONS Mr George Theodossopoulos has about 23 years of work experience as Civil Engineer in different fields, such as industrial, project management and construction of a wide range of structures. In April 2011 was awarded the EUR-ING title by FEANI “European Federation of National Engineering Associations” . The following list is a summary of the projects in which has been involved during the previous years. Cable stayed Bridge: Rion –Antirion (steel structures, seismic devices) Steel highway bridges. Rion –Antirion Approach Viaducts Anti-seismic hydraulic dampers prototype development and application. Elastomeric devices development and application. Housing, mixed use railways facilities and industrial buildings Tunnel kilns construction for ceramics industries. Industrial Quality control & Assurance. Civil engineering on site Quality control & Assurance Industrial production of ceramics, plant management. CO2 Emissions control and plants energetic management. Real estate development Olympic stadium facilities: 35000 seats capacity soccer covered stadium design and construction. Wind tunnel tests for cantilever stadium roof, design development Business management

Upload: others

Post on 23-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

George Theodossopoulos CV 2015 Revision B + photo - 1 -

CURRIC

ULUM VIT

AE

C U R R I C U L U M V I T A E

PERSONAL DATA

Name

Address

Date of Birth

Nationality

Tel & Fax

Mobile

Skype

e-mail

URL

G e o r g e T h e o d o s s o p o u l o s

20 M. Alexandrou str, Ag. Stefanos Attikis, ATHENS - GR 14565

July 3rd

1964

Greek & Italian

+30 210 8144271

+30 6944691145

theodossopoulos

[email protected]

www.georgetheodossopoulos.com

TITLE

EUR ING Msc CIVIL ENGINEERING

CURRENT POSITION

Free Lancer

KEY QUALIFICATIONS

Mr George Theodossopoulos has about 23 years of work experience

as Civil Engineer in different fields, such as industrial, project

management and construction of a wide range of structures. In April

2011 was awarded the EUR-ING title by FEANI “European Federation

of National Engineering Associations” . The following list is a summary

of the projects in which has been involved during the previous years.

• Cable stayed Bridge: Rion –Antirion (steel structures, seismic devices)

• Steel highway bridges. Rion –Antirion Approach Viaducts

• Anti-seismic hydraulic dampers prototype development and application.

• Elastomeric devices development and application.

• Housing, mixed use railways facilities and industrial buildings

• Tunnel kilns construction for ceramics industries.

• Industrial Quality control & Assurance.

• Civil engineering on site Quality control & Assurance

• Industrial production of ceramics, plant management.

• CO2 Emissions control and plants energetic management.

• Real estate development

• Olympic stadium facilities: 35000 seats capacity soccer covered stadium design and construction.

• Wind tunnel tests for cantilever stadium roof, design development

• Business management

George Theodossopoulos CV 2015 Revision B + photo - 2 -

CURRIC

ULUM VIT

AE

EDUCATION

University of BOLOGNA ITALY “Dottore in Ingegneria Civile” 1990 Msc CIVIL ENGINEERING - FEANI EUR ING

• Specialization on Steel structures.

• Graduating Thesis on structural dynamics, on the following subject:

“Structure modeling and programs for computer structural dynamic

analysis.” Prof. P. Sacchi and E. Viola. Istituto di Scienza delle

Costruzioni.

MEK Title extension, which enables the bidding of pubic works, granted from the Greek Ministry of Public Works, after certification of previous experience on the above categories. Lower grade is Class A, Maximum grade Class D.

• Road works Class C

• Building construction works Class C

• Hydraulic works Class B

• Marine works Class B

• Industrial and energy applications Class C

LANGUAGES

SPEAKING

READING

WRITING

GREEK ITALIAN ENGLISH FRENCH Bilingual (mother tongue) Excellent Excellent Very Good Basic Excellent Excellent Very Good Basic Excellent Excellent Very Good Poor * NOTE: Knowledge of all languages extends to technical terms related to the Engineering field.

