thermal power plant training ppt

Upload: ankit-surana

Post on 14-Apr-2018

258 views

Category:

Documents


6 download

TRANSCRIPT

  • 7/30/2019 Thermal Power Plant Training PPT

    1/18

    From:

    Puneet Jeswani

    VII sem (ECE)

    1

  • 7/30/2019 Thermal Power Plant Training PPT

    2/18

  • 7/30/2019 Thermal Power Plant Training PPT

    3/18

    INTRODUCTION

    Located at the left bank of Chambal River at Up Stream of Kota

    Barrage.

    The large expanse of water reached by the barrage provides anefficient direct circulation of cooling system for the power station.

    It comes under RRVUNL(Rajasthan Rajya Vidhyut Utpadan

    Nigam Ltd).

    3

  • 7/30/2019 Thermal Power Plant Training PPT

    4/18

    Overview Of Electricity

    Generation

    4

  • 7/30/2019 Thermal Power Plant Training PPT

    5/18

    In form at ion abou t Differen t

    Stages o f KSTPS

    Stage Unit Capacity(MW) Syncronization date

    Cost(in

    crore)

    I 1 110 17/01/1983 143

    2 110 13/07/1983 143

    II 3 210 25/09/1988 480

    4 210 01/05/1989 480

    III 5 210 2/03/1994 480

    IV 6 195 31/07/2003 635

    V 7 195 30/05/2009 880

    5

  • 7/30/2019 Thermal Power Plant Training PPT

    6/18

    PARTS OF THERMAL

    POWER PLANT

    7

    Coal handling plant

    Ash Handling Plant

    Boilers

    Steam Turbines

    Transformers

    Control room

  • 7/30/2019 Thermal Power Plant Training PPT

    7/18

    Coal Handling plant

    8

    There are different part of coal

    handling plant:-

    (i) Wagon unloading system

    (ii ) Crushing System

    (iii) Conveying system

  • 7/30/2019 Thermal Power Plant Training PPT

    8/189

  • 7/30/2019 Thermal Power Plant Training PPT

    9/18

    10

    ASH HANDLING PLANT

    (i) Fuel & Ash plant

    (ii) Air & Gas plant

    (iii) Ash disposal

  • 7/30/2019 Thermal Power Plant Training PPT

    10/18

    BOILERS

    11

    Converts Water To

    Steam

    Manufactured By

    BHEL Coal & Oil fired

    Tangentially Firing

    SuperheatedSteam

  • 7/30/2019 Thermal Power Plant Training PPT

    11/18

    BOILER OF UNIT-VII

    12

  • 7/30/2019 Thermal Power Plant Training PPT

    12/18

    TRANSFORMERS

    These are equipments

    based on electromagnetic

    induction, alternating

    current and voltage without

    affecting frequency.

    It has mainly two windings

    i.e. primary winding and

    secondary windings.

    It has mainly conservator,

    breather, cooling fans.

    13

  • 7/30/2019 Thermal Power Plant Training PPT

    13/18

    Turbine

    Converts KE To

    Mechanical Energy

    Internal structure of

    turbine

    14

  • 7/30/2019 Thermal Power Plant Training PPT

    14/18

    SWITCHYARD

    Two 220 KV bus bars havebeen provided in switch yard

    and are inter-connected

    through a bus coupler.

    It consists of several parts:(i) Bus bars

    (ii) Circuit breakers

    (iii) Current

    transformers(C.T)

    (iv) Potential

    transformers(P.T.)

    (v) Isolators

    (vi) Lightning Arresters

    15

  • 7/30/2019 Thermal Power Plant Training PPT

    15/18

    Control Room

    D.C.I.M.S system used

    Fan Control desk

    Fuel Control Desk

    Steam and Water Control

    Desk Turbine Control Desk

    Generator Control Panel

    Computurized Panel

    16

  • 7/30/2019 Thermal Power Plant Training PPT

    16/1817

    CONTROL ROOM OF UNIT-

    VII

  • 7/30/2019 Thermal Power Plant Training PPT

    17/18

    CONCLUSION

    Ko ta super thermal power stat ion generates 1240 MW

    power

    It also provides an opportunity to learn how the technology is

    used at proper place and time can have a lot of labor e.g.

    Wagon Tripler .

    However training has proved to be quite fruitful. It has

    allowed an opportunity to get an exposure of the practical

    implementation to theoretical fundamentals.

    18