The SecondPhase Development of the China JinPing Underground Laboratory for Physics Rare Event Detectors and MulBDisciplinary Sensors 13 th InternaBonal Conference on Topics of AstroparBcle and Underground Physics (TAUP) Jainmin Li, Xiangdong Ji, Wick Haxton, Joseph SY Wang With Inputs and PresentaBons by Qiang Du, Jason Detwiler, Davide D’Angelo, Art McDonald Gabriel Orebi Gann, Nigel Smith, Murdock Gilchriese, Dongming Mei, Bela Majorovits at the Town MeeBng on CJPL2 Asilomar, CA, September 12, 2013

Upload: others

Post on 06-Nov-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TheSecondPhaseDevelopmentoftheChina JinPing$ …

The  Second-­‐Phase  Development  of  the  China  JinPing  Underground  Laboratory  for  Physics  Rare  Event  

Detectors  and  MulB-­‐Disciplinary  Sensors    

13th  InternaBonal  Conference  on  Topics  of  AstroparBcle  and  Underground  Physics  (TAUP)  

 Jainmin  Li,  Xiangdong  Ji,  Wick  Haxton,  Joseph  SY  Wang  

 With  Inputs  and  PresentaBons  by  

Qiang  Du,  Jason  Detwiler,  Davide  D’Angelo,    Art  McDonald  

Gabriel  Orebi  Gann,  Nigel  Smith,  Murdock  Gilchriese,  Dongming  Mei,  Bela  Majorovits  

at  the  Town  MeeBng  on  CJPL-­‐2  Asilomar,  CA,  September  12,  2013  

Page 2: TheSecondPhaseDevelopmentoftheChina JinPing$ …

Outline    

1.   China  JinPing  Underground  Laboratory  Extension    Physics  Dark  Ma[er  Experiments  

 Geophysical  and  Regional/Global  OpportuniBes    

2.   Site  Needs:      Neutrino-­‐less  Double  Beta  Decay    

 Dark  Ma[er  Searches    ScinBllaBon  Detectors  for  Solar  Neutrinos  

3.   Infrastructure  Needs  of  New  Laboratories  

4.   Panel  Discussions  

Page 3: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 4: TheSecondPhaseDevelopmentoftheChina JinPing$ …

Jining  II,  China

Scale 0 6m

1630m

4193m

4488m

4309m Jinping I

Jinping II

N Ya Long River

Ya Long River

Power house

Location of the hydropower tunnel

n Seven  high  pressure  tunnels:  two  auxiliary  tunnels,  one  water  drainage  tunnel  and  four  headrace  tunnels    

n Maximum  overburden  of  2525  m  and  principal  stress  of  70MPa  by  back  analysis  

n Average  length  of  17.7km    n Excavated  mainly  in  marble  by  TBM  and  D&B  

Headrace  tunnels  

Page 5: TheSecondPhaseDevelopmentoftheChina JinPing$ …

CJPL  II

Page 6: TheSecondPhaseDevelopmentoftheChina JinPing$ …

8  rooms  of  CJPL-­‐II

9/10/13 6/52

Rock work volume of 8 x labs 130591 m3

Concrete work volume 26427 m3 Steel structure 912 T

Page 7: TheSecondPhaseDevelopmentoftheChina JinPing$ …

Auxiliary tunnel A

2  3   1  

2430m

1900m

2370m

Tunnel B and F, 7.5× 8.0m

K5+186 to K6+198 K7+374 to K9+100

l  Testing tunnels

Tunnel C, 3× 3.2m

Tunnel D, 3× 3.2m

2-­‐1  

Headrace tunnel no.3, D=12.4m

Headrace tunnel no.2, D=13.0m

1800m

Page 8: TheSecondPhaseDevelopmentoftheChina JinPing$ …

"   Evolution of excavation damaged zone

n  ExcavaQon  Damaged  Zone  (EDZ):  new  fractures  observed  by  digital  borehole  camera,  >0.2mm  

n  ExcavaQon  disturbed  Zone  (EdZ):  deformaQon  obviously  and  micro  fractures  concentrated,  measured  by  acousQc  emission  and  sliding  micrometer  

Image of borehole wall and fractures

(a)