MEMBERSHIPS

TEE Greek Technical Chamber http://portal.tee.gr/portal/page/portal/TEE_HOME FEANI European Federation of National Engineering

Associations http://www.feani.org/site/ S.P.M.E. Greek Association of Civil Engineers. http://www.spme.gr/ P.E.D.M.E.D.E. Greek Association of Engineers qualified for the

construction of Public Works. http://www.pedmede.gr/ S.T.A.E. Greek Association of Safety Engineers. http://www.stae.gr

George Theodossopoulos CV 2015 Revision B + photo - 3 -

CURRIC

ULUM VIT

AE

CAREER HIGHLIGHTS EXPERIENCE SUMMARY

CURRENT POSITION - Since April 2012

Free Lancer Technical Consultant for Warehouses and Railway

facilities buildings special steel structures in Thriassio Pedio

project in Athens. Thriassio Pedio is the central and largest multi-

modal transport node (Freight Center) in Greece, receiving cargo and

freight through the main Railway axes of Greece and the commercial

port of Piraeus (Ikonio), with which it acts as long distance dry port,

connected though a newly constructed railway line. (2014-2015)

Greek Technical Chamber (TEE) Assessor on steel structures.

June 2007 – April 2012

TECHNOKERAMIKI SA (Brick manufacturing plant)

• CEO –Vice president (budget 3.5m €)

In parallel with the above activity, as a free lancer

• Greek Technical Chamber (TEE) Assessor on steel structures.

• Offices building re-construction and architectural lighting

applications. (Budget 1.5m €) (Feb 2011- Jan 2012)

• Repair of a building seriously damaged by fire (Budget 0.5m €)

Nov 2005 - Dec 2006

Project

Position

Employer

Place of work

Project description

Main activities and responsibilities

Lakis Gavalas S.A. new building in Kantza (Athens).

Steel structure design construction and erection management.

DIMAND SA

Athens, Greece

It is a building of approx 12000sqm, of special aesthetic and other

requirements to minimize the environmental impact of a semi-industrial

building in a purely agricultural area. The core is a 4600 tons non

symmetric steel structure designed and built in less than 6 months due

to a very tight schedule of the entire project. Budget 13million €.

Steel structure design fabricaton and erection management, as well as

responsible for the development and erection of the special

prefabricated concrete façade elements with owners’ company logo

which characterizes the building specific high end marketing oriented

aspect.

George Theodossopoulos CV 2015 Revision B + photo - 4 -

CURRIC

ULUM VIT

AE

Nov 2005 - Dec 2006

Project

Position

Place of work

Project description

Housing complex with swimming pool

Free lancer - Contractor

Athens - Greece

Design and construction - turn key - of two semidetached houses with

swimming pool. (Budget 0.7m€)

Sept. 2004 – Dec. 2005

Project

Position

Employer

Place of work

Project description

Main activities and responsibilities

ATTRATTIVO S.A. New building (Athens)

Project manager

INTRADEVELOPMENT SA

Athens, Greece

Design and Construction of office and light industrial building, about

4500 sqm - Budget 2.500.000 €

• Coordinate the agreements and the relationships between the owners of the company and the subcontractors.

• Preparation of tender documents and negotiations with major design offices and building companies.- Evaluation of technical and financial offers.

• Decision-making regarding the choice of the final contractors.

• Handle relationships with the authorities.

• Follow up all issues related to the financing of the project, through bank loans.

• Review all design produced by the design team. Integrate construction requirements in the design. Make sure that contractual obligations are respected.

• Support technical issues raised by the on-site team.

• Make sure that major goals, and budget limits are respected and timetables are met.

Nov 2004 – Sept 2005

Project

Position

Employer

Place of work

Project description

TOI & MOI S.A New building Design coordination, Piling, earthworks and foundations, construction manager. Dimand s.a. Athens Design and construction of five floors office building (about 2000 sqm) and independent industrial building (about 8000 sqm) - Budget 8.500.000 €

George Theodossopoulos CV 2015 Revision B + photo - 5 -

CURRIC

ULUM VIT

AE

May 2003 – Sept 2004

Project

Position

Employer

Place of work

Project description

Main activities and

responsibilities

NEW KARAISKAKI STADIUM

(OLYMPIC SOCCER STADIUM)

Design Manager

INTRADEVELOPMENT s.a.

