Petal thermo-mechanical “project”
“Deliverables” at the end of 2016: 14 petal cores of several flavors, 2 of them thermo-mechanical and the rest for module mounting
23 Jan 2014
Components/actions Nov 2014 Dec 2014 Jan 2015 Feb 2015 Mar 2015
Bus tapes
Facings
Honeycomb(s)
Pipes
Allcomp foam
E breaks ?
Closeouts
Locking points
Core gluing
Core milling
Dummy sensors
Hybrids
ASICs
DC-DC dummies
EoP dummies
Manufacture at Elgoline
Co-curing (Liverpool)
Cut and glue trials Cut to size
Cut and glue trialsReceiving Cut to size
Test
Bending and test
Manufacture in PEEK Manufacture in CF (Liverpool?)
Final design Manufacture in PEEK
Gluing step 1 Gluing step 2
Milling step
Design, manufacture, cut to size (IMB-CNM Barcelona)
Design, manufacture (Freiburg) Assembly of dummies (Zeuthen, Freiburg, IFIC)
Assembly of dummies (Zeuthen?)
Assembly of dummies (Zeuthen?)
Design and manufacture of jigs
Assembly of dummies (Zeuthen, Freiburg, IFIC)
Start loading first cores with dummies here
Assembly of dummies (Zeuthen, Freiburg, IFIC)
3
Facings and bus tapes
Bus tapes at Liverpool, ready for co-curing T. Jones merged .dxf files of bus tape with CAD files for facesheets:
• Found a 1.4 mm misalignment of locking point pin, which he was planning to use for alignment:
• Need to double check this again! • Still go ahead for this round of petals? Edges of bus tape (>2 mm of Kapton will still make up
for the misalignment. Cutting tool (at DESY) will get overall shape correct• Not so much worried about bonding pads, only interested in the power lines for these
prototypes
23 Jan 2014
4
Honeycomb
Both CF and N636 honeycombs in hand at DESY First petal in CF Second petal in N636
• Issues with N636 grinding due to epoxy content, also observed in the past by Liverpool• Several companies even refused to do it!
Both the CF and N636 will be milled in-house at DESY (same approach as petalets)
23 Jan 2014
5
Pipes
Tool for pipe bending manufactured and already used at DESY successfully Pipes undergoing brazing of StSt fittings (did that already for the petalets) Barely enough pipes for 5 petals, would join common order
23 Jan 2014
6
High T conductivity foam
Allcomp foam in hand at DESY, enough for ~10 petals Allcomp K9 130 ppi
• 0.23 g/cc, 20 W/m·K min (measured ~ 0.22 g/cc, 40 W/m·K by Allcomp on our piece) Gluing of pipe into foam?
• Pre-sealing foam (BNL’s approach)?• Follow petalet approach (glue dispensing with syringe on foam)?• No strong preference from my side
23 Jan 2014
7
E breaks
Will not be included for now
23 Jan 2014
8
Top and bottom closeouts
Top and bottom closeouts already manufactured at DESY (4 sets) Diameter for E break too tight! Caused some cracking in several samples
• Will adjust to 2.3 mm OD in next round, since E breaks will not be included Slight bending on the longest part
• We still need to characterize the extent of it Annealing of PEEK as suggested by our US colleagues Simplified annealing procedure, since we don’t have a climate chamber (or an
autoclave) that goes so high in T Slowly increase T up to 149 and then to 200
23 Jan 2014
0
50
100
150
200
250
14:32 22:53 7:14 15:35 23:56 8:17 16:38 0:59
Ch
am
ber
Tem
pera
ture
(oC
)
Time (hh:mm)
PEEK Full Anneal in Tenney JR Environmental Chamber 19 x 152 x 152 mm plate
CH1Act
CH1SetP
9
C-channels
CF C-channels already in hand, maufactured at Liverpool by T. Jones and L. Poley Just received them, not yet characterized, but they look nice and flat Were they measured in Liverpool? Enough for 1 petal
Next set of C-channels to be manufactured in PEEK at DESY, any objections to that?
23 Jan 2014
10
Locking points
Being worked out at Valencia, see David’s slides for details
23 Jan 2014
11
Core gluing
Set of tool currently under manufacture or under design Based on precision pins for alignment among them and the petal facesheets In manufacture:
• Main base plate (+ lid) and mirrored base plate All tools align against this one
• Top and bottom closeouts gluing tools• Facing cutting tool
Finishing the design:• Foam gluing tool• HC gluing (if any)• C-channel gluing tools
No clear solution for locking points gluing, manual procedure for now
23 Jan 2014
12
Core gluing tools
23 Jan 2014
13
Dummy sensors, hybrids, ASICs
Dummy sensors 6” (plain) wafers in hand next week at IMB-CNM (Barcelona) Laser cutting undergoing final tests (straight cuts) Sandblast cutting being investigated too
Dummy ASICs with heaters Currently in fabrication at IMB-CNM, delivery in < 2 weeks
Dummy hybrids A few R0 H1 hybrids already in hand at Freiburg Tooling for R0 in manufacture at Freiburg Given the delays due to the accident at the foundry, it doesn’t seem feasible to have
all flavors in hand in reasonable timescale for TM I suggest FR4 dummies once the design of all flavors is finished
• If agreed, should Zeuthen do it?
23 Jan 2014
14
DCDC (power board) and EoP dummies
Manufactured in FR4 Status?
23 Jan 2014
15
Open issues
Mechanical characterization of petal cores Should we follow Valencia’s recipe from previous core (~2009)?
• Where? I would rather do it at DESY and Valencia• I have to figure out if we have the necessary equipment at DESY
Thermal characterization Figure it out soon
• Where? I guess DESY?
Assembly of dummies Tools? Manual? I guess this is the more realistic approach
Industry approach for petal core manufacture investigated at Valencia Will need raw materials for that DESY can provide N636 HC and (a bit of) Allcomp foam Other materials? Joint order?
23 Jan 2014