Flat pattern

Bor

ehol

e de

pth

/m

8.5

8.9

Virtual core Monitoring Borehole  

-  EDZ   EdZ  

Test  tunnel  

-  

Test  tunnel  

Page 9: TheSecondPhaseDevelopmentoftheChina JinPing$ …

l  Description of immediate rockburst

20

Vault

Horizontal distance originated from the entrance of tunnel F(m)25 15 10 5 0

Rock burst zone

Joint

Northern side wall

southern side wall

Stress relaxed zone

Joints

Joints

Corrosion fissurewith the width of 2 to 10mm

35

Zone of monitoring facilities

Joints

J18

Unfolded geological sketching

Rockburst pit

Rockburst occurred on January 09, 2010, with the volume about 6.3 m3

Page 10: TheSecondPhaseDevelopmentoftheChina JinPing$ …

Slight rockburst occurred at northern sidewall to spandrel of 3# TBM headrace tunnel at K11+080-090, June 08, 2010, notch depth: 20-35cm

Evolution mechanism of immediate strain rockburst:tensile failure mainly

20-35cm

Rockburst Mixed

Tensile

Shear

Page 11: TheSecondPhaseDevelopmentoftheChina JinPing$ …

The  relaQon  between  radon    and  earthquake  nearby  CJPL

3.22

4.17

4.25

5.09 5.26

6.18 6.23

7.13

Page 12: TheSecondPhaseDevelopmentoftheChina JinPing$ …

Global  MagneBc  Signals  Detected    by  (SQUID)2  at  LSBB,  Rustrel,  France    

Page 13: TheSecondPhaseDevelopmentoftheChina JinPing$ …

The  LSBB  “Capsule”  with  Shielding  Has    Dimensions:  28  m  Long,  8  m  in  Diameter,    2  cm  Steel  Walls,    2m  Thick  Reinforced    Concrete        -­‐  Waysand  2005  TAUP      and  May  Co-­‐located  with  the  Next  Phase    Superheated  Liquid  Dark  Ma^er  Expt.  SIMPLE,  1,200  m3,  2  m  Water  Shield,  20  Detector  Array  +  DAQ  ,      -­‐  Tom  A  Girard,  7/15/2013    

Page 14: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 15: TheSecondPhaseDevelopmentoftheChina JinPing$ …

Outline    

1.   China  JinPing  Underground  Laboratory  Extension    Physics  Dark  Ma[er  Experiments  

 Geophysical  and  Regional/Global  OpportuniBes    

2.   Site  Needs:      Neutrino-­‐less  Double  Beta  Decay    

 Dark  Ma[er  Searches    Accelerator  for  Nuclear  Astrophysics  

 ScinBllaBon  Detectors  for  Solar  Neutrinos  

3.   Infrastructure  Needs  of  New  Laboratories  

4.   Panel  Discussions  

Page 16: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 17: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 18: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 19: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 20: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 21: TheSecondPhaseDevelopmentoftheChina JinPing$ …
Page 22: TheSecondPhaseDevelopmentoftheChina JinPing$ …

AddiBonal  PresentaBons  in  the  A`ernoon    

•  Gasbriel  Orebi  Gann:  Deep  ScinBtaBon  Detectors  for  Solar  Neutrinos    

•  Murdock  Gilchriese:  Infrastructure  Needs,    SURF  Experience  

•  Dongming  Mei:  CdTe  or  CdZnTe  for  Geoneutrinos,  …  (K-­‐40  threshold,  …)  

•  Bela  Majorovits:  Sino-­‐German  CooperaBon  on    Ge  Dectector  

   

Page 23: TheSecondPhaseDevelopmentoftheChina JinPing$ …

CJPL  Rock  Background  

(Unit:Bq/kg) K-40 Ra-226 (609keV)

Th-232 (911keV)

JinPing Rock Sample < 1.1 1.8±0.2 < 0.27

Beijing Normal Ground Level ~600 ~25 ~50

9/10/13 23/52

Page 24: TheSecondPhaseDevelopmentoftheChina JinPing$ …

CJPL  II

•  More Space •  4000m3 -> 96,000m3

•  60kVA -> 600kVA •  40m3/h -> 5000m3/h

•  More Project •  CDEX-1T •  PandaX-1T •  …..

Page 25: TheSecondPhaseDevelopmentoftheChina JinPing$ …

BackUps  

Page 26: TheSecondPhaseDevelopmentoftheChina JinPing$ …