Athens, Greece

35,000 seats fully covered new built soccer stadium including 6-floor

building for facilities and corporate suites. Complete demolition of the

old facilities. The project was accomplished within 18 months including

design and construction in order to be ready for the 2004 Athens

Olympics. Approximately 7,000 tons of structural steel structures and

40,000 m3 of concrete structures.

• Review all design produced by the design team in Greece and

Italy. Integrate construction requirements in the design.

Responsible for the collaboration with Professor Massimo

Majowiecki in Italy, designer of the steel structure.

• Plan, schedule and monitor the issuance of Particular

Technical Specifications, Technical Requirements and all

necessary contractual documents for all earthwork steel and

concrete works to be sub-contracted.

• Make sure that contractual obligations are respected.

• Organize and follow up of wind tunnel test for the validation of

the design parameters of the cantilever stadium roof.

• Preparation of tender documents and negotiations with

subcontractors.

• Construction, shop-drawings and as built drawing review and approval.

• Follow up of the fabrication, in subcontractor’s facilities.

• Support technical issues raised by the on-site works of major sub-contractors (J&P AVAX, INTRAKAT etc).

• Review and follow up for the design of temporary structures and work methods, necessary for the construction department.

• Report and handle relationships with “Athens 2004, Olympic

Committee”.

George Theodossopoulos CV 2015 Revision B + photo - 6 -

CURRIC

ULUM VIT

AE

Jan. 2000 - May 2003

Project

Position

Employer

Project description

Place of work

Main activities and

responsibilities

Deck on pylon detail

Pivoting frame detail

Pylon head detail

Rion Antirion Cable stayed bridge and approach viaducts

construction.

Steel structure and seismic isolation devices coordinator

KINOPRAXIA GEFYRA (VINCI GROUP)

2,880 m (9,449 ft) long, four spans, cable stayed bridge. Due to the peculiar conditions of the straits, several unique engineering problems needed to be considered. The water depth reaches 65 m, the seabed is mostly of loose sediment, the seismic activity and possibility of tectonic movement is significant, and the Gulf of Corinth is expanding at a rate of about 30 mm a year. For these reasons, special construction techniques were applied for the construction of the bridge. Antirion site Greece, Darlington UK, Italy

• Review all design produced by the design team in France. Integrate construction requirements in the design. Make sure that contractual obligations are integrated.

• Construction, shop-drawings and as built drawing review and approval.

• Plan, schedule and monitor the issuance of Particular Technical Specifications, Technical Requirements and all necessary contractual documents for all steel work to be sub-contracted, either in Greece or to international steel fabricators (Cimolai, DSD Dillinger-Stahlbau GmbH, Cleveland Bridge U.K, Baudin Chateauneuf, etc)

• Preparation of tender documents and negotiations of international subcontracts for seismic isolation and dissipation devices, and of major steel structures.

• Design development of prototype seismic dampers in collaboration with “FIP Industriale” and University of San Diego California for the prototype testing. (Conference paper fib Symposium 2003 "Concrete structures in seismic regions", Athens,Greece,May2003. (http://en.structurae.eu/refs/items/index.cfm?id=r0014047

• Review and follow up for the design of temporary structures and work methods, necessary for the construction department.

• Support technical issues raised by the on-site works of major sub-contractors (Cleveland Bridge UK, METKA, Freyssinet, FIP Industriale, Cimolai spa, ALGA etc) related to the main and approach bridges steelwork assembly and seismic isolation.

• Handle relationships with the Design Checker (Buckland & Taylor Canada), related to the design of the bridge steel structures (deck, pylon head, etc) as well an isolation and dissipation seismic devices.

George Theodossopoulos CV 2015 Revision B + photo - 7 -

CURRIC

ULUM VIT

AE

Rion Antirion Bridge cont’

Prototype viscous damper

Bridge view

• Handle relationships with the Supervision Engineer (Faber Maunsell) related to fabrication and erection of the steel structures and seismic devices.

• Follow up of the fabrication, in subcontractor’s factories, (in Greece, UK, Italy) of all the above-mentioned bridge parts.

Major international contracts involved with

• Main bridge deck steelwork (approximately 17,000 tons). The fabrication of the bridge’s steel deck has been subcontracted to Cleveland Bridge UK, thus during the fabrication period I was located in UK (Darlington.)

• Main bridge Seismic Isolation devices prototype tests in collaboration with the University of California (S. Diego) seismic response laboratory.

• Main bridge Seismic Isolation devices fabrication (16 units 350 tons reaction each)

• Anchorage on bridge pylons heads (approximately 4000 tons steelwork).

• Approach viaducts Seismic Isolation devices fabrication and testing.

• Transition frame and anti-uplift device of main bridge (approximately 1000 tons steelwork).

• Rion approach viaduct (approximately 9500 tons steelwork)

• “Minor” steel structures about 1800 tons.

Dec.1997 –Dec. 1999

Position

Place of work

Project description

Free lancer - contractor

Athens

Design and construction of the following works:

• Retaining wall, 5m high, in Athens

• Internal partitions and general remake of two shops to be used as pharmacies

• General restoration of the office (360 sq.) of TRACO SA in Athens city center.

• On-site visits and technical reports regarding the stability of damaged buildings, after the earthquake of Sept. 7

th, 1999 in

Athens.

• Repair and reinforcement of a neoclassical building in Athens city center, damaged from the earthquake of Sept. 7

th, 1999

• Technical advisor of TECHNOKERAMIKI SA

• Technical advisor of TRACO SA

George Theodossopoulos CV 2015 Revision B + photo - 8 -

CURRIC

ULUM VIT

AE

Feb. 1996 – Nov. 1997

Position

Employer

Place of work

Project description

Main activities and responsibilities

Deputy Technical Manager New Tech SA Athens

• Design and building of a two floor log house in Kalamos (Greece)

• Preliminary design coordination of two vertical parking towers.

New Tech SA, was representing in Greece the Korean company Sigan

for the construction of automatic vertical parking towers and the Italian

company PREMETAL for the construction of industrial buildings, as

well as Finish company CONTYO for log houses. The position of

deputy technical manager regards the follow up of all technical issues

of structural detailing, the design and erection of the buildings.

Sept. 1994 – Jan. 1996

Position

Employer

Place of work

Main activities and responsibilities

.

Quality Control and Sales Manager TECHNOKERAMIKI SA (brick manufacturing company) Ritsona Evias (GREECE) & Athens

• Responsible of the factory production control, inspections,

tests, results interpretation, diagnostics with regard to

equipment, raw materials, production process, and final

products.

• Follow up of the official laboratory tests in order to obtain the

quality control certificates from the local authorities.

Responsible for all aspects of client services: uninterrupted supply, competitive pricing, complaints, etc.

Jan. 1994 - Sept. 1994

Project

Position

Employer

Place of work

Main activities and responsibilities

New brick manufacturing plant

Supervision Engineer

TECHNOKERAMIKI SA (brick manufacturing company)

Ritsona Evias (GREECE)

Coordination of running in and production tests of new built brick

manufacturing plant of TECHNOKERAMIKI SA. Additional secondary

structures design, fabrication and erection.

George Theodossopoulos CV 2015 Revision B + photo - 9 -

CURRIC

ULUM VIT

AE

June 1992 - Dec. 1993

Project

Position

Employer

Place of work

Main activities and responsibilities

New brick manufacturing plant

Site Engineer

TECHNOKERAMIKI SA (brick manufacturing company)

Ritsona Evias (GREECE)

• On site, supervision of the new brick manufacturing plant of TECHNOKERAMIKI SA, designed by Greek-Italian company SABO SA.

• Structural steel and concrete industrial building constructions.

• Construction of a 93 m tunnel kiln for brick firing up to 1000o C.

• In addition to the civil engineering approximately six months site supervision of plants installation and interfacing with structural parts, including: electrical, mechanical, LPG (Liquid petroleum gas), hydraulic etc.

March 1991-June 1992

Military service

Engineer’s corps

• Military building and facilities maintenance and refurbishing.

Jan 1991 - March 1991

Project

Employer

Place of work

Main activities and responsibilities

Urban Design

Gerasimos Markatos engineering design office

Athens

Collaboration on a project of Urban Design regarding the traffic

viability, free spaces and parking rearrangement of local municipality.

ANNOUNCEMENTS IN

CONGRESSES - PAPERS

• FIB - Symposium, Concrete structures in seismic region May 6-9

th 2003, Athens

Oral presentation. Subject:” Rion Antirion Bridge, Full scale testing of seismic devices”

Authors: Samuele Infanti, Panajotis Papanikolas, George Theodossopoulos

http://en.structurae.eu/refs/items/index.cfm?id=r0014047

George Theodossopoulos CV 2015 Revision B + photo - 10 -

CURRIC

ULUM VIT

AE

TRAINING SEMINARS AND

WORKSHOPS

• HILTI SEMINAR May 2001, Antirion site, one day Seminar of HILTI technical department regarding professional fastening systems for construction (buildings, bridges, tunnels) and maintenance.

• CONSTRUCTION SITE SAFETY April 2001, Safety aspects of construction site, in relation to the

European norms and guidelines.

• HEMPEL SEMINAR From June 10

th to 12

th 2000 Seminar regarding the application of

industrial and marine & offshore painting to steel structures in accordance with the European standards.

• THE SALES TECHNIQUE From October 11

th to 27

th, 1994. Seminar of ΕΛΚΕΠΑ (Hellenic

Center of Productivity, Athens).

• BRICK AND HEAVY CLAY ENERGY EFFICIENT APPLIED TECHNOLOGIES ON-SITE VISITS AND WORKSHOPS From May 30

th to June 2

nd 1994, seminar in Rome (Italy)

patronized from THERMIE EU program and organized by ICIE (Italian Institute for Energetic Innovation). On site visits of plants with advanced energy saving methods.

• Σ Ε Β Κ WORKSHOP

August 30th 1992 in Kamena Vourla (Greece). Workshop regarding

the European Union prescriptions for quality control on ceramic products and future CE mark requirements.

George Theodossopoulos CV 2015 Revision B + photo - 11 -

CURRIC

ULUM VIT

AE

EMPLOYERS

TECHNOKERAMIKI S.A. http://www.technokeramiki.blogspot.com/ Dimand S.A. http://www.dimand.gr INTRADEVELOPMENT S.A. http://www.intrakat.gr

VINCI GROUP Kinopraxia Gefyra S.A. http://www.gefyra.gr NEW TECH S.A. (The company is no more active since 1998)

Gerasimos Markatos Design office Athens Tel +30210 7708150 & 7798338 Semelis 32 str. 11528 Athens

REFERENCES

1. Panajotis

Papanikolas

2. Prof. Majowiecki Massimo

3. Panajiotidis Panos

4. Andriopoulos Dimitris

5. Zoulas Fotis

6. John Koumenos

7. Aggelos Tagmatarchis

CEO of Gefyra S.A (VINCI GROUP) Rion Antirion Bridge (Technical manager of Kinopraxia Gefyra S.A during construction period of the

Bridge) http://www.gefyra.gr

Professor of special structures at Bologna’s University. Steel structure designer of Karaiskaki stadium http://www.majowiecki.com/studio/studio/

massimo-majowiecki CEO of Dimand S.A. http://www.dimand.gr Former CEO of INTRADEVELOPMENT S.A. http://www.dimand.gr Steel STRUCTURE designer +30 6944332531 Human Resources Manager of J&P AVAX S.A. http://www.jp-

avax.gr/jp/default.aspx?pid=348&lang=1

Member of the B.o.D of GEK TERNA www.gekterna.com